TE 4 CDC Fitness Facility Listing.pdf

PDF 141 KB Posted

Attached to
Fort Lee Custodial Services
Solicitation number
W91QF5-19-R-0002
Issued by

About this file

This combined synopsis and solicitation requests proposals for custodial services at Fort Lee, Virginia. The contractor shall provide all labor, tools, materials, equipment, and supervision to manage and perform cleaning and custodial services for at least 163 buildings, six latrine buildings, and four child development centers across the installation on a daily or weekly basis. Services include cleaning and supplying restrooms, showers, locker rooms, drinking fountains, and trash removal. The period of performance is a one-year base period starting on or about May 1, 2020 with four one-year option periods. The solicitation is an 8(a) competitive set-aside issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis. Proposals are due by February 6, 2020 and will be evaluated based on mission capability, past performance, and price. Award will be made to the lowest priced technically acceptable offer.

View the file

Other files

File Type Posted
Section B CLINs 12 FEB 2020.docx DOCX document
Amended Section B Amendment Notes.docx DOCX document
Amended Section B Clins February 05, 2020.docx DOCX document
W91QF5-19-R-0002 Solicitation Questions 05 February 2020.docx DOCX document
Copy of TE3 update as 30 jan 2020 _.xls XLS spreadsheet
W91QF5-19-R-0002 Solicitation Questions 4 JAN 30 2020.docx DOCX document
W91QF5-19-R-0002 Site Visit Itinerary 01.23.2020.pdf PDF
Revised TE6 Bldg Restroom and Container Count JAN 24 2020.docx DOCX document
W91QF5-19-R-0002 Solicitation Questions 2 JAN 24 2020.docx DOCX document
W91QF5-19-R-0002 Sign-in Sheet from Site Visit 01.23.2020.pdf PDF
JAN 23 2020 Site Visit Information.docx DOCX document
Revised TE3 update 16 JAN 20.xls XLS spreadsheet
Section I -Solicitation Clauses JAN 16 2020.DOCX DOCX document
W91QF5-19-R-0002 Solicitation Questions 1 JAN 16 2020.docx DOCX document
Section M Evaluation Criteria.docx DOCX document
Section I -Solicitation Clauses.DOCX DOCX document
Attachmen 1 W91QF5-19-R-0002 Fort Lee Custodial PWS.pdf PDF
Section B Clins.docx DOCX document
Attachmen 3 Wage Determination, Collective Bargaining Agreement Local 572 Fort Lee Custodial.pdf PDF
TE 1 Annex D Custodial Services.pdf PDF
Section L - Instructions to Offerors.docx DOCX document
TE 2 Workload Data.pdf PDF
TE3 update as 24OCT19 .xls XLS spreadsheet
TE 6 Building Restroom and Container Count.pdf PDF
TE 5 Special Cleaning Instructions.pdf PDF
Section B Pricing Worksheet.xlsx XLSX spreadsheet
TE 7 Cleaning Product List.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIIBIT #4

(CDC & Fitness Facilities)

BUILDING: 10610

SQ. FT. = 10,144

SQ. FT. BREAKDOWN BY AREA SQ. FT.

A. Lobby (includes information desk area 440

B. Office, admin. and lounge (3 room) 796

C. Restrooms 2 ea. (Staff) ( 38 SQ. FT. ea.) 76

D. Sick Room 62

E. Hallways (not including lobby) 779

F. Classroom 101 1047

G. Classroom 102 741

H. Classroom 103 1461

I. Classroom 104 1085

J. Classroom 105 1062

K. Multipurpose Room (Small) 385

L. Multipurpose Room 515

M. Classroom 106 1038

N. Classroom 107 554

O. Laundry Room 103

TOTAL 10,144

*NOTE: EACH CLASSROOM HAS A BOY’S & GIRL’S RESTROOM AND HANDWASHING AREA.

* NOTE: EACH CLASSROOM AND MULTIPURPOSE ROOM HAS VINYL TILE FLOORS COVERED WITH AREA

RUGS.

BUILDING 10620

SQ. FT. = 6,490

SQ. FT. BREAKDOWN BY AREA SQ. FT.

A. Lobby (includes reception area) & Hallways 1,526

B. Room 103 Director’s Office 106

C. Restrooms ( 3 Staff ) 132

D. Lounge – room 131 180

E. Classroom 116 1,066

F. Classroom 118 944

G. Classroom 123 586

H. Classroom 124 650

I. Classroom 127 650

J. Classroom 128 586

k. Laundry 64

TOTAL 6,490

*NOTE: EACH CLASSROOM HAS A BOY’S & GIRL’S RESTROOM AND HANDWASHING AREA.

* NOTE: EACH CLASSROOM AND MULTIPURPOSE ROOM HAS VINYL TILE FLOORS COVERED WITH AREA

RUGS.

BUILDING: 10622

BREAKDOWN BY AREA:

1. 2 CLASSROOMS / RM. 125 – 845 SF + 45 SF RESTROOM & HANDWASHING

AREA / RM. 126 – 843 SF + 77 SF RESTROOM & HANDWASHING AREA.

LINOLEUM TILE AND CERAMIC TILE IN RESTROOM AREAS.

2. ACTIVITY RMS.

RM. 113 – 349 SF / LINOLEUM TILE

RM. 120 – 571 SF / LINOLEUM TILE

RM. 121 – 341 SF / LINOLEUM TILE

RM. 135 – 363 SF / LINOLEUM TILE

RM. 139 – 524 SF / LINOLEUM TILE

RM. 146 – 367 SF / LINOLEUM TILE

RM. 148 – 2,465 SF / LAMINATE WOOD FLOORING

RM. 149 – 1,360 SF / LAMINATE WOOD FLOORING

RM. 105 – 757 SF / CARPET

3. OFFICE

RM. 132 – 110 SF / CARPET

RM. 133 – 132 SF / CARPET

4. RESTROOMS: ALL RESTROOMS CERAMIC TILE

STAFF – 46 SF

BOYS – 90 SF

GIRLS – 90 SF

BOYS – 195 SF

GIRLS – 180 SF

STAFF – 47 SF

BOYS – 45 SF

GIRLS – 45 SF

BOYS – 91 SF

GIRLS – 91 SF

5. LAUNDRY ROOM – 64 SF

6. CORRIDORS – 3,008 SF

TOTAL 13,141 SQ. FT.

BUILDING: 10624

SQ. FT. = 12,029

BREAKDOWN BY AREA:

1. 11 CLASSROOMS 7,392 SF (TILE)

2. STAFF LOUNGE 266 SF (TILE)

3. TRAINING ROOM 176 SF (TILE)

4. DIRECTOR’S OFFICE 142 SF (CARPET)

5. ASSISTANT’S OFFICE 100 SF (CARPET)

6. STAFF RESTROOM 64 SF (CERAMIC TILE)

7. STAFF RESTROOM 64 SF (CERAMIC TILE)

8. LAUNDRY ROOM 169 SF (TILE)

9. CORRIDOR & LOBBY 1,615 SF (TILE)

ADMINSTRATION SECTION

1. LIBRARY 140 SF (CARPET)

2. OFFICE 1 145 SF (CARPET)

3. OFFICE 2 100 SF (CARPET)

4. OFFICE 3 100 SF (CARPET)

5. OFFICE 4 145 SF (CARPET)

6. CONFERENCE ROOM 240 SF (CARPET)

7. BREAKROOM 143 SF (TILE)

8. CORRIDOR 230 SF (TILE)

9. LOBBY 456 SF (TILE)

10. RECEPTIONIST AREA 150 SF (CARPET)

11. STAFF RESTROOM & SHOWER 128 SF (CERAMIC

TILE)

12. STAFF RESTROOM 64 SF (CERAMIC

TILE)

TOTAL 12,029 SQ. FT.

**NOTE: EACH CLASSROOM HAS A BOY’S & GIRL’S RESTROOM AND HANDWASHING AREA

Fitness Centers – Buildings 2414, 4320B, 6008, 12507 & 18033

Foam Disinfectant Cleaner 7D for Bldgs. 4320B, 5D for Bldgs. 2414 & 6008

Supply Body/Bath Soap 7D for Bldgs. 4320B, 5D for Bldgs. 2414

Clean & Supply Restrooms, 7D for Bldgs. 4320B & 18070, 5D for Bldgs. 2414, 6008 & 12507

Locker Rooms & Shower Rooms 7D for Bldgs. 4320B, 5D for Bldgs. 2414

Clean Drinking Fountains 7D for Bldgs. 4320B & 18070, 5D for Bldgs. 2414, 6008 & 12507

Trash Removal 7D for Bldgs. 4320B, 5D for Bldgs. 2414, 6008 & 12507

Clean Entrance Door Glass each service day for Bldgs. 4320B, 2414, 6008, 12507, & 18033

Basic Level Task: Clean & Supply restrooms, showers, saunas, and locker rooms daily (7 days/wk)

Building 4320 – Men’s restroom 459 sq. ft.

Men’s Locker room (includes sauna) 1,828 sq. ft.

Women’s restroom 429 sq. ft.

Women’s Locker room (includes sauna) 1,075 sq. ft.

Total sq. ft. = 3,791 sq. ft. x 7 = 26,537 sq. ft. per week

Building 18070 – Men’s restroom 182 sq. ft.

Women’s restroom 191 sq. ft.

Total sq. ft. = 373 sq. ft. x 7 = 2,611 sq. ft. per week

Basic Level Task: Clean & Supply restrooms, showers, saunas, and locker rooms daily (5 days/wk)

Building 2414 – Men’s restroom 330 sq. ft.

Men’s Locker room (includes sauna) 1,733 sq. ft.

Women’s restroom 320 sq. ft.

Women’s Locker room (includes sauna) 1,733 sq. ft.

Total sq. ft. = 4,116 sq. ft. x 5 = 20,580 sq. ft. per week

Building 6008 – Men’s restroom 405 sq. ft.

Women’s restroom 361 sq. ft.

Total sq. ft. = 766 sq. ft. x 5 = 3,830 sq. ft.

Building 12507 – Men’s restroom 203 sq. ft.

Women’s restroom 203 sq. ft.

Total sq. ft. = 406 sq. ft. x 5 = 2,030 sq. ft.

Weekly Fitness Center square footage = 55,588 sq. ft.

File details come from the government source that posted it. Updated .