Base Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-17-R-0091 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| Base Period: 1 November 2017 - 31 October 2018 | ||||||
| CLIN | CLIN | |||||
| TYPE | SERVICES DESCRIPTION | Qty | Unit | Unit Price | Amount | GFM or CFM |
| 0001 | FFP | COPPER CABLE |
Government Furnished Materials (GFM)
| Install, Splice, Terminate, and Test - Copper Cable in Duct (25 to 1200 PR) | GFM | |||
| 0001AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Copper Cable | 40,000 | FT | ||
| (Linear Foot) | GFM | |||
| 0001AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 0001AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 0002 | FFP | GROUND ROD |
Contractor Furnished Materials (CFM)
| Install Ground Rod to Include Grounding of Cable / Terminal | 100 | EA | From GFM to CFM | |
| 0003 | FFP | PET HOUSING |
Government Furnished Materials (GFM)
| Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA | GFM | |
| 0004 | FFP | SPLICE CASE FOR COPPER CABLE |
Government Furnished Materials (GFM)
| Install Splice Case for Copper Cable. | 50 | EA | GFM | |
| 0005 | FFP | ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD |
Contractor Furnished Material (CFM)
| Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA | CFM | |
| 0006 | FFP | FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | GFM | |||
| 0006AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Optic Cable | 160,000 | FT | ||
| (Linear Foot) | GFM | |||
| 0006AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 0006AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 0007 | FFP | LEAF FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | GFM | |||
| 0007AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Leaf Fiber Optic Cable | 800,000 | FT | ||
| (Linear Foot) | GFM | |||
| 0007AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 0007AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 0008 | FFP | TERMINATION PANEL |
Government Furnished Materials (GFM)
| Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA | GFM | |
| 0009 | FFP | SPLICE ENCLOSURE KIT |
Government Furnished Materials (GFM)
| Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA | GFM | |
| 0010 | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | CFM | |||
| 0010AA | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 0010AB | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 0010AC | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 0010AD | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 0011 | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | CFM | |||
| 0011AA | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 0011AB | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 0011AC | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 0011AD | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 0012 | FFP | SUB / MULTI / MESH INNERDUCT |
Government Furnished Materials (GFM)
| Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT | |
| (Linear Foot) | GFM | ||
| 0013 | FFP | CORE DRILL ½ TO 4 INCH HOLE |
Labor Only
| Core Drill ½ to 4 Inch Hole. | 1,000 | EA | Labor Only | |
| 0014 | FFP | 4 INCH BUILDING ENTRANCE CONDUIT |
Contractor Furnished Material (CFM)
| Install 4 Inch Building Entrance Conduit. | 50 | EA | CFM | |
| 0015 | FFP | MULTIDIRECTIONAL HANDHOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional 1000 x 1000 x 1000 Milimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 25 | EA | CFM | |
| 0016 | FFP | MULTIDIRECTIONAL MAINTENANCE HOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional W1500 by L2400 x H2100 Milimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 5 | EA | CFM | |
| 0017 | FFP | CAT 6 LAN CABLE |
Government Furnished Materials (GFM)
| Install, Terminate, and Test CAT 6 LAN Cable. | 100,000 | FT | |
| (Linear Foot) | GFM | ||
| 0018 | FFP | CAT 6 WALL OUTLET BOX |
Government Furnished Materials (GFM)
| Install CAT 6 Wall Outlet Box. | 500 | EA | GFM | |
| 0019 | FFP | NON-METALLIC RACEWAY |
Government Furnished Materials (GFM)
| Install of Non-Metallic Raceway. | 30,000 | FT | |
| (Linear Foot) | GFM | ||
| 0020 | FFP | 6 TO 12 INCH METAL CABLE LADDER RACK |
Government Furnished Materials (GFM)
| Install and Bonding of 6 to 12 Inch Metal Cable Ladder Rack. | 10 | FT | |
| (Linear Foot) | GFM | ||
| 0021 | FFP | EQUIPMENT RACK |
Government Furnished Materials (GFM)
| Install Equipment Rack. | 10 | EA | GFM | |
| 0022 | FFP | STRAND AND GUY WIRES FOR AERIAL CABLE |
Contractor Furnished Material (CFM)
| Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT | |
| (Linear Foot) | CFM | ||
| 0023 | FFP | CABLE ON STRAND USING On Guy Wire |
Government Furnished Materials (GFM)
| Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | GFM | |||
| 0023AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Fiber Cable | 65,000 | FT | ||
| (Linear Foot) | GFM | |||
| 0023AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 0023AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 0024 | FFP | SPLICE CASE ON STRAND |
Government Furnished Materials (GFM)
| Install Splice Case on Strand. | 20 | EA | GFM | |
| 0025 | FFP | ½ TO 2 INCH EMT CONDUIT INSIDE |
Contractor Furnished Material (CFM)
| Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 35,000 | FT | |
| (Linear Foot) | GFM to CFM | ||
| 0026 | FFP | PULL OR DROP BOX FOR PDS |
Government Furnished Materials (GFM)
| Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA | GFM | |
| 0027 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 100 | FT | |
| (Linear Foot) | CFM | ||
| 0028 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS BURIED |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 200 | FT | |
| (Linear Foot) | CFM | ||
| 0029 | FFP | DEINSTALL CABLE IN CONDUITS |
Labor Only
| Deinstall Cable in Conduits. | 1,000,000 | FT | |
| (Linear Foot) | Labor Only | ||
| 0030 | FFP | CIS TYPE 25 MILIMETER X 4 EACH |
Contractor Furnished Material (CFM)
| Install Combined Innerduct System (CIS) Type 25 Milimeter x 4 Each (Black, Yellow, Red, Green). | 6,000 | FT | |
| (Linear Foot) | CFM | ||
| 0031 | FFP | OUTSIDE PULL-BOX |
Government Furnished Materials (GFM)
| Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 40 | EA | GFM | |
| 0032 | FFP | PULLING WIRE IN DUCTS |
Contractor Furnished Material (CFM)
| Install Pulling Wire in Ducts. | 1,000,000 | FT | |
| (Linear Foot) | CFM | ||
| 0033 | FFP | ACCOUNTING FOR CONTRACT SERVICES | |
| Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each Calendar Year During the Life of the Contract. | 1 | JOB | |
| 0034 | INFO | ESTIMATED COST FOR WAR HAZARD LOSSES |
Estimated Cost for War Hazard Losses is Zero ($0.00).
Total Amount for Base Period
| NOTE: | CFM CLINs |
| X002, X005, X010, X011, X014, X015, X016, X022, X025, X027, X028, X030, X032 |
| GFM CLINs |
| X001, X003, X004, X006, X007, X008, X009, X012, X017, X018, X019, X020, X021, X023, X024, |
| X026, X031 |
| Labor Only, No Material involved CLINs |
| X013, X029 |
1st Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-17-R-0091 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 1st Option Period: 1 November 2018 - 31 October 2019 | ||||||
| CLIN | CLIN | |||||
| TYPE | SERVICES DESCRIPTION | Qty | Unit | Unit Price | Amount | GFM or CFM |
| 1001 | FFP | COPPER CABLE |
Government Furnished Materials (GFM)
| Install, Splice, Terminate, and Test - Copper Cable in Duct (25 to 1200 PR) | GFM | |||
| 1001AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Copper Cable | 40,000 | FT | ||
| (Linear Foot) | GFM | |||
| 1001AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 1001AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 1002 | FFP | GROUND ROD |
Contractor Furnished Materials (CFM)
| Install Ground Rod to Include Grounding of Cable / Terminal | 100 | EA | From GFM to CFM | |
| 1003 | FFP | PET HOUSING |
Government Furnished Materials (GFM)
| Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA | GFM | |
| 1004 | FFP | SPLICE CASE FOR COPPER CABLE |
Government Furnished Materials (GFM)
| Install Splice Case for Copper Cable. | 50 | EA | GFM | |
| 1005 | FFP | ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD |
Contractor Furnished Material (CFM)
| Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA | CFM | |
| 1006 | FFP | FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | GFM | |||
| 1006AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Optic Cable | 160,000 | FT | ||
| (Linear Foot) | GFM | |||
| 1006AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 1006AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 1007 | FFP | LEAF FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | GFM | |||
| 1007AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Leaf Fiber Optic Cable | 800,000 | FT | ||
| (Linear Foot) | GFM | |||
| 1007AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 1007AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 1008 | FFP | TERMINATION PANEL |
Government Furnished Materials (GFM)
| Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA | GFM | |
| 1009 | FFP | SPLICE ENCLOSURE KIT |
Government Furnished Materials (GFM)
| Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA | GFM | |
| 1010 | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | CFM | |||
| 1010AA | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 1010AB | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 1010AC | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 1010AD | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 1011 | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | CFM | |||
| 1011AA | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 1011AB | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 1011AC | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 1011AD | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 1012 | FFP | SUB / MULTI / MESH INNERDUCT |
Government Furnished Materials (GFM)
| Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT | |
| (Linear Foot) | GFM | ||
| 1013 | FFP | CORE DRILL ½ TO 4 INCH HOLE |
Labor Only
| Core Drill ½ to 4 Inch Hole. | 1,000 | EA | Labor Only | |
| 1014 | FFP | 4 INCH BUILDING ENTRANCE CONDUIT |
Contractor Furnished Material (CFM)
| Install 4 Inch Building Entrance Conduit. | 50 | EA | CFM | |
| 1015 | FFP | MULTIDIRECTIONAL HANDHOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional 1000 x 1000 x 1000 Milimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 25 | EA | CFM | |
| 1016 | FFP | MULTIDIRECTIONAL MAINTENANCE HOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional W1500 by L2400 x H2100 Milimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 5 | EA | CFM | |
| 1017 | FFP | CAT 6 LAN CABLE |
Government Furnished Materials (GFM)
| Install, Terminate, and Test CAT 6 LAN Cable. | 100,000 | FT | |
| (Linear Foot) | GFM | ||
| 1018 | FFP | CAT 6 WALL OUTLET BOX |
Government Furnished Materials (GFM)
| Install CAT 6 Wall Outlet Box. | 400 | EA | GFM | |
| 1019 | FFP | NON-METALLIC RACEWAY |
Government Furnished Materials (GFM)
| Install of Non-Metallic Raceway. | 24,000 | FT | |
| (Linear Foot) | GFM | ||
| 1020 | FFP | 6 TO 12 INCH METAL CABLE LADDER RACK |
Government Furnished Materials (GFM)
| Install and Bonding of 6 to 12 Inch Metal Cable Ladder Rack. | 10 | FT | |
| (Linear Foot) | GFM | ||
| 1021 | FFP | EQUIPMENT RACK |
Government Furnished Materials (GFM)
| Install Equipment Rack. | 10 | EA | GFM | |
| 1022 | FFP | STRAND AND GUY WIRES FOR AERIAL CABLE |
Contractor Furnished Material (CFM)
| Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT | |
| (Linear Foot) | CFM | ||
| 1023 | FFP | CABLE ON STRAND USING On Guy Wire |
Government Furnished Materials (GFM)
| Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | GFM | |||
| 1023AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Fiber Cable | 65,000 | FT | ||
| (Linear Foot) | GFM | |||
| 1023AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 1023AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 1024 | FFP | SPLICE CASE ON STRAND |
Government Furnished Materials (GFM)
| Install Splice Case on Strand. | 20 | EA | GFM | |
| 1025 | FFP | ½ TO 2 INCH EMT CONDUIT INSIDE |
Contractor Furnished Material (CFM)
| Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 30,000 | FT | |
| (Linear Foot) | GFM to CFM | ||
| 1026 | FFP | PULL OR DROP BOX FOR PDS |
Government Furnished Materials (GFM)
| Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA | GFM | |
| 1027 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 80 | FT | |
| (Linear Foot) | CFM | ||
| 1028 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS BURIED |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 160 | FT | |
| (Linear Foot) | CFM | ||
| 1029 | FFP | DEINSTALL CABLE IN CONDUITS |
Labor Only
| Deinstall Cable in Conduits. | 800,000 | FT | |
| (Linear Foot) | Labor Only | ||
| 1030 | FFP | CIS TYPE 25 MILIMETER X 4 EACH |
Contractor Furnished Material (CFM)
| Install Combined Innerduct System (CIS) Type 25 Milimeter x 4 Each (Black, Yellow, Red, Green). | 5,000 | FT | |
| (Linear Foot) | CFM | ||
| 1031 | FFP | OUTSIDE PULL-BOX |
Government Furnished Materials (GFM)
| Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 35 | EA | GFM | |
| 1032 | FFP | PULLING WIRE IN DUCTS |
Contractor Furnished Material (CFM)
| Install Pulling Wire in Ducts. | 800,000 | FT | |
| (Linear Foot) | CFM | ||
| 1033 | FFP | ACCOUNTING FOR CONTRACT SERVICES | |
| Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each Calendar Year During the Life of the Contract. | 1 | JOB | |
| 1034 | INFO | ESTIMATED COST FOR WAR HAZARD LOSSES |
Estimated Cost for War Hazard Losses is Zero ($0.00).
Total Amount for 1st Option Period
2nd Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-17-R-0091 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 2nd Option Period: 1 November 2019 - 31 October 2020 | ||||||
| CLIN | CLIN | |||||
| TYPE | SERVICES DESCRIPTION | Qty | Unit | Unit Price | Amount | GFM or CFM |
| 2001 | FFP | COPPER CABLE |
Government Furnished Materials (GFM)
| Install, Splice, Terminate, and Test - Copper Cable in Duct (25 to 1200 PR) | GFM | |||
| 2001AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Copper Cable | 40,000 | FT | ||
| (Linear Foot) | GFM | |||
| 2001AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 2001AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 2002 | FFP | GROUND ROD |
Contractor Furnished Materials (CFM)
| Install Ground Rod to Include Grounding of Cable / Terminal | 100 | EA | From GFM to CFM | |
| 2003 | FFP | PET HOUSING |
Government Furnished Materials (GFM)
| Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA | GFM | |
| 2004 | FFP | SPLICE CASE FOR COPPER CABLE |
Government Furnished Materials (GFM)
| Install Splice Case for Copper Cable. | 50 | EA | GFM | |
| 2005 | FFP | ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD |
Contractor Furnished Material (CFM)
| Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA | CFM | |
| 2006 | FFP | FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | GFM | |||
| 2006AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Optic Cable | 160,000 | FT | ||
| (Linear Foot) | GFM | |||
| 2006AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 2006AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 2007 | FFP | LEAF FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | GFM | |||
| 2007AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Leaf Fiber Optic Cable | 800,000 | FT | ||
| (Linear Foot) | GFM | |||
| 2007AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 2007AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 2008 | FFP | TERMINATION PANEL |
Government Furnished Materials (GFM)
| Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA | GFM | |
| 2009 | FFP | SPLICE ENCLOSURE KIT |
Government Furnished Materials (GFM)
| Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA | GFM | |
| 2010 | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | CFM | |||
| 2010AA | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 2010AB | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 2010AC | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 2010AD | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 2011 | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | CFM | |||
| 2011AA | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 2011AB | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 2011AC | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 2011AD | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 2012 | FFP | SUB / MULTI / MESH INNERDUCT |
Government Furnished Materials (GFM)
| Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT | |
| (Linear Foot) | GFM | ||
| 2013 | FFP | CORE DRILL ½ TO 4 INCH HOLE |
Labor Only
| Core Drill ½ to 4 Inch Hole. | 1,000 | EA | Labor Only | |
| 2014 | FFP | 4 INCH BUILDING ENTRANCE CONDUIT |
Contractor Furnished Material (CFM)
| Install 4 Inch Building Entrance Conduit. | 50 | EA | CFM | |
| 2015 | FFP | MULTIDIRECTIONAL HANDHOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional 1000 x 1000 x 1000 Milimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 25 | EA | CFM | |
| 2016 | FFP | MULTIDIRECTIONAL MAINTENANCE HOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional W1500 by L2400 x H2100 Milimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 5 | EA | CFM | |
| 2017 | FFP | CAT 6 LAN CABLE |
Government Furnished Materials (GFM)
| Install, Terminate, and Test CAT 6 LAN Cable. | 100,000 | FT | |
| (Linear Foot) | GFM | ||
| 2018 | FFP | CAT 6 WALL OUTLET BOX |
Government Furnished Materials (GFM)
| Install CAT 6 Wall Outlet Box. | 300 | EA | GFM | |
| 2019 | FFP | NON-METALLIC RACEWAY |
Government Furnished Materials (GFM)
| Install of Non-Metallic Raceway. | 18,000 | FT | |
| (Linear Foot) | GFM | ||
| 2020 | FFP | 6 TO 12 INCH METAL CABLE LADDER RACK |
Government Furnished Materials (GFM)
| Install and Bonding of 6 to 12 Inch Metal Cable Ladder Rack. | 10 | FT | |
| (Linear Foot) | GFM | ||
| 2021 | FFP | EQUIPMENT RACK |
Government Furnished Materials (GFM)
| Install Equipment Rack. | 10 | EA | GFM | |
| 2022 | FFP | STRAND AND GUY WIRES FOR AERIAL CABLE |
Contractor Furnished Material (CFM)
| Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT | |
| (Linear Foot) | CFM | ||
| 2023 | FFP | CABLE ON STRAND USING On Guy Wire |
Government Furnished Materials (GFM)
| Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | GFM | |||
| 2023AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Fiber Cable | 65,000 | FT | ||
| (Linear Foot) | GFM | |||
| 2023AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 2023AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 2024 | FFP | SPLICE CASE ON STRAND |
Government Furnished Materials (GFM)
| Install Splice Case on Strand. | 20 | EA | GFM | |
| 2025 | FFP | ½ TO 2 INCH EMT CONDUIT INSIDE |
Contractor Furnished Material (CFM)
| Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 25,000 | FT | |
| (Linear Foot) | GFM to CFM | ||
| 2026 | FFP | PULL OR DROP BOX FOR PDS |
Government Furnished Materials (GFM)
| Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA | GFM | |
| 2027 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 60 | FT | |
| (Linear Foot) | CFM | ||
| 2028 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS BURIED |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 120 | FT | |
| (Linear Foot) | CFM | ||
| 2029 | FFP | DEINSTALL CABLE IN CONDUITS |
Labor Only
| Deinstall Cable in Conduits. | 600,000 | FT | |
| (Linear Foot) | Labor Only | ||
| 2030 | FFP | CIS TYPE 25 MILIMETER X 4 EACH |
Contractor Furnished Material (CFM)
| Install Combined Innerduct System (CIS) Type 25 Milimeter x 4 Each (Black, Yellow, Red, Green). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 2031 | FFP | OUTSIDE PULL-BOX |
Government Furnished Materials (GFM)
| Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 30 | EA | GFM | |
| 2032 | FFP | PULLING WIRE IN DUCTS |
Contractor Furnished Material (CFM)
| Install Pulling Wire in Ducts. | 600,000 | FT | |
| (Linear Foot) | CFM | ||
| 2033 | FFP | ACCOUNTING FOR CONTRACT SERVICES | |
| Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each Calendar Year During the Life of the Contract. | 1 | JOB | |
| 2034 | INFO | ESTIMATED COST FOR WAR HAZARD LOSSES |
Total Amount for 2nd Option Period
3rd Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-17-R-0091 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 3rd Option Period: 1 November 2020 - 31 October 2021 | ||||||
| CLIN | CLIN | |||||
| TYPE | SERVICES DESCRIPTION | Qty | Unit | Unit Price | Amount | GFM or CFM |
| 3001 | FFP | COPPER CABLE |
Government Furnished Materials (GFM)
| Install, Splice, Terminate, and Test - Copper Cable in Duct (25 to 1200 PR) | GFM | |||
| 3001AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Copper Cable | 40,000 | FT | ||
| (Linear Foot) | GFM | |||
| 3001AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 3001AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 3002 | FFP | GROUND ROD |
Contractor Furnished Materials (CFM)
| Install Ground Rod to Include Grounding of Cable / Terminal | 100 | EA | From GFM to CFM | |
| 3003 | FFP | PET HOUSING |
Government Furnished Materials (GFM)
| Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA | GFM | |
| 3004 | FFP | SPLICE CASE FOR COPPER CABLE |
Government Furnished Materials (GFM)
| Install Splice Case for Copper Cable. | 50 | EA | GFM | |
| 3005 | FFP | ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD |
Contractor Furnished Material (CFM)
| Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA | CFM | |
| 3006 | FFP | FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | GFM | |||
| 3006AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Optic Cable | 160,000 | FT | ||
| (Linear Foot) | GFM | |||
| 3006AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 3006AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 3007 | FFP | LEAF FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | GFM | |||
| 3007AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Leaf Fiber Optic Cable | 800,000 | FT | ||
| (Linear Foot) | GFM | |||
| 3007AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 3007AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 3008 | FFP | TERMINATION PANEL |
Government Furnished Materials (GFM)
| Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA | GFM | |
| 3009 | FFP | SPLICE ENCLOSURE KIT |
Government Furnished Materials (GFM)
| Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA | GFM | |
| 3010 | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | CFM | |||
| 3010AA | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 3010AB | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 3010AC | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 3010AD | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 3011 | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | CFM | |||
| 3011AA | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 3011AB | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 3011AC | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 3011AD | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 3012 | FFP | SUB / MULTI / MESH INNERDUCT |
Government Furnished Materials (GFM)
| Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT | |
| (Linear Foot) | GFM | ||
| 3013 | FFP | CORE DRILL ½ TO 4 INCH HOLE |
Labor Only
| Core Drill ½ to 4 Inch Hole. | 1,000 | EA | Labor Only | |
| 3014 | FFP | 4 INCH BUILDING ENTRANCE CONDUIT |
Contractor Furnished Material (CFM)
| Install 4 Inch Building Entrance Conduit. | 50 | EA | CFM | |
| 3015 | FFP | MULTIDIRECTIONAL HANDHOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional 1000 x 1000 x 1000 Milimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 25 | EA | CFM | |
| 3016 | FFP | MULTIDIRECTIONAL MAINTENANCE HOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional W1500 by L2400 x H2100 Milimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 5 | EA | CFM | |
| 3017 | FFP | CAT 6 LAN CABLE |
Government Furnished Materials (GFM)
| Install, Terminate, and Test CAT 6 LAN Cable. | 100,000 | FT | |
| (Linear Foot) | GFM | ||
| 3018 | FFP | CAT 6 WALL OUTLET BOX |
Government Furnished Materials (GFM)
| Install CAT 6 Wall Outlet Box. | 200 | EA | GFM | |
| 3019 | FFP | NON-METALLIC RACEWAY |
Government Furnished Materials (GFM)
| Install of Non-Metallic Raceway. | 12,000 | FT | |
| (Linear Foot) | GFM | ||
| 3020 | FFP | 6 TO 12 INCH METAL CABLE LADDER RACK |
Government Furnished Materials (GFM)
| Install and Bonding of 6 to 12 Inch Metal Cable Ladder Rack. | 10 | FT | |
| (Linear Foot) | GFM | ||
| 3021 | FFP | EQUIPMENT RACK |
Government Furnished Materials (GFM)
| Install Equipment Rack. | 10 | EA | GFM | |
| 3022 | FFP | STRAND AND GUY WIRES FOR AERIAL CABLE |
Contractor Furnished Material (CFM)
| Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT | |
| (Linear Foot) | CFM | ||
| 3023 | FFP | CABLE ON STRAND USING On Guy Wire |
Government Furnished Materials (GFM)
| Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | GFM | |||
| 3023AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Fiber Cable | 65,000 | FT | ||
| (Linear Foot) | GFM | |||
| 3023AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 3023AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 3024 | FFP | SPLICE CASE ON STRAND |
Government Furnished Materials (GFM)
| Install Splice Case on Strand. | 20 | EA | GFM | |
| 3025 | FFP | ½ TO 2 INCH EMT CONDUIT INSIDE |
Contractor Furnished Material (CFM)
| Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 20,000 | FT | |
| (Linear Foot) | GFM to CFM | ||
| 3026 | FFP | PULL OR DROP BOX FOR PDS |
Government Furnished Materials (GFM)
| Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA | GFM | |
| 3027 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 40 | FT | |
| (Linear Foot) | CFM | ||
| 3028 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS BURIED |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 80 | FT | |
| (Linear Foot) | CFM | ||
| 3029 | FFP | DEINSTALL CABLE IN CONDUITS |
Labor Only
| Deinstall Cable in Conduits. | 400,000 | FT | |
| (Linear Foot) | Labor Only | ||
| 3030 | FFP | CIS TYPE 25 MILIMETER X 4 EACH |
Contractor Furnished Material (CFM)
| Install Combined Innerduct System (CIS) Type 25 Milimeter x 4 Each (Black, Yellow, Red, Green). | 3,000 | FT | |
| (Linear Foot) | CFM | ||
| 3031 | FFP | OUTSIDE PULL-BOX |
Government Furnished Materials (GFM)
| Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 25 | EA | GFM | |
| 3032 | FFP | PULLING WIRE IN DUCTS |
Contractor Furnished Material (CFM)
| Install Pulling Wire in Ducts. | 400,000 | FT | |
| (Linear Foot) | CFM | ||
| 3033 | FFP | ACCOUNTING FOR CONTRACT SERVICES | |
| Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each Calendar Year During the Life of the Contract. | 1 | JOB | |
| 3034 | INFO | ESTIMATED COST FOR WAR HAZARD LOSSES |
Total Amount for 3rd Option Period
4th Option Period
ATTACHMENT 2 - SCHEDULE OF SERVICES
Solicitation W91QVN-17-R-0091 Telecommunications Infrastructure Support Services (TISS), USFK-Wide
| 4th Option Period: 1 November 2021 - 31 October 2022 | ||||||
| CLIN | CLIN | |||||
| TYPE | SERVICES DESCRIPTION | Qty | Unit | Unit Price | Amount | GFM or CFM |
| 4001 | FFP | COPPER CABLE |
Government Furnished Materials (GFM)
| Install, Splice, Terminate, and Test - Copper Cable in Duct (25 to 1200 PR) | GFM | |||
| 4001AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Copper Cable | 40,000 | FT | ||
| (Linear Foot) | GFM | |||
| 4001AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 4001AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Copper Cable
| EA = 1 EA Pair | 4,000 | EA | GFM | |
| 4002 | FFP | GROUND ROD |
Contractor Furnished Materials (CFM)
| Install Ground Rod to Include Grounding of Cable / Terminal | 100 | EA | From GFM to CFM | |
| 4003 | FFP | PET HOUSING |
Government Furnished Materials (GFM)
| Install Protected Entrance Terminal (PET) Housing for Copper Cable. | 50 | EA | GFM | |
| 4004 | FFP | SPLICE CASE FOR COPPER CABLE |
Government Furnished Materials (GFM)
| Install Splice Case for Copper Cable. | 50 | EA | GFM | |
| 4005 | FFP | ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD |
Contractor Furnished Material (CFM)
| Install ¾ Inch, Fire-Retardant Plywood Backboard. | 40 | EA | CFM | |
| 4006 | FFP | FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores). | GFM | |||
| 4006AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Optic Cable | 160,000 | FT | ||
| (Linear Foot) | GFM | |||
| 4006AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 4006AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Optic Cable
| EA = 1 EA Core | 1,500 | EA | GFM | |
| 4007 | FFP | LEAF FIBER OPTIC CABLE IN DUCT |
Government Furnished Materials (GFM)
| Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores). | GFM | |||
| 4007AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Leaf Fiber Optic Cable | 800,000 | FT | ||
| (Linear Foot) | GFM | |||
| 4007AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 4007AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Leaf Fiber Optic Cable
| EA = 1 EA Core | 1,000 | EA | GFM | |
| 4008 | FFP | TERMINATION PANEL |
Government Furnished Materials (GFM)
| Install Fiber Optic - Termination Panel (Wall Mount or Rack). | 100 | EA | GFM | |
| 4009 | FFP | SPLICE ENCLOSURE KIT |
Government Furnished Materials (GFM)
| Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores). | 100 | EA | GFM | |
| 4010 | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | CFM | |||
| 4010AA | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 4010AB | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 4,000 | FT | |
| (Linear Foot) | CFM | ||
| 4010AC | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 4010AD | FFP | ENCASED BURIED (EB)-20 CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
| Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area). | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 4011 | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | CFM | |||
| 4011AA | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 4011AB | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 20,000 | FT | |
| (Linear Foot) | CFM | ||
| 4011AC | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 4011AD | FFP | RIGID NONMETALLIC CONDUIT |
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
| Duct Installation to Include Excavation, Backfill, Markers and Warning Tape. | 1,000 | FT | |
| (Linear Foot) | CFM | ||
| 4012 | FFP | SUB / MULTI / MESH INNERDUCT |
Government Furnished Materials (GFM)
| Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct. | 10,000 | FT | |
| (Linear Foot) | GFM | ||
| 4013 | FFP | CORE DRILL ½ TO 4 INCH HOLE |
Labor Only
| Core Drill ½ to 4 Inch Hole. | 1,000 | EA | Labor Only | |
| 4014 | FFP | 4 INCH BUILDING ENTRANCE CONDUIT |
Contractor Furnished Material (CFM)
| Install 4 Inch Building Entrance Conduit. | 50 | EA | CFM | |
| 4015 | FFP | MULTIDIRECTIONAL HANDHOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional 1000 x 1000 x 1000 Milimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 25 | EA | CFM | |
| 4016 | FFP | MULTIDIRECTIONAL MAINTENANCE HOLE |
Contractor Furnished Material (CFM)
| Install Multidirectional W1500 by L2400 x H2100 Milimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation. | 5 | EA | CFM | |
| 4017 | FFP | CAT 6 LAN CABLE |
Government Furnished Materials (GFM)
| Install, Terminate, and Test CAT 6 LAN Cable. | 100,000 | FT | |
| (Linear Foot) | GFM | ||
| 4018 | FFP | CAT 6 WALL OUTLET BOX |
Government Furnished Materials (GFM)
| Install CAT 6 Wall Outlet Box. | 100 | EA | GFM | |
| 4019 | FFP | NON-METALLIC RACEWAY |
Government Furnished Materials (GFM)
| Install of Non-Metallic Raceway. | 6,000 | FT | |
| (Linear Foot) | GFM | ||
| 4020 | FFP | 6 TO 12 INCH METAL CABLE LADDER RACK |
Government Furnished Materials (GFM)
| Install and Bonding of 6 to 12 Inch Metal Cable Ladder Rack. | 10 | FT | |
| (Linear Foot) | GFM | ||
| 4021 | FFP | EQUIPMENT RACK |
Government Furnished Materials (GFM)
| Install Equipment Rack. | 10 | EA | GFM | |
| 4022 | FFP | STRAND AND GUY WIRES FOR AERIAL CABLE |
Contractor Furnished Material (CFM)
| Install Strand and Guy Wires for Aerial Cable. | 50,000 | FT | |
| (Linear Foot) | CFM | ||
| 4023 | FFP | CABLE ON STRAND USING On Guy Wire |
Government Furnished Materials (GFM)
| Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable. | GFM | |||
| 4023AA | FFP | Government Furnished Materials (GFM) | ||
| Install - Fiber Cable | 65,000 | FT | ||
| (Linear Foot) | GFM | |||
| 4023AB | FFP | Government Furnished Materials (GFM) |
Splice and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 4023AC | FFP | Government Furnished Materials (GFM) |
Terminate and Test - Fiber Cable
| EA = 1 EA Pair | 500 | EA | GFM | |
| 4024 | FFP | SPLICE CASE ON STRAND |
Government Furnished Materials (GFM)
| Install Splice Case on Strand. | 20 | EA | GFM | |
| 4025 | FFP | ½ TO 2 INCH EMT CONDUIT INSIDE |
Contractor Furnished Material (CFM)
| Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building. | 15,000 | FT | |
| (Linear Foot) | GFM to CFM | ||
| 4026 | FFP | PULL OR DROP BOX FOR PDS |
Government Furnished Materials (GFM)
| Install Pull or Drop Box for Protected Distribution System (PDS). | 200 | EA | GFM | |
| 4027 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building. | 40 | FT | |
| (Linear Foot) | CFM | ||
| 4028 | FFP | GIP 4 INCH CONDUIT WITH COUPLINGS BURIED |
Contractor Furnished Material (CFM)
| Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of Concrete On All Sides. | 80 | FT | |
| (Linear Foot) | CFM | ||
| 4029 | FFP | DEINSTALL CABLE IN CONDUITS |
Labor Only
| Deinstall Cable in Conduits. | 200,000 | FT | |
| (Linear Foot) | Labor Only | ||
| 4030 | FFP | CIS TYPE 25 MILIMETER X 4 EACH |
Contractor Furnished Material (CFM)
| Install Combined Innerduct System (CIS) Type 25 Milimeter x 4 Each (Black, Yellow, Red, Green). | 2,000 | FT | |
| (Linear Foot) | CFM | ||
| 4031 | FFP | OUTSIDE PULL-BOX |
Government Furnished Materials (GFM)
| Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm | 20 | EA | GFM | |
| 4032 | FFP | PULLING WIRE IN DUCTS |
Contractor Furnished Material (CFM)
| Install Pulling Wire in Ducts. | 200,000 | FT | |
| (Linear Foot) | CFM | ||
| 4033 | FFP | ACCOUNTING FOR CONTRACT SERVICES | |
| Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each Calendar Year During the Life of the Contract. | 1 | JOB | |
| 4034 | INFO | ESTIMATED COST FOR WAR HAZARD LOSSES |
Total Amount for 4th Option Period