ADAL SECURITY FORCES BUILDING P-25 RFP W91SMC-12-R-183-0004- AMENDMENT 001.pdf
PDF 130 KB Posted
- Solicitation number
- W91SMC-12-R-183-0004
About this file
Amendment 001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 2 ADAL SFS 14 MAR 2012.pdf | ||
| BQ-015 - Dmt Mvbl Walls - mark_up.pdf | ||
| RFI 1 ADAL SFS 06 MAR 2012.pdf | ||
| Geotechnical_Report.pdf | ||
| Furniture Listing Detail.pdf | ||
| EXHIBIT C ADAL SFS PERFORMANCE EVAL.docx | DOCX document | |
| EXHIBIT_A_____PERFORMANCE_RELEVANCY_QUESTIONNAIRE ADAL SFS.doc | DOC document | |
| EXHIBIT_D_Option_Execution_Period ADAL SFS.doc | DOC document | |
| EXHIBIT B Key Personnel ADAL SFS.docx | DOCX document | |
| Formal Request for Information ADAL Security Forces.doc | DOC document | |
| ADAL Security Forces Slides Updated.pdf | ||
| Contractor Accesss Autorization Request.pdf | ||
| REQ For Proposal ADAL SECURITY FORCES W91SMC_12_R_183_0004 01FEB 2012.pdf | ||
| ADAL SECURITY FORCES BUILDING P-25 WAGE DETERMINATION.pdf | ||
| Combined_Specs.pdf | ||
| GENERAL.zip | ZIP file | |
| TELECOM.zip | ZIP file | |
| CIVIL.zip | ZIP file | |
| PLUMBING.zip | ZIP file | |
| STRUCTURAL.zip | ZIP file | |
| FIRE PROC.zip | ZIP file | |
| ELEC.zip | ZIP file | |
| ARCH.zip | ZIP file | |
| MECHANICAL.zip | ZIP file |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91SMC-12-R-183-0004
1 | P a g e
NOTICE OF PROPOSED TASK ORDER PROPOSAL
Date: 22 FEB 2012 OFFERED ( X ) SB Set-aside
( ) HUBZone ( ) SVDB ( )
8(a)
PROJECT TITLE AND NO.: ADAL Security Forces Facility, Bldg P-25, DCFT 082025
PROJECT DESCRIPTION: The objective of this project is to award a single, firm fixed-price contract for construction to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary to perform and complete the alterations and addition to
Security Forces Squadron Facility, Building P-25 located at the 183 rd
FW, 3101 J. David Jones
Parkway, Springfield IL 62707. The Security Forces facility work includes selective demolition, alteration and renovation of selected 1 st and 2 nd floor existing spaces ( 15,594 SF), and a two-story 83’x60’ on grade building addition (1200 SF). Contractor to Provide required utilities, HVAC, pavements, and site improvements, fire protection and communication support. The project shall comply with ANG Sustainable Design Policy. The project is classified as vertical construction for the purpose of compliance with ANG policy. The project shall obtain USGBC
LEED Silver Certified recognition. The project shall comply with Energy Policy Act of 2005
(EPAct 05). The project shall comply with Intelligence Community Policy Guidance number
705.2. The project shall comply with Unified Facility Criteria 4-010-01 DoD Minimum Anti
Terrorism Standards for Buildings (22 JAN 2007).
All work shall be in strict accordance with the:
( X ) Plans/drawings and Specifications: ADAL Communications Facility, Bldg P-8, dtd. 22 July
2011.
[ X ] Plans and Specifications will be provided under separate cover at or before the Site Visit.
MAGNITUDE OF PROJECT: ( ) Less than $25,000; ( ) $25,000-$100,000; ( ) $100,000-
$250,000; ( ) $250,000-$500,000; ( )$500,000 - $1,000,000; (X )$1,000,000 - $5,000,000.
PROPOSAL DUE DATE: All offers are due by 22 March 2012 at 1:00 P.M. CST. A bid repository is provided for hand carried proposals and is located at the 183d FW, Contracting
Office, Building P-48 (Room 313), 3101 J David Jones Parkway, Springfield, IL. Email proposals will not be accepted. Facsimile proposals will not be accepted.
Address:
183d FW, Illinois Air National Guard
Base Contracting Office
3101 J. David Jones Parkway
Abraham Lincoln Capital Airport
Springfield Il 62707
2 | P a g e
PERFORMANCE PERIOD: :365 Calendar Days, after receipt of Notice to Proceed.
SITE VISIT: A site visit will be conducted on 15 February 2012 @ 1000hrs. CST and 21
February @ 1300hrs. CST. Site visit location: Buildings P-48 Auditorium 3101 J. David Jones
Parkway, Springfield, IL 62707. . Information provided at this site visit as well as answers to questions shall not change/qualify the terms and conditions of the solicitation and specifications.
Terms remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
PERFORMANCE & PAYMENT BONDS: In accordance with FAR Clause 52.228-15
Performance and Payment Bonds – Construction, contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health
Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx
WAGE DETERMINATION: Currently, General Decision Number IL120004 Modification
No. 01 dated 13 JAN 2012 for Sangamon County in Illinois is applicable to this task order.
Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/IL.html However, the current prevailing Wage Determination will be incorporated at time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.
QUESTIONS AND ANSWERS: All questions and answers must be in writing. Email all questions (brent.keller@ang.af.mil and/or Robert.Mitchell.11@ang.af.mil). Do not contact engineers or A&E as this will only delay receipt of answers. Questions must be received NLT 10 calendar days prior to closing. Answers will be provided with questions, on a non-attribution basis to all eligible MATOC contractors.
BASIS FOR AWARD: NOTE: Only ( ) with (X) apply:
( ) PRICE;
( ) PRICE and PAST PERFORMANCE @ equal weight (see notes);
( ) LPTA See notes/instructions
(X ) OTHER, See notes instructions (Evaluation Factors for Award Sec. 1.2 pg. 6) http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx mailto:brent.keller@ang.af.mil mailto:Robert.Mitchell.11@ang.af.mil
3 | P a g e
The Following Provisions/Clauses if marked [X] are applicable to this task order
[ ] Availability of funds (FAR Clause 52.232-18) Funds are not presently available for this procurement.
[ X ] Contract Clause 52.211-12 LIQUIDATED DAMAGES - Liquidated damages in the amount of $1,442.29 will be assessed for each calendar day past the scheduled completion date required to complete the work on this project. Also, a ―one time‖ fee of $ _N/A_ will be assessed.
[ X ] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.
[ ] 52.204-10 REPORTING: Executive Compensation and First Tier Subcontract Awards
(Jul 2010) Is applicable to this order. The following are the codes needed to accomplish the reporting TAS_________, Agency_____________
[ X ] Alternate proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits.
Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.
[ ] DFARS 252.236-7006 COST LIMITATION (JAN 1997)
(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.
(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.
(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.
(d) Offers may be rejected which—(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.
[ ] PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE
NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause IS
APPLICABLE TO THIS TASK ORDER.
[ X ] FAR 52.217-5 Evaluation of Options applies to this solicitation
4 | P a g e
[ X ] FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Item applies to award when option(s) not taken at time of award. The Government reserves the right to award option individual line items at time of basic line item award or after award, but not later than 120 days after initial award. Performance period upon award of options will not be extended.
Point of Contact for this requirement is;
MSgt Brent Keller
3101 J. David Jones Parkway
Abraham Lincoln Capital Airport
Springfield Il 62707
PHONE: 217-757-1251 FAX 217-757-1309
e-mail: brent.keller@ang.af.mil
//SIGNED//
Brent Keller
MSgt, IL ANG
Base Contracting Officer
5 | P a g e
PROPOSAL INSTRUCTIONS
1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. The technical proposal shall not exceed 10 pages. (resumes or experience cut sheets not to exceed 2 pages are not included in the page count.)
1.1. Discuss company experience with building to United States Green Building Council
(USGBC) LEED® standards. Indicate any previous projects that achieved USGBC
LEED® certification, any level of recognition. Additionally, indicate the lead construction personnel and demonstrate they have experience and required qualifications in assigned roles with building to USGBC LEED® standards. If no experience so state and indicate in detail how you plan to overcome this lack of experience.
1.2. Discuss offerors technical experience and capability to perform a project of this magnitude and complexity. Provide a brief proposal narrative that discusses your management plan and approach for the execution of this contract. The narrative shall include necessary information regarding the offeror’s ability to perform complete project management of the scope requirements.
1.3. Demonstrate, as a minimum, that the following key personnel have experience in managing projects/contracts of the same/similar dollar magnitude, size, complexity and scope, in the capacity in which they are proposed for this project: (1) Project
Manager(s), (2) Site Superintendent(s), (3) Quality Control staff, (4) Safety Manager.
Demonstrate personnel meet any specific experience qualifications included elsewhere in the contract requirements. As a minimum, provide experience information or a resume for the personnel listed above. Indicate which members of the proposed contract/project team personnel have experience working on similar type projects together.
2. Past Performance: For the purposes of this solicitation no specific past performance information is required of the MATOC contractor as part of the proposal. The
Government will evaluate the quality , timeliness, and management of the offeror's past performance considering currency, relevancy, sources, context, and trends on recent (within the last five (5) years projects performed under the existing or predecessor MATOC contracts, other open market projects performed in support of locations serviced by National
Guard Contracting Offices. Also, evaluations available through the Construction Contractor
Assessment System (CCASS) may be used. However, contractors may submit projects that are similar in size, dollar value and scope for consideration. Include a reference POC with current name/phone and email. DoD Performance Evaluations Construction previously referred to as CCASS or other Agency performance evaluations should be submitted if available.
6 | P a g e
3. ENFORCEABILITY OF PROPOSAL: The proposal must set forth full, accurate and complete information as required by this solicitation. By submission of the offer, the Offeror agrees that all items proposed (if applicable e.g., key personnel, subcontractors, etc.) will be utilized for the duration of the contract and any substitutions shall require prior Contracting
Officer's approval.
PROPOSAL EVALUATIONS AND BASIS FOR AWARD
1. This solicitation is for a Firm Fixed Price Task Order. The Government intends to award a single task order to a qualified MATOC Offeror whose proposal conforms to all the RFP's requirements and is judged to represent the Best Value to the Government in accordance with the evaluation scheme set out in this solicitation. The Best Value is the most advantageous offer, price and other factors considered, and consistent with the Government's stated importance of evaluation criteria.
1.1. Offers will be evaluated using the criteria listed in ―Evaluation Factors for Award.‖
Noncompliance with the RFP requirements may raise serious questions regarding an offeror’s technical ability, past performance and/or pricing and may be grounds to eliminate the proposal from consideration for contract award. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
1.2. Evaluation Factors for Award. The evaluation factors are Technical Capability, Past/Present Performance and Price. The relative importance of the evaluation factors is as follows: Technical and Past Performance are approximately equal to each other and when combined, are approximately equal to the Price Factor. The evaluation process will follow a sequence in which the Technical will be evaluated first, the Price factor will be evaluated second and the Past Performance Factor will be evaluated third (and last).
1.3. TECHNICAL PROPOSAL : TECHNICAL EVALUATION FACTOR RATINGS:
1.3.1. The technical proposal will be rated first. Proposal cannot exceed 10 pages.
(Resumes excluded from page count) Any offeror receiving a rating of ―red‖ in any subfactor may be eliminated from the competition. The Government will evaluate and rate an offeror's Technical proposal at the sub-factor and overall Factor level using a color rating that combines technical merit and proposal risk considering all subfactors identified in this section. The technical proposal assigned rating reflects the degree to which the proposed approach meets or does not meet the minimum performance or capability requirements through an assessment of the strengths, weaknesses, deficiencies, and risks of a proposal.
7 | P a g e
Color Rating Evaluation Criteria
Blue Outstanding Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
Purple Good
Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal
Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
RED Unacceptable Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
1.3.2. Offerors who are deemed to merit an ―RED‖ rating in the Technical Factor or any subfactor will be removed from further consideration for award unless the
Contracting Officer determines discussion are necessary and a revision of the technical proposal may result in the offeror being eligible for award. The
Government intends to award without discussions. Due to the evaluation process the
Technical Proposal must contain all the required information for a complete evaluation. The technical subfactors are equal in weight.
1.4. Technical Subfactor 1 (USGBC) LEED® experience and capability - The proposal for this subfactor should demonstrate company experience with building to United States
Green Building Council (USGBC) LEED® standards. The proposal also needs to demonstrate that the named lead construction personnel have experience and required qualifications in assigned roles with building to USGBC LEED® standards. If there is no such experience/required qualifications with USGBC LEED® standards, the onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience/required qualifications. The Government, in its sole and broad discretion, will analyze the above-referenced plans to overcome the lack of experience and/or qualifications with USGBC LEED® standards.
1.5. Technical Subfactor 2 Experience and Capability Proposal:
1.5.1. Using the information in Technical Proposal the Government will evaluate the extent of related experience, and determine to what degree the offeror has the experience and capability to manage a multi-disciplined construction project
8 | P a g e comparable to the work requirements of this solicitation. Accordingly, higher ratings can be achieved by offerors whose projects more closely resemble the scope, size, and complexity of this solicitation’s requirements. Proposal demonstrates adequate quality control processes to give government confidence of the offeror’s ability to successfully manage the material submittal process, and ensure subcontractor compliance with contract documents Proposal demonstrates, as a minimum, that the following key personnel: Contract Manager; Project Manager(s), Site Superintendent(s), Estimator(s), Safety Manager, Scheduler, have experience in managing projects/contracts of the same/similar dollar magnitude, size, complexity and scope, in the capacity in which they are proposed for this project.
Personnel meet experience and education qualifications included in the contract requirements, if any. Members of the proposed contract/project team personnel that have experience working together on successful similar type projects may be given additional consideration.
1.6. The Past/Present Performance evaluation will consider such things as an offeror's business practices, customer relationship, ability to successfully perform as proposed, and other considerations as described in Past/Present Performance Sub-factors, elements and other considerations. The Government will evaluate the Past/Present Performance of offers receiving rating higher than ―RED‖ Technical rating starting with the lowest reasonable and realistic price offered until an offeror is rated ―Substantial Confidence,‖ which is the best Past/Present Performance rating possible under the terms of the evaluation criteria in this solicitation. If the lowest (reasonable and realistic) price is deemed by the Government to merit a ―Substantial Confidence‖ in Past Performance and has been rated ―Blue‖ in the Technical Factor there will be no tradeoff and that offeror will be selected for award. If the lowest price offeror is not deemed to merit a
―Blue‖ Technical rating and a ―Substantial Confidence‖ the Government will continue to evaluate the Past Performance of all offers in price order. The Government will then use a standard tradeoff process as described at FAR 15.101-1 to arrive at the offeror representing the best value in this competition. By using this method it is possible that some offerors’ Past/Present Performance will not be evaluated.
1.6.1. Past/Present Performance includes current/on-going (present) performance complete to 70%. Projects currently in progress for the National Guard will also be considered regardless of percentage complete. In assessing performance confidence, the evaluator may: (1) evaluate present and past performance information through the use of questionnaires completed by the offeror's references; (2) use data independently obtained from other Government or commercial sources; from any other sources available to the Government, to include, but not limited to, the Past
Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting
System (eSRS), or other databases; (3) interviews with Program/Project Managers, Contracting Officers or rely upon personal business experience with the offeror; (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The
Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate.
9 | P a g e
1.6.2. The following ratings and related definitions will be used to define the performance confidence assessment. Based on the evaluation results, the evaluators will assign the Past Performance factor one of the ratings as defined below.
SUBSTANTIAL CONFIDENCE: Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
SATISFACTORY CONFIDENCE: Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
LIMITED CONFIDENCE: Based on the offeror’s recent/relevant performance record, the
Government has a low expectation that the offeror will successfully perform the required effort.
NO CONFIDENCE: Based on the offeror’s recent/relevant performance record, the
Government has no expectation that the offeror will be able to successfully perform the required effort.
UNKNOWN CONFIDENCE (NEUTRAL): No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
1.7. The Government will conduct a price/cost evaluation of each offeror's proposal to determine whether or not each proposal complies with the stated criteria:
"Reasonableness" and ―Realism".
2. To arrive at a Best Value decision this acquisition will utilize the FAR Part 15.101-1 tradeoff process unless the lowest priced offeror (with a price deemed reasonable and realistic) is also deemed to be the highest rated in terms of non-price evaluation criteria. If the lowest priced offeror (with a price deemed reasonable and realistic) is also the highest rated in terms of non-Price Factors, no tradeoff is necessary. Further, there is no tradeoff necessary between any offer that is lower priced (with a price deemed reasonable and realistic) and higher rated in terms of non-Price Factors with respect to any other offers that are higher priced and lower rated for the non-Price Factors. While the Government will strive for maximum objectivity, the evaluation process, by its nature, is subjective and therefore, professional judgment is implicit throughout the entire evaluation process. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer, in his/her sole discretion, later determines them to be necessary or appropriate. Further, the Government reserves the right to create or not to create a competitive range.
10 | P a g e
MATOC PROPOSAL FORM
PROJECT NO. DCFT 082025
ADAL Security Forces Facility, Bldg P-25
PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to complete the alterations and addition to
Security Forces Squadron Facility, Building P-25 located at the 183 rd
FW, 3101 J. David Jones
Parkway, Springfield IL 62707 in accordance with the task order requirements for ―ADAL
Security Forces Facility, Bldg P-25‖. This project is for a Firm Fixed Task Order against the
MATOC IDIQ Contract.
Item
Number Description Quantity Unit Amount
0001 Project No. DCFT 82025
ADAL Security Forces Facility
Renovation 1 JOB Lump Sum $_____________
0002 Project No. DCFT 82025
ADAL Security Forces Facility
Addition 1 JOB Lump Sum $_____________
OPTION(s)
0003 ADAL
Security Forces Furniture 1 JOB Lump Sum $_____________
ACKNOWLEDGEMENT OF AMENDMENTS
The Offeror acknowledges receipt of amendments to this Task Order
Amendment No. Date Amendment No. Date
____001______ _22FEB2012__ ____________ __________
SIGNATURE: COMPANY NAME
Name and title of person authorized to sign Offer Date
11 | P a g e
Note the following provision(s) is/are applicable to this task order:
DEVIATION 2012-O0004 Complete the certification and return with proposal.
Deviation 2012-O0004
Class Deviation— Prohibition Against Contracting With Corporations That Have an Unpaid
Delinquent Tax Liability or a Felony Conviction under Federal Law
252.209-7999 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law.
REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX
LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-
O0004) (JAN 2012)
(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated
Appropriations Act, 2012,(Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that—
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the
Government.
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that—
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability,
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a
Federal law within the preceding 24 months.
(End of provision)
Note: Offerors are reminded that unlike the bid process, the request for quotation process is not public. No information will be released until an award decision is made. All contractors submitting an offer will be notified, via email of the award results
12 | P a g e
Note: The Government intends to evaluate proposals and award the delivery order without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. The Government reserves the right to reject any or all proposals at any time prior to award; negotiate with any or all offerors; award a contract to other than the offeror submitting the highest technically rated; and award contracts to offerors submitting a proposal determined by the Government to be the most advantageous (best value) to the Government in accordance with the factors stated above.
Note: In the event the Government does not award a contract pursuant to this solicitation within
60 calendar days after receipt of proposals and award will be made without discussions, the following will apply:
The Government reserves the right to (1) allow offerors to extend their acceptance period or if that is not acceptable (2) will allow offerors to make an adjustment in their price proposals to allow pricing adjustments caused by fluctuating construction material market conditions. The
Contracting Officer will notify Offerors, normally by electronic mail (email) of a common closing date for receipt of the adjusted price proposals. No additional proposal revisions will be allowed under these conditions. This does not constitute and shall not be construed as discussions.
In the event the current prevailing Wage Determination is changed by the Department of
Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.