SEE ADDENDUM
(No Collect Calls)
W91QVN-17-R-0091 15-May-2017
b. TELEPHONE NUMBER
02-7914-7565
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 07 Jul 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. CHONG, SO-HUI
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES OF AMERICA (THE)
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE WT4G3U 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
HHC, 1ST SIG BDE
1ST SIGNAL BRIGADE
UNIT #15271
APO AP 96205-5271
UNITED STATES OF AMERICA (THE)
TEL: (0505) 725-6973 FAX: .
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
238210
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF251
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN-17-R-0091
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SOLICITATION NOTES
***ADMINISTRATIVE NOTE: Original Solicitation W91QVN-17-R-0091 has not been issued and will be replaced by Amendment W91QVN-17-R-0091-0001 (Conform Copy).***
DESCRIPTION OF AMENDMENT 0003
a. The purpose of this amendment is to provide the following clarifications to the solicitation (SF1449), and to also post the conformed copy of the solicitation with the revised CLIN structure and the revised Attachment 2 ‐ Schedule of Services (CLINs).
1) Breakdown CLINs ‐ Include Sub‐CLINs and Estimated Quantity added CLIN X001 (Sub‐CLINs for X001AA, X001AB & X001AC) CLIN X006 (Sub‐CLINs for X006AA, X006AB & X006AC) CLIN X007 (Sub‐CLINs for X007AA, X007AB & X007AC) CLIN X010 (Sub‐CLINs for X010AA, X010AB, X010AC & X010AD) CLIN X011 (Sub‐CLINs for X011AA, X011AB, X011AC & X011AD) CLIN X023 (Sub‐CLINs for X023AA, X023AB & X023AC)
2) Changed CLINs from GFM to Provide CFM CLIN X002 ‐ added the words "Provide Contractor Furnished Material (CFM)" CLIN X025 ‐ added the words "Provide Contractor Furnished Material (CFM)"
3) Added language that identifies Government Furnished Materials (GFM), Contractor Furnished Materials (CFM) and Labor Only (No Material Involved CLINs) for all CLINs.
4) Revised in the CLIN Descriptions CLIN X001 ‐ added the words "in Duct" CLIN X013 ‐ added the words "Labor Only" CLIN X014 ‐ deleted the words "2 INCH TO" & "2 to" CLIN X015 ‐ revised the words "1000 x 1000 x 1000" CLIN X016 ‐ revised the words "W1500 by L2400 x H2100" CLIN X023 ‐ revised the words " On Guy Wire" & "Guy Wires for Aerial" CLIN X029 ‐ added the words "Labor only and" CLIN X031 ‐ added the words " Average 40cm x 40cm x 20cm"
5) Quantity of CLIN X017 & CLIN X026 adjusted the Estimated Quantity CLIN X017 ‐ has been decreased for the base period & all options to 100,000 FT CLIN X026 ‐ has been increased for the base period & all options to 200 EA
b. The Contract Period has been modified
FROM:
Base Period: 1 September 2017 – 31 August 2018 1st Option Year: 1 September 2018 – 31 August 2019 2nd Option Year: 1 September 2019 – 31 August 2020 3rd Option Year: 1 September 2020 – 31 August 2021 4th Option Year: 1 September 2021 – 31 August 2022
TO:
Base Period: 1 November 2017 – 31 October 2018 1st Option Year: 1 November 2018 – 31 October 2019 2nd Option Year: 1 November 2019 – 31 October 2020 3rd Option Year: 1 November 2020 – 31 October 2021 4th Option Year: 1 November 2021 – 31 October 2022
c. All other terms and conditions of the solicitation remain unchanged.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
COPPER CABLE
Government Furnished Materials (GFM) Install, Splice, Terminate, and Test - Copper Cable in Duct (25 to 1200 PR).
FOB: Destination
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0001AA 40,000 Linear Foot
INSTALL - COPPER CABLE
FFP
Government Furnished Materials (GFM) Install - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
0001AB 4,000 Each
SPLICE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Copper Cable EA = 1 EA Pair
UNIT UNIT PRICE MAX AMOUNT
0001AC 4,000 Each
TERMINATE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
0002 100 Each
GROUND ROD
FFP
Contractor Furnished Materials (CFM) Install Ground Rod to Include Grounding of Cable / Terminal.
UNIT UNIT PRICE MAX AMOUNT
0003 50 Each
PET HOUSING
FFP
Government Furnished Materials (GFM) Install Protected Entrance Terminal (PET) Housing for Copper Cable.
UNIT UNIT PRICE MAX AMOUNT
0004 50 Each
SPLICE CASE FOR COPPER CABLE
FFP
Government Furnished Materials (GFM) Install Splice Case for Copper Cable.
UNIT UNIT PRICE MAX AMOUNT
0005 40 Each
¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Contractor Furnished Material (CFM) Install ¾ Inch, Fire-Retardant Plywood Backboard.
UNIT UNIT PRICE MAX AMOUNT
FIBER OPTIC CABLE IN DUCT
Install, Terminate, Splice, and Test - Fiber Optic Cable in Duct (2 to 144 Fiber Cores).
UNIT UNIT PRICE MAX AMOUNT
0006AA 160,000 Linear
INSTALL - OPTIC CABLE
Government Furnished Materials (GFM) Install - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
0006AB 1,500 Each
SPLICE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Optic Cable EA = 1 EA Core
UNIT UNIT PRICE MAX AMOUNT
0006AC 1,500 Each
TERMINATE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
LEAF FIBER OPTIC CABLE IN DUCT
Install, Terminate, Splice, and Test - LEAF Fiber Optic Cable in Duct (12 to 96 Fiber Cores).
UNIT UNIT PRICE MAX AMOUNT
0007AA 800,000 Linear
INSTALL - LEAF FIBER OPTIC CABLE
Government Furnished Materials (GFM) Install - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
0007AB 1,000 Each
SPLICE AND TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
0007AC 1,000 Each
TERMINATE & TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
0008 100 Each
TERMINATION PANEL
FFP
Government Furnished Materials (GFM) Install Fiber Optic - Termination Panel (Wall Mount or Rack).
UNIT UNIT PRICE MAX AMOUNT
0009 100 Each
SPLICE ENCLOSURE KIT
FFP
Install Fiber Optic Cable - Splice Enclosure Kit (12 to 144 Cores).
UNIT UNIT PRICE MAX AMOUNT
ENCASED BURIED (EB)-20 CONDUIT
Contractor Furnished Material (CFM) Install 4 Inch (1 to 4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning Tape(Paved Area).
UNIT UNIT PRICE MAX AMOUNT
0010AA 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
0010AB 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
0010AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
0010AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
RIGID NONMETALLIC CONDUIT
Install 4 Inch (1 to 4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
Duct Installation to Include Excavation, Backfill, Markers and Warning Tape.
UNIT UNIT PRICE MAX AMOUNT
0011AA 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
0011AB 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
0011AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
0011AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
0012 10,000 Linear
SUB / MULTI / MESH INNERDUCT
Government Furnished Materials (GFM) Install Sub-Duct / Innerduct / Multi-Duct / Fabric-Mesh Innerduct.
UNIT UNIT PRICE MAX AMOUNT
0013 1,000 Each
CORE DRILL ½ TO 4 INCH HOLE
FFP
Labor Only Core Drill ½ to 4 Inch Hole.
UNIT UNIT PRICE MAX AMOUNT
0014 50 Each
4 INCH BUILDING ENTRANCE CONDUIT
FFP
Contractor Furnished Material (CFM) Install 4 Inch Building Entrance Conduit.
UNIT UNIT PRICE MAX AMOUNT
0015 25 Each
MULTIDIRECTIONAL HANDHOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation.
UNIT UNIT PRICE MAX AMOUNT
0016 5 Each
MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding Installation.
UNIT UNIT PRICE MAX AMOUNT
0017 100,000 Linear
CAT 6 LAN CABLE
Government Furnished Materials (GFM) Install, Terminate, and Test CAT 6 LAN Cable.
UNIT UNIT PRICE MAX AMOUNT
0018 500 Each
CAT 6 WALL OUTLET BOX
FFP
Government Furnished Materials (GFM) Install CAT 6 Wall Outlet Box.
UNIT UNIT PRICE MAX AMOUNT
0019 30,000 Linear
NON-METALLIC RACEWAY
Government Furnished Materials (GFM) Install Non-Metallic Raceway.
UNIT UNIT PRICE MAX AMOUNT
0020 10 Linear
6 TO 12 INCH METAL CABLE LADDER RACK
Government Furnished Materials (GFM) Install and Bonding of 6 to 12 Inch Metal Cable Ladder Rack.
UNIT UNIT PRICE MAX AMOUNT
0021 10 Each
EQUIPMENT RACK
FFP
Government Furnished Materials (GFM) Install Equipment Rack.
UNIT UNIT PRICE MAX AMOUNT
0022 50,000 Linear
STRAND AND GUY WIRES FOR AERIAL CABLE
Contractor Furnished Material (CFM) Install Strand and Guy Wires for Aerial Cable.
UNIT UNIT PRICE MAX AMOUNT
CABLE ON STRAND USING On Guy Wire
Install Cable on Guy Wires for Aerial to Include Splicing, Termination, and Testing of Cable.
UNIT UNIT PRICE MAX AMOUNT
0023AA 65,000 Linear
INSTALL - FIBER CABLE
Government Furnished Materials (GFM) Install - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
0023AB 500 Each
SPLICE AND TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
0023AC 500 Each
TERMINATE & TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
0024 20 Each
SPLICE CASE ON STRAND
FFP
Government Furnished Materials (GFM) Install Splice Case on Strand.
UNIT UNIT PRICE MAX AMOUNT
0025 35,000 Linear
½ TO 2 INCH EMT CONDUIT INSIDE
Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of Building.
UNIT UNIT PRICE MAX AMOUNT
0026 200 Each
PULL OR DROP BOX FOR PDS
FFP
Government Furnished Materials (GFM) Install Pull or Drop Box for Protected Distribution System (PDS).
UNIT UNIT PRICE MAX AMOUNT
0027 100 Linear
GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE
Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Inside of Building.
UNIT UNIT PRICE MAX AMOUNT
0028 200 Linear
GIP 4 INCH CONDUIT WITH COUPLINGS BURIED
Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of Concrete On All Sides.
UNIT UNIT PRICE MAX AMOUNT
0029 1,000,000 Linear
DEINSTALL CABLE IN CONDUITS
Labor Only Deinstall Cable in Conduits.
UNIT UNIT PRICE MAX AMOUNT
0030 6,000 Linear
CIS TYPE 25 MILLIMETER X 4 EACH
Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) Type 25 Millimeter X 4 Each (Black, Yellow, Red, Green).
UNIT UNIT PRICE MAX AMOUNT
0031 40 Each
OUTSIDE PULL-BOX
FFP
Government Furnished Materials (GFM) Install Outside Pull-Box (Various Sizes). Average 40cm x 40cm x 20cm
UNIT UNIT PRICE MAX AMOUNT
0032 1,000,000 Linear
PULLING WIRE IN DUCTS
Contractor Furnished Material (CFM) Install Pulling Wire in Ducts.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0033 1 Job
ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each Calendar Year During the Life of the Contract.
ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
Estimated Cost for War Hazard Losses is Zero ($0.00).
UNIT UNIT PRICE MAX AMOUNT
OPTION COPPER CABLE
UNIT UNIT PRICE MAX AMOUNT
1001AA 40,000 Linear
OPTION INSTALL - COPPER CABLE
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1001AB 4,000 Each
OPTION SPLICE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
1001AC 4,000 Each
OPTION TERMINATE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
1002 100 Each
OPTION GROUND ROD
FFP
Contractor Furnished Materials (CFM)
UNIT UNIT PRICE MAX AMOUNT
1003 50 Each
OPTION PET HOUSING
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
OPTION FIBER OPTIC CABLE IN DUCT
UNIT UNIT PRICE MAX AMOUNT
1006AA 160,000 Linear
OPTION INSTALL - OPTIC CABLE
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1006AB 1,500 Each
OPTION SPLICE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
1006AC 1,500 Each
OPTION TERMINATE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
OPTION LEAF FIBER OPTIC CABLE IN DUCT
UNIT UNIT PRICE MAX AMOUNT
1007AA 800,000 Linear
OPTION INSTALL - LEAF FIBER OPTIC CABLE
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1007AB 1,000 Each
OPTION SPLICE AND TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
1007AC 1,000 Each
OPTION TERMINATE & TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
1008 100 Each
OPTION TERMINATION PANEL
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1009 100 Each
OPTION SPLICE ENCLOSURE KIT
FFP
UNIT UNIT PRICE MAX AMOUNT
OPTION ENCASED BURIED (EB)-20 CONDUIT
Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
1010AA 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
1010AB 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
1010AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
1010AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
OPTION RIGID NONMETALLIC CONDUIT
Conduit.
UNIT UNIT PRICE MAX AMOUNT
1011AA 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
1011AB 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
1011AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
1011AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
1012 10,000 Linear
OPTION SUB / MULTI / MESH INNERDUCT
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
Labor Only
UNIT UNIT PRICE MAX AMOUNT
1014 50 Each
OPTION 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
1015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding
UNIT UNIT PRICE MAX AMOUNT
1016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and
UNIT UNIT PRICE MAX AMOUNT
1017 100,000 Linear
OPTION CAT 6 LAN CABLE
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1018 400 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1019 24,000 Linear
OPTION NON-METALLIC RACEWAY
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1020 10 Linear
OPTION 6 TO 12 INCH METAL CABLE LADDER RACK
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1021 10 Each
OPTION EQUIPMENT RACK
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1022 50,000 Linear
OPTION STRAND AND GUY WIRES FOR AERIAL CABLE
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
OPTION CABLE ON STRAND USING On Guy Wire
UNIT UNIT PRICE MAX AMOUNT
1023AA 65,000 Linear
OPTION INSTALL - FIBER CABLE
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1023AB 500 Each
OPTION SPLICE AND TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
1023AC 500 Each
OPTION TERMINATE & TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
1024 20 Each
OPTION SPLICE CASE ON STRAND
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1025 30,000 Linear
OPTION ½ TO 2 INCH EMT CONDUIT INSIDE
Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of
UNIT UNIT PRICE MAX AMOUNT
1026 200 Each
OPTION PULL OR DROP BOX FOR PDS
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1027 80 Linear
OPTION GIP 4 INCH CONDUIT WITH COUPLINGS INSIDE
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
1028 160 Linear
OPTION GIP 4 INCH CONDUIT WITH COUPLINGS BURIED
Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of
UNIT UNIT PRICE MAX AMOUNT
1029 800,000 Linear
OPTION DEINSTALL CABLE IN CONDUITS
Labor Only
UNIT UNIT PRICE MAX AMOUNT
1030 5,000 Linear
OPTION CIS TYPE 25 MILLIMETER X 4 EACH
Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) Type 25 Millimeter X 4 Each (Black, UNIT UNIT PRICE MAX AMOUNT
1031 35 Each
OPTION OUTSIDE PULL-BOX
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
1032 800,000 Linear
OPTION PULLING WIRE IN DUCTS
Contractor Furnished Material (CFM)
1033 1 Job
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
2001AA 40,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2001AB 4,000 Each
OPTION SPLICE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
2001AC 4,000 Each
OPTION TERMINATE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
2002 100 Each
OPTION GROUND ROD
FFP
Contractor Furnished Materials (CFM)
UNIT UNIT PRICE MAX AMOUNT
2003 50 Each
OPTION PET HOUSING
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
2006AA 160,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2006AB 1,500 Each
OPTION SPLICE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
2006AC 1,500 Each
OPTION TERMINATE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
2007AA 800,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2007AB 1,000 Each
OPTION SPLICE AND TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
2007AC 1,000 Each
OPTION TERMINATE & TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
2008 100 Each
OPTION TERMINATION PANEL
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2009 100 Each
OPTION SPLICE ENCLOSURE KIT
FFP
UNIT UNIT PRICE MAX AMOUNT
Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
2010AA 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
2010AB 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
2010AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
2010AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
Conduit.
UNIT UNIT PRICE MAX AMOUNT
2011AA 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
2011AB 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
2011AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
2011AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
2012 10,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
Labor Only
UNIT UNIT PRICE MAX AMOUNT
2014 50 Each
OPTION 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
2015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding
UNIT UNIT PRICE MAX AMOUNT
2016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and
UNIT UNIT PRICE MAX AMOUNT
2017 100,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2018 300 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2019 18,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2020 10 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2021 10 Each
OPTION EQUIPMENT RACK
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2022 50,000 Linear
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
2023AA 65,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2023AB 500 Each
OPTION SPLICE AND TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
2023AC 500 Each
OPTION TERMINATE & TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
2024 20 Each
OPTION SPLICE CASE ON STRAND
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2025 25,000 Linear
Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of
UNIT UNIT PRICE MAX AMOUNT
2026 200 Each
OPTION PULL OR DROP BOX FOR PDS
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2027 60 Linear
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
2028 120 Linear
Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of
UNIT UNIT PRICE MAX AMOUNT
2029 600,000 Linear
Labor Only
UNIT UNIT PRICE MAX AMOUNT
2030 4,000 Linear
Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) Type 25 Millimeter X 4 Each (Black, UNIT UNIT PRICE MAX AMOUNT
2031 30 Each
OPTION OUTSIDE PULL-BOX
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
2032 600,000 Linear
Contractor Furnished Material (CFM)
2033 1 Job
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
3001AA 40,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3001AB 4,000 Each
OPTION SPLICE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
3001AC 4,000 Each
OPTION TERMINATE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
3002 100 Each
OPTION GROUND ROD
FFP
Contractor Furnished Materials (CFM)
UNIT UNIT PRICE MAX AMOUNT
3003 50 Each
OPTION PET HOUSING
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
3006AA 160,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3006AB 1,500 Each
OPTION SPLICE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
3006AC 1,500 Each
OPTION TERMINATE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
3007AA 800,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3007AB 1,000 Each
OPTION SPLICE AND TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
3007AC 1,000 Each
OPTION TERMINATE & TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
3008 100 Each
OPTION TERMINATION PANEL
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3009 100 Each
OPTION SPLICE ENCLOSURE KIT
FFP
UNIT UNIT PRICE MAX AMOUNT
Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
3010AA 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
3010AB 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
3010AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
3010AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
Conduit.
UNIT UNIT PRICE MAX AMOUNT
3011AA 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
3011AB 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
3011AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
3011AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
3012 10,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
Labor Only
UNIT UNIT PRICE MAX AMOUNT
3014 50 Each
OPTION 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
3015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding
UNIT UNIT PRICE MAX AMOUNT
3016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and
UNIT UNIT PRICE MAX AMOUNT
3017 100,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3018 200 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3019 12,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3020 10 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3021 10 Each
OPTION EQUIPMENT RACK
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3022 50,000 Linear
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
3023AA 65,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3023AB 500 Each
OPTION SPLICE AND TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
3023AC 500 Each
OPTION TERMINATE & TEST-FIBER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Fiber Cable
UNIT UNIT PRICE MAX AMOUNT
3024 20 Each
OPTION SPLICE CASE ON STRAND
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3025 20,000 Linear
Contractor Furnished Material (CFM) Installation of ½ to 2 Inch Electrical Metallic Tubing (EMT) Conduit Inside of
UNIT UNIT PRICE MAX AMOUNT
3026 200 Each
OPTION PULL OR DROP BOX FOR PDS
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3027 40 Linear
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
3028 80 Linear
Contractor Furnished Material (CFM) Install Galvanized (GIP) 4 Inch Conduit with Couplings Buried at a Minimum of 1 Meter Below the Surface, Encased Within a Minimum of 20 Centimeters of
UNIT UNIT PRICE MAX AMOUNT
3029 400,000 Linear
Labor Only
UNIT UNIT PRICE MAX AMOUNT
3030 3,000 Linear
Contractor Furnished Material (CFM) Install Combined Innerduct System (CIS) Type 25 Millimeter X 4 Each (Black, UNIT UNIT PRICE MAX AMOUNT
3031 25 Each
OPTION OUTSIDE PULL-BOX
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
3032 400,000 Linear
Contractor Furnished Material (CFM)
3033 1 Job
OPTION ACCOUNTING FOR CONTRACT SERVICES
FFP
Contractor Manpower Reporting (CMR) Must be Reported by 31 October of Each
OPTION ESTIMATED COST FOR WAR HAZARD LOSSES
FFP
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
4001AA 40,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4001AB 4,000 Each
OPTION SPLICE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
4001AC 4,000 Each
OPTION TERMINATE AND TEST - COPPER CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Copper Cable
UNIT UNIT PRICE MAX AMOUNT
4002 100 Each
OPTION GROUND ROD
FFP
Contractor Furnished Materials (CFM)
UNIT UNIT PRICE MAX AMOUNT
4003 50 Each
OPTION PET HOUSING
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4004 50 Each
OPTION SPLICE CASE FOR COPPER CABLE
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4005 40 Each
OPTION ¾ INCH, FIRE-RETARDANT PLYWOOD BACKBOARD
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
4006AA 160,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4006AB 1,500 Each
OPTION SPLICE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
4006AC 1,500 Each
OPTION TERMINATE AND TEST - OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Optic Cable
UNIT UNIT PRICE MAX AMOUNT
UNIT UNIT PRICE MAX AMOUNT
4007AA 800,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4007AB 1,000 Each
OPTION SPLICE AND TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Splice and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
4007AC 1,000 Each
OPTION TERMINATE & TEST-LEAF FIBER OPTIC CABLE
FFP
Government Furnished Materials (GFM) Terminate and Test - Leaf Fiber Optic Cable
UNIT UNIT PRICE MAX AMOUNT
4008 100 Each
OPTION TERMINATION PANEL
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4009 100 Each
OPTION SPLICE ENCLOSURE KIT
FFP
UNIT UNIT PRICE MAX AMOUNT
Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
4010AA 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
4010AB 4,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
4010AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
4010AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Encased Buried (EB)-20 Conduit Where Vehicular Traffic (i.e., Automotive, Railway) is Present.
Duct Installation to Include Excavation, Backfill, Restoration of Paved and Concrete Surfaces, Concrete Encasing, Spacers, Markers and Warning
UNIT UNIT PRICE MAX AMOUNT
Conduit.
UNIT UNIT PRICE MAX AMOUNT
4011AA 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (1 Duct) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
4011AB 20,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (2 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
4011AC 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (3 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
4011AD 1,000 Linear
Contractor Furnished Material (CFM) Install 4 Inch (4 Ducts) Rigid Nonmetallic Conduit Schedule 40 PVC Conduit.
UNIT UNIT PRICE MAX AMOUNT
4012 10,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4013 1,000 Each
OPTION CORE DRILL ½ TO 4 INCH HOLE
FFP
Labor Only
UNIT UNIT PRICE MAX AMOUNT
4014 50 Each
OPTION 4 INCH BUILDING ENTRANCE CONDUIT
FFP
Contractor Furnished Material (CFM)
UNIT UNIT PRICE MAX AMOUNT
4015 25 Each
OPTION MULTIDIRECTIONAL HANDHOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional 1000 x 1000 x 1000 Millimeter Handhole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and Grounding
UNIT UNIT PRICE MAX AMOUNT
4016 5 Each
OPTION MULTIDIRECTIONAL MAINTENANCE HOLE
FFP
Contractor Furnished Material (CFM) Install Multidirectional W1500 by L2400 x H2100 Millimeter Maintenance Hole to Include Excavation, Restoration, Backfill, Plugging Ducts, All Hardware and
UNIT UNIT PRICE MAX AMOUNT
4017 100,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4018 100 Each
OPTION CAT 6 WALL OUTLET BOX
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4019 6,000 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4020 10 Linear
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4021 10 Each
OPTION EQUIPMENT RACK
FFP
Government Furnished Materials (GFM)
UNIT UNIT PRICE MAX AMOUNT
4022 50,000 Linear
Install Strand and Guy Wires for
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .