New Sunshine Substation Transmission Line Construction
Solicitation number
ITB-2614
Issued by
San Juan County, New Mexico

About this file

This is a Wage Decision Approval Summary issued by the New Mexico Department of Workforce Solutions for the City of Gallup's New Sunshine Substation Transmission Line Construction project located at the North End of Gomez Street in McKinley County. The project encompasses the construction and installation of two 115 kV transmission tap structures, modification or replacement of existing transmission line structures, installation of transmission conductors, shield wire, insulators, hardware, and switches, and associated transmission line components. Work includes coordination and installation activities related to protection and isolation methods, stringing and tensioning of conductors and shield wire, coordination with new substation upgrade activities, and field construction activities necessary to test, energize, and place transmission line facilities into service. The estimated contract award date is April 1, 2026, with a total project cost of $673,000.00. The wage decision is effective January 1, 2026, and expires on June 10, 2026.

The wage decision classifies this project as Highway/Utilities (Type A) construction and establishes prevailing wage rates for multiple trade classifications applicable to work performed in McKinley County and Los Alamos County, including Lineman ($51.71 base/$21.43 fringe), Journeyman Transmission Technician ($47.58 base/$20.40 fringe), Cable Splicer ($52.98 base/$21.75 fringe), Equipment Operator ($40.94 base/$17.73 fringe), and various laborer and operator classifications. All contractors are required to pay subsistence, zone, and incentive pay according to the particular trade classification. No federal funds are involved in this project, and it does not involve a building structure or comprise part of a larger construction plan.

View the file

Other files

File Type Posted
New_Sunshine_Substation_Transmission_Line_Construction_(Addendum_#1_Revision).pdf PDF
New_Sunshine_Substation_Transmission_Line_Construction.pdf PDF
New_Sunshine_Substation_T-Line_Package.pdf PDF
New_Sunshine_Substation_Transmission_Line_115kV.kmz KMZ file
New_Sunshine_Substation_Transmission_Line_115kV.kmz KMZ file
SECTION_11-J_Plans.pdf PDF
New_Sunshine_Substation_T-Line_Package.pdf PDF
SECTION_11-J_Plans.pdf PDF
Affidavit_of_Wages_Paid_(5).pdf PDF
GALLUP_PAYMENT_BOND.pdf PDF
NMDOT_A-066TrafficControlRoadwayWorkPermit.pdf PDF
EPA_Form_3510-13.pdf PDF
SAMPLE_CONTRACT.pdf PDF
EPA_Form_3510-9.pdf PDF
SAMPLE_CONTRACT.pdf PDF
EPA_Form_3510-9.pdf PDF
Gallup_Municipal_ROW-Public_Easement_Work_Permit_(1).pdf PDF
EPA_Form_3510-13.pdf PDF
NMDOT_Indemnification_and_Hold_Harmless_Agreement.pdf PDF
STATE_OF_INTENT_TO_PAY_PREVAILING_WAGES.pdf PDF
Affidavit_of_Wages_Paid_(5).pdf PDF
GALLUP_PAYMENT_BOND.pdf PDF
WAGE_DECISION_MC-26-0477-A.pdf PDF
GALLUP_PERFORMANCE_BOND.pdf PDF
Gallup_Municipal_ROW-Public_Easement_Work_Permit_(1).pdf PDF
GALLUP_PERFORMANCE_BOND.pdf PDF
NMDOT_A-066TrafficControlRoadwayWorkPermit.pdf PDF
NMDOT_Indemnification_and_Hold_Harmless_Agreement.pdf PDF
STATE_OF_INTENT_TO_PAY_PREVAILING_WAGES.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wage Decision Approval Summary

1) Project Title: New Sunshine Substation Transmission Line Construction Requested Date: 02/09/2026 Approved Date: 02/10/2026 Approved Wage Decision Number: MC-26-0477-A

Wage Decision Expiration Date: 06/10/2026

2) Physical Location of Jobsite for Project:

Job Site Address: North End of Gomez Street Job Site City: Gallup Job Site County: McKinley

3) Contracting Agency Name (Department or Bureau): City of Gallup Contracting Agency Contact's Name: Frances Rodriguez Contracting Agency Contact's Phone: (505) 863-1334 Ext.

4) Estimated Contract Award Date: 04/01/2026

5) Estimated total project cost: $673,000.00

a. Are any federal funds involved?: No

b. Does this project involve a building?: No

c. Is this part of a larger plan for construction on or appurtenant to the property that is subject to this project?: No

d. Are there any other Public Works Wage Decisions related to this project?: No

e. What is the ultimate purpose or functional use of the construction once it is completed?: The purpose of the project is to enhance the reliability and performance of the citys electrical distribution system. Project is a vital infrastructure initiative intended to enhance the electrical distribution network serving the City of Gallup and the surrounding region. As population growth, economic development, and increased energy usage continue to place greater demands on the existing system, the current substation facility has become inadequate to reliably support present and future electrical loads.

6) Classifications of Construction:

Classification Type and Cost Total

Description

Highway/Utilities (A) Cost: $673,000.00

The purpose of the project is to enhance the reliability and performance of the citys electrical distribution system Project is a vital infrastructure initiative intended to enhance the electrical distribution network serving the City of Gallup and the surrounding region As population growth economic development and increased energy usage continue to place greater demands on the existing system the current substation facility has become inadequate to reliably support present and future electrical loads Project work to include Construction and installation of two 2 115 kV transmission tap structures to serve new substation Modification relocation replacement or retirement of any existing transmission line structuresInstallation of transmission conductors shield wire insulators hardware switches and associated transmission line

LABOR RELATIONS DIVISION WWW.DWS.STATE.NM.US

401 Broadway NE Albuquerque, NM 87102 Phone: 505-841-4400 Fax: 505-841-4424

226 South Alameda Blvd Las Cruces, NM 88005 Phone: 575-524-6195 Fax: 575-524-6194

An Equal Opportunity Employer Page 1 of 2 componentsCoordination and installation activities related to the selected protection and isolation method at the primary transmission tap location including review and implementation of the overhead line switch configurationStringing sagging tensioning clipping and deadending of conductors and shield wire in accordance with the approved plans and specified tensionsCoordination with ongoing new substation upgrade activities to ensure proper sequencing and integration of the transmission facilitiesPerformance of all field construction activities necessary to test energize and place the transmission line facilities into service

An Equal Opportunity Employer Page 2 of 2

Page | 1

Trade Classification Base Rate Fringe Rate

Cement Mason 21.75 7.43

Drywall Finisher/Taper 31.60 9.58

Drywall Finisher/Taper – Los Alamos County

35.85 12.82

Glazier/Fabricator 22.75 7.70

Glazier/Fabricator – Los Alamos County 22.75 7.70

Painter 21.00 5.75

Painter – Los Alamos County 35.85 12.82

Paper Hanger 21.00 5.75

Paper Hanger – Los Alamos County 36.85 12.82

Plumber/Pipefitter 44.32 18.00

Soft Floor Layers 21.52 9.40

Soft Floor Layers – Los Alamos County 35.87 12.92

Bricklayer/Block Layer/Stonemason

Bricklayer/Block layer/Stonemason 33.41 12.04

Bricklayer/ Block layer/Stonemason – Curry, DeBaca, Quay and Roosevelt counties

23.10 8.98

Bricklayer/ Block layer/Stonemason – Dona Ana, Otero, Eddie, and Lea counties

29.56 14.10

Carpenter

Carpenter/Lather 32.12 14.28

Carpenter- Los Alamos County 38.56 14.70

Electricians- Outside Classifications: Zone 1

Ground man 28.54 13.36

Equipment Operator 40.94 17.73

Lineman 51.71 21.43

Journeyman technician 48.15 20.53

Journeyman substation technician 48.15 20.53

Journeyman transmission technician 47.58 20.40

Cable Splicer 52.98 21.75

TYPE “A” –

STREET, HIGHWAY, UTILITY & LIGHT ENGINEERING

Effective January 1, 2026

Page | 2 TYPE “A” – STREET, HIGHWAY, UTILITY &

LIGHT ENGEINERRING

Effective January 1, 2026

Electricians-Outside Classifications: Zone 2

Ground man 58.54 13.36

Equipment Operator 40.94 17.73

Lineman 51.71 21.43

Journeyman technician 48.15 20.53

Journeyman substation technician 48.15 20.53

Journeyman transmission technician 47.58 20.40

Cable Splicer 52.98 21.75

Trade Classification Base Rate Fringe Rate

Electricians-Outside Classifications: Los Alamos County

Ground man 29.35 13.38

Equipment Operator 42.12 17.76

Lineman 53.07 21.77

Journeyman technician 49.55 20.89

Cable Splicer 58.28 23.07

Ironworker

Ironworker Journeyman 29.45 19.51

Probationary Ironworker 23.56 19.51

Laborers

Group I – unskilled 18.41 7.74

Group II – semiskilled 19.41 7.74

Group III – skilled 19.91 7.74

Group IV – specialty 20.41 7.74

Operators

Group I 23.69 6.95

Group II 24.72 6.95

Group III 27.03 6.95

Group IV 28.65 6.95

Group V 28.79 6.95

Group VI 29.05 6.95

Group VII 29.28 6.95

Group VIII 30.27 6.95

Page | 3 TYPE “A” – STREET, HIGHWAY, UTILITY &

LIGHT ENGEINERRING

Effective January 1, 2026

Group IX 40.08 6.95

Group X 44.72 6.95

Roofers

Roofer Journeyman 31.20 9.36

Roofer Helper 18.72 9.36

Truck Drivers

Group I-IX 21.70 9.65

NOTE: All contractors are required to pay SUBSISTENCE, ZONE, AND INCENTIVE PAY according to the particular trade. More information available at https://www.dws.state.nm.us/public-works.

For more information about the Subsistence, Zone, and Incentive Pay rates, or to file a wage claim, contact the New Mexico Department of Workforce Solutions Labor Relations Division at (505) 841-4400 or visit us online at www.dws.state.nm.us.