U.S. Department of Agriculture - Forest Service Bridge Use Application and Permit.pdf

PDF 629 KB Posted

Attached to
WA ERFO FS MTBKR605 2022-1(3) Mt. Baker - Forest Road 11 MP 23. 9 Repair
Solicitation number
69056726B000002
Issued by

About this file

This is a Bridge Use Application and Permit form issued by the U.S. Department of Agriculture Forest Service under 36 CFR 261.12 and 261.54(c). The form is a template used to request authorization for vehicles to traverse designated bridges on National Forest System lands for timber sales, construction contracts, or other purposes.

The applicant must provide identifying information including name, address, phone, and fax number, along with the reason for bridge use and desired travel dates and routes. The vehicle section requires comprehensive specifications including total gross weight, maximum dimensions (length, width, height), license number, and detailed axle information such as axle spacing, axle load, axle width, tire width, number of tires per axle, and tire size for up to ten axles. A registered professional engineer must evaluate the bridge(s) for the specified vehicle and sign the form. The Forest Bridge Inspection Program Manager and Regional Bridge Engineer (R-6) must provide recommendations and concurrence before final approval. The Forest Supervisor grants final approval of the permit, which specifies the designated bridge(s), effective dates, and any provisions or attachments. The form requires signatures and dates from the applicant, engineer, program manager, regional engineer, and forest supervisor.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF AGRICULTURE – FOREST SERVICE

BRIDGE USE APPLICATION AND PERMIT

36CFR 261.12, and 261.54(c)

DATE RECEIVED:__________________ EFFECTIVE DATES OF PERMIT (Section for Forest Servcie Use Only) PERMIT NO.: _____________________ BEGINNING: ______________ TERMINATING: ______________ EXCLUDING: _____________

PERMITTEE/APPLICANT: ______________________________________ PHONE: _______________ ADDRESS: ____________________________________________________ FAX: _______________

REASON FOR PERMIT: TIMBER SALE:________________________________________________

CONSTRUCTION CONTRACT: __________________________________

OTHER: _____________________________________________________

DESIRED TRAVEL DATES: BEGIN: ____________ END: _____________

DESIRED TRAVEL ROUTE (Road #’s, Termini & Bridges): ___________________________________ TYPE OF VEHICLE: __________________________________________________________________

TOTAL GROSS WEIGHT:______________ POUNDS LICENSE NO: ____________ STATE: ____

MAXIMUM DIMENSIONS: LENGTH: ______________WIDTH: ____________ HEIGHT: ___________

VEHICLE DESCRIPTION

AXLE WIDTH TIRE WIDTH (OUT-OUT) NO. OF

AXLE AXLE SPACING AXLE LOAD (OUT – OUT) PER WHEEL LINE TIRES TIRE

NO. FEET & INCHES POUNDS FEET INCHES INCHES PER AXLE SIZE

1 P1 ___________ _____ ′ _____ ″ _______″ _____ _______ D1 _____ ′ _____ ″ 2 P2 ___________ _____ ′ _____ ″ _______″ _____ _______ D2 _____ ′ _____ ″ 3 P3 ___________ _____ ′ _____ ″ _______″ _____ _______ D3 _____ ′ _____ ″ 4 P4 ___________ _____ ′ _____ ″ _______″ _____ _______ D4 _____ ′ _____ ″ 5 P5 ___________ _____ ′ _____ ″ _______″ _____ _______ D5 _____ ′ _____ ″ 6 P6 ___________ _____ ′ _____ ″ _______″ _____ _______ D6 _____ ′ _____ ″ 7 P7 ___________ _____ ′ _____ ″ _______″ _____ _______ D7 _____ ′ _____ ″ 8 P8 ___________ _____ ′ _____ ″ _______″ _____ _______ D8 _____ ′ _____ ″ 9 P9 ___________ _____ ′ _____ ″ _______″ _____ _______ D9 _____ ′ _____ ″ 10 P10___________ _____ ′ _____ ″ _______″ _____ _______

SIGNATURE OF APPLICANT: NAME OF REGISTERED PROFESSIONAL ENGINEER EVALUATING BRIDGE(S)

FOR ABOVE VEHICLE: _______________________________________________(PE)

SIGNATURE: _______________________________

FOREST BRIDGE INSPECTION PROGRAM MANAGER RECOMMENDATION

__________________________________________ AND REGIONAL BRIDGE ENGINEER CONCURRENCE (Print Name) SUBJECT TO PROVISIONS AND ATTACHMENTS INCLUDED HEREIN

TITLE: _____________________________________ SIGNATURE: ___________________________________ DATE: _________ Forest Bridge Program Manager

DATE: ________________________ SIGNATURE: ___________________________________ DATE: _________ R-6 Regional Bridge Engineer

APPROVAL OF PERMIT

PERMISSION IS HEREBY GIVEN TO THE ABOVE APPLICANT FOR THE USE OF THE DESIGNATED BRIDGE(S) IN THE MANNER DESCRIBED, SUBJECT TO THE PROVISIONS AND ATTACHMENTS INCLUDED WITH THIS PERMIT

SIGNATURE: ____________________________________________ DATE: _____________ __________

TITLE: ________________________________________________________________________________ Forest Supervisor

36CFR 261.12, and 261.54(c)

Check Box2: Off
Check Box3: Off
Check Box4: Off
34:
35:
36:
37:
38:
39:
40:
41:
42:
43:
44:
45:
46:
47:
48:
49:
50:
51:
52:
53:
54:
55:
56:
57:
58:
59:
60:
61:
62:
63:
64:
65:
66:
67:
68:
69:
70:
71:
72:
73:
74:
75:
76:
77:
78:
79:
80:
81:
82:
83:
84:
85:
86:
87:
88:
89:
90:
91:
92:
93:
94:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
16:
17:
18:
19:
20:
21:
22:
23:
24:
25:
26:
27:
28:
29:
30:
31:
32:
33:
15:
97:
98:
a:
b:
c:
d:
e:
95:
f:
g:
96:
h:
i:
1:
3:
2:

File details come from the government source that posted it. Updated .