About this file

This Project Manual is a bid document for an Electric Distribution Construction Contract issued by Stanley Consultants, Inc. for Mountain Parks Electric, Inc. in Granby, Colorado, covering Construction Services for a DHSEM Mitigation Project. The project involves approximately 6.3 miles of underground single-phase 25 kV distribution line construction, 3.2 miles of underground three-phase 25 kV distribution line construction, 4.2 miles of overhead single-phase 25 kV distribution line construction, 14 miles of overhead three-phase 25 kV distribution line construction, and the removal of 8.6 miles of single-phase and 20.8 miles of three-phase 25 kV overhead lines. The project is located in Grand and Jackson Counties, Colorado, with sealed proposals to be received via BidNet Direct by 2:00 PM on May 29, 2025, for a labor-only contract to be completed by November 14, 2026.

The contract is structured as a Rural Utilities Service (RUS) Form 830 labor-only construction contract, with the owner furnishing most materials. The bidder must be prequalified and will be responsible for work on both de-energized and energized lines, including adjusting existing lines, making connections, and incorporating new construction into the existing system. The project requires compliance with various federal, state, and local regulations, including environmental protection, equal opportunity provisions, and safety standards. Bidders must provide a bid bond of 5% of the maximum bid price and will be required to furnish a Contractor's Bond. The contract includes provisions for monthly payments, with 90% of each estimate paid during construction and final payment made upon project completion, subject to the contractor's compliance with contract terms.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

©Stanley Consultants, Inc. 2025

Project Manual for

Electric Distribution Construction Contract RUS 830 (Labor Only) Construction Services for DHSEM Mitigation Project

Mountain Parks Electric, Inc.

Granby, Colorado

Issued for Bid May 2025

30266.01.00 TABLE OF CONTENTS

ms2393 SECTION 00 01 10 - Page 1

ELECTRIC DISTRIBUTION CONSTRUCTION CONTRACT

RUS 830 (LABOR ONLY)

CONSTRUCTION SERVICES FOR DHSEM MMITIGATION PROJECT

MOUNTAIN PARKS ELECTRIC, INC.

GRANBY, COLORADO

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

Document Title Page

RUS Form 830 Electric Distribution Construction Contract, Project Construction 1 thru 20 RUS Form 231 Certificate of Contractor 21 RUS Form 187 Certificate of Completion – Contract Construction 22 thru 23 RUS Form 213 Buy American Certificate 24 RUS Form 307 Bid Bond 25 RUS Form 168b Contractor’s Bond 26 thru 27 Project Details 28 Distribution Construction Assembly Units – Line Changes 29 thru 38 Proposal Summary 39 Certification Regarding Debarment, Suspension, and other Responsibility Matters - Primary Covered Transactions 1 thru 2 List of Owner-Furnished Materials 1 thru 19 00 73 00 Supplementary Conditions 1 00 74 00 DHSEM Project Supplementary Conditions 1 thru 2 ms2393 1 RUS FORM 830 (Rev. 2-04)

According to the paperwork Reduction Act of 7995, an agency may not conductor sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0572-0107. The time required to complete this information collection is estimated to average 5 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

U.S. Department of Agriculture

Rural Utilities Service

ELECTRIC SYSTEM CONSTRUCTION CONTRACT

PROJECT CONSTRUCTION

NOTICE AND INSTRUCTIONS TO BIDDERS

1. Sealed proposals for the construction, including the supply of necessary labor and equipment, of a rural electric project of Mountain Parks Electric Inc. , (hereinafter called the "Owner') will be received by the Owner on or before 2:00 o'clock P.M., May 29th , 2025, on BidNet Direct at which time and place the proposals will be privately opened and read.

2. Owner Furnished Materials. The unit prices in the Contractor's Proposal are to include provisions for Owner

Furnished Materials since as stated in Article 1, Section 3 of the Contractor's Proposal, the value of the Owner Furnished Materials, if any, will be deducted from payments to the Bidder for completed Construction Units.

3. Obtaining Documents. The Plans, Specifications and Construction Drawings, together with all necessary forms and other documents for bidders may be obtained in electronic form from Bidnet Direct.

(https://www.bidnetdirect.com/).

4. Manner of Submitting Proposals. Proposals and all supporting instruments must be submitted on the forms furnished by the Owner and must be delivered via email to the Owner’ representative Adam Paulson adambp@mpei.com. The email must contain the subject line “DHSEM Mitigation Project” The successful Bidder will be required to execute two additional counterparts of the Proposal.

5. Due Diligence. Prior to the submission of the Proposal, the Bidder shall make and shall be deemed to have made a careful examination of the site of the project and of the Plans, Specifications, Construction Drawings, and forms of Contractor's Proposal and Contractor's Bond, and shall review the location and nature of the proposed construction, the transportation facilities, the kind and character of soil and terrain to be encountered, the kind of facilities required before and during the construction of the project, general local conditions, environmental and historic preservation considerations, and all other matters that may affect the cost and time of completion of the project. Bidder will be required to comply with all federal, state, and local laws, rules, and regulations applicable to its performance, including those pertaining to the licensing of contractors, and the Anti Kick-Back Act of 1986 (41 U.S. C. 51 et seq.).

6. Proposals will be accepted only from those prequalified bidders invited by the Owner to submit a proposal.

7. The Time for Completion of Construction of the project is of the essence of the Contract and shall be as specified by the Engineer in the Proposal.

8. Bid Bond. Each Proposal must be accompanied by a Bid Bond in the form attached hereto or a certified check on a bank that is a member of the Federal Deposit Insurance Corporation, payable to the order of the Owner, in an amount equal to five percent (5%) of the maximum bid price. Each Bidder agrees, provided its Proposal is one of the three low Proposals, that, by filing its Proposal together with such Bid Bond or check in consideration of the Owner's receiving and considering such Proposals, said Proposal shall be firm and binding upon each such Bidder and such Bid Bond or check shall be held by the Owner until a Proposal is accepted and a satisfactory Contractor's Bond is furnished (where required) by the successful Bidder and such acceptance has been approved by the Administrator, or for a period not to exceed sixty (60) days from the date hereinbefore set for the opening of Proposals, whichever period shall be the shorter. If such Proposal is not https://www.bidnetdirect.com/ mailto:adambp@mpei.com

RUS FORM 830 (Rev. 2-04) 2 ms2393 one of the three low Proposals, the Bid Bond or check will be returned in each instance within a period of ten

(10) days to the Bidder furnishing same.

9. Contractor's Bond. The Bidder agrees to furnish a Contractor's Bond in triplicate in the form attached hereto with sureties listed by the United States Treasury Department as Acceptable Sureties, in a penal sum not less than the contract price. Contractor’s Bond shall cover the Total Line Changes amount shown on the Proposal Summary and shall be valid through the one-year warranty period after completion of construction as defined in Article II, Section 7.

10. Failure to Furnish Contractor's Bond. Should the successful Bidder fail or refuse to execute such counterparts or to furnish a Contractor's Bond (where required) within ten (10) days after written notification of the acceptance of the Proposal by the Owner, the Bidder will be considered to have abandoned the Proposal.

In such event, the Owner shall be entitled (a) to enforce the Bid Bond in accordance with its terms, or (b) if a certified check has been delivered with the Proposal, to retain from the proceeds of the certified check, the difference (not exceeding the amount of the certified check) between the amount of the Proposal and such larger amount for which the Owner may in good faith contract with another party to construct the project. The term "Successful Bidder" shall be deemed to include any Bidder whose Proposal is accepted after another Bidder has previously refused or has been unable to execute the counterparts or to furnish a satisfactory Contractor's Bond (where required.)

11. Debarment Certification. The Bidder must provide to the Owner a suspension and debarment certificate in the form attached hereto.

12. Contract is Entire Agreement. The Contract to be effected by the acceptance of the Proposal shall be deemed to include the entire agreement between the parties thereto, and the Bidder shall not claim any modifications thereof resulting from any representation or promise made at any time by any officer, agent or employee of the Owner or by any other person.

13. Minor Irregularities. The Owner reserves the right to waive minor irregularities or minor errors in any

Proposal, if it appears to the Owner that such irregularities or errors were made through inadvertence. Any such irregularities or errors so waived must be corrected on the Proposal in which they occur prior to the acceptance thereof by the Owner.

14. Bid Rejection. The Owner reserves the right to reject any or all Proposals. The attention of Bidders is called to the desirability of a proper balance between prices for labor and materials and between the total prices for the respective Construction Units. Lack of such a balance may be considered as a reason for rejecting a Proposal.

15. Discrepancy in Unit Prices. Where the unit prices in the Contractor's Proposal are separated into three columns designated as "Labor " "Materials," and "Labor and Materials," and where a discrepancy appears between the sum shown in the "Labor and Materials" column and the correct addition of the sums appearing in the "Labor" column and the "Materials" column, the correct addition of the sums appearing in the "Labor" column and the "Materials" column shall control. Similarly, the quantities appearing in the "No. of Units" column multiplied by the correct addition of the sums in the "Labor" column and the "Materials" shall control the amounts appearing in the "Extended Price - Labor & Materials" column. Likewise, the correct extensions shall control the amounts appearing in the "Total, Part" line for each respective part.

16. Definition of Terms. The terms “Administrator,” “Engineer,” "Completion of Construction,” “Control,”

“Borrower,” and "Completion of the Project" as used throughout this Contract shall be as defined in Article VI, Section 1, of the Proposal.

17. The Owner Represents:

a. If by provisions of the Proposal the Owner shall have undertaken to furnish any materials for the construction of the project, such materials are on hand at locations specified or if such materials are not on hand they will be made available by the Owner to the successful Bidder at the locations specified before the time such materials are required for construction.

ms2393 3 RUS FORM 830 (Rev. 2-04)

b. All titles, easements and rights-of-way, have been obtained from the owners of the properties on which the project is to be constructed (including tenants who may reasonably be expected to object to such construction).

c. All staking, except as shown on the maps included in the Plans and Specifications, will be completed prior to construction and sufficient staking crews will be available to maintain stakes at all times in advance of construction.

d. Where underground distribution construction is required, permission has been obtained from state and local highway and road authorities to install underground distribution power facilities and set pedestals, if any, on the highway and road right-of-way in the project area. Notwithstanding such permission granted to the Owner, each Bidder is responsible for ascertaining that the equipment, methods of construction, and repair proposed to be used on the project will meet all requirements of public authorities having jurisdiction over highway and road right-of-way. The successful Bidder will be required to furnish proof satisfactory to the Owner of compliance with this requirement. If required by highway or road authorities, the successful Bidder will furnish to such authorities a bond or meet other guaranty requirements to assure the prompt repair of all damages to highways and roads and their associated rights-of-way caused by the Bidder during construction of the project. This requirement is in addition to and independent of the Contractor's Bond required under this Contract. The acceptance of a bid from any Bidder is not to be construed as approval of the Bidder's equipment or proposed construction methods by or on behalf of the highway and road authorities. Bidders may obtain information concerning the requirements of highway and road authorities by communicating with the following:

Kay Borda 467 E. Topaz Ave.

P.O. Box 9 Granby, CO 80446 Road and Bridge Supervisor Telephone: 970-887-2123

e. All funds necessary for prompt payment for the construction of the project will be available.

f. Owner reserves the right to revise the Plans and Specifications prior to the date set for the opening of proposals by addendum issued through Engineer. Addendum must be acknowledged in the Proposal Summary.

g. Owner has performed all tree clearing and trimming as required. Bidder shall coordinate with Owner in the event any additional clearing is required.

h. Staging Areas: Bidder shall be responsible for expenses and securing staging areas for material and equipment.

i. Prior to commencement and upon completion of each line section, Bidder shall notify the Road and Bridge Supervisor of the location the Bidder will be or has been working.

If the Owner shall fail to comply with any of the undertakings contained in the foregoing representation or if any of such representations shall be incorrect, the Bidder will be entitled to an extension of time of completion for a period equal to the delay, if any, caused by the failure of the Owner to comply with such undertakings or by any such incorrect representation; provided the Bidder shall have promptly notified the Owner in writing of its desire to extend the time of completion in accordance with the foregoing; provided, however, that such extension, if any, of the time of completion shall be the sole remedy of the Bidder for the Owner's failure, because of conditions beyond the control and without the fault of the Owner, to furnish materials in accordance with subparagraph a. above.

RUS FORM 830 (Rev. 2-04) 4 ms2393

PROPOSAL

TO:

Mountain Parks Electric Inc. (hereinafter called the "Owner').

ARTICLE I- - GENERAL

Section 1. Offer to Construct. The undersigned (hereinafter called the "Bidder) hereby proposes to receive and install such materials and equipment as may hereinafter be specified to be furnished by the Owner, and to furnish all other materials and equipment, all machinery, tools, labor, transportation and other means required to construct the project in strict accordance with the Plans, Specifications and Construction Drawings for the prices hereinafter stated.

The total length of the project lines shall be determined by taking the sum of all straight horizontal span distances between pole stakes or from center to center of poles, or centerline of structures, carrying conductors, plus the length of service drops, if any, measured horizontally from center of last pole to the point of attachment to the consumer's building.

Section 2. Materials and Equipment. The Bidder agrees to furnish and use in the construction of the project under this Proposal, in the event the Proposal is accepted, only such 'fully accepted, " "conditionally accepted, " and "technically accepted" materials and equipment which have been accepted by RUS as indicated in the current RUS Informational Publication 202-1, "List of Materials Acceptable for Use on Systems of RUS Electrification Borrowers," including revisions adopted prior to the Bid Opening. The use of "conditionally accepted" or "technically accepted" materials and equipment requires prior consent by the Owner or Engineer.

The Bidder agrees that the prices for wood poles, wood crossarms, and other timber products set forth herein shall include the cost of preservative treatment and inspection, insured warranty, or quality assurance. The Bidder further agrees to obtain from the supplier inspection and treatment reports or insured warranties, for checking against the delivered timber, and to submit such reports or warranties to the Owner as one of the prerequisites to monthly and final payments.

The Bidder will purchase all materials and equipment (other than Owner Furnished Materials) outright and not subject to any conditional sales agreements, bailment, lease or other agreement reserving unto the seller any right, title or interest therein. All such materials and equipment shall be new and shall become the property of the Owner when erected in place.

Owner will provide materials for this projects, except those listed below shall be provided by the Bidder.

• Boring Pipe – 2”, 4”, 6” Bore Conduit – Contractor’s choice of material.

Section 3. Owner Furnished Materials. The Bidder understands and agrees that, if this Proposal is accepted, the Owner will furnish to the Bidder all the material required for the project. For those items not yet delivered, the Bidder will, on behalf of the Owner, accept delivery of such of the materials as may be subsequently delivered and will promptly forward to the Owner for payment the supplier's invoice. The Bidder will acknowledge in writing the receipt of all materials received.

Materials, if any, not required for the project, which have been furnished to the Bidder by the Owner or delivery of which has been accepted by the Bidder on behalf of the Owner, shall be returned to the Owner by the Bidder upon completion of construction of the project. The value of all materials not installed in the project nor returned to the Owner shall be deducted from the final payment to the Bidder.

Upon delivery, the Bidder shall promptly receive, unload, transport and handle all materials at its expense and shall be responsible for demurrage, if any.

When bidder has signed for and taken physical possession of the material, that material shall be treated the same as bidder-furnished material according to provisions of the Contract.

ms2393 5 RUS FORM 830 (Rev. 2-04)

Section 4. Proposal on Unit Basis. The Bidder understands and agrees that the various Construction Units on which bids are made are defined by symbols and descriptions in this Proposal, that all said bids are on a unit basis, and that the Owner may specify any number or combination of Construction Units that the Owner may deem necessary for the construction of the project. Separate Construction Units are designated for each different arrangement which may be used in the construction of the project. This Proposal is based on a consideration of each unit in place and includes only the materials listed on the corresponding Construction Drawings or description of unit where no drawing exists.

Section 5. Description of Contract. The Notice and Instructions to Bidders, Plans, Specifications, and

Construction Drawings, which by this reference are incorporated herein, together with the Proposal and Acceptance constitute the Contract. The Plans, Specifications, and Construction Drawings, including maps, special drawings, and approved modifications in standard specifications are attached hereto and identified as follows:

1. Construction Specifications.

2. Framing and Assembly Drawings.

3. Stringing Data.

4. Construction Plan.

5. Existing Plan (Retirement).

Section 6. Due Diligence. The Bidder has made a careful examination of the site of the project to be constructed and of the Plans, Specifications, Construction Drawings, and form of Contractor's Bond attached hereto, and has become informed as to the location and nature of the proposed construction, the transportation facilities, the kind and character of soil and terrain to be encountered, and the kind of facilities required before and during the construction of the project, and has become acquainted with the labor conditions, federal, state, and local laws, rules, and regulations applicable to its performance.

Section 7. License. The Bidder warrants that a Contractor's License or registration is _X_, is not __ required, and if required, it possesses Contractor's License or registration No. for the State of Colorado in which the project is located and said license expires on , 20 .

The Bidder is responsible for Contractor registration and bonding requirements set forth by the State Administrative Rules – Department of Labor and Employment 1100. Refer to:

https://www.coloradosos.gov/CCR/NumericalDeptList.do#1100

Section 8. Warranty of Good Faith. The Bidder warrants that this Proposal is made in good faith and without collusion or connection with any person or persons bidding on the same work.

Section 9. Financial Resources.

a. The Bidder warrants that it has or will obtain the financial resources necessary to ensure completion of the project.

b. The Bidder agrees that in the event this Proposal is accepted and a Contractor's Bond is required, it will furnish a Contractor's Bond in the form attached hereto, in a penal sum not less than the maximum Contract price, with a surety or sureties listed by the United States Department of Treasury as Acceptable Sureties.

Section 10. Taxes. The unit prices for Construction Units in this Proposal include provisions for the payment of all monies which will be payable by the Bidder or the Owner in connection with the construction of the project on account of taxes imposed by any taxing authority upon the sale, purchase or use of materials, supplies and equipment, or services or labor of installation thereof to be incorporated in the project as part of such Construction Units. The Bidder agrees to pay all such taxes, except taxes upon the sale, purchase or use of Owner Furnished Materials and it is understood that, as to Owner Furnished Materials, the values stated in the attached "List of Owner Furnished Materials include taxes upon the sale, purchase or use of Owner Furnished Materials, if applicable. The Bidder will furnish to the appropriate taxing authorities all required information and reports pertaining to the project, except as to the Owner Furnished Materials.

Section 11. Changes in Quantities. The Bidder understands and agrees that the quantities called for in this

Proposal are approximate, and that the total number of units upon which payment shall be made shall https://www.coloradosos.gov/CCR/NumericalDeptList.do#1100

RUS FORM 830 (Rev. 2-04) 6 ms2393 be as set forth in the inventory. The Bidder also understands that at any time the Owner can change the remainder of the units to zero and terminate the contract. If the Owner changes the quantity of any unit or units specified this Proposal by more than fifteen percent (15%) and the materials cost to the Bidder is increased thereby to an extent which would not be adequately compensated by application of the unit prices in this Proposal to the revised quantity of such unit or units, such change, to the extent of the quantities of such units in excess of such fifteen percent (15%) shall be regarded as a change in the construction within the meaning of Article II, Section 1 (d) of this proposal.

ARTICLE II - - CONSTRUCTION

Section 1. Time and Manner of Construction.

a. The Bidder agrees to commence construction of the project on a date (hereinafter called the

"Commencement Date') which shall be determined by the Engineer after notice to the bidder in writing of approval of the contract by the Administrator, if approval of the Administrator is required, but in no event will the Commencement Date be later than 30 calendar days after date of approval of the contract by the Administrator, if approval of the Administrator is required notice of award. The Bidder further agrees to prosecute diligently and to complete construction in strict accordance with the Plans, Specifications and Construction Drawings within on or before November 14, 2026 calendar days after Commencement Date: Provided, however, that the Bidder will not be required to dig holes, set poles, install anchors, install underground conduit, perform any plowing for the installation of underground cable, or dig trenches if there are more than six (6) inches of frost on the ground nor to perform any construction on such days when in the judgment of the Engineer snow, rain, or wind, or the results of snow, rain, or frost make it impracticable to perform any operation of construction; provided further that the Bidder will not be required to perform any plowing for the installation of underground cable on public roads or highways if there are more than two (2) inches of frost in the ground. To the extent of the time lost due to the conditions described herein and approved in writing by the Engineer, the time of completion set out above will be extended if the Bidder makes a written request therefore to the Owner as provided in subsection b of this Section 1.

b. The time for Completion of Construction shall be extended for the period deemed reasonable by the

Owner or Engineer of any reasonable delay which is due exclusively to causes beyond the control and without the fault of the Bidder, including Acts of God, fires, floods, inability to obtain materials and acts or omissions of the Owner with respect to matters for which the Owner is solely responsible:

Provided, however that no such extension of time for completion shall be granted the Bidder unless within ten (10) days after the happening of any event relied upon by the Bidder for such an extension of time the Bidder shall have made a request therefore in writing to the Owner, and provided further that no delay in such time of completion or in the progress of the work which results from any of the above causes except acts or omissions of the Owner, shall result in any liability on the part of the Owner. The time for completion of construction shall not be extended for seasonal weather conditions, including but not limited to: frost, snow, wind, wet road conditions, or seasonal rain.

c. The sequence of construction shall be as set forth below, the number or names being the designations of extensions or areas (hereinafter called the "Sections') corresponding to the numbers or names shown on the maps attached hereto, or if no Sections are set forth below, the sequence of construction shall be as determined by the Bidder, subject to the approval of the Engineer.

d. The Owner, acting through the Engineer with the approval of the Administrator, if approval of the

Administrator is required, may from time to time during the progress of the construction of the project make such changes, additions or subtractions from the Plans, Specifications, Construction Drawings, List of Materials and sequence of construction provided for in the previous paragraph which are part of the Contractor's Proposal as conditions may warrant: Provided, however, that if any change in the construction to be done shall require an extension of time, a reasonable extension will be granted if the Bidder shall make a written request therefore to the Owner within (10) days after any such change is made. And provided further, that if the cost to the Bidder of construction of the project shall be materially increased by any such change or addition, the Owner shall pay the Bidder for the reasonable cost thereof in accordance with a Construction Contract Amendment signed by the Owner and the Bidder and approved by the Administrator, if approval by the Administrator is required, but no ms2393 7 RUS FORM 830 (Rev. 2-04) claim for additional compensation for any such change or addition will be considered unless the Bidder shall have made a written request therefore to the Owner prior to the commencement of work in connection with such change or addition.

Section 2. Environmental Protection. The Bidder shall perform the work in compliance with all applicable

Federal, State, and local Environmental Laws. For purposes of this Agreement, the term "Environmental Laws" shall mean all Federal, state, and local laws including statutes, regulations ordinances, codes, rules, and other governmental restriction and requirements relating to the environment or solid waste, hazardous substances, hazardous waste, toxic or hazardous material, pollutants or contaminants including, but not limited to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended, 42 U.S. C. ,§,¢ 9601, et seq., the Federal Water Pollution Control Act, as amended, 33 U.S. C. §§ 1251, et seq., and the Solid Waste Disposal Act, as amended, 42 U.S. C. §§ 6901, et seq., now or at any time hereafter in effect.

Section 3. Tools, Equipment, and Qualified Personnel. The Bidder agrees that in the event this Proposal is accepted it will make available for use in connection with the proposed construction all necessary tools and equipment and qualified supervisors and workers.

Section 4. Changes in Construction. The Bidder agrees to make such changes in construction previously installed in the project by the Bidder as required by the Owner for prices arrived at as follows:

a. For substations and other units where only a portion of the complete unit is affected by the change, the compensation for such change shall be as agreed upon in writing by the Bidder and the Owner and approved by the Administrator, if approval by the Administrator is required, prior to the commencement of work in connection with such change.

b. For all other units, the compensation for such change shall be the reasonable cost thereof as agreed upon by the Bidder and the Owner, but in no event shall it exceed two (2) times the labor price quoted in the Proposal for the installation of the unit to be changed. Such compensation shall be in lieu of any other payment for the installation and removal of the original unit. (If a new or replacing unit is installed, payment for such new or replacing unit shall be made as shown in the final inventory.)

No payment shall be made to the Bidder for materials or labor involved in correcting errors or omissions on the part of the Bidder which result in construction not in accordance with the Plans and Specifications.

Section 5. Construction Not in Proposal. The Bidder also agrees that when it is necessary to construct units not shown in the Proposal, in absence of other mutual agreement, it will construct such units for a price arrived at as follows:

a. Owner will supply all the material expect for boring conduit.

b. The cost of labor will be determined by comparing to similar units that are in the contract. The cost of labor shall be the reasonable cost thereof, but in no event shall it exceed an amount determined by calculating the ratio of the total labor costs to the total material costs in the section of the Proposal involved, and multiplying the cost of materials for the unit in question by this ratio as mutually agreed to by Bidder and Owner.

c. It is anticipated that additional units will be identified during the course of the construction of the Project. For all such units identified, a Unit Price will be mutually agreed to based on the provisions of this Section.

Section 6. Supervision and Inspection.

a. The Bidder shall give sufficient supervision to the work, using its best skill and attention. The Bidder will carefully study and compare all drawings, specifications and other instructions and will at once report to the Owner any error, inconsistency or omission which it may discover. The Bidder shall cause the construction work on the project to receive constant supervision by a competent superintendent (hereinafter called the "Superintendent') who shall be present at all times during working hours where construction is being carried on. The Bidder shall also employ, in connection with the construction of the project, capable, experienced and reliable supervisors

RUS FORM 830 (Rev. 2-04) 8 ms2393 and such skilled workers as may be required for the various classes of work to be performed. The Bidder shall be solely responsible for the means and methods of construction and for the supervision of the Bidder's employees.

b. The Owner reserves the right to require the removal from the project of any employee of the Bidder if in the judgment of the Owner such removal shall be necessary in order to protect the interest of the Owner. The Owner shall have the right to require the Bidder to increase the number of its employees and to increase or change the amount or kind of tools and equipment if at any time the progress of the work shall be unsatisfactory to the Owner; but the failure of the Owner to give any such directions shall not relieve the Bidder of its obligations to complete the work within the time and in the manner specified in this Proposal.

c. The construction of the project and all materials and equipment used therein, shall be subject to the inspection, tests, and acceptance by the Owner and the Administrator and the Bidder shall furnish all information required by the Owner or by the Administrator concerning the nature or source of any materials incorporated or to be incorporated in the project. All Bidder procedures and records pertaining to the work shall be made available to the Owner and the Administrator for review prior to such inspections and tests. The Bidder shall provide all reasonable facilities necessary for such inspection and tests and shall maintain an office at the site of the project, with telephone service where obtainable and at least one office employee to whom communications from the Owner may be delivered. Delivery of such communications in writing to the employee of the Bidder at such office shall constitute delivery to the Bidder. The Bidder shall have an authorized agent accompany the Engineer when final inspection is made and, if requested by the Owner, when any other inspection is made. The performance of such inspections or tests by the Owner or the Administrator shall not relieve the Bidder of its obligations to perform the work in accordance with the requirements of this Contract.

d. In the event that the Owner, or the Administrator, shall determine that the construction contains or may contain numerous defects, it shall be the duty of the Bidder and the Bidder's Surety or Sureties, if any, to have an inspection made by an engineer approved by the Owner and the Administrator, if approval by the Administrator is required, for the purpose of determining the exact nature, extent and location of such defects.

e. The Engineer may recommend to the Owner that the Bidder suspend the work wholly or in part for such period or periods as the Engineer may deem necessary due to unsuitable weather or such other conditions as are considered unfavorable for satisfactory prosecution of the work or because of the failure of the Bidder to comply with any of the provisions of the Contract: Provided, however, that the Bidder shall not suspend work pursuant to this provision without written authority from the Owner so to do. The time of completion hereinabove set forth shall be increased by the number of days of any such suspension, except when such suspension is due to the failure of the Bidder to comply with any of the provisions of this Contract. In the event that work is suspended by the Bidder with the consent of the Owner, the Bidder before resuming work shall give the Owner at least twenty-four (24) hours notice thereof in writing.

Section 7. Defective Materials and Workmanship.

a. The acceptance of any materials, equipment (except Owner Furnished Materials) or any workmanship by the Owner or the Engineer shall not preclude the subsequent rejection thereof if such materials, equipment, or workmanship shall be found to be defective after delivery or installation, and any such materials, equipment or workmanship found defective before final acceptance of the construction shall be replaced or remedied, as the case may be, by and at the expense of the Bidder. Any such condemned material or equipment shall be immediately removed from the site of the project by the Bidder at the Bidder's expense. The Bidder shall not be entitled to any payment hereunder so long as any defective materials, equipment or workmanship in respect to the project, of which the Bidder shall have had notice, shall not have been replaced or remedied, as the case may be.

b. Notwithstanding any certificate which may have been given by the Owner or the Engineer, if any materials, equipment (except Owner Furnished Materials) or any workmanship which does not comply with the requirements of this Contract shall be discovered within one (1) year after ms2393 9 RUS FORM 830 (Rev. 2-04)

Completion of Construction of the project, the Bidder shall replace such defective materials or equipment or remedy any such defective workmanship within thirty (30) days after notice in writing of the existence thereof shall have been given by the Owner. If any such defective materials, equipment, or workmanship so replaced or repaired is found to be defective within one year after the completion of the replacement or repair, the Bidder shall replace or remedy such defective materials, equipment, or workmanship. If the Bidder shall be called upon to replace any defective materials or equipment or to remedy defective workmanship as herein provided, the Owner, if so requested by the Bidder shall deenergize that section of the project involved in such work. In the event of failure by the Bidder so to do, the Owner may replace such defective materials or equipment or remedy such defective workmanship, as the case may be, and in such event the Bidder shall pay to the Owner the cost and expense thereof.

RUS FORM 830 (Rev. 2-04) 10 ms2393

ARTICLE III - - PAYMENTS AND RELEASE OF LIENS

Section 1. Payments to Bidder.

a. On or before the fifth (5) day of each calendar month, the Bidder will make application for payment, and the Owner, on or before the fifteenth (15) day of such the fifth (5) day of the following month, shall mail or postmark make partial payment to the Bidder for construction accomplished during the preceding calendar month on the basis of completed Construction Units furnished and certified to by the Bidder, recommended by the Engineer and approved by the Owner solely for the purposes of payment: Provided, however, that such approval shall not be deemed approval of the workmanship or materials. Only ninety percent (90%) of each such estimate approved during the construction of the project shall be paid by the Owner to the Bidder prior to Completion of the project. Upon completion by the Bidder of the construction of the project, the Engineer will prepare an inventory of the project showing the total number and character of Construction Units and, after checking such inventory with the Bidder, will certify it to the Owner. Upon the approval by the Owner and the Administrator, if the approval of the Administrator is required, of a Certificate of Completion in the form attached hereto, showing the total cost of the construction performed, the Owner shall make payment to the Bidder of all amounts to which the Bidder shall be entitled thereunder which shall not have been paid:

Provided, however, that such final payment shall be made not later than ninety (90) days after the date of Completion of Construction of the project, as specified in the Certificate of Completion, unless withheld because of the fault of the Bidder.

b. The Bidder shall be paid on the basis of the number of Construction Units actually installed at the direction of the Owner shown by the inventory based on the staking sheets or structure lists.

c. Notwithstanding the provisions of Section 1. a above, the Bidder may, by giving written notice thereof to the Owner, elect to receive payment in full for any Section of the project upon:

(1) completion of construction of such Section as certified by the Engineer and approved by the

Owner and the Administrator, if approval by the Administrator is required;

(2) submission to the Owner and the Administrator, if (submission to the Administrator is required, of the releases of lien and the certificate referred to in Section 2 of this Article;

(3) approval by the Owner and the Administrator, if approval by the Administrator is required, of the inventory in respect of such Section; and

(4) submission to the Owner and the Administrator, if submission to the Administrator is required, of the consent in writing by the Surety or Sureties, if any, on the Contractor's Bond to payment in full for such Section prior to Completion of the project.

If no Sections are designated in Article II, Section 1 c, the term "Section” shall mean for purposes of this subsection c and Article IV Section 3b only, a part of the project as designated by the Owner which represents at least twenty-five percent (25,) of the contract price, and which is capable of being energized and operated by the Owner.

d. Interest at the rate of seven and one half percent1 (7.5%) per annum shall be paid by the Owner to the Bidder on all unpaid balances due on monthly estimates, commencing fifteen (15) days after the due date; provided the delay in payment beyond the due date is not caused by any condition within the control of the Bidder. The due date for purposes of such monthly payment or interest on all unpaid balances shall be the fifteenth (15)fifth (5) day of each the following calendar month provided (1) the Bidder on or before the fifth (5) day of such month shall have submitted its certification of Construction Units completed during the preceding month and (2) the Owner on or before the fifteenth (15)fifth (5) day of such the following month shall have approved such

1 The Owner shall insert a rate equal to the lowest "Prime Rate" listed in the "Money Rates" section of the Wall Street Journal on the date such invitation to bid is issued.

ms2393 11 RUS FORM 830 (Rev. 2-04) certification. If, for reasons not due to the Bidder's fault, such approval shall not have been given on or before the fifteenth (15)fifth (5) day of such the following month, the due date for purposes of this subsection d shall be the fifteenth (15)fifth (5) day of such the following month notwithstanding the absence of the approval of the certification.

e. Interest at the rate of seven and one half percent1 (7.5%) per annum shall be paid by the Owner to the Bidder on the final payment for the project or any completed Section thereof commencing fifteen

(15) days after the due date. The due date for purposes of such final payment or interest on all unpaid balances shall be the date of approval by the Owner of all of the documents requiring such approval, as a condition precedent to the making of final payment, or ninety (90) days after the date of Completion of Construction of the project, as specified in the Certificate of Completion, whichever date is earlier.

f. No payment shall be due while the Bidder is in default in respect of any of the provisions of this

Contract and the Owner may withhold from the Bidder the amount of any claim by a third party against either the Bidder or the Owner based upon an alleged failure of the Bidder to perform the work hereunder in accordance with the provisions of this Contract.

g. The Owner and the Administrator shall have the right to inspect all payrolls, invoices of materials, and other data and records of the Bidder and of any subcontractor, relevant to the construction of the project.

h. The Bidder shall complete payment application forms provided by Owner.

Section 2. Release of Liens and Certificate of Contractor. Upon the completion by the Bidder of the construction of the project (or any Section thereof if the Bidder shall elect to receive payment in full for any Section when completed as provided above) but prior to final payment to the Bidder, the Bidder shall deliver to the Owner, in duplicate, releases of all liens and of rights to claim any lien, in the form attached hereto from all manufacturers, material suppliers, and subcontractors furnishing services or materials for the project or such Section and a certificate in the form attached hereto to the effect that all labor used on or for the project or such Section has been paid and that all such releases have been submitted to the Owner.

Section 3. Payments to Material Suppliers and Subcontractors. The Bidder shall pay each material supplier, if any, within five (5) days after receipt of any payment from the Owner, the amount thereof allowed the Bidder for and on account of materials furnished or construction performed by each material supplier or each subcontractor.

ARTICLE IV -- PARTICULAR UNDERTAKINGS OF THE BIDDER

Section 1. Protection to Persons and Property. The Bidder shall at all times take all reasonable precautions for the safety of employees on the work and of the public, and shall comply with all applicable provisions of federal, state, and local laws, rules, and regulations and building and construction codes, in addition to the safety rules and procedures of the Owner.

Owner is its capacity as “host employer” and Bidder in its capacity as “contract employer” pursuant to OSHA regulation 29 CFR § 1926.950(c) are required to transfer certain information about the design and operation of Owner and Bidder shall coordinate their work rules and procedures so that each employee of Owner and Bidder is protected.

Compliance with OSHA host employer/contract employer information transfer requirements set forth in 29 CFR § 1926.950(c) in not intended to nor does it create an employer-employee relationship between Owner and Bidder. As is established herein, Article VI, Section 10; the Bidder shall perform the work as an independent contractor, not as a subcontractor, agent, or employee of the Owner.

1 The Owner shall insert a rate equal to the lowest "Prime Rate" listed in the "Money Rates" section of the Wall Street Journal on the date such invitation to bid is issued.

RUS FORM 830 (Rev. 2-04) 12 ms2393

The following provisions shall not limit the generality of the above requirements:

a. The Bidder shall at no time and under no circumstances cause or permit any employee of the Bidder to perform any work upon energized lines, or upon poles carrying energized lines, unless otherwise specified in the Notice and Instructions to Bidders.

b. The Bidder shall transport and store all material in facilities and vehicles which are designed to protect the material from damage. The Bidder shall ensure that all vehicles, trailers, and other equipment used comply with all applicable licensing, traffic, and highway requirements.

c, The Bidder shall so conduct the construction of the project as to cause the least possible obstruction of public highways.

d. The Bidder shall provide and maintain all such guard lights and other protection for the public as may be required by applicable statutes, ordinances and regulations or by local conditions.

e. The Bidder shall do all things necessary or expedient to properly protect any and all parallel, converging and intersecting lines, joint line poles, highways, and any and all property of others from damage, and in the event that any such parallel, converging and intersecting lines, joint line poles, highways or other property are damaged in the course of the construction of the project the Bidder shall at its own expense replace restore any or all of such damaged property with comparable new property immediately to as good a state as before such damage occurred.

f. Where the right-of-way of the project traverses cultivated or grazing lands, the Bidder shall limit the movement of its crews and equipment so as to cause as little damage as possible to crops, orchards or property and shall endeavor to avoid marring the lands. All fences which are necessarily opened or moved during the construction of the project shall be replaced in as good condition as they were found and precautions shall he taken to prevent the escape of livestock.

Except as otherwise provided in the descriptions of underground plowing and trenching assembly units, the Bidder shall not be responsible for loss of or damage to crops, orchards or property (other than livestock) on the right-of-way necessarily incident to the construction of the project and not caused by negligence or inefficient operation of the Bidder. The Bidder shall be responsible for all other loss of or damage to crops, orchards, or property, whether on or off the right-of-way, and for all loss of or damage to livestock caused by the construction of the project.

The right-of-way for purposes of this said section shall consist of an area extending 10 feet on both sides of the center line of the poles along the route of the project lines, plus such area reasonably required by the Bidder for access to the route of the project lines from public roads to carry on construction activities.

g. The project, from the commencement of work to completion, or to such earlier date or dates when the Owner may take possession and control in whole or in part as hereinafter provided shall be under the charge and control of the Bidder and during such period of control by the Bidder all risks in connection with the construction of the project and the materials to be used therein, including owner furnished material signed out to Bidder by Owner, shall be borne by the Bidder. The Bidder shall make good and fully repair all injuries and damages to the project or any portion thereof under the control of the Bidder by reason of any act of God or other casualty or cause whether or not the same shall have occurred by reason of the Bidder's negligence.

(i) To the maximum extent permitted by law, Bidder shall defend, indemnify, and hold harmless

Owner and Engineer and Owner's directors, officers, and employees from all claims, causes of action, losses, liabilities, and expenses (including reasonable attorney's fees) for personal loss, injury, or death to persons (including but not limited to Bidder's employees) and loss, damage to or destruction of Owner's property or the property of any other person or entity (including but not limited to Bidder's property) in any manner arising out of or connected with the Contract, or the materials or equipment supplied or services performed by Bidder, its subcontractors and suppliers of any tier. But nothing herein shall be construed as making Bidder liable for any injury, death, loss, damage, or destruction caused by the sole negligence of Owner.

ms2393 13 RUS FORM 830 (Rev. 2-04)

(ii) To the maximum extent permitted by law, Bidder shall defend, indemnify, and hold harmless Owner, and Engineer, and Owner's directors, officers, and employees from all liens and claims filed or asserted against Owner, its directors, officers, and employees, or Owner's property or facilities, for services performed or materials or equipment furnished by Bidder, its subcontractors and suppliers of any tier, and from all losses, demands, and…