Affidavit_of_Wages_Paid_(5).pdf
PDF 111 KB Posted
- Solicitation number
- ITB-2614
- Issued by
- San Juan County, New Mexico
About this file
This is an Affidavit of Wages Paid form used by the City of Gallup, New Mexico for the New Sunshine Substation Transmission Line Construction project. The form must be completed by all contractors and subcontractors upon project completion and submitted to the contracting agency. The document requires general contractor information including company name, address, contact details, estimated completion date, State Wage Decision Number, project title, and project physical address. Subcontractors and tiered subcontractors must also complete the form with their respective information and completion dates. A separate signed form is required for each contractor level involved in the project.
All contractors certify through this affidavit that workers employed on the public works project were paid no less than the Prevailing Wage Rates as determined by the Department of Workforce Solutions, Labor Relations Division, as identified by the State Wage Decision Number listed in the bid documents. Contractors acknowledge that violations of Prevailing Wage Laws—including incorrect job classification, improper payment of prevailing wages, and overtime violations—subject them to debarment procedures and requirements to pay back wages owed to workers. The form is governed by the Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) and the Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78), ensuring compliance with New Mexico prevailing wage requirements for all public works projects.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFFIDAVIT OF WAGES PAID
To Be Completed After Construction Is Complete
All FIELDS ARE REQUIRED
FORM MUST BE SENT TO THE CONTRACTING AGENCY
General Contractor Information Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Estimated Completion Date: State Wage Decision Number:
Project Title:
Project Physical Address:
Print Name:
General Contractor Signature:
Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Sub Contractor Signature:
2nd, 3rd, etc. Tier Sub Contractor Information
Date you completed work on this project:
Company Name:
Address:
City: State: Zip:
Phone: Fax: E-Mail:
Tier Signature:
I hereby certify that the above information is correct and that all workers I employ on this public works project were paid no less than the Prevailing Wage Rate(s) as determined by the Department of Workforce Solutions, Labor Relations Division for this project as identified by the State Wage Decision Number. I understand that contractors who violate Prevailing Wage Laws (i.e., incorrect job classification, improper payment of prevailing wages, and/or overtime, etc.), are subject to debarment procedures and shall be required to pay any back wages due to workers. (Ref. Labor Relations Division Public Works Minimum Wage Act Policy Manual (11.1.2 NMAC) & Public Works Minimum Wage Act (13-4-11 through 13-4-18, NMSA 78)).
Contractor’s Signature Date
(Revised 08/23/13)
INSTRUCTIONS FOR COMPLETING AFFIDAVIT OF WAGES PAID
GENERAL CONTRACTOR
1. Enter general contractor information and provide signature.
2. Enter State Wage Decision Number as listed in bid documents. (Example: BE 13-0123 B)
3. Enter project title - listed in bid documents.
4. Enter project physical address - exact location of project (job site).
5. Enter completion date of project.
6. All Affidavits’ must be sent to the Contracting Agency.
SUB CONTRACTOR
1. Enter general contractor information, but general contractor signature is not needed.
2. Enter sub contractor information as indicated and provide signature.
3. Enter sub contractor completion date.
NOTE: A separate signed form is needed for each contractor.
2ND, 3rd, etc TIER SUB CONTRACTOR
1. Enter sub contractor information, subcontractor signature is not needed.
2. Enter 2nd tier sub contractor information and provide signature.
3. Enter 2nd tier contract completion date.
(Revised 8/23/13)
File details come from the government source that posted it. Updated .