NMDOT_A-066TrafficControlRoadwayWorkPermit.pdf
PDF 217 KB Posted
- Solicitation number
- ITB-2614
- Issued by
- San Juan County, New Mexico
About this file
This is a Traffic Control/Roadway Work Permit form issued by the New Mexico Department of Transportation (NMDOT). The permit establishes the framework for contractors to conduct roadway work activities while maintaining traffic safety and control compliance. The form requires contractors to provide essential project information including the NMDOT project number, contractor name and contact details, traffic control firm identification, and work zone location specifics such as route, mile post, intersections, and road configuration (ranging from two to eight lanes). Contractors must specify the purpose of work, which may include roadway construction/rehabilitation, shoulder work, signal and lighting work, utility work, drainage/excavation, soil testing, or signing and striping placement. The permit requires submission of a Traffic Control Plan (TCP), specification of working duration with start and end dates and daily work hours, and identification of any proposed speed limit reductions within the work zone. The permit is not processed without an accompanying TCP plan and becomes effective only upon approval by the NMDOT District Office Traffic Section.
Approval of the permit is conditioned on several mandatory requirements that contractors accept upon submission. Contractors must ensure all traffic control operations conform to the Manual on Uniform Traffic Control Devices (MUTCD) and agree to indemnify and hold harmless NMDOT and its employees from any liability, claims, damages, losses, or expenses resulting from negligent acts by the contractor, its employees, or agents. Additionally, contractors are required to provide NMDOT with a certified copy of their insurance policy and certificate of insurance naming NMDOT as an additional-named insured with primary coverage over any other valid insurance. The permit may be approved as submitted, approved with amendments, or denied, with the NMDOT District Office and TCP firm authorized to attach additional conditions as necessary. Contractors and TCP firms must confirm actual start dates with the District Office and adhere to all attached notes and conditions.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form No. A-66 New 03/13
NEW MEXICO DEPARTMENT OF TRANSPORTATION
(NMDOT)
TRAFFIC CONTROL/ROADWAY WORK PERMIT
NMDOT Project Number (If applicable): Control Number:
General Scope of work:
Contractor Name:
Contact Person:
Contact Telephone: ( ) - Fax: ( ) -
Traffic Control Firm:
Certified Traffic Control Supervisor:
Contact Telephone: ( ) - Fax: ( ) -
Work Zone Location Information:
Route:
Mile Post: From To:
Or Intersection: Intersection:
Direction (NB, SB, EB, WB, or both):
2 lane Road 4 lane Road 6 lane Road 8 Lane Road Divided Undivided Existing Speed limit in area: ___ MPH or Ranges from ___MPH to ___MPH Proposed Speed Limit reduction within work zone (If Applicable):______________ MPH
Working Duration:
Start Date: End Date :_______________________________ Daily Start Time End Time:
Purpose of Permit: Roadway Construction/Rehab. Shoulder Work Signal and Lighting Work Utility work Drainage/Excavation work Soil Testing Signing and Striping Placement
Other:
TCP Plan Enclosed ___ (TC Permit will not be processed without a TCP plan)
If no, describe why:
Approval is conditioned on the following terms that are deemed accepted by the Contractor upon submission of this Permit
1. Traffic Control for operations under this permit shall conform with the Manual on Uniform Traffic Control Devices (MUTCD).
2. The Contractor agrees to indemnify and hold harmless the NMDOT and its employees from liability, claims, damages losses or expenses due to any negligent act of the Contractor, the Contractor’s employees, any agent acting on the Contractor’s behalf, and anyone else engaged by the Contractor to work pursuant to this permit.
3. The Contractor shall provide the NMDOT a certified copy of the its insurance policy and certificate of insurance and shall include on the certificate of insurance the NMDOT as an additional-named insured, with notice that the coverage is primary over any other valid insurance.
4. Any additional conditions as attached and referenced below.
For Official Use:
Approved (see conditions below) Approved As Amended Not Approved
Contractor/TCP firm SHALL contact the District Office and confirm the actual start dates.
TCP Firm and Contractor must adhere to the attached notes.
Permit Number: - Approved By
NMDOT District Office – Traffic Section Submitted to the District Public Information Officer By:_____________________________ On:____/_____/_____
| TRAFFIC CONTROL/ROADWAY WORK PERMIT |
| Or Intersection: Intersection: |
| NMDOT Project Number If applicable: |
| Control Number: |
| General Scope of work: |
| Contractor Name: |
| Contact Person: |
| Traffic Control Firm: |
| Certified Traffic Control Supervisor: |
| Mile Post From: |
| To: |
| Or Intersection: |
| Intersection: |
| Direction NB SB EB WB or both: |
| 4 lane Road: Off |
| 6 lane Road: Off |
| 8 Lane Road: Off |
| Divided: Off |
| Undivided: Off |
| Proposed Speed Limit reduction within work zone If Applicable: |
| Start Date: |
| Daily Start Time: |
| End Time: |
| Other: |
| TCP Plan Enclosed 1: |
| TCP Plan Enclosed 2: |
| If no describe why: |
| Approved By: |
| Submitted to the District Public Information Officer By: |
| On: |
| undefined_7: |
| undefined_8: |
| Text1: |
| Text2: |
| Text3: |
| 2 lane Road: Off |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| 15: Off |
| 16: Off |
| 17: Off |
| 18: Off |
| 19: Off |
| 20: Off |
| 21: Off |
| 22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Text85: |
| Text86: |
| Text87: |
| Text13: |
| Text563: |
| Text564: |
| Text566: |
| Text258: |
File details come from the government source that posted it. Updated .