This is a Summary of Quantities document for an Invitation for Bids (IFB) related to the Mt. Baker-Snoqualmie Emergency Forest Operations (ERFO) Forest Road 11 MP 23.9 Repair project, issued by the Department of Transportation Federal Highway Administration. The document outlines detailed bid items and estimated quantities for a forest road repair project in Washington State, with coordinates and survey control data provided in Washington North State Plane Coordinates (NAD83 2011). The project involves site preparation, erosion control, and restoration work at an elevation range of approximately 776 to 877 feet.
The bid schedule encompasses 35 pay items across mobilization, surveying, quality control, soil erosion and sediment control, clearing and grubbing, excavation, fill materials, geosynthetic reinforcement, riprap placement, equipment rental, labor, topsoil placement, turf establishment, willow cuttings, stream diversion, temporary traffic control, and environmental design features such as log deflectors and root wads. Estimated quantities include 2,577 to 2,850 cubic yards of subexcavation, 1,883 to 2,100 cubic yards of select borrow, 2,979 to 3,280 square yards of geosynthetic reinforcement, 1,340 to 1,500 square yards of turf establishment, and various equipment hours for dump trucks, backhoe loaders, motor graders, hydraulic excavators, and chain saws. The document was finalized in August 2023 following field work conducted in July 2023, with survey control established at four benchmark points and prepared as of February 19, 2025.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WA ERFO FS MTBKR605 2022-1(3) A.2
Sheet and Description
D E F
PLAN-PROFILE
SOIL
EROSION AND
SEDIMENT
CONTROL
TEMPORARY
TRAFFIC
CONTROL
BID
SCHEDULE
A0100 15101-0000 MOBILIZATION LPSM ALL
A0110 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0130 15401-0000 CONTRACTOR TESTING LPSM ALL
A0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0150 15706-0200 SOIL EROSION CONTROL, CHECK DAM,(FIBER ROLL) EACH 4 4
A0160 20102-0000 CLEARING AND GRUBBING LPSM ALL
A0170 20402-0000 SUBEXCAVATION CUYD 2577 273 2850
A0180 20410-0000 SELECT BORROW CUYD 1883 217 2100
A0190 20706-0300 REINFORCEMENT GEOSYNTHETIC, TYPE 3,(UNIAXIAL GEOGRID) SQYD 2979 301 3280
A0200 25101-0500 PLACED RIPRAP, CLASS 5 CUYD 349 51 400
A0210 30201-1000 ROADWAY AGGREGATE, METHOD 1 CUYD 47 3 50
A0220 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0230 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 30-INCH WIDTH HOUR 24
A0240 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 24
A0250 62201-3150 HYDRAULIC EXCAVATOR, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 24
A0260 62201-3750 CHAIN SAW HOUR 24
A0270 62301-0000 GENERAL LABOR HOUR 100
A0280 62401-0400 PROVIDING AND PLACING TOPSOIL, 6-INCH DEPTH SQYD 538 62 600
A0290 62502-0000 TURF ESTABLISHMENT SQYD 1340 160 1500
A0300 62604-5000 CUTTINGS, WILLOW POLE EACH 300 300
A0310 62801-0000 TEMPORARY STREAM DIVERSION LPSM ALL ALL
A0320 62901-1050 ROLLED EROSION CONTROL PRODUCT, TYPE 4.A SQYD 375 25 400
A0330 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL ALL
A0340 64703-2000 ENVIRONMENTAL DESIGN, LOG DEFLECTOR,(GOVERNMENT-FURNISHED) EACH 15 15
A0350 64703-5000 ENVIRONMENTAL DESIGN, ROOT WAD,(GOVERNMENT-FURNISHED) EACH 21 21
PAY ITEM
NUMBER
LINE
ITEM
NO.
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\ W
A E
R
FO
\S ite
M P
.9
\1 p ct m w -s um m ar y-qu an tit ie s2
9.
xl sm
]S he et
-N ov
-2
9:
A
M
A M E N D
SUMMARY OF QUANTITIES
Milestone: 100% PS&E; Date Completed:
Remarks and/or Determination of Estimated Quantity
Estimated Quantities
ALLOWANCEUNITPAY ITEM DESCRIPTION
PROJECT
B.1WA ERFO FS MTBKR605 2022-1(3)
SHEET
NUMBER
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ORTHOMETRIC
ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
23101 637587.943 1456173.622 876.919 48°44'43.210939"N 121°35'48.998611"W 817.1236 0.999963249 5/8" IR w/fhwa alum cap 1.
23102 637580.313 1456449.069 859.991 48°44'43.162606"N 121°35'44.888012"W 800.2058 0.999964054 5/8" IR w/fhwa alum cap
23103 637378.276 1456582.020 847.316 48°44'41.182159"N 121°35'42.874642"W 787.5298 0.999964554 5/8" IR w/fhwa alum cap
23104 637195.031 1456719.054 835.090 48°44'39.387520"N 121°35'40.803180"W 775.3034 0.999965043 5/8" IR w/fhwa alum cap
COORDINATE SYSTEM : Washington North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : WA83/2011-NIF NSRS11(NAD83/2011) Washington, North Zone, International foot
PROJECT : Mt. Baker-Snoqualmie Erfo Repairs 2022-1(3) FR11-MP 23.9 DATE OF FIELD WORK : July, 2023 DATE OF FINAL ADJUSTMENT : August 2023
PROJECT UNITS : International foot
-F eb -2
:4
A M c:
\p w -w or k\ d0 w a-ef
-m tb kr
-1
-3 _c on tr ol -s he et
.x ls x] S he et
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
D.1WA ERFO FS MTBKR605 2022-1(3)
SHEET
NUMBER
SURVEY CONTROL
WA ERFO FS MTBKR605 2022-1(3) E.2
WA ERFO FS MTBKR605 2022-1(3) E.3
WA ERFO FS MTBKR605 2022-1(3) F.2
| 2026-01-12T11:43:29-0800 | |
| BRENT LEE COE |
File details come from the government source that posted it. Updated .