This document is a Roof Asbestos Abatement Plan prepared as part of 65% construction documents for Project No. 25-126. The plan, dated December 3, 2025, with a 100% completion target of March 20, 2026, is prepared by FE Engineering LLP with offices in Middletown and Poughkeepsie, New York, and includes architectural/engineering services by EDPONS located in Wilkes-Barre, Pennsylvania.

The asbestos abatement contractor is responsible for the removal and disposal of asbestos-containing materials (ACM) tar vapor barrier and ACM flashing tar on the non-ACM brick facade. All removal work shall include non-ACM roofing and insulation layers down to the non-ACM wood deck below. The plan includes a roof asbestos abatement plan drawing with an asbestos abatement legend identifying areas requiring contractor removal and disposal. Further detailed work requirements are referenced in Specification 020800, Section 3.17, which provides comprehensive descriptions of all asbestos abatement work requirements for this project.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING LLPFE PROJECT NO: 25-126

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

65% CONSTRUCTION DOCUMENTS

70 South Franklin Street, Wilkes-Barre, PA

18701

570 | 824-6340 info@edpons.com edpons.com

P

R

O

G

R

E

S

S

P

R

I

N

T

N

O

T

F

R

C

O

N

S

T

R

U

C

T

I

N

1376 Route 9

Wappingers Falls, NY 12590

Tel: 845-298-6031

QUALITY ENVIRONMENTAL

SOLUTIONS & TECHNOLOGIES, INC.

ASB-100

ASBESTOS ABATEMENT CONTRACTOR RESPONSIBLE FOR REMOVAL AND

DISPOSAL OF ACM TAR VAPOR BARRIER. REMOVALS SHALL INCLUDE ALL

NON-ACM ROOFING AND INSULATION LAYERS TO THE NON-ACM WOOD DECK

BELOW.

REFER SPECIFICATION 020800 - SECTION 3.17 FOR A FURTHER DESCRIPTION OF THE ASBESTOS

ABATEMENT WORK REQUIREMENTS.

ASBESTOS ABATEMENT LEGEND

ASBESTOS ABATEMENT CONTRACTOR RESPONSIBLE FOR REMOVAL AND

DISPOSAL OF ACM FLASHING TAR ON NON-ACM BRICK FACADE.

EXPIRES 11-30-2028

1/8" = 1'-0"

ROOF ASBESTOS ABATEMENT PLAN