Wage Determination - Dutchess County.pdf

PDF 88 KB Posted

Attached to
Building 13 Stair and Roof Replacement at Castle Point VAMC
Solicitation number
36C24227B0002
Issued by

About this file

This is a Davis-Bacon prevailing wage determination for federal construction contracts in New York counties (Dutchess, Orange, Sullivan, and Ulster), effective through May 18, 2026, with building construction excluded in Sullivan County.

The document establishes mandatory hourly wage rates and fringe benefits for numerous construction trades and classifications performing work on federally-funded projects in the designated geographic area. Wage rates vary significantly by trade, county, and sometimes by specific tasks or equipment operation. Representative rates include: Ironworkers at $42.63/hour plus $53.70 fringe; Electricians (standard) at $51.50/hour plus $42.22 fringe; Carpenters at $44.72/hour plus $31.23 fringe; Power Equipment Operators ranging from $36.45 to $77.82/hour depending on equipment type and location within the region; Plumbers/Pipefitters at $53.20-$60.66/hour plus $45.35-$46.57 fringe; and various laborer classifications at $36.45-$46.20/hour plus $27.80-$32.90 fringe. The determination includes specialized classifications for hazardous material handlers, asbestos workers, line construction electricians, and equipment-specific operators. Contractors must comply with paid sick leave requirements under Executive Order 13706 (1 hour per 30 hours worked, up to 56 hours annually) and minimum wage requirements under Executive Order 13658 ($13.65/hour or applicable rate, whichever is higher, through December 31, 2026). The wage determination provides appeal procedures through the Department of Labor's Wage and Hour Division and Administrative Review Board for parties disputing classification rates or applicability.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: NY20260007 05/18/2026

State: New York

Construction Types: Building, Heavy and Highway

Counties: New York Counties of Dutchess, Orange, Sullivan and Ulster

Excludes building construction in Sullivan County

Modification Number Publication Date 1 01/30/2026 2 05/18/2026

ASBE0040-003 05/01/2025

Rates Fringes

INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF

ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,

COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL

SYSTEMS) (SULLIVAN AND ULSTER COUNTIES).............$ 41.74 27.58

HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO

PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING;

VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION

MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM

MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES)...$ 41.74 27.58

ASBE0091-002 06/02/2025

Rates Fringes

INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF

ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,

COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL

SYSTEMS) (DUTCHESS AND ORANGE COUNTIES).............$ 46.62 49.30

HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO

PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING,

VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION

MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT

FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE

COUNTIES)...........................................$ 46.62 49.30

BOIL0005-001 01/01/2025

Rates Fringes

BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY

AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW

YEAR'S EVE..........................................$ 68.88 49.83

BRNY0005-001 06/01/2024

Rates Fringes

BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE

MASONS, HIGHWAY CONSTRUCTION (DUTCHESS, ORANGE

(EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER

COUNTIES)...........................................$ 46.45 37.50

BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE

MASONS, HEAVY CONSTRUCTION (ORANGE COUNTY (TOWN OF

TUXEDO))............................................$ 47.44 38.00

BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE

MASONS, HEAVY CONSTRUCTION (DUTCHESS, ORANGE

(EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES).$ 46.45 37.50

BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE

MASONS, BUILDING CONSTRUCTION (ORANGE COUNTY (TOWN

OF TUXEDO)).........................................$ 47.44 38.00

BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE

MASONS, BUILDING CONSTRUCTION (DUTCHESS, ORANGE

(EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES).$ 46.45 37.50

CARP0279-005 07/01/2025

Rates Fringes

CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS

(HEAVY & HIGHWAY CONSTRUCTION)......................$ 44.72 31.23

CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS

(BUILDING CONSTRUCTION).............................$ 44.72 31.23

CARP0740-002 07/01/2025

Rates Fringes

MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES)...........$ 47.83 43.03

CARP1556-005 07/01/2024

Rates Fringes

DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE

COUNTIES)...........................................$ 60.59 55.84

DIVER TENDER (DUTCHESS AND ORANGE COUNTIES).........$ 55.00 55.84

DIVER (DUTCHESS AND ORANGE COUNTIES)................$ 75.46 55.84

ELEC0363-001 04/01/2025

Rates Fringes

ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF

FISHKILL, EAST FISHKILL AND BEACON) COUNTIES).

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY,

LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S

DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING,

CHRISTMAS DAY.......................................$ 51.50 42.22

ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER

AND SULLIVAN COUNTIES). FOOTNOTE: A. PAID

HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, FOURTH OF JULY, LABOR DAY,

PRESIDENTIAL ELECTION DAY, VETERAN'S DAY,

THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS

DAY.................................................$ 51.50 42.22

ELEC1249-002 05/05/2025

Rates Fringes

ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND

TRAFFIC MONITORING SYSTEMS, ROAD WEATHER

INFORMATION SYSTEMS: MECHANIC. PAID HOLIDAYS: A.

MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 43.35 30.73

ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND

TRAFFIC MONITORING SYSTEMS, ROAD WEATHER

INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN. PAID

HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY,

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT

OF THE UNITED STATES AND ELECTION DAY FOR THE

GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE

WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE

HOLIDAY.............................................$ 54.19 35.69

ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND

TRAFFIC MONITORING SYSTEMS, ROAD WEATHER

INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER

(TRACTOR TRAILER UNIT). PAID HOLIDAYS: A.

MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 43.35 30.73

ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND

TRAFFIC MONITORING SYSTEMS, ROAD WEATHER

INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER). PAID

HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY,

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT

OF THE UNITED STATES AND ELECTION DAY FOR THE

GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE

WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE

HOLIDAY.............................................$ 43.35 30.73

ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND

TRAFFIC MONITORING SYSTEMS, ROAD WEATHER

INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE

OPERATOR). PAID HOLIDAYS: A. MEMORIAL DAY, NEW

YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY

FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION

DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED

THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS

AFTER THE HOLIDAY...................................$ 48.77 31.31

ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND

TRAFFIC MONITORING SYSTEMS, ROAD WEATHER

INFORMATION SYSTEMS: FLAGMAN. PAID HOLIDAYS: A.

MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 32.51 29.93

ELEC1249-004 05/05/2025

Rates Fringes ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC

(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Substation:)............................$ 61.56 36.21

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installat............................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cab........................................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Substation:)......................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN

(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installation)........................$ 64.59 42.92

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Substation:).......................................$ 63.14 33.82

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;

RAILROAD CATENARY INSTALLATION AND MAINTENANCE,

THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED

TRANSMISSION CONDUIT AND CABLE INSTALLATIONS

(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES), PIPETYPE CABLE INSTALLATION AND

MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE

BONDING OF RAILS; PIPETYPE CABLE INSTALLATION

GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT

OF THE UNITED STATES AND ELECTION DAY FOR THE

GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE

WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE

HOLIDAY.............................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND

MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD

FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING

DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE

PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR

THE GOVERNOR OF NEW YORK STATE, PROVIDED THE

EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER

THE HOLIDAY.........................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND

UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND

ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK

INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,

FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,

MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21

ELEC1249-005 05/05/2025

Rates Fringes

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY

FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING

SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:

MECHANIC (SULLIVAN COUNTY). FOOTNOTE: A. NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 49.25 31.15

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY

FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING

SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:

LINEMAN & TECHNICIAN (SULLIVAN COUNTY). FOOTNOTE:

A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE

DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,

PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 61.56 36.21

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY

FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING

SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:

GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)

(SULLIVAN COUNTY). FOOTNOTE: A. NEW YEAR'S

DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 49.25 31.15

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY

FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING

SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:

GROUNDMAN (TRUCK DRIVER) (SULLIVAN COUNTY).

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF

THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR

OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE

WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 49.25 31.15

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY

FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING

SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:

GROUNDMAN (DIGGING MACHINE OPERATOR) (SULLIVAN

COUNTY). FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 55.40 31.78

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY

FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING

SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS.:

FLAGMAN (SULLIVAN COUNTY). FOOTNOTE: A. NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 35.34 30.12

ELEC1249-008 01/01/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT INSTALLER

REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT

OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW

YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.

NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99

ELEV0138-001 01/01/2026

Rates Fringes

ELEVATOR MECHANIC FOOTNOTE: A.VACATION:

6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR

ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR

HOURLY RATE FOR ALL HOURS WORKED. B. PAID

HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;

THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING

DAY; AND CHRISTMAS DAY..............................$ 76.12 38.98

ENGI0137-001 03/04/2024

Rates Fringes

POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 49.26 31.32

POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 47.00 31.32

POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 61.95 31.32

POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 49.53 31.32

POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 45.94 31.32

POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 54.33 31.32

POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 52.25 31.32

POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 54.88 31.32

POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 56.97 31.32

POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 54.41 31.32

POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY

(POUGHKEEPSIE AND SOUTH THEREOF) BUILDING

CONSTRUCTION).......................................$ 59.04 31.32

ENGI0137-007 03/04/2024

Rates Fringes

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

5OILER (POUGHKEEPSIE AND SOUTH THEREOF) NOTES:

LOADER OPERATOR (OVER 5 CU YDS) .50

SHOVAL OPERATORS (OVER 4 CU YD)

1.00 HAZMAT PREMIUM OVER REGULAR RATE 20%

CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN

GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE

THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS

DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;

THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 64.02 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM);

POST HOLE DIGGER (POUGHKEEPSIE AND SOUTH

THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU

YDS) .50 SHOVAL OPERATORS (OVER 4

CU YD) 1.00 HAZMAT PREMIUM OVER

REGULAR RATE 20% CRANES: 100 FT- 149 FT:

RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND

OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS

DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND

CHRISTMAS DAY.......................................$ 59.19 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE

(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:

LOADER OPERATOR (OVER 5 CU YDS) .50

SHOVAL OPERATORS (OVER 4 CU YD) 1.00

HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:

100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1

RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN

GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS

DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;

THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 70.41 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

5-A-3 ENGINEER-- PILE DRIVER (POUGHKEEPSIE AND

SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER 5

CU YDS) .50 SHOVAL OPERATORS (OVER

4 CU YD) 1.00 HAZMAT PREMIUM OVER

REGULAR RATE 20% CRANES: 100 FT- 149 FT:

RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND

OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS

DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND

CHRISTMAS DAY.......................................$ 75.13 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING

CRANES AND ALL CRANES OF 100 TON CAPACITY OR

GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF

MANUFACTURER AND REGARDLESS OF HOW THE SAME IS

RIGGED (EXCEPT FOR PILE RIGS). (POUGHKEEPSIE AND

SOUTH THEREOF) NOTES: LOADER OPERATOR (OVER

5 CU YDS) .50 SHOVAL OPERATORS

(OVER 4 CU YD) 1.00 HAZMAT PREMIUM

OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT:

RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND

OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS

DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND

CHRISTMAS DAY.......................................$ 77.82 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

5-A-1 MASTER MECHANIC (POUGHKEEPSIE AND SOUTH

THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU

YDS) .50 SHOVAL OPERATORS (OVER 4

CU YD) 1.00 HAZMAT PREMIUM OVER

REGULAR RATE 20% CRANES: 100 FT- 149 FT:

RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND

OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS

DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND

CHRISTMAS DAY.......................................$ 64.02 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT

COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE;

LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS

- PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.;

ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE

(STEEL ERECTION EXCAVATION); WELL POINT SYSTEM;

BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE

UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON

PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO

5); COMPRESSOR TRUCK MOUNTED (2-6) (POUGHKEEPSIE

AND SOUTH THEREOF) NOTES: LOADER OPERATOR

(OVER 5 CU YDS) .50 SHOVAL

OPERATORS (OVER 4 CU YD) 1.00 HAZMAT

PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT-

149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149

FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS

DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND

CHRISTMAS DAY.......................................$ 44.19 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

4-A SERVICE MEN (FUEL OR GREASE TRUCK).

(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:

LOADER OPERATOR (OVER 5 CU YDS) .50

SHOVAL OPERATORS (OVER 4 CU YD) 1.00

HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:

100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1

RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN

GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS

DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;

THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 51.57 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3

A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT;

BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE

PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM

TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE);

FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT

(ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING

MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE

(ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING

SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE

- 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE

ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE

CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER

UNDER 4 TON; SPREADING AND FINE GRADING MACHINE;

STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER;

TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ;

WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR.

(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:

LOADER OPERATOR (OVER 5 CU YDS) .50

SHOVAL OPERATORS (OVER 4 CU YD) 1.00

HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:

100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1

RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN

GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS

DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;

THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 56.81 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

2-B MECHANIC (OUTSIDE) ALL TYPES (POUGHKEEPSIE

AND SOUTH THEREOF) NOTES: LOADER OPERATOR

(OVER 5 CU YDS) .50 SHOVAL

OPERATORS (OVER 4 CU YD) 1.00 HAZMAT

PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT-

149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149

FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS

DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND

CHRISTMAS DAY.......................................$ 59.67 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED;

COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES;

ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK;

SWITCH TAMPERS; VIBRATORY ROLLER, ETC.

(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:

LOADER OPERATOR (OVER 5 CU YDS) .50

SHOVAL OPERATORS (OVER 4 CU YD) 1.00

HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:

100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1

RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN

GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS

DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;

THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 57.84 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

1-B ROAD PAVER, ASPHALT (POUGHKEEPSIE AND SOUTH

THEREOF) NOTES: LOADER OPERATOR (OVER 5 CU

YDS) .50 SHOVAL OPERATORS (OVER 4

CU YD) 1.00 HAZMAT PREMIUM OVER

REGULAR RATE 20% CRANES: 100 FT- 149 FT:

RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND

OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY;

LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS

DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND

CHRISTMAS DAY.......................................$ 63.70 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP

1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE

AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE

(ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX

PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT

T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE

HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING

MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER;

DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS

OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.;

HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE

MOBILE UNIT; HOIST ENGINEER-CONCRETE

(CRANE-DERRICK-MINE HOIST); HOIST

ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR

TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG

SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER &

TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD

CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON

(BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT

HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR

MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM

MACHINE; SPREADER (ASPHALT);

SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS;

TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW

TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION

EQUIPMENT, WHIRLY (POUGHKEEPSIE AND SOUTH THEREOF)

NOTES: LOADER OPERATOR (OVER 5 CU YDS)

.50 SHOVAL OPERATORS (OVER 4 CU YD)

1.00 HAZMAT PREMIUM OVER REGULAR RATE 20%

CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN

GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE

THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS

DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;

THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 60.42 35.25

POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1

BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE,

(CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE

(POUGHKEEPSIE AND SOUTH THEREOF) NOTES:

LOADER OPERATOR (OVER 5 CU YDS) .50

SHOVAL OPERATORS (OVER 4 CU YD) 1.00

HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES:

100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1

RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN

GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW

YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;

MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS

DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;

THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 68.63 35.25

ENGI0158-006 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATORS:: GROUP C FORK LIFT, HIGH

LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER,

BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR,

MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR,

WELDING MACHINE, WELL POINT, MECHANICAL HEATER,

GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS,

ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE

DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE

MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM),

SEEDING, AND MULCHING MACHINES, PUMPS. (NORTHERN

PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF

THE CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION)

HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE

INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER

REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY................$ 51.01 33.20

POWER EQUIPMENT OPERATORS:: GROUP B BACKHOE,

(TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN

DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR,

TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE

GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP

SPREADER, POWER BROOMS, SWEEPERS, TRENCHING

MACHINE, BARBER GREEN LOADER, SIDE BOOMS,

HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING

MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE

DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE,

POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND

SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD

HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS

(ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP

OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR,

DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK

EXCAVATOR 5/8 CU. YD. OR SMALLER. (NORTHERN PART

OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE

CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION)

HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE

INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER

REGULAR RATE. FOOTNOTE: A. PAID HOLIDAY: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY................$ 53.91 33.20

POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE,

HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE,

PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE,

BOOM TRUCK (OVER 5 TONS) GROUP A(1): CRANE

PREMIUMS 1 OVER 150' :ADD $1.00 2 OVER

200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN

PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF

THE CITY OF POUGHKEEPSIE)...........................$ 55.42 33.20

POWER EQUIPMENT OPERATORS: GROUP A SHOVEL, ALL

EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN

DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER,

ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER,

TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING

MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP,

BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT

AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND

UNDER). (NORTHERN PART OF DUTCHESS (TO THE NORTHEN

BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) BUILDING

CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING

ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50

PER HOUR OVER REGULAR RATE. FOOTNOTE: A. PAID

HOLIDAY: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY.......................................$ 54.93 33.20

ENGI0158-018 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY)

MASTER MECHANIC (NORTHERN PART OF DUTCHESS (TO THE

NORTHERN BOUNDARY LINE OF THE CITY OF

POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 58.91 33.55

POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY)

CRANES 49 TONS AND BELOW (NORTHERN PART OF

DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY

OF POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 60.30 33.55

POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY)

CRANES 50 TONS AND OVER (NORTHERN PART OF DUTCHESS

(TO THE NORTHERN BOUNDARY LINE OF THE CITY OF

POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 61.80 33.55

POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY)

TOWER CRANES (NORTHERN PART OF DUTCHESS (TO THE

NORTHERN BOUNDARY LINE OF THE CITY OF

POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 63.30 33.55

POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY)

A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY

HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE

GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR,

RIDE-ON BOILER (USED IN CONJUNCTION WITH

PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED,

BOAT (POWERED), CEMENT AND BIN OPERATOR,

COMPRESSORS, DUST COLLECTORS, FORK LIFT,

GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS,

HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT

SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S

AND UNDER), CONCRETE SAW (SELF-PROPELLED),

CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE

LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR

WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER,

RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER,

RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER,

RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON,

TRACTOR, TRACTOR (WITH TOWED ACCESSORIES),

VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT

(NORTHERN PART OF DUTCHESS (TO THE NORTHERN

BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE))

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, AND CHRISTMAS DAY.................$ 53.82 33.55

POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY)

ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER

TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS

SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED),

BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED),

BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT

(NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS,

CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE

PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED,

CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR

MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.),

GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER

(15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE,

KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS,

L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR

STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE,

PLANT ENGINEER, PROFILER (105 H.P. AND UNDER),

GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER

BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER,

REVINIUS WIDENER, ROLLER (GRADE AND FILL),

SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER

(BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM

CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE

PLANT REFRIGERATION EQUIPMENT (FOR SOIL

STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE

SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK

DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER,

TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER

HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE),

WINCH, WINCH CAT (NORTHERN PART OF DUTCHESS (TO

THE NORTHERN BOUNDARY LINE OF THE CITY OF

POUGHKEEPSIE)) FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY......$ 56.39 33.55

POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY &

HIGHWAY)............................................$ 57.30 33.55

ENGI0825-007 07/01/2025

Rates Fringes POWER EQUIPMENT OPERATOR BUILDING, HEAVY &

HIGHWAY GROUP 1.....................................$ 61.72 37.50

POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY

GROUP 6 HELICOPTER PILOT (ORANGE, ULSTER AND

SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM

20% HYDROGRAPHIC PREMIUM .50 A.

PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY

MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,

ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,

PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE

CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 63.54 37.50

POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY

GROUP 5 OILER (ORANGE, ULSTER AND SULLIVAN

COUNTIES) NOTES: HAZMAT PREMIUM 20%

HYDROGRAPHIC PREMIUM .50 A. PAID

HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY

MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,

ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,

PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE

CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 61.72 37.50

POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY

GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS

(SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR

LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES,

LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM

TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND

MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE);

FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER

(UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL

AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER

TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE

UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS;

MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT

(OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS

THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND

OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL

ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD

FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE,

FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION

AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS

(USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE);

STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE;

STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE

ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE,

INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS);

WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN

CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN

100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY

TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING

SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL

POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG

AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (ORANGE,

ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT

PREMIUM 20% HYDROGRAPHIC PREMIUM

.50 A. PAID HOLIDAYS: NEW YEARS DAY,

WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR

DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY,

AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE

DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY

OCCURS..............................................$ 56.59 37.50

POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY

GROUP 3 ASPHALT CURBING MACHINE, ASPHALT PLANT

ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER

& TEXTURING MACHINE (CMI AND SIMILAR TYPES)

AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR

TYPES); BAR BENDING MACHINES (POWER), BATCHERS,

BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR

SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK

FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD);

CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS

(USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE

TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE,

IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY

ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS);

COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING

MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE);

CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR

TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125

FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL

(DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS

(MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS;

ELEVATOR; FIREMAN; FORKLIFTS (ECONOMOBILE, LULL,

AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS

(1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS

(2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE

GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP;

GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER

VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS

(ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS),

HOPPERS, HOPPERS DOORS (POWER OPERATED);

HYDRO-BLASTER (WHERE REQUIRED); LADDERS

(MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE;

MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS

(EXCEPTING PAVING MIXERS); MOTOR PATROLS AND

GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED

RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR

HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED;

PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER

PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST

POUNDER AND AUGER); ROD BENDING MACHINES (POWER);

ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN

PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER

MACHINES (BOOM TYPE); STEEL CUTTING MACHINE,

SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS;

TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION

WITH UNLOADING); WELDER AND REPAIR MACHINES.

CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR;

DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT

ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE

OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL

SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM

BLASTING MACHINE OPERATOR (ORANGE, ULSTER AND

SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM

20% HYDROGRAPHIC PREMIUM .50 A.

PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY

MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,

ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,

PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE

CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 58.22 37.50

POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY

GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM

ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF

BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND

DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE

SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS,

CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE

AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER;

DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR,

MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS

THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING

MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL

TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL,

ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM,

CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND

OR ANY OTHER SIMILAR TYPE HOISTING MACHINES,

PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE).

LONG BOOM RATE TO BE APPLIED IF HOIST IS ""OUTSIDE

MATERIAL LOWER HOIST""; HYDRAULIC CRANES-10TONS AND

UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR

HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT

HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER;

PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER

PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND

CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS;

SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR

TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS

(HOISTING). (ORANGE, ULSTER AND SULLIVAN COUNTIES)

NOTES: HAZMAT PREMIUM 20%

HYDROGRAPHIC PREMIUM .50 A. PAID

HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY

MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY,

ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY,

PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE

CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS...........$ 60.13 37.50

ENGI0825-008 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND

TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER,

GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE

REPAIR AND MAINTENANCE (ORANGE, ULSTER AND

SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC

PREMIUM .50 HAZMAT PREMIUM

20% TUNNEL PREMIUM

.75 FOOTNOTE: A. PAID HOLIDAYS: NEW

YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,

ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY

PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR

WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 53.34 37.50

POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND

TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER

PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES)

NOTES: HYDROGRAPHIC PREMIUM .50

HAZMAT PREMIUM 20%

TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY,

WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE

DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY,

THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE

EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING

WHICH THE HOLIDAYS OCCURS...........................$ 64.28 37.50

POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND

TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR

(SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT

PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND

OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION);

PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF

POWER); WELDING MACHINES, GAS OR ELECTRIC

CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE

WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION

AND MAINTENANCE); FRAM TRACTORS. (ORANGE, ULSTER

AND SULLIVAN COUNTIES) NOTES: HYDROGRAPHIC

PREMIUM .50 HAZMAT PREMIUM

20% TUNNEL PREMIUM

.75 FOOTNOTE: A. PAID HOLIDAYS: NEW

YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,

ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY

PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR

WEEK DURING WHICH THE HOLIDAYS OCCURS...............$ 57.06 37.50

POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND

TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER;

BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3

IN BATTERY); CHIEF OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .