Wage Determination - Dutchess County.pdf
PDF 88 KB Posted
- Solicitation number
- 36C24227B0002
About this file
This is a Davis-Bacon prevailing wage determination for federal construction contracts in New York counties (Dutchess, Orange, Sullivan, and Ulster), effective through May 18, 2026, with building construction excluded in Sullivan County.
The document establishes mandatory hourly wage rates and fringe benefits for numerous construction trades and classifications performing work on federally-funded projects in the designated geographic area. Wage rates vary significantly by trade, county, and sometimes by specific tasks or equipment operation. Representative rates include: Ironworkers at $42.63/hour plus $53.70 fringe; Electricians (standard) at $51.50/hour plus $42.22 fringe; Carpenters at $44.72/hour plus $31.23 fringe; Power Equipment Operators ranging from $36.45 to $77.82/hour depending on equipment type and location within the region; Plumbers/Pipefitters at $53.20-$60.66/hour plus $45.35-$46.57 fringe; and various laborer classifications at $36.45-$46.20/hour plus $27.80-$32.90 fringe. The determination includes specialized classifications for hazardous material handlers, asbestos workers, line construction electricians, and equipment-specific operators. Contractors must comply with paid sick leave requirements under Executive Order 13706 (1 hour per 30 hours worked, up to 56 hours annually) and minimum wage requirements under Executive Order 13658 ($13.65/hour or applicable rate, whichever is higher, through December 31, 2026). The wage determination provides appeal procedures through the Department of Labor's Wage and Hour Division and Administrative Review Board for parties disputing classification rates or applicability.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"General Decision Number: NY20260007 05/18/2026
State: New York
Construction Types: Building, Heavy and Highway
Counties: New York Counties of Dutchess, Orange, Sullivan and Ulster
Excludes building construction in Sullivan County
Modification Number Publication Date 1 01/30/2026 2 05/18/2026
ASBE0040-003 05/01/2025
Rates Fringes
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS) (SULLIVAN AND ULSTER COUNTIES).............$ 41.74 27.58
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING;
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION
MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM
MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES)...$ 41.74 27.58
ASBE0091-002 06/02/2025
Rates Fringes
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS) (DUTCHESS AND ORANGE COUNTIES).............$ 46.62 49.30
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO
PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING,
VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION
MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT
FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE
COUNTIES)...........................................$ 46.62 49.30
BOIL0005-001 01/01/2025
Rates Fringes
BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY
AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW
YEAR'S EVE..........................................$ 68.88 49.83
BRNY0005-001 06/01/2024
Rates Fringes
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE
MASONS, HIGHWAY CONSTRUCTION (DUTCHESS, ORANGE
(EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER
COUNTIES)...........................................$ 46.45 37.50
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE
MASONS, HEAVY CONSTRUCTION (ORANGE COUNTY (TOWN OF
TUXEDO))............................................$ 47.44 38.00
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE
MASONS, HEAVY CONSTRUCTION (DUTCHESS, ORANGE
(EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES).$ 46.45 37.50
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE
MASONS, BUILDING CONSTRUCTION (ORANGE COUNTY (TOWN
OF TUXEDO)).........................................$ 47.44 38.00
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE
MASONS, BUILDING CONSTRUCTION (DUTCHESS, ORANGE
(EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES).$ 46.45 37.50
CARP0279-005 07/01/2025
Rates Fringes
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS
(HEAVY & HIGHWAY CONSTRUCTION)......................$ 44.72 31.23
CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS
(BUILDING CONSTRUCTION).............................$ 44.72 31.23
CARP0740-002 07/01/2025
Rates Fringes
MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES)...........$ 47.83 43.03
CARP1556-005 07/01/2024
Rates Fringes
DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE
COUNTIES)...........................................$ 60.59 55.84
DIVER TENDER (DUTCHESS AND ORANGE COUNTIES).........$ 55.00 55.84
DIVER (DUTCHESS AND ORANGE COUNTIES)................$ 75.46 55.84
ELEC0363-001 04/01/2025
Rates Fringes
ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF
FISHKILL, EAST FISHKILL AND BEACON) COUNTIES).
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING,
CHRISTMAS DAY.......................................$ 51.50 42.22
ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER
AND SULLIVAN COUNTIES). FOOTNOTE: A. PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, FOURTH OF JULY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS
DAY.................................................$ 51.50 42.22
ELEC1249-002 05/05/2025
Rates Fringes
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS: MECHANIC. PAID HOLIDAYS: A.
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 43.35 30.73
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN. PAID
HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY,
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 54.19 35.69
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER
(TRACTOR TRAILER UNIT). PAID HOLIDAYS: A.
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 43.35 30.73
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER). PAID
HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY,
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 43.35 30.73
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE
OPERATOR). PAID HOLIDAYS: A. MEMORIAL DAY, NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY...................................$ 48.77 31.31
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS: FLAGMAN. PAID HOLIDAYS: A.
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 32.51 29.93
ELEC1249-004 05/05/2025
Rates Fringes ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC
(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &
TECHNICIAN (Substation:)............................$ 61.56 36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable installat............................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK
DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cab........................................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Substation:)......................$ 55.40 31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING
MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN
(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;
Pipetype cable installation)........................$ 64.59 42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER
(Substation:).......................................$ 63.14 33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;
RAILROAD CATENARY INSTALLATION AND MAINTENANCE,
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.............................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND
MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21
ELEC1249-005 05/05/2025
Rates Fringes
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:
MECHANIC (SULLIVAN COUNTY). FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 49.25 31.15
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:
LINEMAN & TECHNICIAN (SULLIVAN COUNTY). FOOTNOTE:
A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,
PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 61.56 36.21
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:
GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
(SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 49.25 31.15
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:
GROUNDMAN (TRUCK DRIVER) (SULLIVAN COUNTY).
FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 49.25 31.15
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:
GROUNDMAN (DIGGING MACHINE OPERATOR) (SULLIVAN
COUNTY). FOOTNOTE: A. NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY.........................................$ 55.40 31.78
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:
FLAGMAN (SULLIVAN COUNTY). FOOTNOTE: A. NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 35.34 30.12
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99
ELEV0138-001 01/01/2026
Rates Fringes
ELEVATOR MECHANIC FOOTNOTE: A.VACATION:
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR
ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR
HOURLY RATE FOR ALL HOURS WORKED. B. PAID
HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING
DAY; AND CHRISTMAS DAY..............................$ 76.12 38.98
ENGI0137-001 03/04/2024
Rates Fringes
POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 49.26 31.32
POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 47.00 31.32
POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 61.95 31.32
POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 49.53 31.32
POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 45.94 31.32
POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 54.33 31.32
POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 52.25 31.32
POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 54.88 31.32
POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 56.97 31.32
POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 54.41 31.32
POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY
(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING
CONSTRUCTION).......................................$ 59.04 31.32
ENGI0137-007 03/04/2024
Rates Fringes
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES:
LOADER OPERATOR (OVER 5 CU YDS) .50
SHOVAL OPERATORS (OVER 4 CU YD)
1.00 HAZMAT PREMIUM OVER REGULAR RATE 20%
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN
GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE
THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 64.02 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM);
POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH
THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU
YDS) .50 SHOVAL OPERATORS (OVER 4
CU YD) 1.00 HAZMAT PREMIUM OVER
REGULAR RATE 20% CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY.......................................$ 59.19 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE
(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:
LOADER OPERATOR (OVER 5 CU YDS) .50
SHOVAL OPERATORS (OVER 4 CU YD) 1.00
HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1
RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN
GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 70.41 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND
SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5
CU YDS) .50 SHOVAL OPERATORS (OVER
4 CU YD) 1.00 HAZMAT PREMIUM OVER
REGULAR RATE 20% CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY.......................................$ 75.13 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING
CRANES AND ALL CRANES OF 100 TON CAPACITY OR
GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF
MANUFACTURER AND REGARDLESS OF HOW THE SAME IS
RIGGED (EXCEPT FOR PILE RIGS). (POUGHKEEPSIE AND
SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER
5 CU YDS) .50 SHOVAL OPERATORS
(OVER 4 CU YD) 1.00 HAZMAT PREMIUM
OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY.......................................$ 77.82 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH
THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU
YDS) .50 SHOVAL OPERATORS (OVER 4
CU YD) 1.00 HAZMAT PREMIUM OVER
REGULAR RATE 20% CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY.......................................$ 64.02 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT
COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE;
LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS
- PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.;
ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE
(STEEL ERECTION EXCAVATION); WELL POINT SYSTEM;
BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE
UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON
PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO
5); COMPRESSOR TRUCK MOUNTED (2-6) (POUGHKEEPSIE
AND SOUTH THEREOF) NOTES: LOADER OPERATOR
(OVER 5 CU YDS) .50 SHOVAL
OPERATORS (OVER 4 CU YD) 1.00 HAZMAT
PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT-
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY.......................................$ 44.19 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
4-A SERVICE MEN (FUEL OR GREASE TRUCK).
(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:
LOADER OPERATOR (OVER 5 CU YDS) .50
SHOVAL OPERATORS (OVER 4 CU YD) 1.00
HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1
RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN
GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 51.57 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3
A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT;
BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE
PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM
TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE);
FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT
(ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING
MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE
(ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING
SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE
- 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE
ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE
CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER
UNDER 4 TON; SPREADING AND FINE GRADING MACHINE;
STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER;
TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ;
WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR.
(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:
LOADER OPERATOR (OVER 5 CU YDS) .50
SHOVAL OPERATORS (OVER 4 CU YD) 1.00
HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1
RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN
GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 56.81 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE
AND SOUTH THEREOF) NOTES: LOADER OPERATOR
(OVER 5 CU YDS) .50 SHOVAL
OPERATORS (OVER 4 CU YD) 1.00 HAZMAT
PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT-
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY.......................................$ 59.67 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED;
COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES;
ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK;
SWITCH TAMPERS; VIBRATORY ROLLER, ETC.
(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:
LOADER OPERATOR (OVER 5 CU YDS) .50
SHOVAL OPERATORS (OVER 4 CU YD) 1.00
HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1
RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN
GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 57.84 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH
THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU
YDS) .50 SHOVAL OPERATORS (OVER 4
CU YD) 1.00 HAZMAT PREMIUM OVER
REGULAR RATE 20% CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE
FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY.......................................$ 63.70 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP
1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE
AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE
(ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX
PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT
T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE
HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING
MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER;
DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS
OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.;
HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE
MOBILE UNIT; HOIST ENGINEER-CONCRETE
(CRANE-DERRICK-MINE HOIST); HOIST
ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR
TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG
SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER &
TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD
CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON
(BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT
HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR
MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM
MACHINE; SPREADER (ASPHALT);
SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS;
TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW
TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION
EQUIPMENT, WHIRLY (POUGHKEEPSIE AND SOUTH THEREOF)
NOTES: LOADER OPERATOR (OVER 5 CU YDS)
.50 SHOVAL OPERATORS (OVER 4 CU YD)
1.00 HAZMAT PREMIUM OVER REGULAR RATE 20%
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN
GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE
THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS:
NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 60.42 35.25
POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1
BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE,
(CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE
(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:
LOADER OPERATOR (OVER 5 CU YDS) .50
SHOVAL OPERATORS (OVER 4 CU YD) 1.00
HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1
RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN
GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 68.63 35.25
ENGI0158-006 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS:: GROUP C FORK LIFT, HIGH
LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER,
BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR,
MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR,
WELDING MACHINE, WELL POINT, MECHANICAL HEATER,
GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS,
ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE
DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE
MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM),
SEEDING, AND MULCHING MACHINES, PUMPS. (NORTHERN
PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF
THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION)
HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE
INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER
REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY................$ 51.01 33.20
POWER EQUIPMENT OPERATORS:: GROUP B BACKHOE,
(TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN
DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR,
TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE
GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP
SPREADER, POWER BROOMS, SWEEPERS, TRENCHING
MACHINE, BARBER GREEN LOADER, SIDE BOOMS,
HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING
MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE
DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE,
POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND
SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD
HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS
(ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP
OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR,
DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK
EXCAVATOR 5/8 CU. YD. OR SMALLER. (NORTHERN PART
OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE
CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION)
HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE
INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER
REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY................$ 53.91 33.20
POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE,
HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE,
PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE,
BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE
PREMIUMS 1 OVER 150' :ADD $1.00 2 OVER
200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN
PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF
THE CITY OF POUGHKEEPSIE)...........................$ 55.42 33.20
POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL
EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN
DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER,
ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER,
TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING
MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP,
BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT
AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND
UNDER). (NORTHERN PART OF DUTCHESS (TO THE NORTHEN
BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING
CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING
ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50
PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID
HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY.......................................$ 54.93 33.20
ENGI0158-018 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY)
MASTER MECHANIC (NORTHERN PART OF DUTCHESS (TO THE
NORTHERN BOUNDARY LINE OF THE CITY OF
POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 58.91 33.55
POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY)
CRANES 49 TONS AND BELOW (NORTHERN PART OF
DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY
OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 60.30 33.55
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY)
CRANES 50 TONS AND OVER (NORTHERN PART OF DUTCHESS
(TO THE NORTHERN BOUNDARY LINE OF THE CITY OF
POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 61.80 33.55
POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY)
TOWER CRANES (NORTHERN PART OF DUTCHESS (TO THE
NORTHERN BOUNDARY LINE OF THE CITY OF
POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 63.30 33.55
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY)
A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY
HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE
GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR,
RIDE-ON BOILER (USED IN CONJUNCTION WITH
PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED,
BOAT (POWERED), CEMENT AND BIN OPERATOR,
COMPRESSORS, DUST COLLECTORS, FORK LIFT,
GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS,
HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT
SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S
AND UNDER), CONCRETE SAW (SELF-PROPELLED),
CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE
LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR
WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER,
RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER,
RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER,
RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON,
TRACTOR, TRACTOR (WITH TOWED ACCESSORIES),
VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT
(NORTHERN PART OF DUTCHESS (TO THE NORTHERN
BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE))
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 53.82 33.55
POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY)
ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER
TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS
SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED),
BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED),
BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT
(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS,
CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE
PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED,
CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR
MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.),
GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER
(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE,
KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS,
L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR
STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE,
PLANT ENGINEER, PROFILER (105 H.P. AND UNDER),
GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER
BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER,
REVINIUS WIDENER, ROLLER (GRADE AND FILL),
SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER
(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM
CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE
PLANT REFRIGERATION EQUIPMENT (FOR SOIL
STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE
SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK
DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,
TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER
HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),
WINCH, WINCH CAT (NORTHERN PART OF DUTCHESS (TO
THE NORTHERN BOUNDARY LINE OF THE CITY OF
POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:
NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 56.39 33.55
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY &
HIGHWAY)............................................$ 57.30 33.55
ENGI0825-007 07/01/2025
Rates Fringes POWER EQUIPMENT OPERATOR BUILDING, HEAVY &
HIGHWAY GROUP 1.....................................$ 61.72 37.50
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY
GROUP 6 HELICOPTER PILOT (ORANGE, ULSTER AND
SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM
20% HYDROGRAPHIC PREMIUM .50 A.
PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY
MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,
ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 63.54 37.50
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY
GROUP 5 OILER (ORANGE, ULSTER AND SULLIVAN
COUNTIES) NOTES: HAZMAT PREMIUM 20%
HYDROGRAPHIC PREMIUM .50 A. PAID
HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY
MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,
ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 61.72 37.50
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY
GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS
(SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR
LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES,
LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM
TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND
MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE);
FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER
(UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL
AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER
TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE
UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS;
MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT
(OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS
THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND
OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL
ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD
FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE,
FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION
AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS
(USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE);
STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE;
STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE
ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE,
INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS);
WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN
CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN
100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY
TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING
SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL
POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG
AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (ORANGE,
ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT
PREMIUM 20% HYDROGRAPHIC PREMIUM
.50 A. PAID HOLIDAYS: NEW YEARS DAY,
WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR
DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY,
AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE
DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY
OCCURS..............................................$ 56.59 37.50
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY
GROUP 3 ASPHALT CURBING MACHINE, ASPHALT PLANT
ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER
& TEXTURING MACHINE (CMI AND SIMILAR TYPES)
AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR
TYPES); BAR BENDING MACHINES (POWER), BATCHERS,
BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR
SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK
FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD);
CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS
(USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE
TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE,
IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY
ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS);
COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING
MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE);
CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR
TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125
FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL
(DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS
(MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS;
ELEVATOR; FIREMAN; FORKLIFTS (ECONOMOBILE, LULL,
AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS
(1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS
(2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE
GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP;
GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER
VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS
(ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS),
HOPPERS, HOPPERS DOORS (POWER OPERATED);
HYDRO-BLASTER (WHERE REQUIRED); LADDERS
(MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE;
MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS
(EXCEPTING PAVING MIXERS); MOTOR PATROLS AND
GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED
RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR
HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED;
PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER
PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST
POUNDER AND AUGER); ROD BENDING MACHINES (POWER);
ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN
PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER
MACHINES (BOOM TYPE); STEEL CUTTING MACHINE,
SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS;
TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION
WITH UNLOADING); WELDER AND REPAIR MACHINES.
CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR;
DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT
ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE
OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL
SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM
BLASTING MACHINE OPERATOR (ORANGE, ULSTER AND
SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM
20% HYDROGRAPHIC PREMIUM .50 A.
PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY
MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,
ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 58.22 37.50
POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY
GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM
ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF
BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND
DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE
SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS,
CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE
AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER;
DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR,
MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS
THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING
MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL
TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL,
ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM,
CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND
OR ANY OTHER SIMILAR TYPE HOISTING MACHINES,
PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE).
LONG BOOM RATE TO BE APPLIED IF HOIST IS ""OUTSIDE
MATERIAL LOWER HOIST""; HYDRAULIC CRANES-10TONS AND
UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR
HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT
HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER;
PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER
PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND
CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS;
SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR
TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS
(HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES)
NOTES: HAZMAT PREMIUM 20%
HYDROGRAPHIC PREMIUM .50 A. PAID
HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY
MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,
ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,
PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE
CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 60.13 37.50
ENGI0825-008 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER,
GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE
REPAIR AND MAINTENANCE (ORANGE, ULSTER AND
SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC
PREMIUM .50 HAZMAT PREMIUM
20% TUNNEL PREMIUM
.75 FOOTNOTE: A. PAID HOLIDAYS: NEW
YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,
ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 53.34 37.50
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER
PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES)
NOTES: HYDROGRAPHIC PREMIUM .50
HAZMAT PREMIUM 20%
TUNNEL PREMIUM .75
FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,
WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY,
THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE
EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING
WHICH THE HOLIDAYS OCCURS...........................$ 64.28 37.50
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR
(SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT
PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND
OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION);
PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF
POWER); WELDING MACHINES, GAS OR ELECTRIC
CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE
WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION
AND MAINTENANCE); FRAM TRACTORS. (ORANGE, ULSTER
AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC
PREMIUM .50 HAZMAT PREMIUM
20% TUNNEL PREMIUM
.75 FOOTNOTE: A. PAID HOLIDAYS: NEW
YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,
ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY
PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR
WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 57.06 37.50
POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND
TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER;
BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3
IN BATTERY); CHIEF OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .