This document contains a general wage determination from the Department of Labor for construction work in Broome and Chenango Counties in New York.

The wage determination outlines prevailing wage rates for various construction crafts such as asbestos workers, boilermakers, bricklayers, carpenters, electricians, elevator constructors, ironworkers, laborers, operating engineers, painters, plumbers and pipefitters, roofers, sheet metal workers, sprinkler fitters, and truck drivers. For each craft, the wage determination provides the classification, applicable rates and fringe benefits for both building and heavy/highway construction projects. Key details include prevailing hourly wages ranging from $23.90 to $48.12, as well as fringe benefit amounts for health and welfare, pension, and vacation funds. The wage determination is effective until superseded.

View the file

Other files for this federal contract opportunity

Other files attached to Construction Services for Fire Alarm System Replacement and and Sprinkler System Expansion/Replacement in the Binghamton US Courthouse, newest first.
File Type Posted
Amendment No. 6.pdf PDF
Binghamton Courthouse Fire and Sprinkler System RFI 1 March 26 2020.pdf PDF
Binghamton Courthouse Fire and Sprinkler System Amendment 05 Government Responses to RFI March 26 2020.pdf PDF
Binghamton Courthouse Fire and Sprinkler System Amendment 04 - Solicitation Changes March 25 2020.pdf PDF
Revised Past Performance Questionnaire March 26 2020.pdf PDF
Binghamton Courthouse Fire and Sprinkler System Amendment 03 - Requests for Information Change March 12 2020.pdf PDF
Binghamton Courthouse Fire and Sprinkler System Amendment 02 - Revised Solicitation Document and Uploaded Additional Documents March 11 2020.pdf PDF
Hydraulic Calculations for Binghamton Courthouse First Floor Dated July 10 2019.pdf PDF
Limited Hazmat Survey Report Dated January 14 2019.pdf PDF
Binghamton Courthouse Revised Solicitation March 11 2020.pdf PDF
Hydraulic Calculations for Binghamton Courthouse Second Floor Dated May 23 2019.pdf PDF
Amendment 1.pdf PDF
PPQ for Amendment 1.pdf PDF
Binghamton Courthouse - Solicitation.pdf PDF
SF1442.pdf PDF
Bid Bond.pdf PDF
Binghamton Courthouse - SOW.pdf PDF
Binghamton Courthouse - Agreement.pdf PDF
Past Performance - Questionnaire_ DRAFT.pdf PDF
Performance Bond.pdf PDF
Payment Bond.pdf PDF
Financial Evaluation.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: NY20200004 02/07/2020

Superseded General Decision Number: NY20190004

State: New York

Construction Types: Building, Heavy and Highway

Counties: Broome and Chenango Counties in New York.

BUILDING CONSTRUCTION PROJECTS FOR BROOME COUNTY ONLY (does not include single family homes and apartments up to and including

4 stories, HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

1 02/07/2020

ASBE0030-004 05/01/2019

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

Asbestos/Insulator Worker includes application of all materials, protective coverings, coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement......$ 32.40 23.24

HAZARDOUS MATERIAL HANDLER

SCOPE OF WORK: DUTIES

LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system...........$ 32.40 23.24

BOIL0197-004 01/01/2017

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

BOILERMAKER......................$ 34.54 24.78

BRNY0003-002 07/01/2019

BINGHAMTON CHAPTER

Rates Fringes

BRICKLAYER

BUILDING CONSTRUCTION,

BROOME COUNTY

Bricklayers, Cement

Masons, Stone Masons, Pointers, Caulkers and

Cleaners...................$ 30.68 21.32

Marble Masons, Tile

Layers, and Terrazzo

Workers....................$ 29.67 19.98

Marble, Tile and Terrazzo

Finishers..................$ 27.00 17.11

HEAVY AND HIGHWAY

CONSTRUCTION, BROOME &

CHENANGO COUNTIES

Cement Masons..............$ 30.91 20.62

CARP0277-010 07/01/2019

Rates Fringes

CARPENTER (BUILDING

CONSTRUCTION)

BROOME COUNTY

Carpenters, Carpet Layer, Drywall Applicator, Floor

Coverer, Lather............$ 27.10 18.96

Millwrights................$ 27.10 18.96

CARPENTER (HEAVY & HIGHWAY

CONSTRUCTION)

BROOME COUNTY

Carpenter..................$ 31.23 22.75

CHENANGO COUNTY

Carpenter..................$ 31.23 22.75

FOOTNOTES:

a. Paid Holidays: Independence Day and Labor Day, provided the employee works his scheduled day before and his scheduled day after the holiday and is on the payroll in the payroll week in which the holiday falls.

ELEC0043-003 06/01/2019

CHENANGO (Twps of Columbus, New Berlin & Sherburne): Heavy and

Highway

Rates Fringes

ELECTRICIAN......................$ 38.75 26.08

ELEC0325-002 06/01/2019

BROOME (Building, Heavy, and Highway) and CHENANGO (Entire

County, except Columbus, New Berlin and Sherburne Townships)

Heavy and Highway

Rates Fringes

CABLE SPLICER....................$ 40.35 28.16

ELECTRICIAN......................$ 34.10 27.97

ELEC1249-010 05/06/2019

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal

Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 27.00 6.75%+24.15

Groundman (Truck Driver)....$ 36.00 6.75%+24.15

Groundman Truck Driver

(tractor trailer unit)......$ 36.00 6.75%+24.15

Lineman & Technician........$ 45.00 6.75%+24.15

Mechanic....................$ 36.00 6.75%+24.15

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-011 05/06/2019

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

ELECTRICIAN (Line

Construction)

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 31.23 6.75%+24.15+a

Groundman digging machine operator...................$ 46.85 6.75%+24.15+a

Groundman truck driver

(tractor trailer unit).....$ 41.64 6.75%+24.15+a

Groundman Truck driver.....$ 41.64 6.75%+24.15+a

Lineman and Technician.....$ 52.05 6.75%+24.15+a

Mechanic...................$ 41.64 6.75%+24.15+a

Substation:

Cable Splicer..............$ 57.26 6.75%+24.15+a

Flagman....................$ 31.23 6.75%+24.15+a

Ground man truck driver....$ 41.64 6.75%+24.15+a

Groundman digging machine operator...................$ 46.85 6.75%+24.15+a

Groundman truck driver

(tractor trailer unit).....$ 41.64 6.75%+24.15+a

Lineman & Technician.......$ 52.05 6.75%+24.15+a

Mechanic...................$ 41.64 6.75%+24.15+a

Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation

Cable Splicer..............$ 58.71 6.75%+24.15+a

Flagman....................$ 32.02 6.75%+24.15+a

Groundman Digging Machine

Operator...................$ 48.03 6.75%+24.15+a

Groundman Truck Driver

(tractor-trailer unit).....$ 42.70 6.75%+24.15+a

Groundman Truck Driver.....$ 42.70 6.75%+24.15+a

Lineman & Technician.......$ 53.37 6.75%+24.15+a

Mechanic...................$ 42.70 6.75%+24.15+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

Day, Good Friday, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New

York State, provided the employee works two days before or two days after the holiday.

ELEC1249-012 01/01/2019

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

ELECTRICIAN (Line

Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 32.78 3%+4.93

Groundman..................$ 16.49 3%+4.93

Installer Repairman-

Teledata

Lineman/Technician-

Equipment Operator.........$ 31.12 3%+4.93

Tree Trimmer................$ 25.79 3%+9.98+a

a. New Year's Day, President's Day, Good Friday, Decoration

Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

* ELEV0062-003 01/01/2020

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

ELEVATOR MECHANIC................$ 48.12 34.765+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence

Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0106-006 07/01/2018

BROOME COUNTY

Rates Fringes

Power equipment operators:

(BUILDING:)

GROUP A(1)..................$ 43.79 25.70+a

GROUP A.....................$ 43.30 25.70+a

GROUP B.....................$ 42.28 25.70+a

GROUP C.....................$ 39.38 25.70+a

Hazardous work- Anytime Operating Engineers are involved with

Level C or above, $3.00 per hour over regular rate.

FOOTNOTE:

a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas

Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (Building)

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom trucks over 5 tons

GROUP A: Shovel, all excavators (including rubber tire, full swing), gradalls, power road grader all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, belcrete system, automated asphalt concrete plant, tractor road paver, boom trucks 5 tons and under, Maintenance Engineer, self contained crawler drill-hydraulic rock drill.

GROUP B: Backhoes (rubber tired backhoe/loader combination), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydro hammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, core and well drillers (one drum), post hole digger, model CHB VibroTamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd.

or smaller.

GROUP C: Fork lift, high lift, lull, oiler, fireman and heavy-duty greaser, boilers and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, selding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type disel generator, conveyor, elevators, concrete mixer and beltcrete power pack (belcrete system seeding and mulching machines pumps.

ENGI0106-011 07/01/2018

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 43.47 26.05+a

GROUP 2.....................$ 42.56 26.05+a

GROUP 3.....................$ 39.99 26.05+a

GROUP 4.....................$ 47.47 26.05+a

GROUP 5.....................$ 46.47 26.05+a

GROUP 6.....................$ 45.47 26.05+a

GROUP 7.....................$ 45.08 26.05+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine

Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop

Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb

Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual

Drum Paver, Excavator (All Purpose Hydraulically Operated)

(Gradall or Similar), Front End Loader ( 4 cu. yd. and

Over), Head Tower (Sauerman or Equal), Hoist (Two or Three

Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump

(jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or

Trailer Mounted Log , Chipper (Self Feeder), Tug Operator

(Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber

Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary

Drill (Truck or Tractor Mounted), Boring Machine, Cage

Hoist, Central Mix Plant (NonAutomated) and All Concrete

Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication

Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One

Drum), Hydro-Axe, Kolman Plant Loader and Similar Type

Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant

Engineer, Profiler (105 H.P. and under), Grinder, Post Hole

Digger and Post Driver, Power Broom (towed), Power

Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam

Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant

Refrigeration Equipment (for soil stabilization)Road

Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type

Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy

Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw

(self-propelled), Conveyor, Deck Hand, Directional Drill

Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie

Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day

IRON0060-001 07/01/2019

BROOME; CHENANGO (Twps. of Afton, Bainbridge, Coventry, German, Greene, Gilford, McDonough, Norwich, Oxford, Preston, and

Smithville):

Rates Fringes

IRONWORKER

Structural, Ornamental, Reinforcing, Pre-cast

Concrete Erector, Machinery Mover & Rigger, Fence Erector, Stone

Derrickman, Welder, Sheeter, Sheeter Bucker-up..$ 30.00 27.30

IRON0440-003 01/01/2019

CHENANGO (Twps. of Columbus, New Berlin, North Norwich, Plymouth, Sherburne and Smyrna):

Rates Fringes

IRONWORKER

Structural, Ornamental, Rodmen, Reinforcement, Rigger, Machinery Mover, Fence Erector, Stone

Derrickman..................$ 28.25 25.94

LABO0017-003 07/01/2019

TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY

Rates Fringes

LABORER

HEAVY and HIGHWAY

GROUP 1....................$ 32.40 25.95+a

GROUP 2....................$ 32.50 25.95+a

GROUP 3....................$ 35.65 25.95+a

GROUP 4....................$ 40.00 25.95+a

FOOTNOTES:

a. Paid Holidays: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day, Washington's Birthday, Election Day, Veterans Day provided the employee works one day in the calendar week during which the holiday occurs

HEAVY AND HIGHWAY CLASSIFICATIONS

GROUP 1: Flagperson, gateperson

GROUP 2: General Laborers, Chuck Tenders, Handling and

Distributing of Drinking Water, Distributing all Tools and

Supplies of Laborers, AFL-CIO Trades Tenders, Nipper, Powder Carrier, Magazine Tender, Warehousemen, Concrete

Men, Vibrator Men, Mason Tender, Mortar Men, Spraying, Brushing and Covering of Concrete for Curing and

Preservative Purposes, Traffic Striper, Scaffold Builder, Concrete Curb and Sidewalk Form Setters, permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipelining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier core drill, rock splitter, Hilti gun, air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer

(including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and acoustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork, gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men, ground man on milling machine

GROUP 3: Ingersoll Rand heavy duty crawler master type HCMZ, any drill using 4"" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe, concrete, clearing, blacktop drill, paving and blaster etc., hydraulic drill or similar, forklift for masonry only, blaster and asphalt screedman

GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman

LABO0785-012 07/01/2018

BROOME; CHENANGO (Remainder of Counties):

Rates Fringes

LABORER

LABORER HEAVY AND HIGHWAY:

GROUP 1....................$ 29.30 19.91

GROUP 2....................$ 29.30 19.91

GROUP 3....................$ 29.50 19.91

GROUP 4....................$ 29.70 19.91

GROUP 5....................$ 31.30 19.91

LABORER CLASSFICATIONS

GROUP 1: Laborers, flaggers, outboard and hand boats

GROUP 2: Bull float, chain saw, concrete aggregate, bin concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage pipe, pipelayers, vibrator type rollers, tamper, drill doctor tail or screw operator on asphalt paver, water pump operator (1 1\2' and single diaphragm), nozzle (asphalt gunnite, seeding and sandblasting), laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil and air tool operators, wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), acetylene torch operators and asphalt paver, powderman

GROUP 4: Blasters, form setters, stone or granite curb setters

GROUP 5: Asbestos and hazardous waste removal

LABO0785-013 07/01/2018

BROOME (Remainder of County)

Rates Fringes

LABORER

LABORERS BUILDING:

GROUP 1....................$ 23.90 17.85

GROUP 2....................$ 25.40 17.85

GROUP 3....................$ 25.40 17.85

LABORERS CLASSIFICATION:

GROUP 1: Common laborers

GROUP 2: Masonry forklifts, bob cats, rock drilling equipment and blasters

GROUP 3: Asbestos and hazardous waste removal

PAIN0004-056 05/01/2019

Rates Fringes

Painters:

Bridges.....................$ 38.50 28.40

Epoxy-Brush & Roller........$ 26.50 19.98

Painters and Tapers.........$ 25.40 19.98

Spray Epoxy.................$ 26.90 19.98

Spray Work/Steeple Jack

(over 100 ft)...............$ 26.40 19.98

Structural Steel

(buildings) Spray Work......$ 26.00 19.98

Swing Scaffold, Boatswain

Chair, Spray, Sandblasting, Steam

Cleaning, Acid and High

Pressure Water, Paperhangers, Vinyl

Hangers, Power Grinders w/respirator................$ 26.00 19.98

PAIN0677-003 05/01/2019

Rates Fringes

GLAZIER..........................$ 25.50 23.25

PLUM0112-010 05/01/2018

BROOME COUNTY (Building, Heavy, and Highway) Townships of

Lisle, Triangle, Barker, Nanticoke, Newark Valley, Owego, Maine, Union, Vestal, Kirkwood, Conklin, Chenango, Fenton, Colesville, Windsor and Stanford

CHENANGO COUNTY (Heavy and Highway) Townships of Linklaen, Otselic, Smyrna, Sherburne, Columbus, Pitcher, Pharsalia, Plymouth, North Norwich, New Berlin, German, McDonough, Preston, Norwich, Smithville, Oxford, Guilford

Rates Fringes

PLUMBER/PIPEFITTER

Southern Zone...............$ 34.48 27.09

ROOF0203-004 06/01/2019

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

ROOFER...........................$ 26.30 16.16

SFNY0669-005 04/01/2019

BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and

Highway)

Rates Fringes

SPRINKLER FITTER.................$ 34.91 24.93

SHEE0058-002 05/01/2019

CHENANGO COUNTY (Heavy and Highway):

Rates Fringes

SHEET METAL WORKER, Includes

HVAC Duct Installation

Projects over $10 million...$ 30.00 21.34

SHEETMETAL WORKER (HVAC Duct

Installation Only)

Projects with sheetmetal work contracts totalling

$10 million or less.........$ 29.00 21.34

SHEE0112-003 01/01/2013

BROOME COUNTY

Rates Fringes

Sheet Metal Worker...............$ 27.60 15.26

TEAM0317-009 07/01/2018

Rates Fringes

Truck drivers:

HEAVY & HIGHWAY

GROUP 1....................$ 25.29 25.02+a

GROUP 2....................$ 25.29 25.02+a

GROUP 3....................$ 25.49 25.02+a

GROUP 4....................$ 25.49 25.02+a

GROUP 5....................$ 25.49 25.02+a

FOOTNOTES:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holidays.

TRUCK DRIVERS HEAVY & HIGHWAY CLASSIFICATIONS:

GROUP 1: Pickups; panel trucks; flatboy material trucks

(straight jobs); single-axle dump trucks; dumpsters;

receivers; greasers; truck tiremen

GROUP 2: Tandems; batch trucks mechanics

GROUP 3: Semi-trailers; low-boy trucks; asphalt distributors trucks; agitator; mixer trucks and dumpcrete type vehicles;

truck mechanic; fuel truck

GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self loaded;

straddle (ross) carrier; self contained concrete unit

GROUP 5: Off-highway tandem back-dump; twin engine equipment and double hitched equipment where not self loaded

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"