ADAL Security Forces Slides Updated.pdf
PDF 638 KB Posted
- Solicitation number
- W91SMC-12-R-183-0004
About this file
Pre Solicitation/Site Visit Slides
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 2 ADAL SFS 14 MAR 2012.pdf | ||
| BQ-015 - Dmt Mvbl Walls - mark_up.pdf | ||
| RFI 1 ADAL SFS 06 MAR 2012.pdf | ||
| Geotechnical_Report.pdf | ||
| Furniture Listing Detail.pdf | ||
| EXHIBIT C ADAL SFS PERFORMANCE EVAL.docx | DOCX document | |
| EXHIBIT_A_____PERFORMANCE_RELEVANCY_QUESTIONNAIRE ADAL SFS.doc | DOC document | |
| EXHIBIT_D_Option_Execution_Period ADAL SFS.doc | DOC document | |
| EXHIBIT B Key Personnel ADAL SFS.docx | DOCX document | |
| ADAL SECURITY FORCES BUILDING P-25 RFP W91SMC-12-R-183-0004- AMENDMENT 001.pdf | ||
| Formal Request for Information ADAL Security Forces.doc | DOC document | |
| Contractor Accesss Autorization Request.pdf | ||
| REQ For Proposal ADAL SECURITY FORCES W91SMC_12_R_183_0004 01FEB 2012.pdf | ||
| ADAL SECURITY FORCES BUILDING P-25 WAGE DETERMINATION.pdf | ||
| Combined_Specs.pdf | ||
| GENERAL.zip | ZIP file | |
| TELECOM.zip | ZIP file | |
| CIVIL.zip | ZIP file | |
| PLUMBING.zip | ZIP file | |
| STRUCTURAL.zip | ZIP file | |
| FIRE PROC.zip | ZIP file | |
| ELEC.zip | ZIP file | |
| ARCH.zip | ZIP file | |
| MECHANICAL.zip | ZIP file |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre Proposal Conference February 15, 2012 @ 10:00 am February 21, 2012 @ 1:00 pm
Request for Proposal W91SMC-12-R-183-0004 ADAL Security Forces Building P-25 183D Fighter Wing, Springfield, IL
ADAL Security Forces Facility, Building P-25
P-25
Points of Contact
MSgt Brent Keller– Contracting Officer
(217) 757-1251 brent.keller@ang.af.mil
Captain Bob Mitchell– Deputy Base Civil Engineer/COTR robert.mitchell.11@ang.af.mil
OPENING STATEMENT
No minutes of this meeting or sign in sheet will be published
Any changes to the RFP resulting from this meeting will be made in writing with an amendment posted to the Federal Business Opportunities (FBO)website at https://www.fbo.gov/
The pre-proposal conference presentation slides will be posted on the FBO website
ON THE WEB
http://www.fbo.gov/
SOLICITATION
PLANS & SPECIFICATIONS
QUESTIONS and ANSWERS DOCUMENT
AMENDMENTS
check regularly for updates/amendments
SOLICITATION, PLANS &
SPECIFICATIONS
Dates and Time Line
Site Visits 15th and 21st of February Questions due NLT 14 days prior to RPF closing date in Required Format Answers to be posted NLT 13 MAR RFP Closing date (20 March 2012 @11:00 A.M Unless otherwise extended in future amendment
Estimated Award Date of 13 April 2012 Subject to Availability of Funding
Period of Performance is 365 days from issuance of Notice to Proceed
This procurement is limited to current IL MATOC contractors
North American Industry Classification System (NAICS): 236220, Commercial and Institutional Building Construction
Size Standard: $33.5M The project magnitude is $1-5M
RFP HIGHLIGHTS
Eligible MATOC Contractors
Charpie - Korte JV Scott Alliance, Inc.
Reliable Contracting Group
JEI/ MALONE Joint Venture DWG & Associates, Inc.
Hammer LGC, Inc.
R. L. Alvarez MKB Construction Co.
Old Veteran Construction, Inc.
J & B Builders, Inc.
Limbaugh Construction Co
Price and Past Performance are approximately equal in weight
Basis for Award
BASIS OF EVALUATION
The Government’s sources of information for evaluating past performance may include, but are not limited to:
Information provided by the Offeror Inquiries of owner representatives Other known sources not provided by the Offeror Occupational Safety and Health Administration (OSHA) CCASS or ACASS retrieved through the Past Performance
Information Retrieval System (PPIRS)
Burden of providing detailed, current, accurate and complete past performance information rests with the Offeror
Option to submit Past Performance Narratives for up to 3 projects within the last five years Brief Description of Project Square
Footage/Value/Customer Project requirements included:
HVAC
Fire Protection Demolition Vertical Construction Masonry
Past Performance
The Security Forces facility work included selective demolition, alteration and renovation of selected 1st and 2nd floor existing spaces ( 15,594 SF), and a two-story 83'x60' on grade building addition (1200 SF). Contractor to Provide required utilities, HVAC, pavements, and site improvements, fire protection and communication support. This project was USGBC LEED Silver Certified.
Continued
Experience
What to submit Resumes of Key Personnel that will actually be assigned to this project…… Past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects for this project Certifications (LEED)
RFP Line Items
001- ADAL Security Forces Facility Renovation 002-ADAL Security Forces Facility Addition 003 (Option) Security Forces Furniture
BASIS OF EVALUATION
Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
Comparison of all proposed total prices received in response to the RFP
Comparison of each proposed price with the Independent Government Estimate
Price Evaluation
This is to be completed to determine if proposed price is reasonable and realistic in relation to the RFP requirements.
Contractor must demonstrate understanding of proposal requirements.
Price is not rated!
Disclaimer
Offerors are advised that an award may be made without discussions or any contact concerning the proposals received
Offerors shall not assume that they will be contacted or afforded an opportunity to qualify, discuss, or revise their proposals.
However, the Government reserves the right to clarify certain aspects of the proposals or conduct discussions
REMINDER
Participants shall submit all questions electronically using the Request for
Information (RFI) posted on the FBO website
Proposal Due Date
Proposals are due on 20 March 2012 @ 1100 hrs.
CST or as indicated in most recent amendment
Late proposals will not be considered.
Solicitation Packages must addressed/delivered to:
MSgt Brent Keller
Base Contracting Office
3101 J David Jones Pkwy
Building P-48 Room 313
CLOSING STATEMENT
No minutes of this meeting will be published
Any changes to the RFP resulting from this meeting will be made in writing with an amendment posted to the Federal Business Opportunities (FBO)website at https://www.fbo.gov/
The attendance sheet and pre-proposal conference presentation slides will be posted on the FBO website
| Pre Proposal Conference �February 15, 2012 @ 10:00 am�February 21, 2012 @ 1:00 pm |
| ADAL Security Forces Facility, Building P-25�� |
| �Points of Contact�� |
| OPENING STATEMENT� |
| SOLICITATION, PLANS & SPECIFICATIONS |
| Dates and Time Line |
| RFP HIGHLIGHTS |
| Eligible MATOC Contractors |
| Basis for Award |
| BASIS OF EVALUATION |
| Past Performance |
| Continued |
| Experience |
| RFP Line Items |
| �BASIS OF EVALUATION� |
| Price Evaluation |
| Disclaimer |
| �REMINDER� |
| Slide Number 19 |
| Proposal Due Date |
| �CLOSING STATEMENT� |
File details come from the government source that posted it. Updated .