This is a Quantities Report by Named Boundary, generated on July 17, 2025, documenting material quantities and volumes for a construction project. The report presents detailed measurements organized by station locations and named boundary segments, with all units expressed in feet, square feet, and cubic feet unless otherwise specified.
The report encompasses three primary station segments: Totals (baseline data), 801+40 - 802+00 (416.156 linear feet), and 800+50 - 801+40 (425.115 linear feet). Key materials and their associated quantities include Pavement Layer 1 (847.947-1,275.540 square feet with volumes of 261.051-391.876 cubic feet), Subex_Backfill1 (214.815-1,704.083 square feet with volumes ranging from 327.819-7,307.575 cubic feet), Volumes_Cut (1,451.053-8,179.364 square feet with volumes of 6,917.640-54,959.006 cubic feet), Shoulder Layer 1 (300.484-542.204 square feet with volumes of 99.990-179.982 cubic feet), and Turf Establishment (2,046.091-2,507.153 square feet). Additional materials tracked include Foreslope, Rockery Wall, Volumes_Fill, and various surface symbology elements. The report also documents linear measurements for numerous boundary markers and reference lines such as Centerline, Baseline, Edge of Widen, Edge of Pavement, and Edge of Shoulder, supporting the project's survey and construction layout requirements.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quantities Report by Named Boundary Report Created: Thursday, July 17, 2025
Time: 1:32:57 PM
Named Boundary Group: Quantity
Alignment Name:
Input Grid Factor: Note: All units in this report are in feet, square feet and cubic feet unless specified otherwise.
Station Named Boundary Name Material Count Length Top Sloped Area Volume Totals
Foreslope: 112.280 Cut: 1699.161
Pavement Layer 1: 707.522 217.709 Turf Establishment: 2507.153
Shoulder Layer 1: 300.484 99.990 Subex_Backfill1: 1704.083 6422.861
Volumes_Fill: 7.474 0.600 Volumes_Cut: 1451.053 6917.640 Rockery Wall: 50.000
Baseline: 100.000 Centerline 1: 50.000
Centerline: 50.000
DNC: 150.000
Edge of Widen 1: 100.000 Edge of Widen: 100.000 Edge of Pavt 1: 100.000 Edge of Shld 1: 100.000
Edge of Shld: 100.000 Centerline Exist: 50.000
Hinge: 100.689 Subex_Backfill1:
AUX_01:
AUX_02: 50.000
Prop Clearing: 151.140 Cut: 160.867
416.156 801+40 - 802+00 Cut: 1854.171
Pavement Layer 1: 847.947 261.051 Foreslope: 133.638
Volumes_Fill: 2.765 0.100 Shoulder Layer 1: 330.545 109.989 Subex_Backfill1: 1625.003 7307.575
Turf Establishment: 2258.946 Volumes_Cut: 1630.805 7707.547
Page 1 of 3Volumes Report
7/17/2025
Station Named Boundary Name Material Count Length Top Sloped Area Volume Rockery Wall: 60.000
Baseline: 126.358 Centerline 1: 60.000
Centerline: 60.000
DNC: 180.000
Edge of Widen 1: 120.065 Edge of Widen: 120.067 Edge of Pavt 1: 120.067 Edge of Shld 1: 120.000
Edge of Shld: 120.000 Centerline Exist: 60.000
Hinge: 120.320
AUX_02: 60.000
Prop Clearing: 156.720 Cut: 167.631
Subex_Backfill1:
AUX_01:
425.115 800+50 - 801+40 Foreslope: 202.103
Volumes_Fill: 5.699 0.345 Cut: 2157.023
Pavement Layer 1: 1275.540 391.876 Surface 5 Symbology: 26814.809 Surface 3 Symbology: 3066.586 9634.267
Shoulder Layer 1: 542.204 179.982 Subex_Backfill1: 214.815 327.819
Surface 6 Symbology: 3373.898 Surface 4 Symbology: 7468.854 50853.096 Surface 2 Symbology: 1442.915 1067.665
Turf Establishment: 2046.091 Surface 9 Symbology: 1497.007 2943.388
Volumes_Cut: 8179.364 54959.006 Rockery Wall: 578.690
Baseline: 180.000 Centerline 1: 90.000
Centerline: 90.000
DNC: 450.250
Edge of Widen 1: 180.000 Edge of Widen: 180.000 Edge of Pavt 1: 180.000 Edge of Shld 1: 180.000
Edge of Shld: 180.000 Centerline Exist: 90.000
Hinge: 90.125 Subex_Backfill1: 180.000
AUX_01: 92.092
Page 2 of 3Volumes Report
7/17/2025 select borrow
Riprap
RECP
geosynthetic
Station Named Boundary Name Material Count Length Top Sloped Area Volume
AUX_02: 90.000
Prop Clearing: 191.145 Cut: 297.320
Page 3 of 3Volumes Report