The document is a comprehensive staking sheet for the Mountain Parks Electric (MPEI) 39758 Walton Peak Rebuild project, located in Grand County, Colorado. The staking sheet details a specific electrical infrastructure rebuild involving 53 pole stations, with a focus on rebuilding and potentially undergrounding existing overhead power lines. The project is part of a broader wildfire mitigation effort, targeting the West Circuit/North Park electrical feeder at the North Park 2 (NP2) substation. The work involves multiple actions including retiring existing conductors, leaving neutrals in place, and installing new wire configurations using various conductor types such as ACSR 1/0, ACSR 4, and specialized tree wire.
The staking sheet provides granular technical details for each pole station, including specific wire sizes, primary and secondary units, line angles, transformer specifications, and service details. The project appears to be funded through a 2022 loan, with the work staked on September 13, 2022. While the document does not explicitly outline pricing, it suggests a significant infrastructure investment involving multiple wire types, pole replacements, and potential underground conversions. The extensive documentation indicates a methodical approach to electrical infrastructure improvements, likely aimed at enhancing grid reliability, reducing wildfire risks, and modernizing the electrical distribution system in a rural Colorado setting.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet No. 1 of 29
Name:
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N Range: 82W Section: 19
Pri Voltage: Sec Voltage: Loan No.: 2022
Ruling Span: Primary Wire Size: RUS Code:
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 1 P45-5 2008 VA6-M VG105 M2-11
E UM5 15 KVA 15
E VM3-10A
C VM5-2H E1-2F78 F1-3S
C
(120) CREW
HOURS
(100)
ENGINEERIN
G HOURS
E 2 P40-5 2008 VA1-2-M 0 M2-11
R 415 (2) ACSR 1/0
ACSR 1/0 TREE
WIRE
(2) VM5-2H
Retire Conductor Only Leave Neutral
E 3 P40-5 2008 VA2-M -1 M2-11 E1-2F78 F1-3S
R 131 ACSR 1/0 (2) VM5-2
E 4 P40-5 2008 VA1-2-M 17 M2-11
R 319 ACSR 1/0 (2) VM5-2
Sheet No. 2 of 29
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 5 P45-5 2000 VA2-M 0 M2-11 E1-2F78 F1-3S
R 315 ACSR 1/0 VM5-2
C VM5-2
E 6 P45-5 2008 VA1-2-M -23 M2-11
R 273 ACSR 1/0 (2) VM5-2
E 7 P45-5 2008 VA1-2-M 0 M2-11
R 287 ACSR 1/0 (2) VM5-2
E 8 P40-5 2008 (2) VA2-M 1 M2-11 E1-2F78 F1-3S
R 255 ACSR 1/0 (2) VM5-2
E 9 P45-5 2008 VA1-M -19 M2-11
R 261 ACSR 1/0 VM5-2
VM5-2H
E 10 P40-5 2008 VA6-2M -1 (2) M2-11 (6) E1-2F78 (5) F1-3S
R 210 ACSR 1/0 VM5-2
E 11 P40-5 2008 VA6-2M 1 M2-11 (6) E1-2F78 (5) F1-3S
R 480 ACSR 1/0 VM5-2
missing pole?
E 12 P40-5 2008 VA1-M 1 M2-11
R 334 ACSR 1/0 VM5-2
E 13 P45-5 2008 VA1-M -1 M2-11
R 230 ACSR 1/0 VM5-2
Sheet No. 3 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 14 P40-5 2008 VA1-M 0 M2-11
R 250 ACSR 1/0 VM5-2
E 15 P40-5 2008 VA2-M 1 M2-11 E1-2F78 F1-3S
R 272 ACSR 1/0 (2) VM5-2
E 16 P40-5 2008 VA1-M 18 M2-11
R 198 ACSR 1/0 VM5-2
E 17 P40-5 2008 VA2-M 1 M2-11 E1-2F78 F1-3S
R 203 ACSR 1/0 (2) VM5-2
E 18 P50-3 2008 VA1-M -27 M2-11
R 283 ACSR 1/0
E 19 P50-3 2008 VA1-M 0 M2-11
R 271 ACSR 1/0 VM5-2
E 20 P40-5 2008 VA1-2-M 1 M2-11
R 188 ACSR 1/0 (2) VM5-2
E 21 P55-3 2008 VA6-1-M 1 VG105 M2-11 MC-200
E 15 KVA 15
R 285 ACSR 1/0 VM5-2
E 22 P45-5 2008 VA6-1-M -2 M2-11
R 177 ACSR 1/0 VM5-2
E 23 P40-5 2008 VA1-2-M 1 (2) M2-11
R 259 ACSR 1/0 VM5-2
Sheet No. 4 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 24 P45-4 2008 VA1-2-M VM5-9 0 M2-11 E1-2F78 F1-3S
E VA5-1-M
R 287 ACSR 1/0 (2) VM5-2
E 25 P35-5 1964 VA4-M 77 M2-11 (2) E1-2 (2) F1-3S
R 401 (2) ACSR 4
E 26 P40-4 2014
VA5-M 64 10 KVA 10 M2-11 E1-2F78 F1-3S
AMI
COLLECTOR
E VG105
R 371 (2) ACSR 4
E 27 P40-5 2008 VA1-M -1 M2-11
R 282 ACSR 1/0 VM5-2
E 28 P45-5 2008 VA1-M 0 M2-11
R 235 ACSR 1/0 VM5-2
E 29 P40-5 2008 VA6-1-M 1 M2-11 (2) E1-2F78 (2) F1-3S
R 305 ACSR 1/0 VM5-2
E 30 P45-5 2008 VA1-M -1 M2-11
R 276 ACSR 1/0 VM5-2
E 31 P45-5 2008 VA1-M 2 M2-11
R 245 ACSR 1/0 VM5-2
E 32 P45-5 2008 VA1-M -2 M2-11
R 235 ACSR 1/0
E 33 P45-5 2008 VA1-M 0 M2-11
Sheet No. 5 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 34 P45-5 2008 VA1-M 1 M2-11
R 278 ACSR 1/0 VM5-2
E 35 P45-5 2008 VA1-M 0 M2-11
R 236 ACSR 1/0 VM5-2
E 36 P45-5 2008 VA1-M -1 M2-11
R 246 ACSR 1/0 VM5-2
E 37 P45-5 2008 VA1-M 1 M2-11
R 245 ACSR 1/0 VM5-2
E 38 P40-5 2008 VA1-2-M 0 M2-11
R 299 ACSR 1/0 (2) VM5-2
E 39 P40-5 2008 VA6-1-M 0 M2-11 (2) E1-2F78 (2) F1-3S
R 215 ACSR 1/0 VM5-2
E 40 P40-5 2008 VA1-M -1 M2-11
R 266 ACSR 1/0 VM5-2
E 41 P40-5 2008 VA1-M 1 M2-11
R 283 ACSR 1/0 VM5-2
E 42 P40-5 2008 VA1-M -1 M2-11
R 282 ACSR 1/0 VM5-2
E 43 P40-5 2008 VA1-M 0 M2-11
R 276 ACSR 1/0 VM5-2
E 44 P40-5 2008 VA1-M 1 M2-11
Sheet No. 6 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 45 P40-5 2008 -1 M2-11
R 207 ACSR 1/0 VA1-M
VA6-1-M VM5-2H
E1-2F78 F1-3S
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 7 of 29
834 0 834
SCALE IN FEET
Sheet No. 8 of 29
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 46 P45-5 2002 VA5-1-M M2-11 E1-2 F1-2
E VA1-2-M
E 47 P45-5 2002 VA1-M 0
R 189 ACSR 4 VM5-2
E 48 P45-5 2002 VA9-2-M -6
R 182 ACSR 4 VM5-2
E 49 P45-5 2002 VA9-2-M 2
R 293 ACSR 4 VM5-2
E 50 P40-5 2002 VA1-M -3
R 218 ACSR 4 VM5-2
E 51 P40-5 2002 VA1-M 2
R 149 ACSR 4 VM5-2
Sheet No. 9 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 52 P45-5 2002 VA2-M 2 25 KVA 25 (2) E1-2 F1-3S
E VG105 E1-2F12
R 246 ACSR 4 (2) VM5-2
E 53 P45-5 2002 VA5-M 12 25 KVA 25 (2) E1-2 F1-4S K11
E VG105 F1-3S J6
R 281 ACSR 4
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 10 of 29
353 0 353
Sheet No. 11 of 29
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 54 P45-5 2008 M2-11
R VA1-M
VA5-M
U-PLOW-
MOB
E1-2F78 F1-3S
C UA1
R 55 P45-5 2008 239 (2) ACSR 1/0 VA1-M 0 M2-11
R VM3-10A
R 56 P45-5 2008 302 (2) ACSR 1/0 VA1-M 0 M2-11
R 57 P40-4 2008 300 (2) ACSR 1/0 VA1-M 1 VG105 M2-11 VM8-10
R 10 KVA 10
R 58 P40-5 2008 262 (2) ACSR 1/0 VA1-M -1 M2-11
R 59 P40-5 2008 241 (2) ACSR 1/0 VA1-M 1 M2-11
R 60 P40-5 2008 258 (2) ACSR 1/0 VA1-M -1 M2-11
R 61 P40-5 2008 250 (2) ACSR 1/0 VA1-M 0 M2-11
R 62 P45-5 2008 240 (2) ACSR 1/0 VA1-M 0 M2-11
C 126 1001 U-1/0-CIC-PLOW UM1-7NC UM12 0 UM6-6
C UM1-7NCL UM6-28-1/0
This station had a service to be removed in 2024. Service should not be restored per USFS. Only a splice vault at this location. jj 4/18/24
C 127 1045 U-1/0-CIC-PLOW UM1-7NC UM12 33 UM6-6
C UM1-7NCL UM6-28-1/0
R 126 A -87 47 (47) U-4/0-TPLEX F2S-RD
Meter should be retired in 2024 per USFS. jj 4/17/24
Sheet No. 12 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
C 128 1048 U-1/0-CIC-PLOW UM1-7NC UM12 -35 UM6-6
C UM1-7NCL UM6-28-1/0
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 13 of 29
355 0 355
Sheet No. 14 of 29
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
R 63 P45-5 2008 273 (2) ACSR 1/0 VA1-M 2 M2-11
R 64 P40-5 2008 266 (2) ACSR 1/0 VA1-M -2 M2-11
R 65 P40-5 2008 270 (2) ACSR 1/0 VA1-M 1 M2-11
R 66 P40-5 2008 272 (2) ACSR 1/0 VA1-M -1 M2-11
R 67 P35-7 2008 68 (2) ACSR 1/0 VA1-M 0 VG105 M2-11
R 10 KVA 10
R 68 P40-5 2008 176 (2) ACSR 1/0 VA1-2-M 3 M2-11
R 69 P40-5 2008 289 (2) ACSR 1/0 VA1-M -3 M2-11
R 70 P40-5 2008 233 (2) ACSR 1/0 VA1-M 1 M2-11
R 71 P55-3 2008 346 (2) ACSR 1/0 VA1-M 0 M2-11
R 72 P40-5 2008 318 (2) ACSR 1/0 VA1-2-M 0 M2-11
R 73 P45-5 2008 239 (2) ACSR 1/0 VA1-2-M -2 M2-11
R 74 P45-5 2008 266 (2) ACSR 1/0 VA6-M VM5-2 1 M2-11
C 129 929 U-1/0-CIC-PLOW UM1-7NC UM12F -43 UG7 UM6-6 (2) UJ2-6-500
C (2) UM6-1 U15 KVA 15 UJ2-8-500-B
E 129A 23 F2S-RD
C (10) UR2-LIFT 14 (25) U-4/0-TPLEX UM8-3
(10) UM20-
FLEX3
C (10) UR2-SEC
(10) U-MA-
COMP
Sheet No. 15 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
C 132 1114 U-1/0-CIC-PLOW UM1-7NCL UM12 -8 UM6-6
C UM1-7NC UM6-28-1/0
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 16 of 29
336 0 336
Sheet No. 17 of 29
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
R 75 P45-5 2008 286 (2) ACSR 1/0 VA1-M 2 M2-11
R 76 P40-5 2008 295 (2) ACSR 1/0 VA1-M -1 M2-11
R 77 P45-5 2008 156 (2) ACSR 1/0 VA6-M VM5-2 -2 M2-11 (2) E1-2F78 (2) F1-3S
R 78 P45-5 2008 218 (2) ACSR 1/0 VA6-M VM5-2 4 M2-11
R 79 P45-5 2008 267 (2) ACSR 1/0 VA1-2-M -4 M2-11
R 80 P40-5 2008 241 (2) ACSR 1/0 VA1-M 1 M2-11
R 81 P40-5 2008 377 (2) ACSR 1/0 VA1-M 1 M2-11
R 82 P55-3 2008 273 (2) ACSR 1/0 VA1-M -1 M2-11
R 83 P40-5 2008 260 (2) ACSR 1/0 VA1-M 0 M2-11
R 84 P40-5 2008 291 (2) ACSR 1/0 VA1-M 0 M2-11
R 85 P45-5 2008 261 (2) ACSR 1/0 VA1-M 2 M2-11
R 86 P40-5 2008 235 (2) ACSR 1/0 VA1-2-M -2 M2-11
R 87 P45-5 2008 247 (2) ACSR 1/0 VA1-M 1 M2-11
C 135 1228 U-1/0-CIC-PLOW UM1-7NC UM12 2 UM6-6
C UM1-7NCL UM6-28-1/0
C 133 983 U-1/0-CIC-PLOW UM1-7NCL UM12 57 UM6-6
C UM1-7NC UM6-28-1/0
C 134 1149 U-1/0-CIC-PLOW UM1-7NCL UM6-28-1/0 -45 UM6-6
C UM1-7NC UM12
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 18 of 29
370 0 370
Sheet No. 19 of 29
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
R 108 P40-5 2008 246 (2) ACSR 1/0 VA1-M -3 M2-11
R 109 P40-5 2008 251 (2) ACSR 1/0 VA1-M 0 M2-11
R 110 P40-5 2008 222 (2) ACSR 1/0 VA6-M VM5-2 4 M2-11 (2) E1-2F78 (2) F1-3S
R 111 P45-4 2008 422 (2) ACSR 1/0 VA6-M VM5-2 -3 M2-11 (3) E1-2F78 (3) F1-3S
R 112 P45-4 2008 274 (2) ACSR 1/0 VA6-M VM5-2 -16 M2-11 (2) E1-2F78 (2) F1-3S
R 113 P45-4 2008 445 (2) ACSR 1/0 VA6-M VM5-2 -1 M2-11 (2) E1-2F78 (2) F1-3S
R 114 P45-4 2008 269 (2) ACSR 1/0 VA1-M 0 M2-11
R 115 P40-4 2008 255 (2) ACSR 1/0 VA2-M -2 M2-11 E1-2F78 F1-3S
R 116 P40-5 2008 248 (2) ACSR 1/0 VA1-M 23 M2-11
R 117 P40-5 2008 236 (2) ACSR 1/0 VA1-M -1 M2-11
R 118 P40-4 2008 230 (2) ACSR 1/0 VA6-M VM5-2 1 M2-11
R 119 P40-5 2008 212 (2) ACSR 1/0 VA1-M -2 M2-11
Sheet No. 20 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
C 144 1008 U-1/0 UM1-7NCL UM12 29 UM6-6
UM1-7NC
(1008) UM20-
PVC4
(3) UM22-
P-90-4
(1008) UR2-
RA
C UM6-28-1/0
LIFT
(1008) U-MA-
NT
C 145 896 U-1/0 UM1-7NC
(896) U-MA-
COMP
6 UM6-6
C UM1-7NCL UM6-28-1/0
C (896) UR2-NT
(2) UM22-
C (896) UR2-RA
(896) UR2-
C UM12
(896) UM20-
C 146 1202 U-1/0 UM1-7NCL UM6-28-1/0 -16 UM6-6
UM1-7NC
(1202) UM20-
(1202) UR2-
RA
(1202) U-MA-
C UM22-P-22-4
Sheet No. 21 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
C 147 1027 U-1/0 UM1-7NC UM12 20 UM6-6
UM1-7NCL
(1027) UM20-
C UM22-P-45-4
C UM6-28-1/0
(1027) U-MA-
(1027) UR2-
(1027) UR2-
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 22 of 29
399 0 399
Sheet No. 23 of 29
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
R 120 P40-5 2008 287 (2) ACSR 1/0 VA1-M 1 M2-11
R 121 P40-5 2008 206 (2) ACSR 1/0 VA1-M -2 M2-11
R 122 P45-5 2008 212 (2) ACSR 1/0 VA1-M 3 M2-11
R 123 P40-5 2008 234 (2) ACSR 1/0 VA1-M -2 M2-11
E 124 P40-4 2008 2 M2-11 E1-2F12 F1-3S K11
R 315 (2) ACSR 1/0 VA5-M VG105 E1-2F78
R 37.5 KVA 37.5
C UM5 (10) UR2-LIFT 315 (65) U-1/0-TPLEX
E 125 P30-6 2008 50 M2-11 E1-2 F1-2 K11 74 (74) TPLEX 1/0
Sheet No. 24 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
C 148 1111 U-1/0 UM6-34
(1120) UR2-
NT
0 U15 KVA 15 UM6-6 (2) UJ2-6-500
UM6-1
UJ2-8-500-B
C UM1-7NCL UM22-P-22-4
C UM1-7NC UM12F
(3) UM22-
P-45-4
C (500) UR2-RA
(1120) U-MA-
(1120) UR2-
(1120) UM20-
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 25 of 29
210 0 210
Sheet No. 26 of 29
Map Location:
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Comments:
Station 2-53 Retire only the conductor leave the neutral.
Directions:
Operations Notes
As-Built
Revised Employee #s Start Date Completed Date
Action Conductor Wire Feet No. of Wires
Pole Line
R ACSR 1/0 10721 1 10721
R ACSR 1/0 35797 2 18147
R ACSR 4 772 2 772
R ACSR 4 1558 1 1558
R U-4/0-TPLEX 47 1 22
E TPLEX 1/0 74 1 74
E TPLEX 4 33 1 40
C ACSR 1/0 TREE WIRE 13466 1 13466
C U-1/0 5373 1 5244
C U-1/0-CIC-PLOW 17363 1 16705
C U-1/0-TPLEX 65 1 286
C U-4/0-TPLEX 90 1 319
PRIMARY GUY & ANCHOR SECONDARY SERVICE
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
R 88 P45-5 2008 249 (2) ACSR 1/0 VA1-M 0 M2-11
R 89 P45-5 2008 268 (2) ACSR 1/0 VA1-M 0 M2-11
R 90 P50-3 2008 233 (2) ACSR 1/0 VA1-M -1 M2-11
R 91 P40-5 2008 252 (2) ACSR 1/0 VA1-M 0 M2-11
R 92 P40-5 2008 236 (2) ACSR 1/0 VA1-2-M 1 M2-11
R 93 P45-5 2008 187 (2) ACSR 1/0 VA1-M -2 M2-11
R 94 P40-5 2008 230 (2) ACSR 1/0 VA6-M VM5-2 2 M2-11
R 95 P40-5 2008 257 (2) ACSR 1/0 VA6-M VM5-2 0 M2-11
R 96 P40-5 2008 250 (2) ACSR 1/0 VA1-M 0 M2-11
R 97 P45-5 2008 258 (2) ACSR 1/0 VA1-M -1 M2-11
R 98 P45-4 2008 237 (2) ACSR 1/0 VA5-1-M 0 M2-11 E1-2F12 F1-3S
R VA1-M
R 99 P45-5 2008 285 (2) ACSR 1/0 VA1-M 85 M2-11
R 100 P45-5 2008 337 (2) ACSR 1/0 VA1-M -1 M2-11
R 101 P45-5 2008 186 (2) ACSR 1/0 VA1-M -1 M2-11
R 102 P45-5 2008 199 (2) ACSR 1/0 VA1-M 3 M2-11
Sheet No. 27 of 29
* STATION NUMBER POLE SPAN
FEET
WIRE SIZE PRIMARY UNIT MISC UNIT LINE
ANGLE
XFMR KVA GRND UNIT GUY LEAD ANCHOR UNIT SPAN
FEET
UNIT "J OR U" WIRE SIZE SPAN
FEET
UNIT "K
OR U"
WIRE SIZE METER OR LOOP
E 103 P45-5 2008 -4 M2-11 K11
R 305 (2) ACSR 1/0 VA5-M VG105 E1-2F78 F1-3S (3) J2-5-250
R 25 KVA 25
UM5
E1-2F12 F1-3S 305 (65) U-4/0-TPLEX
C (10) UR2-LIFT
C UM20-PVC3
P-90-3
E 104 P30-5 2008 -16 K11 40 (33) TPLEX 4
R 105 P45-4 2008
58 (2) ACSR 1/0 VA6-M
OH-FUSE-SO
LID
-2 M2-11
R
VM5-9-
SWITCH
R 106 P50-3 2008 318 (2) ACSR 1/0 VA6-M VM5-2 2 M2-11
R 107 P45-4 2008 308 (2) ACSR 1/0 VA6-M VM5-2 2 M2-11 E1-2F78 F1-3S
C 136 1040 U-1/0-CIC-PLOW UM1-7NC UM12F 5 UM6-6
C UM1-7NCL UM6-28-1/0
C UM1-5
C 137 1184 U-1/0-CIC-PLOW UM1-5 UM6-28-1/0 81 UM6-6
C UM1-7NCL UM12F
C UM1-7NC
C 138 1150 U-1/0-CIC-PLOW UM1-7NCL UM12F 11 UM6-6
C UM1-5 UM6-28-1/0
C UM1-7NC
C 139 1089 U-1/0-CIC-PLOW UM1-7NC UM12F 5 UM6-6
C UM1-7NCL UM6-28-1/0
C UM1-5
C 140 1118 U-1/0-CIC-PLOW UM1-7NCL UM6-28-1/0 -27 UM6-6
C UM1-7NC UM12F
C UM1-5
C 141 1092 U-1/0-CIC-PLOW UM1-7NC UM12F -50 UM6-6
C UM1-7NCL UM6-28-1/0
C 142 673 U-1/0-CIC-PLOW UM6-34 UM12F -25 UM6-6
C UM1-7NC
C UM3E-1-4SF
C (4) UM6-13
C (3) UM6-1
C 143 862 U-1/0-CIC-PLOW UM6-34 UM12F 122 U15 KVA 15 UM6-6 (2) UJ2-6-500
C UM1-7NC UG7 UJ2-8-500-B
C UM6-1
Needs to move next to 103
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 28 of 29
643 0 643
Description: MPEI (K) 39758 Walton Peak Rebuild
County: GRAND Township: 5N
Substation: NP2 - North Park 2Feeder: West Circuit/North Park Phase:
SO Number: Work Order #: 20220618
Staked By: Date: 09/13/2022
Eng Review By: Date:
Released By: Date:
Const Comp By: Date:
Inspected By: Inspected By Date:
Sheet No. 29 of 29