This file is a PLS-CADD drawing (Section 11-J Plans) prepared for the City of Gallup, New Mexico by T & D Services, LLC, depicting the design of a 115 kV transmission line for the New Sunshine Substation project. The plan shows a transmission line route with multiple tower locations and configurations, including existing towers to be replaced and new towers to be installed. The project involves eight primary transmission structures: an existing T8-N tower at station 0+000 to be maintained, a T7-N tower to be replaced with a new T7-NA configuration at station 0+857, a new T6-NA tower at station 0+951, a retiring T6-N tower at station 1+180, a new T6-N tower at station 1+449, a T5-N tower to be replaced at station 1+849, and an existing T4-N tower at station 2+257. The drawing includes detailed specifications for two H-Frame Steel structures and provides cable tension calculations for both 3/8-inch 7-strand EHS steel and Cardinal ACSR conductors at various line segments, with initial tensions ranging from 182 to 3,681 pounds at 60 degrees Fahrenheit.
The drawing was prepared for preliminary design review with revisions dated January 30, 2025, and indicates design completion as of September 10, 2025. The project site encompasses approximately 4.375 acres and includes property boundary information, utility easements, and infrastructure details such as concrete walls, wire fencing, and chain-link fencing. Geographic coordinates and elevation data are provided for each tower location, with embedment lengths ranging from 8 to 16 feet and tower heights between 52 and 92.5 feet. Maintenance specifications require the existing T7-N to T8-N line tensions to be maintained and mandate epoxy coating application to a minimum of 1 foot above ground line for all direct embedment poles. The drawing serves as the technical design foundation for the transmission line construction contract in Gallup, New Mexico.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLS-CADD Drawing
E X
IS
T
IN
G
T
-N st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.7 e m b e d l e n
.0
E
-1
E T
S -5
A
R E
P L
A C
E T
-N st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.1 e m b e d l e n
.0
R
-1 N
C H
R
T S
-5 A
A N
T S
-5 A
A N
E W
T
-N A st a
L o n g
-1
.7
L a t=
.5 h t=
.5 e le
.5 e m b e d l e n
.5
N
C H
-W A
Y S
W
IT
C H
S T
A T
IO
N
E Q
U A
T
IO
N
.8
B A
C K
S T
A T
IO
N
E Q
U A
T
IO
N
.0
A H
E A
D N
E W
T
-N A st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.4 e m b e d l e n
.0
N
C H
-W A
Y S
W
IT
C H
S T
A T
IO
N
E Q
U A
T
IO
N
.6
B A
C K
S T
A T
IO
N
E Q
U A
T
IO
N
.0
A
H E
A D
R E
T
IR
E T
-N st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.2 e m b e d l e n
.0
R
-1 R
T U
-1 N
E W
T
-N st a
L o n g
-1
.7
L a t=
.5 h t=
.5 e le
.2 e m b e d l e n
.5
N C
H
N
T P
-1
-B
P
R E
P L
A C
E T
-N st a
L o n g
-1
.7
L a t=
.5 h t=
.5 e le
.3 e m b e d l e n
.5
R
-1 N
C H
R
T U
-1 N
T P
-1
-B
P
E X
IS
T
IN
G
T
-N st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.7 e m b e d l e n
.0
E
-1 E
T U
-1 M
O D
E L
E D
A S
M E
T H
O D
D
E A
D E
N D
S E
C T
IO
N
E N
D S
A T
303 2
498, 245 269
115KV
115KV
115KV
115KV
115KV
115KV
H -F
R A
M E
S T
E E
L st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.5
H -F
R A
M E
S T
E E
L
H -F
R A
M E
S T
E E
L st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.7
221, 95
498, 245
115KV 115KV
FOUND 1/2" REBAR w/ PS13606 ALUM.
CAP
FOUND 1/2" REBAR WITH PS6540 CAP AND
PS13606 WASHER AT BASE OF BENT STEEL ROD
FOUND 1/2" REBAR WITH PS6540 CAP
DIMENSION POINT ONLY
TRAIL ROAD
(TYP.)
N 0° 2
2'10"W
457 .18'
S 2°0 4
' 11" E
4 21 .23 '
S89°14'36"E 461.81'
(6
.0
(N
°3
'W
(S89°43'29"E) {} (462.05') {}
(S
°5
'0 4 "E
(1
.0
GATE
G A
T E
LOT 10{} LOT 1
LOT 2 LOT 9
LOT 8 LOT 3
LOT 4
LOT 7
LOT 6 LOT 5
BLOCK 2
BLOCK 3
BLOCK 1
LOT 1 LOT 2 LOT 3 LOT 4
LOT 5
LOT 6
LOT 7
LOT 8
LOT 9
LOT 9
LOT 7
LOT 4
LOT 5
LOT 1
LOT 2
LOT 3
LOT 4
LOT 5
LOT 6
LOT 7
LOT 8
LOT 9
LOT 10{}
LOT 11
LOT 12
HOUSTON STREET
O W
E N
S T
R E
E T
G O
M E
Z D
R I V
E
50.0'
E
A S
E M
E N
T D
O C
U M
E N
T N
O . 3
TRAIL ROAD
(TYP.)
C O
N C
R E
T E
W
A
LL
WIRE
FENCE
CHAIN LINK
FENCE (TYP.)
UNDEVELOPED AREA
LOT 1 LOT 2 LOT 3
S89°37'51"W 74.82'
S 2°0 5
' 05" E 64 .98 '
N89°13'46"W {} 300.50'
N2°05'05"W 29.94'
N89°13'34"W {} 100.14'
4.375 ACRES
C U
R B
G U
T T
E R
WIRE FENCE
(TYP.)
EXISTING T8-N
REPLACE T7-N NEW T7-NA NEW T6-NA RETIRE T6-N NEW T6-N REPLACE T5-N EXISTING T4-N
H-FRAME STEEL
H-FRAME STEEL
CACIFC DESIGN09/10/2503
CACFOR REVIEW06/25/2502
CACPRELIMINARY01
CITY OF GALLUP
GALLUP, NM
BAO AJR CAC 11/08/24 240112
NEW SUNSHINE SUBSTATION
4:1 NM
115 KV TRANSMISSION LINE
PLAN AND PROFILE
DWN: CKD: APVD: DATE: JOB #:
REVISIONSDATE
STATESCALE SHEET
Transmission & Distribution Services Consulting Engineers & Surveyors
5401 Beverly Hills Ave NE Albuquerque, NM 87113 www.t-d-services.com
This drawing is a copyrighted work product of T & D Services, LLC. as of the date shown on this drawing. Any re-use or copying of any portion of this drawing, without written permission from an authorized employee of T & D Services, LLC. is strictly prohibited.
BYREV
01/30/25
N E
W T
-N
A st a
L o n g
-1
.7
L a t=
.5 h t=
.5 e le
.5 e m b e d l e n
.5
N C
H
-W
A Y
S W
IT
C
H S
T A
T
IO
N E
Q U
A T
IO
N
.8
B
A C
K S
T A
T
IO
N E
Q U
A T
IO
N
.0
A
H E
A D
N E
W T
-N
A st a
L o n g
-1
.7
L a t=
.5 h t=
.0 e le
.4 e m b e d le n
.0
N
C H
-W A
Y S
W
IT
C H
S T
A T
IO
N
E Q
U A
T
IO
N
.6
B
A C
K S
T A
T
IO
N E
Q U
A T
IO
N
.0
A
H E
A D
MAINTAIN EXISTING
TENSIONS FROM T7-N
BACK TOWARDS T8-N
APPOXY COATING IS REQUIRED FOR ALL DIRECT EMBEDMENT POLES TO A
MINIMUM OF 1` ABOVE GROUND LINE.
04.01
EXISTING T8-N - REPLACE T7-N, 3_8-7_strand_ehs_steel - Existing.wir, Tension 1032 (lbs) at 60 (deg F) Initial NEW T7-NA - NEW T6-NA, 3_8-7_strand_ehs_steel_15.wir, Tension 2284 (lbs) at 60 (deg F) Initial NEW T6-NA - EXISTING T4-N, 3_8-7_strand_ehs_steel_15.wir, Tension 2290 (lbs) at 60 (deg F) Initial NEW T7-NA - H-FRAME STEEL, 3_8-7_strand_ehs_steel - REDUCED.wir, Tension 182 (lbs) at 60 (deg F) Initial NEW T6-NA - H-FRAME STEEL, 3_8-7_strand_ehs_steel - REDUCED.wir, Tension 187 (lbs) at 60 (deg F) Initial EXISTING T8-N - REPLACE T7-N, cardinal_acsr - Existing.wir, Tension 3681 (lbs) at 60 (deg F) Initial NEW T7-NA - NEW T6-NA, cardinal_acsr_18.wir, Tension 3471 (lbs) at 60 (deg F) Initial NEW T7-NA - H-FRAME STEEL, hawk_acsr - REDUCED.wir, Tension 467 (lbs) at 60 (deg F) Initial NEW T6-NA - H-FRAME STEEL, hawk_acsr - REDUCED.wir, Tension 476 (lbs) at 60 (deg F) Initial REPLACE T7-N - NEW T7-NA, 3_8-7_strand_ehs_steel_15.wir, Tension 2301 (lbs) at 60 (deg F) Initial REPLACE T7-N - NEW T7-NA, cardinal_acsr_18.wir, Tension 3482 (lbs) at 60 (deg F) Initial NEW T6-NA - EXISTING T4-N, cardinal_acsr_18.wir, Tension 3433 (lbs) at 60 (deg F) Initial
Vert. Scale
Horiz. Scale
30.0 ft.
120.0 ft.
N
W E