Wages.pdf
PDF 64 KB Posted
- Attached to
- Construction Services for Fire Alarm System Replacement and and Sprinkler System Expansion/Replacement in the Binghamton US Courthouse Federal contract opportunity
- Solicitation number
- EQ2PSEUS-20-0048
About this file
This document contains a general wage determination from the Department of Labor for construction work in Broome and Chenango Counties in New York.
The wage determination outlines prevailing wage rates for various construction crafts such as asbestos workers, boilermakers, bricklayers, carpenters, electricians, elevator constructors, ironworkers, laborers, operating engineers, painters, plumbers and pipefitters, roofers, sheet metal workers, sprinkler fitters, and truck drivers. For each craft, the wage determination provides the classification, applicable rates and fringe benefits for both building and heavy/highway construction projects. Key details include prevailing hourly wages ranging from $23.90 to $48.12, as well as fringe benefit amounts for health and welfare, pension, and vacation funds. The wage determination is effective until superseded.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"General Decision Number: NY20200004 02/07/2020
Superseded General Decision Number: NY20190004
State: New York
Construction Types: Building, Heavy and Highway
Counties: Broome and Chenango Counties in New York.
BUILDING CONSTRUCTION PROJECTS FOR BROOME COUNTY ONLY (does not include single family homes and apartments up to and including
4 stories, HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2020
1 02/07/2020
ASBE0030-004 05/01/2019
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
Asbestos/Insulator Worker includes application of all materials, protective coverings, coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement......$ 32.40 23.24
HAZARDOUS MATERIAL HANDLER
SCOPE OF WORK: DUTIES
LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system...........$ 32.40 23.24
BOIL0197-004 01/01/2017
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
BOILERMAKER......................$ 34.54 24.78
BRNY0003-002 07/01/2019
BINGHAMTON CHAPTER
Rates Fringes
BRICKLAYER
BUILDING CONSTRUCTION,
BROOME COUNTY
Bricklayers, Cement
Masons, Stone Masons, Pointers, Caulkers and
Cleaners...................$ 30.68 21.32
Marble Masons, Tile
Layers, and Terrazzo
Workers....................$ 29.67 19.98
Marble, Tile and Terrazzo
Finishers..................$ 27.00 17.11
HEAVY AND HIGHWAY
CONSTRUCTION, BROOME &
CHENANGO COUNTIES
Cement Masons..............$ 30.91 20.62
CARP0277-010 07/01/2019
Rates Fringes
CARPENTER (BUILDING
CONSTRUCTION)
BROOME COUNTY
Carpenters, Carpet Layer, Drywall Applicator, Floor
Coverer, Lather............$ 27.10 18.96
Millwrights................$ 27.10 18.96
CARPENTER (HEAVY & HIGHWAY
CONSTRUCTION)
BROOME COUNTY
Carpenter..................$ 31.23 22.75
CHENANGO COUNTY
Carpenter..................$ 31.23 22.75
FOOTNOTES:
a. Paid Holidays: Independence Day and Labor Day, provided the employee works his scheduled day before and his scheduled day after the holiday and is on the payroll in the payroll week in which the holiday falls.
ELEC0043-003 06/01/2019
CHENANGO (Twps of Columbus, New Berlin & Sherburne): Heavy and
Highway
Rates Fringes
ELECTRICIAN......................$ 38.75 26.08
ELEC0325-002 06/01/2019
BROOME (Building, Heavy, and Highway) and CHENANGO (Entire
County, except Columbus, New Berlin and Sherburne Townships)
Heavy and Highway
Rates Fringes
CABLE SPLICER....................$ 40.35 28.16
ELECTRICIAN......................$ 34.10 27.97
ELEC1249-010 05/06/2019
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
ELECTRICIAN (LINE
CONSTRUCTION: LIGHTING AND
TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal
Systems, Traffic Monitoring systems and Road Weather information systems)
Flagman.....................$ 27.00 6.75%+24.15
Groundman (Truck Driver)....$ 36.00 6.75%+24.15
Groundman Truck Driver
(tractor trailer unit)......$ 36.00 6.75%+24.15
Lineman & Technician........$ 45.00 6.75%+24.15
Mechanic....................$ 36.00 6.75%+24.15
FOOTNOTE:
a. New Year's Day, Memorial Day, Independence Day, Labor
Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.
ELEC1249-011 05/06/2019
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
ELECTRICIAN (Line
Construction)
Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :
Flagman....................$ 31.23 6.75%+24.15+a
Groundman digging machine operator...................$ 46.85 6.75%+24.15+a
Groundman truck driver
(tractor trailer unit).....$ 41.64 6.75%+24.15+a
Groundman Truck driver.....$ 41.64 6.75%+24.15+a
Lineman and Technician.....$ 52.05 6.75%+24.15+a
Mechanic...................$ 41.64 6.75%+24.15+a
Substation:
Cable Splicer..............$ 57.26 6.75%+24.15+a
Flagman....................$ 31.23 6.75%+24.15+a
Ground man truck driver....$ 41.64 6.75%+24.15+a
Groundman digging machine operator...................$ 46.85 6.75%+24.15+a
Groundman truck driver
(tractor trailer unit).....$ 41.64 6.75%+24.15+a
Lineman & Technician.......$ 52.05 6.75%+24.15+a
Mechanic...................$ 41.64 6.75%+24.15+a
Switching structures;
railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation
Cable Splicer..............$ 58.71 6.75%+24.15+a
Flagman....................$ 32.02 6.75%+24.15+a
Groundman Digging Machine
Operator...................$ 48.03 6.75%+24.15+a
Groundman Truck Driver
(tractor-trailer unit).....$ 42.70 6.75%+24.15+a
Groundman Truck Driver.....$ 42.70 6.75%+24.15+a
Lineman & Technician.......$ 53.37 6.75%+24.15+a
Mechanic...................$ 42.70 6.75%+24.15+a
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial
Day, Good Friday, Independence Day, Labor Day, Thanksgiving
Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New
York State, provided the employee works two days before or two days after the holiday.
ELEC1249-012 01/01/2019
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
ELECTRICIAN (Line
Construction)
TELEPHONE, CATV
FIBEROPTICS CABLE AND
EQUIPMENT
Cable splicer..............$ 32.78 3%+4.93
Groundman..................$ 16.49 3%+4.93
Installer Repairman-
Teledata
Lineman/Technician-
Equipment Operator.........$ 31.12 3%+4.93
Tree Trimmer................$ 25.79 3%+9.98+a
a. New Year's Day, President's Day, Good Friday, Decoration
Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.
* ELEV0062-003 01/01/2020
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
ELEVATOR MECHANIC................$ 48.12 34.765+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0106-006 07/01/2018
BROOME COUNTY
Rates Fringes
Power equipment operators:
(BUILDING:)
GROUP A(1)..................$ 43.79 25.70+a
GROUP A.....................$ 43.30 25.70+a
GROUP B.....................$ 42.28 25.70+a
GROUP C.....................$ 39.38 25.70+a
Hazardous work- Anytime Operating Engineers are involved with
Level C or above, $3.00 per hour over regular rate.
FOOTNOTE:
a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas
Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (Building)
GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom trucks over 5 tons
GROUP A: Shovel, all excavators (including rubber tire, full swing), gradalls, power road grader all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, belcrete system, automated asphalt concrete plant, tractor road paver, boom trucks 5 tons and under, Maintenance Engineer, self contained crawler drill-hydraulic rock drill.
GROUP B: Backhoes (rubber tired backhoe/loader combination), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydro hammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, core and well drillers (one drum), post hole digger, model CHB VibroTamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd.
or smaller.
GROUP C: Fork lift, high lift, lull, oiler, fireman and heavy-duty greaser, boilers and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, selding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type disel generator, conveyor, elevators, concrete mixer and beltcrete power pack (belcrete system seeding and mulching machines pumps.
ENGI0106-011 07/01/2018
HEAVY & HIGHWAY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 43.47 26.05+a
GROUP 2.....................$ 42.56 26.05+a
GROUP 3.....................$ 39.99 26.05+a
GROUP 4.....................$ 47.47 26.05+a
GROUP 5.....................$ 46.47 26.05+a
GROUP 6.....................$ 45.47 26.05+a
GROUP 7.....................$ 45.08 26.05+a
POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY):
GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine
Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop
Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb
Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual
Drum Paver, Excavator (All Purpose Hydraulically Operated)
(Gradall or Similar), Front End Loader ( 4 cu. yd. and
Over), Head Tower (Sauerman or Equal), Hoist (Two or Three
Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)
Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump
(jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or
Trailer Mounted Log , Chipper (Self Feeder), Tug Operator
(Manned Rented Equipment Excluded), Tunnel Shovel
GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber
Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary
Drill (Truck or Tractor Mounted), Boring Machine, Cage
Hoist, Central Mix Plant (NonAutomated) and All Concrete
Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication
Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One
Drum), Hydro-Axe, Kolman Plant Loader and Similar Type
Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant
Engineer, Profiler (105 H.P. and under), Grinder, Post Hole
Digger and Post Driver, Power Broom (towed), Power
Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam
Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant
Refrigeration Equipment (for soil stabilization)Road
Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type
Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.
Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat
GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy
Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw
(self-propelled), Conveyor, Deck Hand, Directional Drill
Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie
Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point
GROUP 4: Tower Cranes
GROUP 5: Cranes 50 tons and over
GROUP 6: Cranes 49 tons and below
GROUP 7: Master Mechanic
FOOTNOTE:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, and Christmas Day
IRON0060-001 07/01/2019
BROOME; CHENANGO (Twps. of Afton, Bainbridge, Coventry, German, Greene, Gilford, McDonough, Norwich, Oxford, Preston, and
Smithville):
Rates Fringes
IRONWORKER
Structural, Ornamental, Reinforcing, Pre-cast
Concrete Erector, Machinery Mover & Rigger, Fence Erector, Stone
Derrickman, Welder, Sheeter, Sheeter Bucker-up..$ 30.00 27.30
IRON0440-003 01/01/2019
CHENANGO (Twps. of Columbus, New Berlin, North Norwich, Plymouth, Sherburne and Smyrna):
Rates Fringes
IRONWORKER
Structural, Ornamental, Rodmen, Reinforcement, Rigger, Machinery Mover, Fence Erector, Stone
Derrickman..................$ 28.25 25.94
LABO0017-003 07/01/2019
TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY
Rates Fringes
LABORER
HEAVY and HIGHWAY
GROUP 1....................$ 32.40 25.95+a
GROUP 2....................$ 32.50 25.95+a
GROUP 3....................$ 35.65 25.95+a
GROUP 4....................$ 40.00 25.95+a
FOOTNOTES:
a. Paid Holidays: New Years Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, Washington's Birthday, Election Day, Veterans Day provided the employee works one day in the calendar week during which the holiday occurs
HEAVY AND HIGHWAY CLASSIFICATIONS
GROUP 1: Flagperson, gateperson
GROUP 2: General Laborers, Chuck Tenders, Handling and
Distributing of Drinking Water, Distributing all Tools and
Supplies of Laborers, AFL-CIO Trades Tenders, Nipper, Powder Carrier, Magazine Tender, Warehousemen, Concrete
Men, Vibrator Men, Mason Tender, Mortar Men, Spraying, Brushing and Covering of Concrete for Curing and
Preservative Purposes, Traffic Striper, Scaffold Builder, Concrete Curb and Sidewalk Form Setters, permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipelining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier core drill, rock splitter, Hilti gun, air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer
(including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and acoustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork, gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men, ground man on milling machine
GROUP 3: Ingersoll Rand heavy duty crawler master type HCMZ, any drill using 4"" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe, concrete, clearing, blacktop drill, paving and blaster etc., hydraulic drill or similar, forklift for masonry only, blaster and asphalt screedman
GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman
LABO0785-012 07/01/2018
BROOME; CHENANGO (Remainder of Counties):
Rates Fringes
LABORER
LABORER HEAVY AND HIGHWAY:
GROUP 1....................$ 29.30 19.91
GROUP 2....................$ 29.30 19.91
GROUP 3....................$ 29.50 19.91
GROUP 4....................$ 29.70 19.91
GROUP 5....................$ 31.30 19.91
LABORER CLASSFICATIONS
GROUP 1: Laborers, flaggers, outboard and hand boats
GROUP 2: Bull float, chain saw, concrete aggregate, bin concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage pipe, pipelayers, vibrator type rollers, tamper, drill doctor tail or screw operator on asphalt paver, water pump operator (1 1\2' and single diaphragm), nozzle (asphalt gunnite, seeding and sandblasting), laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil and air tool operators, wrecking laborers
GROUP 3: All rock or drilling machine operators (except quarry master and similar type), acetylene torch operators and asphalt paver, powderman
GROUP 4: Blasters, form setters, stone or granite curb setters
GROUP 5: Asbestos and hazardous waste removal
LABO0785-013 07/01/2018
BROOME (Remainder of County)
Rates Fringes
LABORER
LABORERS BUILDING:
GROUP 1....................$ 23.90 17.85
GROUP 2....................$ 25.40 17.85
GROUP 3....................$ 25.40 17.85
LABORERS CLASSIFICATION:
GROUP 1: Common laborers
GROUP 2: Masonry forklifts, bob cats, rock drilling equipment and blasters
GROUP 3: Asbestos and hazardous waste removal
PAIN0004-056 05/01/2019
Rates Fringes
Painters:
Bridges.....................$ 38.50 28.40
Epoxy-Brush & Roller........$ 26.50 19.98
Painters and Tapers.........$ 25.40 19.98
Spray Epoxy.................$ 26.90 19.98
Spray Work/Steeple Jack
(over 100 ft)...............$ 26.40 19.98
Structural Steel
(buildings) Spray Work......$ 26.00 19.98
Swing Scaffold, Boatswain
Chair, Spray, Sandblasting, Steam
Cleaning, Acid and High
Pressure Water, Paperhangers, Vinyl
Hangers, Power Grinders w/respirator................$ 26.00 19.98
PAIN0677-003 05/01/2019
Rates Fringes
GLAZIER..........................$ 25.50 23.25
PLUM0112-010 05/01/2018
BROOME COUNTY (Building, Heavy, and Highway) Townships of
Lisle, Triangle, Barker, Nanticoke, Newark Valley, Owego, Maine, Union, Vestal, Kirkwood, Conklin, Chenango, Fenton, Colesville, Windsor and Stanford
CHENANGO COUNTY (Heavy and Highway) Townships of Linklaen, Otselic, Smyrna, Sherburne, Columbus, Pitcher, Pharsalia, Plymouth, North Norwich, New Berlin, German, McDonough, Preston, Norwich, Smithville, Oxford, Guilford
Rates Fringes
PLUMBER/PIPEFITTER
Southern Zone...............$ 34.48 27.09
ROOF0203-004 06/01/2019
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
ROOFER...........................$ 26.30 16.16
SFNY0669-005 04/01/2019
BROOME (Building, Heavy, and Highway) and CHENANGO (Heavy and
Highway)
Rates Fringes
SPRINKLER FITTER.................$ 34.91 24.93
SHEE0058-002 05/01/2019
CHENANGO COUNTY (Heavy and Highway):
Rates Fringes
SHEET METAL WORKER, Includes
HVAC Duct Installation
Projects over $10 million...$ 30.00 21.34
SHEETMETAL WORKER (HVAC Duct
Installation Only)
Projects with sheetmetal work contracts totalling
$10 million or less.........$ 29.00 21.34
SHEE0112-003 01/01/2013
BROOME COUNTY
Rates Fringes
Sheet Metal Worker...............$ 27.60 15.26
TEAM0317-009 07/01/2018
Rates Fringes
Truck drivers:
HEAVY & HIGHWAY
GROUP 1....................$ 25.29 25.02+a
GROUP 2....................$ 25.29 25.02+a
GROUP 3....................$ 25.49 25.02+a
GROUP 4....................$ 25.49 25.02+a
GROUP 5....................$ 25.49 25.02+a
FOOTNOTES:
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holidays.
TRUCK DRIVERS HEAVY & HIGHWAY CLASSIFICATIONS:
GROUP 1: Pickups; panel trucks; flatboy material trucks
(straight jobs); single-axle dump trucks; dumpsters;
receivers; greasers; truck tiremen
GROUP 2: Tandems; batch trucks mechanics
GROUP 3: Semi-trailers; low-boy trucks; asphalt distributors trucks; agitator; mixer trucks and dumpcrete type vehicles;
truck mechanic; fuel truck
GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self loaded;
straddle (ross) carrier; self contained concrete unit
GROUP 5: Off-highway tandem back-dump; twin engine equipment and double hitched equipment where not self loaded
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
File details come from the government source that posted it. Updated .