wa-ef-mtbkr2022-1-3_GEO_4024-R1.pdf
PDF 1 MB Posted
- Solicitation number
- 69056726B000002
About this file
This is a Geotechnical Memorandum providing engineering recommendations for repair of Mt. Baker Forest Road 11 at milepost 23.9 in the Mount Baker-Snoqualmie National Forest, Washington. The project is funded under the Emergency Relief for Federally Owned Roads (ERFO) program administered by the Western Federal Lands Highway Division (WFLHD), a division of the Federal Highway Administration. The memorandum, dated May 27, 2025 and prepared by Senior Geotechnical Engineer Eric Lim, documents findings from field and office reviews conducted on October 10-11, 2023, and addresses the failure site at milepost 29.3 caused by stream scour from Shannon Creek during a high-water event combined with large wood blockage. The site is located on a Maintenance Level 3 forest road (low-speed, single-lane with turnouts) and is constructed into the toe of a deep-seated Holocene age landslide overlying Darrington Phyllite and Bell Pass mélange bedrock formations.
The repair approach recommends a root wad and riprap revetment structure to protect the roadway from stream flows, combined with a deep patch reinforcement system using alternating geogrid and aggregate layers to create a composite roadway that bridges the repair area and accommodates potential future scour or slope movement. The repair incorporates wrap-returned geogrid forming a reinforced soil slope face with soft armoring features including 1V:1.25H to 1V:1.5H select borrow backfill, topsoil, grass seed, and willow plantings to enhance riparian habitat per U.S. Forest Service preference. Construction considerations note that the narrow, steep forest road limits equipment access and staging; excavation will encounter roadway fills, native soils, and potentially bedrock requiring ripping or impact hammer attachments, with blasting likely prohibited due to environmental restrictions; boulders up to 4 feet in diameter have been observed; and all excavation, sloping, and benching must adhere to OSHA 1926 Subpart P, Appendix B. No subsurface geotechnical investigation or material testing was conducted, and onsite materials are assumed not to meet Select Borrow requirements, necessitating imported select borrow for the deep patch construction.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
158377846
M E M O R A N D U M
Western Federal Lands Highway Division 610 E. Fifth Street
Vancouver, WA 98661
DATE: May 27, 2025
TO: David Arena Project Manager
FROM: Eric Lim Senior Geotechnical Engineer
SUBJECT: Geotechnical Memo 4024 R1 Geotechnical Recommendations (Revision 1) Mt. Baker Forest Road 11 MP 23.9 Repair
WA ERFO FS MTBKR605 2022-1(3)
Mount Baker – Snoqualmie National Forest, Washington
INTRODUCTION
On October 10, 2023, an office review was held at the United States Forest Service (USFS) Mt. Baker Ranger District Forest office located in Sedro-Woolley, Washington to discuss the background of multiple failure sites in the Mount Baker-Snoqualmie (MBS) National Forest.
On October 11, 2023, MBS National Forest personnel escorted Western Federal Lands Highway Division (WFLHD) staff to the failure sites for a field review. This document presents geotechnical findings from the field and office review of the above-referenced site. This document will present the following:
• Background of failure sites;
• Geotechnical recommendations for repairs; and
• Construction considerations.
PROJECT DESCRIPTION
We understand that Forest Road 11 is designated as a Forest Service Maintenance Level 3 road, which are typically low speed, single lane roads with turnouts passable to prudent drivers in passenger cars during the normal season of use. However, Maintenance Level 3 does not consider use comfort and convenience as priorities (Apodaca, et al., 2012). The one-lane forest roads appear to be original construction with later modifications and maintenance.
We anticipate that the one-lane, limited width roadway will only allow one-way construction traffic. Closure of the road at the repair site will likely be required to complete repairs.
DESCRIPTION OF THE FAILURE SITE ON FSR 11 – MP 29.3 (2022)
Forest Service Road (FSR) was constructed with cut and sidecast methods lost a section of outboard fill from scouring of the Shannon Creek drainage. A high water flow event combined with a large wood blockage directed stream flow into the eastern bank. This scour event removed the entire bank of Shannon Creek and left a vertical face that threatens the roadway (Figure 1). This section of road is constructed into the toe of a deep-seated landslide.
The LiDAR bare earth hillshade (Figure 2) shows the Shannon Creek drainage confined by the gently sloping landslide and a large, wedge-shaped alluvial fan deposit. Upstream of the bridge at FSR 11, Shannon Creek consists of two parallel running drainages but becomes a single channel downstream of the bridge. This is likely the result of streams following the lateral extents of two landslide failures. These failures are flowing toward the center of the mapped landslide, but the stream channels roughly define the extents of the more recently active individual slides within the larger mapped landslide feature. The large, wedge-shaped alluvial fan deposit downstream of the bridge appears to be relatively flat and stable.
As mapped by the USGS (Figure 3) the site is Holocene age landslide (Qls) and Holocene age alluvial fan deposits (Qf). Beyond the site limits the bedrock is mapped as Darrington Phyllite and Bell Pass mélange, which are both metamorphic formations prone to developing unstable slopes. Underlying bedrock was not exposed at the site during our site visit;
however, bedrock is often found along the bottom of stream levels where it is more resistant to stream erosion.
Figure 1 – Damage photo from the DDIR.
LiDAR Hillshade Geologic Map
Figure 2 - WA DNR LiDAR; North Puget 2017 Figure 3 - Geologic Map of Mount Baker 30”x60” Quad, WA. 2003
DESIGN RECOMMENDATIONS
No subsurface geotechnical investigation was conducted as part of this project, which is not uncommon for emergency projects funded under the Emergency Relief for Federally Owned Roads (ERFO) program.
The intent for the FSR 11 – MP 23.9 repair is to protect the remainder of the roadway from stream flows with a root wad and riprap revetment structure. Since the revetment will only be designed near the design stream levels and the roadway itself is on landslide materials, the remaining exposed roadway soils will need to be reinforced with a deep patch type of construction. The primary intent of the deep patch is to create a composite (alternating geogrid and aggregate layers) roadway that essentially bridges the repaired area should additional scour and/or slope movement occur in the future. The sides of the deep patch reinforcement will also be wrap-returned geogrid, which will form a reinforced soil slope face that can be vegetated and planted. Figure 4 shows a conceptual level detail of the proposed repair.
Figure 4 - Deep patch concept with root wad/riprap revetment
We understand that it is the USFS’s desire to have a soft armoring with plantings over the riprap up against the face of the deep patch. Therefore, the repair will incorporate a 1V:1.25H to 1V:1.5H select borrow backfill with topsoil at the face wrap and grass seed. Willow plantings will also be added to the slope face and riprap. The desired performance expectation of the soft armoring and willow plantings is to enhance riparian habitat.
CONSTRUCTION CONSIDERATIONS
The project repair sites are located on narrow, steep forest roads which will limit equipment access and staging.
Excavation
The proposed repairs consider the variable geologic formations and slope conditions. With this in mind, this site is anticipated to encounter roadway fills, native soils and bedrock. Soils will range from fine grained materials (silt and sand) to gravel and cobbles. Boulders up to 4 feet diameter have been observed at FSR 11, and larger boulders could be encountered during construction that may require reduction for handling and hauling.
If bedrock is encountered, excavation will require ripping or impact hammer attachments with heavy duty equipment. Blasting may not be allowed due to environmental restrictions.
Excavation, sloping and benching into rock and soils should adhere to OSHA 1926 Subpart P, Appendix B based on the rock and soil types which are encountered.
Backfill Material
No samples have been tested to confirm onsite material properties. It is assumed that onsite materials do not meet Select Borrow requirements for the deep patch.
REFERENCES
Apodaca, M., M. Tippie, A. M. Verde, V. Barandino, Jr., 2012, Guidelines for Road Maintenance Levels, United States Department of Agriculture, Forest Service, National Technology & Development Program, June 2012.
USGS, 2003, Geologic Map of Mount Baker 30”x60” Quad, WA., Map I-2660, United States Geological Survey.
WA DNR, Washington LiDAR Portal, North Puget 2017 dataset, available at:
https://lidarportal.dnr.wa.gov/, accessed March 2024, Washington State Department of Natural Resources, Division of Geology and Earth Resources.
CLOSING
Please contact Eric Lim at (360) 619-7826 or eric.lim@dot.gov with any questions regarding this memorandum.
CC: Thao Truong, Highway Design Vernon Bevan, Hydraulics Ben White, Environment Mark Swank, GEO Team Functional Manager Geotechnical File
| 2025-05-27T12:01:38-0700 | |
| ERIC J. LIM |