EXHIBIT_A_____PERFORMANCE_RELEVANCY_QUESTIONNAIRE ADAL SFS.doc

DOC document 33 KB Posted

Attached to
ADAL Security Forces Facility, Bldg P-25, DCFT 082025
Solicitation number
W91SMC-12-R-183-0004
Issued by

About this file

EHIBIT A PERFORMANCE RELEVANCY QUESTIONAIRE

View the file

Other files

File Type Posted
RFI 2 ADAL SFS 14 MAR 2012.pdf PDF
BQ-015 - Dmt Mvbl Walls - mark_up.pdf PDF
RFI 1 ADAL SFS 06 MAR 2012.pdf PDF
Geotechnical_Report.pdf PDF
Furniture Listing Detail.pdf PDF
EXHIBIT C ADAL SFS PERFORMANCE EVAL.docx DOCX document
EXHIBIT_D_Option_Execution_Period ADAL SFS.doc DOC document
EXHIBIT B Key Personnel ADAL SFS.docx DOCX document
ADAL SECURITY FORCES BUILDING P-25 RFP W91SMC-12-R-183-0004- AMENDMENT 001.pdf PDF
Formal Request for Information ADAL Security Forces.doc DOC document
ADAL Security Forces Slides Updated.pdf PDF
Contractor Accesss Autorization Request.pdf PDF
REQ For Proposal ADAL SECURITY FORCES W91SMC_12_R_183_0004 01FEB 2012.pdf PDF
ADAL SECURITY FORCES BUILDING P-25 WAGE DETERMINATION.pdf PDF
Combined_Specs.pdf PDF
GENERAL.zip ZIP file
TELECOM.zip ZIP file
CIVIL.zip ZIP file
PLUMBING.zip ZIP file
STRUCTURAL.zip ZIP file
FIRE PROC.zip ZIP file
ELEC.zip ZIP file
ARCH.zip ZIP file
MECHANICAL.zip ZIP file
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

PERFORMANCE RELEVANCY QUESTIONNAIRE

SOLICITATION/RFP # W91SMC-12-R-183-0004 ADAL SECURITY FORCES BLDG P-25

PART 1: Prepare questionnaires in the format provided.

Provide the following information requested in this format for each of the projects/contracts (up to $10 million in awarded amount) being described. Prepare not more than Four (5) of these documents. Contractors should select their projects carefully because the quality of the contractor’s relevant performance is more important than the quantity of projects submitted. Projects may be on going, if complete to 70%, and cannot have been completed any earlier than 5 years prior to the solicitation issue date. Provide frank, concise comments regarding your performance on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as ___________Prime or _________Subcontractor

2. Contract Number

3. Original Contract $ Value _____________ Current/Final Contract $ Value ____________

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date: ______________

2. Current Schedule____________________

3. Estimate/Final Completion Date:________________________________

4. Primary cause for Contract Modifications__________________________________

D. Provide detailed description of the work performed under the contract including, but not limited to, similarity of construction and documentation experience, Government/Department of Defense experience, cost magnitude, scope (remodel, new addition, abatement, Square Footage), geographic experience (American Midwest) and complexity of work performed to those required for the proposed effort Also discuss similarity of the client type, United States Green Building Council (USGBC) (LEED®) or similar sustainability requirements. Discuss the similarity of the location at which work was performed to the location(s) at which work will be performed

In addition, address the following: (Use as much space as necessary)

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to use these subcontractors, please list name and principal areas of work they will perform. If you do not intend on utilizing any of these subcontractors please so indicated.

3. Address any technical areas about this project you consider uniquely relevant to this project. Include in your discussion if project had sustainability requirements. Of particular interest is USGBC LEED® and the level of recognition received. received. If no such requirements please so state.

4. If you intend to use any of the same key personnel on this solicitations’ project, indicate by name and position those personnel proposed to be utilized on the referenced contract. (Project Manager, Site Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation’s contract. If you do not intend on utilizing any of these same personnel please so indicated.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)

E. List a point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired. (This information is required here even though you will be sending Exhibit C letters and questionnaires to theses references. (Do NOT include a copy of the Exhibit Cs you sent to your references.)

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of projects discussed in the Exhibit As.

PART 2 : Provide the following information one time.

Additional offeror information required, but not project specific. This information need only be provided once in your submission package.

2 A. Applicable to all offerors - Describe your Compliance with the requirements of FAR clause 52.219-8 Utilization of Small Business Concerns (Deviation). (Even if you are a Small or Small Disadvantaged Business this clause in Federal Contracts applies. It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts.) Describe below the methods you have used to comply with this policy on prior federal contracts. Include any evidence, or a point of contact to verify this information, if available.

2B: Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problem(s).

2C: List any projects within the last five (5) years that have been assessed Liquidated damages. If none have been assessed, make a positive statement to that effect.

2D: List any projects within the last five (5) years that have been terminated, for any reason. Provide an explanation. If none, make a positive statement to that effect.

2E: List of Projects USGBC LEED® certified with date and level of certification

2F: Other Past Performance Considerations (OPTIONAL) Information, if provided, shall be limited to the period starting 5 years prior to the solicitation release date.

Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of customer benefiting from the VEC).

Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations.

Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

End of Questionnaire Requirements

File details come from the government source that posted it. Updated .