A21_Solicitation-Amendment_1_-_W91QVN-17-R-0091-0001_(CONFORM_COPY).pdf
PDF 819 KB Posted
- Solicitation number
- W91QVN-17-R-0091
About this file
SOLICITATION W91QVN-17-R-0091-0001 (CONFORM COPY)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN-17-R-0091 15-May-2017
b. TELEPHONE NUMBER
02-7914-7565
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 14 Jun 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. CHONG, SO-HUI
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES OF AMERICA (THE)
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE WT4G3U 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
HHC, 1ST SIG BDE
1ST SIGNAL BRIGADE
UNIT #15271
APO AP 96205-5271
UNITED STATES OF AMERICA (THE)
TEL: (0505) 725-6973 FAX: .
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
238210
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF193
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN-17-R-0091
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SOLICITATION NOTES
***ADMINISTRATIVE NOTE: Original Solicitation W91QVN-17-R-0091 has not been issued and will be replaced by Amendment W91QVN-17-R-0091-0001 (Conform Copy).***
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 40,000 Linear Foot
COPPER CABLE
FFP
Install, Splice, Terminate, and Test - Copper Cable (25 to 1200 PR).
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 100 Each
GROUND ROD
FFP
Install Ground Rod to Include Grounding of Cable / Terminal.
UNIT UNIT PRICE MAX AMOUNT
0003 50 Each
PET HOUSING
FFP
Install Protected Entrance Terminal (PET) Housing for Copper Cable.
UNIT UNIT PRICE MAX AMOUNT
0004 50 Each
SPLICE CASE FOR COPPER CABLE
FFP
Install Splice Case for Copper Cable.
UNIT UNIT PRICE MAX AMOUNT
0005 40 Each
¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Provide Contractor Furnished Material (CFM) and Install ¾ Inch, Fire-Retardant Plywood Backboard.
UNIT UNIT PRICE MAX AMOUNT
0006 160,000 Linear
FIBER OPTIC CABLE IN DUCT
Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores).
UNIT UNIT PRICE MAX AMOUNT
0007 800,000 Linear
LEAF FIBER OPTIC CABLE IN DUCT
Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores).
UNIT UNIT PRICE MAX AMOUNT
0008 100 Each
TERMINATION PANEL
FFP
Install Fiber Optic - Termination Panel (Wall Mount or Rack).
UNIT UNIT PRICE MAX AMOUNT
0009 100 Each
SPLICE ENCLOSURE KIT
Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores).
UNIT UNIT PRICE MAX AMOUNT
0010 5,000 Linear
ENCASED BURIED (EB)-20 CONDUIT
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area).
UNIT UNIT PRICE MAX AMOUNT
0011 20,000 Linear
RIGID NONMETALLIC CONDUIT
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
Duct Installation to Include Excavation, Backfill, Markers and Warning Tape.
UNIT UNIT PRICE MAX AMOUNT
0012 10,000 Linear
SUB / MULTI / MESH INNERDUCT
Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct.
UNIT UNIT PRICE MAX AMOUNT
0013 1,000 Each
CORE DRILL ½ TO 4 INCH HOLE
FFP
Core Drill ½ to 4 Inch Hole.
UNIT UNIT PRICE MAX AMOUNT
0014 50 Each
2 TO 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building Entrance Conduit.
UNIT UNIT PRICE MAX AMOUNT
0015 25 Each
MULTIDIRECTIONAL HANDHOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220 x 1220mm x 1220 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation.
UNIT UNIT PRICE MAX AMOUNT
0016 5 Each
MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850 x L3700 x H2150 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation.
UNIT UNIT PRICE MAX AMOUNT
0017 500,000 Linear
CAT 6 LAN CABLE
Install, Terminate, and Test CAT 6 LAN Cable.
UNIT UNIT PRICE MAX AMOUNT
0018 500 Each
CAT 6 WALL OUTLET BOX
FFP
Install CAT 6 Wall Outlet Box.
UNIT UNIT PRICE MAX AMOUNT
0019 30,000 Linear
NON-METALLIC RACEWAY
Install Non-Metallic Raceway.
UNIT UNIT PRICE MAX AMOUNT
0020 10 Linear
6 TO 12 INCH METAL CABLE LADDER RACK
Install and Bonding of 6 to 12 Inch Metal Cable Ladder Rack.
UNIT UNIT PRICE MAX AMOUNT
0021 10 Each
EQUIPMENT RACK
FFP
Install Equipment Rack.
UNIT UNIT PRICE MAX AMOUNT
0022 50,000 Linear
STRAND AND GUY WIRES FOR AERIAL CABLE
Provide Contractor Furnished Material (CFM) and Install Strand and Guy Wires for Aerial Cable.
UNIT UNIT PRICE MAX AMOUNT
0023 65,000 Linear
CABLE ON STRAND USING LASHING MACHINE
Install Cable on Strand Using Lashing Machine to Include Splicing, Termination, and Testing of Cable.
UNIT UNIT PRICE MAX AMOUNT
0024 20 Each
SPLICE CASE ON STRAND
FFP
Install Splice Case on Strand.
UNIT UNIT PRICE MAX AMOUNT
0025 35,000 Linear
½ TO 2 INCH EMT CONDUIT INSIDE
Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building.
UNIT UNIT PRICE MAX AMOUNT
0026 10 Each
PULL OR DROP BOX FOR PDS
FFP
Install Pull or Drop Box for Protected Distribution System (PDS).
UNIT UNIT PRICE MAX AMOUNT
0027 100 Linear
GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building.
UNIT UNIT PRICE MAX AMOUNT
0028 200 Linear
GIP 4 INCH CONDUIT WITH COUPLINGS BURIED
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of Concrete On All Sides.
UNIT UNIT PRICE MAX AMOUNT
0029 1,000,000 Linear
DEINSTALL CABLE IN CONDUITS
Deinstall Cable in Conduits.
UNIT UNIT PRICE MAX AMOUNT
0030 6,000 Linear
CIS TYPE 25 MILLIMETER X 4 EACH
Provide Contractor Furnished Material (CFM) and Install Combined Innerduct System (CIS) Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green).
UNIT UNIT PRICE MAX AMOUNT
0031 40 Each
OUTSIDE PULL-BOX
FFP
Install Outside Pull-Box (Various Sizes).
UNIT UNIT PRICE MAX AMOUNT
0032 1,000,000 Linear
PULLING WIRE IN DUCTS
Provide Contractor Furnished Material (CFM) and Install Pulling Wire in Ducts.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0033 1 Job
ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each Calendar Year During the Life of the Contract.
ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
Estimated Cost for War Hazard Losses is Zero ($0.00).
UNIT UNIT PRICE MAX AMOUNT
1001 40,000 Linear
OPTION COPPER CABLE
UNIT UNIT PRICE MAX AMOUNT
1002 100 Each
OPTION GROUND ROD
FFP
UNIT UNIT PRICE MAX AMOUNT
1003 50 Each
OPTION PET HOUSING
FFP
UNIT UNIT PRICE MAX AMOUNT
1004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
UNIT UNIT PRICE MAX AMOUNT
1005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Provide Contractor Furnished Material (CFM) and Install ¾ Inch, Fire-Retardant
UNIT UNIT PRICE MAX AMOUNT
1006 160,000 Linear
OPTION FIBER OPTIC CABLE IN DUCT
Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber
UNIT UNIT PRICE MAX AMOUNT
1007 800,000 Linear
OPTION LEAF FIBER OPTIC CABLE IN DUCT
Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96
UNIT UNIT PRICE MAX AMOUNT
1008 100 Each
OPTION TERMINATION PANEL
FFP
UNIT UNIT PRICE MAX AMOUNT
1009 100 Each
OPTION SPLICE ENCLOSURE KIT
UNIT UNIT PRICE MAX AMOUNT
1010 5,000 Linear
OPTION ENCASED BURIED (EB)-20 CONDUIT
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
1011 20,000 Linear
OPTION RIGID NONMETALLIC CONDUIT
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
1012 10,000 Linear
OPTION SUB / MULTI / MESH INNERDUCT
UNIT UNIT PRICE MAX AMOUNT
1013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
UNIT UNIT PRICE MAX AMOUNT
1014 50 Each
OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building
UNIT UNIT PRICE MAX AMOUNT
1015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220 x 1220mm x 1220 Millimeter Handhole to Include Excavation, Restoration, UNIT UNIT PRICE MAX AMOUNT
1016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850 x L3700 x H2150 Millimeter Maintenance Hole to Include Excavation, UNIT UNIT PRICE MAX AMOUNT
1017 400,000 Linear
OPTION CAT 6 LAN CABLE
UNIT UNIT PRICE MAX AMOUNT
1018 400 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
1019 24,000 Linear
OPTION NON-METALLIC RACEWAY
UNIT UNIT PRICE MAX AMOUNT
1020 10 Linear
OPTION 6 TO 12 INCH METAL CABLE LADDER RACK
UNIT UNIT PRICE MAX AMOUNT
1021 10 Each
OPTION EQUIPMENT RACK
FFP
UNIT UNIT PRICE MAX AMOUNT
1022 50,000 Linear
OPTION STRAND AND GUY WIRES FOR AERIAL CABLE
Provide Contractor Furnished Material (CFM) and Install Strand and Guy Wires
UNIT UNIT PRICE MAX AMOUNT
1023 65,000 Linear
OPTION CABLE ON STRAND USING LASHING MACHINE
Install Cable on Strand Using Lashing Machine to Include Splicing, Termination, UNIT UNIT PRICE MAX AMOUNT
1024 20 Each
OPTION SPLICE CASE ON STRAND
FFP
UNIT UNIT PRICE MAX AMOUNT
1025 30,000 Linear
OPTION ½ TO 2 INCH EMT CONDUIT INSIDE
Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of
UNIT UNIT PRICE MAX AMOUNT
1026 10 Each
OPTION PULL OR DROP BOX FOR PDS
FFP
UNIT UNIT PRICE MAX AMOUNT
1027 80 Linear
OPTION GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4
UNIT UNIT PRICE MAX AMOUNT
1028 160 Linear
OPTION GIP 4 INCH CONDUIT WITH COUPLINGS BURIED
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, UNIT UNIT PRICE MAX AMOUNT
1029 800,000 Linear
OPTION DEINSTALL CABLE IN CONDUITS
UNIT UNIT PRICE MAX AMOUNT
1030 5,000 Linear
OPTION CIS TYPE 25 MILLIMETER X 4 EACH
Provide Contractor Furnished Material (CFM) and Install Combined Innerduct
UNIT UNIT PRICE MAX AMOUNT
1031 35 Each
OPTION OUTSIDE PULL-BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
1032 800,000 Linear
OPTION PULLING WIRE IN DUCTS
1033 1 Job
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
UNIT UNIT PRICE MAX AMOUNT
2001 40,000 Linear
UNIT UNIT PRICE MAX AMOUNT
2002 100 Each
OPTION GROUND ROD
FFP
UNIT UNIT PRICE MAX AMOUNT
2003 50 Each
OPTION PET HOUSING
FFP
UNIT UNIT PRICE MAX AMOUNT
2004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
UNIT UNIT PRICE MAX AMOUNT
2005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Provide Contractor Furnished Material (CFM) and Install ¾ Inch, Fire-Retardant
UNIT UNIT PRICE MAX AMOUNT
2006 160,000 Linear
Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber
UNIT UNIT PRICE MAX AMOUNT
2007 800,000 Linear
Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96
UNIT UNIT PRICE MAX AMOUNT
2008 100 Each
OPTION TERMINATION PANEL
FFP
UNIT UNIT PRICE MAX AMOUNT
2009 100 Each
OPTION SPLICE ENCLOSURE KIT
UNIT UNIT PRICE MAX AMOUNT
2010 5,000 Linear
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
2011 20,000 Linear
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
2012 10,000 Linear
UNIT UNIT PRICE MAX AMOUNT
2013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
UNIT UNIT PRICE MAX AMOUNT
2014 50 Each
OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building
UNIT UNIT PRICE MAX AMOUNT
2015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220 x 1220mm x 1220 Millimeter Handhole to Include Excavation, Restoration, UNIT UNIT PRICE MAX AMOUNT
2016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850 x L3700 x H2150 Millimeter Maintenance Hole to Include Excavation, UNIT UNIT PRICE MAX AMOUNT
2017 300,000 Linear
UNIT UNIT PRICE MAX AMOUNT
2018 300 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
2019 18,000 Linear
UNIT UNIT PRICE MAX AMOUNT
2020 10 Linear
UNIT UNIT PRICE MAX AMOUNT
2021 10 Each
OPTION EQUIPMENT RACK
FFP
UNIT UNIT PRICE MAX AMOUNT
2022 50,000 Linear
Provide Contractor Furnished Material (CFM) and Install Strand and Guy Wires
UNIT UNIT PRICE MAX AMOUNT
2023 65,000 Linear
Install Cable on Strand Using Lashing Machine to Include Splicing, Termination, UNIT UNIT PRICE MAX AMOUNT
2024 20 Each
OPTION SPLICE CASE ON STRAND
FFP
UNIT UNIT PRICE MAX AMOUNT
2025 25,000 Linear
Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of
UNIT UNIT PRICE MAX AMOUNT
2026 10 Each
OPTION PULL OR DROP BOX FOR PDS
FFP
UNIT UNIT PRICE MAX AMOUNT
2027 60 Linear
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4
UNIT UNIT PRICE MAX AMOUNT
2028 120 Linear
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, UNIT UNIT PRICE MAX AMOUNT
2029 600,000 Linear
UNIT UNIT PRICE MAX AMOUNT
2030 4,000 Linear
Provide Contractor Furnished Material (CFM) and Install Combined Innerduct
UNIT UNIT PRICE MAX AMOUNT
2031 30 Each
OPTION OUTSIDE PULL-BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
2032 600,000 Linear
2033 1 Job
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
UNIT UNIT PRICE MAX AMOUNT
3001 40,000 Linear
UNIT UNIT PRICE MAX AMOUNT
3002 100 Each
OPTION GROUND ROD
FFP
UNIT UNIT PRICE MAX AMOUNT
3003 50 Each
OPTION PET HOUSING
FFP
UNIT UNIT PRICE MAX AMOUNT
3004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
UNIT UNIT PRICE MAX AMOUNT
3005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Provide Contractor Furnished Material (CFM) and Install ¾ Inch, Fire-Retardant
UNIT UNIT PRICE MAX AMOUNT
3006 160,000 Linear
Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber
UNIT UNIT PRICE MAX AMOUNT
3007 800,000 Linear
Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96
UNIT UNIT PRICE MAX AMOUNT
3008 100 Each
OPTION TERMINATION PANEL
FFP
UNIT UNIT PRICE MAX AMOUNT
3009 100 Each
OPTION SPLICE ENCLOSURE KIT
UNIT UNIT PRICE MAX AMOUNT
3010 5,000 Linear
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
3011 20,000 Linear
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
3012 10,000 Linear
UNIT UNIT PRICE MAX AMOUNT
3013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
UNIT UNIT PRICE MAX AMOUNT
3014 50 Each
OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building
UNIT UNIT PRICE MAX AMOUNT
3015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220 x 1220mm x 1220 Millimeter Handhole to Include Excavation, Restoration, UNIT UNIT PRICE MAX AMOUNT
3016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850 x L3700 x H2150 Millimeter Maintenance Hole to Include Excavation, UNIT UNIT PRICE MAX AMOUNT
3017 200,000 Linear
UNIT UNIT PRICE MAX AMOUNT
3018 200 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
3019 12,000 Linear
UNIT UNIT PRICE MAX AMOUNT
3020 10 Linear
UNIT UNIT PRICE MAX AMOUNT
3021 10 Each
OPTION EQUIPMENT RACK
FFP
UNIT UNIT PRICE MAX AMOUNT
3022 50,000 Linear
Provide Contractor Furnished Material (CFM) and Install Strand and Guy Wires
UNIT UNIT PRICE MAX AMOUNT
3023 65,000 Linear
Install Cable on Strand Using Lashing Machine to Include Splicing, Termination, UNIT UNIT PRICE MAX AMOUNT
3024 20 Each
OPTION SPLICE CASE ON STRAND
FFP
UNIT UNIT PRICE MAX AMOUNT
3025 20,000 Linear
Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of
UNIT UNIT PRICE MAX AMOUNT
3026 10 Each
OPTION PULL OR DROP BOX FOR PDS
FFP
UNIT UNIT PRICE MAX AMOUNT
3027 40 Linear
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4
UNIT UNIT PRICE MAX AMOUNT
3028 80 Linear
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, UNIT UNIT PRICE MAX AMOUNT
3029 400,000 Linear
UNIT UNIT PRICE MAX AMOUNT
3030 3,000 Linear
Provide Contractor Furnished Material (CFM) and Install Combined Innerduct
UNIT UNIT PRICE MAX AMOUNT
3031 25 Each
OPTION OUTSIDE PULL-BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
3032 400,000 Linear
3033 1 Job
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
UNIT UNIT PRICE MAX AMOUNT
4001 40,000 Linear
UNIT UNIT PRICE MAX AMOUNT
4002 100 Each
OPTION GROUND ROD
FFP
UNIT UNIT PRICE MAX AMOUNT
4003 50 Each
OPTION PET HOUSING
FFP
UNIT UNIT PRICE MAX AMOUNT
4004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
UNIT UNIT PRICE MAX AMOUNT
4005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Provide Contractor Furnished Material (CFM) and Install ¾ Inch, Fire-Retardant
UNIT UNIT PRICE MAX AMOUNT
4006 160,000 Linear
Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber
UNIT UNIT PRICE MAX AMOUNT
4007 800,000 Linear
Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96
UNIT UNIT PRICE MAX AMOUNT
4008 100 Each
OPTION TERMINATION PANEL
FFP
UNIT UNIT PRICE MAX AMOUNT
4009 100 Each
OPTION SPLICE ENCLOSURE KIT
UNIT UNIT PRICE MAX AMOUNT
4010 5,000 Linear
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
4011 20,000 Linear
Provide Contractor Furnished Material (CFM) and Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
4012 10,000 Linear
UNIT UNIT PRICE MAX AMOUNT
4013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
UNIT UNIT PRICE MAX AMOUNT
4014 50 Each
OPTION 2 TO 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Provide Contractor Furnished Material (CFM) and Install 2 to 4 Inch Building
UNIT UNIT PRICE MAX AMOUNT
4015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional 1220 x 1220mm x 1220 Millimeter Handhole to Include Excavation, Restoration, UNIT UNIT PRICE MAX AMOUNT
4016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Provide Contractor Furnished Material (CFM) and Install Multidirectional W1850 x L3700 x H2150 Millimeter Maintenance Hole to Include Excavation, UNIT UNIT PRICE MAX AMOUNT
4017 100,000 Linear
UNIT UNIT PRICE MAX AMOUNT
4018 100 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
4019 6,000 Linear
UNIT UNIT PRICE MAX AMOUNT
4020 10 Linear
UNIT UNIT PRICE MAX AMOUNT
4021 10 Each
OPTION EQUIPMENT RACK
FFP
UNIT UNIT PRICE MAX AMOUNT
4022 50,000 Linear
Provide Contractor Furnished Material (CFM) and Install Strand and Guy Wires
UNIT UNIT PRICE MAX AMOUNT
4023 65,000 Linear
Install Cable on Strand Using Lashing Machine to Include Splicing, Termination, UNIT UNIT PRICE MAX AMOUNT
4024 20 Each
OPTION SPLICE CASE ON STRAND
FFP
UNIT UNIT PRICE MAX AMOUNT
4025 15,000 Linear
Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of
UNIT UNIT PRICE MAX AMOUNT
4026 10 Each
OPTION PULL OR DROP BOX FOR PDS
FFP
UNIT UNIT PRICE MAX AMOUNT
4027 40 Linear
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4
UNIT UNIT PRICE MAX AMOUNT
4028 80 Linear
Provide Contractor Furnished Material (CFM) and Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, UNIT UNIT PRICE MAX AMOUNT
4029 200,000 Linear
UNIT UNIT PRICE MAX AMOUNT
4030 2,000 Linear
Provide Contractor Furnished Material (CFM) and Install Combined Innerduct
UNIT UNIT PRICE MAX AMOUNT
4031 20 Each
OPTION OUTSIDE PULL-BOX
FFP
UNIT UNIT PRICE MAX AMOUNT
4032 200,000 Linear
4033 1 Job
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
NOTICE TO OFFERORS
All sources may submit a proposal as applicable. However, the Republic of Korea (ROK)-United States (U.S.)
Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative Status to any offeror, for this requirement. All sources submitting a proposal, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal - that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award.
Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer.
“All offerors interested in competing for this requirement are required to submit their price proposal in Korean Won (KW) only. A proposal submitted in currency other than Korean Won will not be considered for award.”
CONTRACT PERIOD
Base Period: 1 September 2017 – 31 August 2018 1st Option Year: 1 September 2018 – 31 August 2019 2nd Option Year: 1 September 2019 – 31 August 2020 3rd Option Year: 1 September 2020 – 31 August 2021 4th Option Year: 1 September 2021 – 31 August 2022
PWS
PERFORMANCE WORK STATEMENT (PWS)
FOR
TELECOMMUNICATIONS INFRASTRUCTURE SUPPORT SERVICE (TISS)
1. GENERAL: The Contractor shall supply all personnel, equipment, tools, materials, supervision, other items and non-personal services necessary to provide the Telecommunications Infrastructure Support Services (TISS) as defined in this Performance Work Statement (PWS).
1.1. Background: This document will identify the safety requirements, list of materials/specifications and performance work standards that will be required by the contractor. It is the vehicle that will allow the assignment of work to a contractor when the 1st Signal Brigade deems it necessary. This document is also synchronized with the Unified Facilities Criteria (UFC), which are mandated under Department of Defense (DOD) policy. The UFC system is prescribed by Military Standard (MIL-STD) 3007, Standard Practice for Unified Facilities Criteria and Unified Facilities Guide Specifications (UFGS) and provides planning, design, construction, sustainment, restoration, and modernization criteria. The standard applies to military departments, defense agencies, and DOD field activities in accordance with (IAW) the Under Secretary of Defense for Acquisition Technology and Logistics (AT&L) Memorandum dated 29 May 2002. The Technical Criteria for the Installation Information Infrastructure Architecture (I3A) document dated February 2010 will be the governing document for the contractor. This document establishes an implementation concept that can be used to shape architectural templates and to influence the design process for the I3A. It identifies proven infrastructure construction techniques, defines common practices, and serves as an authoritative implementation criterion.
1.2. Scope of Work: The contractor shall install, relocate, repair, or remove fiber optic and/or copper cable, and/or Protected Distribution Systems, and/or LAN infrastructure in accordance with (IAW) Contract Line Item Numbers (CLINs) identified within project specific Engineering Design Plans (EDPs). The contractor shall provide emergency repairs/relocations for outside plant (OSP) (copper and/or fiber optic) cables and except those items specified in paragraph 3 as government furnished materials (GFM) for this contract. The contractor shall perform to the standards identified by paragraph 4 and associated attachments.
1.3. Quality Control Plan (QCP): The Contractor shall develop and maintain an effective quality control plan to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor shall provide the QCP as a part of the proposal to be evaluated. The contractor shall implement data collection methods to record data ensuring work accomplished meets acceptable performance and technical standards. The data shall identify trends, potential and actual problem areas, deficiencies, and any required corrective action. The contractor shall retain all records of inspections and corrective actions throughout the period of performance. Inspection documents shall be made available to the Government COR, Quality Assurance (QA) representative and the Contracting Office within 24 hours of written request by either party.
1.3.1. At a minimum the quality control plan should address:
Overall project management and administration.
Be a comprehensive program to plan and deliver quality services to the Government.
Cover and prioritize all services described in this contract.
Describe a method acceptable to the Government of identifying deficiencies in the quality of service performed under this contract before the level of performance becomes unacceptable and address processes for corrective actions without dependence upon Government direction.
Establish an inspection system covering all services required by this contract. This plan shall specify areas to be inspected on either a scheduled or an unscheduled basis and the title of the individual who will do the inspection.
Contain specific quality control techniques and standards for contract services identified in the Performance Requirements Summary and Inspection of Services Clause list. The quality control methods shall be comprehensive and adaptable to the reporting systems of the QCP. Control measures must be specified and metrics developed to ensure accurate program monitoring.
Include a customer complaint feedback system for correction of validated complaints and to inform the Government of corrections. The QCP shall describe how the Government may identify problem areas or situations to the contractor. The customer complaint program shall be compatible with the reporting and communication systems of the QCP.
Require documentation of all contractor quality control inspections and corrective actions to be maintained by the contractor throughout the term of this contract. Inspection documents and the corrective action taken shall be made available to the KO or designated representative.
1.3.2. The Quality Control Plan will be used by the contractor to collect data, evaluate and document performance against standards associated with each specific requirement. Performance is measured by assessing the required workload quantity in terms of quality and timeliness. The contractor shall use the format measure each line item in the PRS table.
1.4. Quality Assurance (QA): The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the maximum acceptable defect rate(s).
1.4.1. Deficiencies: The Government reserves the right to refuse final acceptance until all deficiencies have been resolved (per all stated requirements). The Government will review all results and prepare a list of deficiencies, if any. The deficiency list shall include any problem(s) detected/identified during testing and/or inspections conducted by either the contractor or the government, or both.
1.5. Recognized Holidays: The contractor is required to provide services on the Holidays listed below.
1.6. Hours of Operation: The contractor is responsible for provisioning, installation, coordination with Government Tech-Control Facilities (TCF), operation and maintenance of provided leased circuits, troubleshooting, routine maintenance (between the hours of 0730 - 1700, Monday through Friday, excluding ROK Legal Holidays and ROK executive order as a ROK Legal Holiday) and emergency maintenance (between the hours of 0000 - 2459, Monday thru Sunday, except when a government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings). The contractor must at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this performance work statement when the government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force is essential.
1.7. Place of Performance: The work to be performed under this contract will be in locations where all trunks, circuits, telephones, cables and cable routing are installed. Minimum locations include Camp Casey, Camp Hovey, Camp Bonifay, Warrior Base, Camp Red Cloud, Camp Stanley, Camp Jackson, Camp Market, Yongsan Garrison, FEDE Compound, K-16 Airfield, Command Post Tango, Suwon Air Base (AB), Third Republic Of Korea Army (TROKA), First Republic Of Korea Army (FROKA), Osan AB, Camp Humphreys, Kunsan AB, Kwangju AB, Camp Mujuk, Camp Carroll, Camp Henry, Camp Walker, K2 AB, Second Republic Of Korea Army (SROKA), Camp Carroll, Busan Storage Facility, Pier #8, and Kimhae AB. Area of coverage may exceed what is currently documented – manned and unmanned mountain-top locations will be placed under this contract.
1.8. Security Requirements. All communication methods that includes analog/digital trunks, circuits, telephones, cables, duct and network or telecommunication long haul paths will be adequately protected to provide secure and uninterrupted services to the Government 24 hours a day 7 days a week. The secret-level security clearance is not required; however, the contractor is required to comply with the physical security as provided below.
1.8.1. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.8.2. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.8.3. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.
This training shall be completed within 90 calendar days of contract award and within 60 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
1.9. Contractor’s Qualification. The prime contractor shall have the following qualifications:
a. Communications License issued by the Korean Communications Commission (KCC) (정보통신공사업등록증).
1.9.1 Personnel:
1.9.2 Key Personnel: The contractor shall provide a Contract Manager (CM) who shall be responsible for the performance of the work. The contract manager shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager shall be available between the hours of 0000 - 2459, Monday thru Sunday, except when a government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. Qualifications for all key personnel are listed below:
1.9.3 Contract Manager (CM): The contractor shall provide a Contract Manager (CM) and validating resume with the following qualifications:
a. Minimum Bachelors of Science (BS) degree in Information Technology or related field.
b. Demonstrating a minimum of three (3) years of experience within the last five (5) years in contract management or project management with satisfactory prior experience relating to telecommunications support (installing, relocating, repairing, and removing fiber optics, copper, and Local Area Network).
c. CM shall be able to communicate and fully be able to carry a coherent conversation in English without constant stoppage due to inadequate English language skills or understanding.
Contract Manager’s resume must clearly identify the qualifications above in the following format:
a. Position title held.
b. A clear description of qualifying work experience.
c. Length of work experience (year/month/date – year/month/date).
d. Complete point of contract of employer (business name, point of contact information [name, phone number, email address]).
1.9.3.1 The Contractor shall ensure that the professional and technical personnel working on this contract have sufficient qualifications to perform the work in accordance with all requirements of this contract.
1.9.3.2 When working with non-1st Signal Brigade stakeholders, contractors shall provide technical advice or information only. Contractor employees shall clearly indicate that they do not represent the Government. The contractor shall not exercise any Governmental discretion by obligating Government by entering into agreements with stakeholders.
1.9.3.3 Identification of Contractor Personnel: Contractor identification requirements: In accordance with FAR subpart 37.114, l Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious are required to identify themselves as such to avoid being mistaken for Government officials. Contractors performing work at Government workplaces will provide their employees with an easily readable identification (ID) badge indicating the employee’s name, the Contractor’s name, the functional area of assignment, and a recent color photograph of the employee. Contractors shall require their employees to wear the ID badges visibly when performing work at Government workplaces. Contractor personnel must also ensure that all e-mails, documents or reports they produce are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All signature blocks on e-mails shall identify the contractor employee as such and identify the employing contractor. All e-mail address lines shall include CTR in the address line.
1.9.4.1 Safety Requirements: In performing work under this contract, the contractor shall:
1.9.4.2 Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
1.9.4.3 Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational Safety and Health Standards (29 CFR 1910) and Korea Environmental Governing Standards by U.S. Forces Korea.
1.9.4.4 Develop and deliver a safety plan within 30 calendar days of contract award for the protection of government facilities and property and to provide a safe work environment for the contractor personnel.
1.9.4.5 Provide protection to government property in preventing damage during the period of time the property is under the control or in possession of the contractor.
1.9.4.6 Include a clause in all subcontractors contracts to require subcontractors to comply with the Safety provisions of this contract as applicable.
1.9.4.7. Report promptly (within one hour), 24 hours a day, 7 days a week, 365 days a year, to the Contracting Officer or Contracting Officer's Representative, all available facts relating to each instance of damage to government property and/or injury to either contractor or government personnel.
1.9.4.8. In the event of an accident/mishap, take reasonable and prudent actions to establish control of the accident/mishap scene, prevent further injury to persons or property, and preserve evidence until released by the accident/mishap investigative authority with the verbal and/or written concurrence of the Contract Officer.
1.9.4.9. If the government elects to conduct an investigation of the accident/mishap, cooperate fully and assist any government representative in the conduct of the investigation until the investigation is completed.
1.9.5. Include a clause in each applicable subcontract requiring the subcontractor’s cooperation and assistance with the accident reporting and investigation.
1.9.5.1. DA form 285, US Army Accident Report, shall be completed and submitted to HQs, 1st Signal Brigade, and ATTN: NETC-SKC-SA, Unit #15271, and APO AP 96205-0044 within five (5) working days after the occurrence of the accident. All blocks of the report shall be completed to include the descriptive narrative. Cost of damage and/or injuries shall be included in the report.
1.9.6. Enforcing Safety Regulations.
1.9.6.1. Providing annual training to all personnel on the safe practices and skills to include First Aid and Cardio pulmonary Resuscitation (CPR).
1.9.6.2 Establishing a fire prevention program at each work site location and ensure each employee is familiar with operating fire suppression equipment.
1.9.6.3 Ensuring a bilingual (Korean and English) Safety Standard Operating Procedures (SOP) is available at all operational work sites. Contract supervisors shall ensure that all personnel read and understand the Safety SOP.
1.9.6.4. Posting bilingual (Korean and English) accident prevention signs and symbols at designated and known physical hazard areas. Reference DA PAM 385-10 for design specifications and safety color-coding.
1.9.6.5. All contractor personnel working in maintenance holes shall have a ROK certificate of training for confined space entry and confined space rescue.
1.9.6.6. All contractor personnel performing direct labor for any delivery order shall have a valid ROK Cardiopulmonary resuscitation (CPR) and First Aid certificate.
1.9.7. Emergency Repairs/Relocations.
1.9.7.1. Emergency services are work that is required outside of normal duty hours for restoration of communications circuits or system identified by the 1st Signal Brigade, the COR, or their designated representatives. The initiation of emergency work after normal duty hours shall be directed by the Contracting Officer. The KO will give a verbal authorization for work to proceed and an order will be accomplished after the work has been completed. No other Government representative is authorized to order emergency repair and maintenance services. Emergency services ordered by anyone other than the KO will not be reimbursed.
1.9.7.2. The Contractor will be notified by the COR of the malfunction, location(s), and type of work required to include any special instructions or date deemed necessary for the required emergency work.
1.9.7.3. Emergency services shall be provided outside of normal duty hours, seven (7) days per week, on an on-call basis. Within ten (10) working days after contract award, the Contractor shall provide the Contracting Officer/Contracting Officer's Representative with a point of contact where notification of emergency requirements can be made at any time. The Contractor roving team for emergency services shall be at the suspected trouble area within four (4) hours after notification by the Contracting Officer.
1.9.7.4. It is anticipated that emergency services work would occur no more than three times per year.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. Contractor. A supplier or vendor having a contract to provide specific supplies or service to the government.
2.1.2. Contracting Officer (KO). An employee of the U.S. Government with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Ordering Officer (OO). An individual authorized by FAR to place orders against indefinite delivery contracts.
2.1.4 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.5 Defective Service. A service output that does not meet the standard of performance associated with it in the Performance Work Statement.
2.1.6 Deliverable. Anything that can be physically delivered but may include non-physical things such as meeting minutes.
2.1.7 Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.8 Physical Security. Actions that prevent the loss or damage of Government property.
2.1.9 Quality Assurance. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.10 Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.11 Quality Control. All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.12 Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privities of contract with the subcontractor.
2.1.13 Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.14 Work Week. Is defined as Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
CFM Contractor Furnished Material CFR Code of Federal Regulations COR Contracting Officer’s Representative
CSA Communications Services Agreement DID Direct Inward Dialing DOD Direct Outward Dialing FAR Federal Acquisition Regulation FSC Federal Service Code GFM Government Furnished Material IDIQ Indefinite delivery indefinite quantity KO Contracting Officer OCI Organizational Conflict of Interest OSHA Occupational Safety and Health Act of 1970 PWS Performance Work Statement ROK Republic of Korea QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan ROK Republic of Korea TCF Technical Control Facility UIC Unit Identification Code XML Extensible Markup Language
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, SERVICES, AND FACILITY
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. GENERAL: The Government will provide material listed below, as required by individual Engineering Design Plan (EDP). Material for each EDP requirement will be delivered to Camp Humphreys and/or within USFK before contractor performs each EDP.
3.1.1 COPPER CABLE INSTALLATION PROJECTS
3.1.1.1 Copper Cable, 24AWG, Jelly Filled, 12pr, 25pr, 50pr, 100pr, 200pr, 300pr
3.1.1.2 Copper Splice Closure Kit for Maintenance hole, 50 pr, 200 pr, 400 pr, 600 pr, 900 pr, 1,200 pr, 1,800 pr
3.1.1.3 Copper Splice Closure Kit for Cable Vault, 600 pr, 900 pr
3.1.1.4 Water Protection Compound for Copper Cable
3.1.1.5 Cable Cleaning Kit
3.1.1.6 Double and/or Triple End Cap for Copper Cable, 3", 4", 5", 7", 9"
3.1.1.7 Splice Modules
3.1.1.8 Splice Module Sealant
3.1.1.9 Splice Connectors
3.1.1.10 Building Terminal, 66-Block, 25 pr, 50 pr, 100 pr
3.1.1.11 Building Terminal, 110-Block, 25 pr, 50 pr, 100 pr
3.1.1.12 MDF Center Connector, 100 pr
3.1.2 FIBER OPTIC CABLE INSTALLATION PROJECTS
3.1.2.1 Splice Organizer Tray, 12-24 core
3.1.2.2 Fiber Optic Cable, Single Mode (SM), 12 core, 24 core, 48 core, 72 core, 96 core, 144 core
3.1.2.3 Fiber Optic Cable, Single Mode (SM), 12 core, Aerial Cable
3.1.2.4 Fiber Optic Cable, Multi-Mode (MM), 12 core
3.1.2.5 Splice Closure, Large, Small, Additional
3.1.2.6 Fiber Optic Cable, Single…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .