This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract, Amendment Number 0002, issued by the U.S. Army MICC (Materiel Integrated Command Center) at Fort Leavenworth, Kansas on 14 September 2026.

The amendment modifies solicitation W91QF426BA013 for Lightning Protection services at Fort Leavenworth's TE-A Facilities. The primary changes involve adjusting the performance period and contract line item structure. The Base Year period shifts from 24 September 2026 – 23 September 2027 to 30 September 2026 – 29 September 2027. CLIN 0001 (Lightning Protection Inspection, Testing, and CAD Drawing services) is modified from a 12-month monthly unit of measure to a single "Job" deliverable with an 11-unit reduction. The SOV (Schedule of Values) allocation for project execution is now required at the post-award conference submission. Identical period adjustments apply to Option Year #1, shifting from 24 September 2027 – 23 September 2028 to 30 September 2027 – 29 September 2028. The amendment incorporates a new Question and Answer attachment (z-Attch-12-QandA_Lightning_Protection, dated 10 September 2026) and updates sealed bid procedures per FAR Part 14. Contract administration remains under Robert M. Parvin at MICC Leavenworth. All other terms and conditions remain unchanged except as explicitly noted. Contractor acknowledgment of this amendment is required prior to the extended offer receipt deadline.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATI

ON

FROM TO AMOUNT

Description Complete in Base Year Lightning Protection (Inspection - Testing - LPS CAD Drawing) of TE-A Facilities List and execute requirements per attached Scope of Work Tab-C.

Base Year 24 SEP 2026 - 23

SEP 2027

Complete in Base Year Lightning Protection (Inspection - Testing - LPS CAD Drawing) of TE-A Facilities List and execute requirements per attached Scope of Work Tab-C.

Base Year 30 SEP 2026 - 29

SEP 2027

Quantity 12 1 -11 Unit of Measure

Months Job

INFORMATION FROM TO

Description DO NOT PRICE THIS CLIN - Base

Year Lightning Protection - Miscellaneous Repairs

Base Year 24 SEP 2026 - 23 SEP

DO NOT PRICE THIS CLIN - Base Year Lightning Protection - Miscellaneous Repairs

Base Year 30 SEP 2026 - 29 SEP

Option Line Item 1001

INFORMATI

ON

FROM TO AMOUNT

W91QF426BA0130002

Description Complete in Option Year #1 - Lightning Protection (Inspection - Testing - LPS CAD Drawing) of TE-A Facilities List and execute requirements per attached Scope of Work Tab-C.

OY #1 - 24 SEP 2027 - 23

SEP 2028

Complete in Option Year #1 - Lightning Protection (Inspection - Testing - LPS CAD Drawing) of TE-A Facilities List and execute requirements per attached Scope of Work Tab-C.

OY #1 - 30 SEP 2027 - 29

SEP 2028

Quantity 12 1 -11 Unit of Measure

Months Job

Option Line Item 1002

INFORMATION FROM TO

Description DO NOT PRICE THIS CLIN - Base

Year Lightning Protection - Miscellaneous Repairs

Option Year #1 - 24 SEP 2027 - 23

SEP 2028

DO NOT PRICE THIS CLIN - Base Year Lightning Protection - Miscellaneous Repairs

Option Year #1 - 30 SEP 2027 - 29

SEP 2028

Section C - Description/Specifications/Statement of Work

The Requirements text has been modified to:

Sealed Bid Procedures - FAR Part 14 - Base YR - 30 SEP 2026 - 29 SEP 2027 / OY#1 - 30 SEP

2027 - 29 SEP 2028

Section F - Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Period of Performance

24 Sep 2026 to 23 Sep 2027 30 Sep 2026 to 29 Sep 2027

INFORMATION FROM TO

Period of Performance

24 Sep 2026 to 23 Sep 2027 30 Sep 2026 to 29 Sep 2027

INFORMATION FROM TO

Period of Performance

24 Sep 2026 to 02 Oct 2026 30 Sep 2026 to 09 Oct 2026

Option Line Item 1001

INFORMATION FROM TO

Period of Performance

24 Sep 2027 to 23 Sep 2028 30 Sep 2027 to 29 Sep 2028

Option Line Item 1002

INFORMATION FROM TO

Period of Performance

24 Sep 2027 to 23 Sep 2028 30 Sep 2027 to 29 Sep 2028

Option Line Item 1003

INFORMATION FROM TO

Period of 24 Sep 2027 to 02 Oct 2027 30 Sep 2027 to 09 Oct 2027

Performance

Section H - Special Contract Requirements

Miscellaneous text in this section has been modified from:

Local Instructions

H.1. A copy of the current Wage Determination as contained in the Register of Wage Determinations applicable to this requirement may be accessed at: https://sam.gov/wage-

.determinations

H.2. RESPONSIBILITY FOR ADMINISTRATION OF CONTRACT

a. The Contracting Officer is responsible for the administration of this contract. The Contracting Officer alone is authorized to the extent indicated in the contract to act on behalf of the government which results in changes in the terms of the contract, including deviations from specifications, details and delivery schedules. Communications pertaining to contractual administrative matters will be addressed to the Contracting Officer. No changes in or deviation from the scope of work shall be affected without a written modification to the contract executed by the Contracting Officer.

Delivery/Task orders will be issued by the Contract Administration Division.

b. No oral statement of any person will in any manner or degree, modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer.

c. All matters pertaining to Government administration of this contract should be directed to:

ATTN: ROBERT M. PARVIN - MICC Leavenworth - 731 MCCLELLAN AVE, ROOM 105, FORT

LEAVENWORTH, KS 66027 - TELEPHONE NUMBER - 520-944-3389 - E-MAIL ADDRESS -

robert.m.parvin.civ@army.mil

H.3. PRECONSTRUCTION CONFERENCE

W91QF426BA0130002

https://sam.gov/wage-determinations

A Preconstruction Conference will be scheduled by the Contracting Officer after contract award and prior to the time and date set for commencement of work. The meeting will be held at Fort Leavenworth. At this meeting, the Contractor will be oriented with respect to Government procedures and lines of authority, as well as contractual, administrative, and construction matters.

The Contractor is required to furnish the following.

a. Current Certificate of Liability Insurance

b. Letter appointing their Key Personnel to include but not limited to their Superintendent, Quality Control Inspector/Manager(s), Administrative Personnel, and/or as otherwise specified within this contract requirement.

c. Construction Bonds due 10 Days after contract award.

d. Ensure administrative personnel are aware weekly Payrolls are to be sent to the Contracting at the following e-mail address usarmy.leavenworth.acc-micc.mbx.construction@army.mil Officer utilizing the contract number with task order number, building number and payroll end date as the naming convention for both the e-mail subject line and the title of the file.

(e.g. W91QF4-26-C-AXXX-LPS-W-E_5FEB26)

H.4. Common Access Card (CAC)

a. The government issued issued credential (CAC) is the property of the U. S. government and shall not be retained upon expiration, replacement, or when the DoD affiliation of the employee has been terminated. The Contractor has a responsibility to ensure the government issued credential (CAC) is returned in accordance with local command or installation procedures.

Unauthorized possession of an official credential, like a CAC, can be prosecuted criminally under section 701, title 18, United States Code.

b. Department of War issued ID card, Locally Approved Credential (LAC), or other Temporary Pass (1 to 30 days) may use Grant or Hancock Gates. See locations and hours of operation at the below listed link.

https://home.army.mil/leavenworth/about/visitor-information/gate-information

c. If a contractor or a contractor's employee does not possess any of the ID cards listed above in paragraph B, the first stop must be at the Fort Leavenworth Visitor Control Center at the corner of Metropolitan Avenue and 4th Street and/or may view web link above in paragraph (b) to apply for a temporary online pass.

d. Personnel entering the Fort Leavenworth Visitor Control Center (VCC) must contain a valid REAL ID Driver's License and proof of vehicle insurance. Other additional form identification that

W91QF426BA0130002

https://home.army.mil/leavenworth/about/visitor-information/gate-information may be used in conjunction with a state non-REAL ID driver's license to request access to the installation such a United States Passport (see the web link above in paragraph (b) for other acceptable forms of ID).

H.5. COMPLIANCE WITH ENVIRONMENTAL AND HEALTH LAWS

a. The Contractor understands the responsibility for compliance with federal, state, and local laws, rules, and regulations pertaining to environmental protection, occupational health and safety, and transportation, storage, and disposal of hazardous materials and hazardous waste is the sole responsibility of the contractor. This shall include, but not be limited to: all responsibilities of an "owner or operator" of all equipment used by the Contractor and of the areas in which work is being done from the time when the Contractor begins work until the work is accepted and the worksite cleaned up and cleared, and the sole responsibility for compliance with all Army regulations pertaining to hauling and disposal of materials, as well as all federal and Kansas laws and local ordinances regulating the hauling and disposal of hazardous materials and hazardous waste. This clause is meant to supplement, not replace, any requirements pertaining to compliance with the law or safety requirements contained elsewhere in this contract.

b. The Contractor shall be solely responsible for all costs of compliance with all such laws, rules, and regulations, to include all training of personnel, submission of permit and license applications, purchases of materials, payment of applicable fees and taxes, and payment of fines and penalties for noncompliance. The U.S. Government shall not pay fines or penalties resulting from noncompliance and shall not pay fees required to maintain and process required records or permit applications necessary to perform this contract. Should the Government choose to do so, it may, but does not have to, correct violations of environmental and occupational and safety laws which the Contractor fails to correct after reasonable notice; if the Government chooses to correct the violation(s), as opposed to having the Contractor do so, the Contractor shall reimburse to the Government all direct and indirect costs of correcting the violation(s).

c. The Contractor understands that compliance with all environmental and occupational safety and health laws is a part of this contract to which the Government is entitled to strict compliance. The Contractor understands it has no authority to dispose of government waste in absence of the necessary regulatory authorizations. The Contractor further agrees to notify the Government if the Contractor is (1) cited as being in violation of federal, state, or local waste disposal regulations; or

(2) loses its authority to haul or dispose of waste under federal or state laws. Delays caused by the Contractor's need to comply with such laws, or resulting from failure to comply with such laws, shall not result in any equitable adjustments or claims under this contract nor excuse the Contractor's obligation to complete the work under the contract.

d. The Contractor shall notify the Contracting Officer immediately upon discovery of exposure to lead, other hazardous waste or substances, or asbestos to the air, land, or water in any location in which the Contractor is required by law to report the exposure to a regulatory agency. In the event that such exposure is the result of any action of the Contractor, the Contractor will cease work immediately and notify the Contracting Officer. The Contractor understands that there will be no equitable adjustment for time lost or expenses incurred as a result of the need to correct any such exposure which is the result of negligent or intentional acts of Contractor personnel.

e. The Contractor Officer or their designated representative shall be permitted access to contractor compliance files as they strictly relate to the Contract Award and can assist the Contracting Officer or their designated representative in determining compliance with contract award.

f. If any Hazardous Waste (HW) is generated during the course of the project, the contractor shall be solely responsible for its proper characterization, packaging, labeling, manifesting, transport, disposal, and all associated costs. All activities must be performed in strict accordance with federal Environmental Protection Agency (EPA) regulations (40 CFR Parts 260-279), Department of Transportation (DOT) Hazardous Materials Regulations (49 CFR Parts 171-180), the Kansas Solid and Hazardous Waste Act (K.S.A. Chapter 65, Article 34), and the Kansas Department of Health and Environment (KDHE) Hazardous Waste Management Standards (K.A.R. Agency 28, Article 31).

- The contractor will provide all containers required to ship any HW using only approved UN shipping containers for the type of waste being shipped.

- Ft. Leavenworth Environmental will be notified when any containers are opened for use and will provide labeling using the HMMS HW tracking system.

- The contractor will be liable for all fines and notice of violations (NOV's) which may occur from either the EPA or KDHE for improper handling of any HW.

- Ft. Leavenworth Environmental are the only persons designated to sign any HW manifests, a copy of all shipments of HW that will require a Bill of Lading will be reviewed by and given to the Environmental Office.

H.6. SAFETY AND ACCIDENT PREVENTION

The Contractor shall take all reasonable steps and precautions to prevent accidents and preserve the life and health of both Contractor and Government personnel performing or in any way meeting the performance of this contract, while also implementing any additional, immediate precautions for safety and accident prevention that the Contracting Officer may reasonably require.

Compliance and adherence to these standards will be continuously monitored by the installation Safety Officer Pursuant to DA PAM 385-10 (27 November 2013), the Contractor is strictly required to develop and submit a site-specific safety plan prior to beginning work. In performing work under this contract, the Contractor shall strictly conform to all contract-specific safety requirements and comply with all safety rules of the Government installation that concern related activities not directly addressed herein.

H. 7. KANSAS SALES AND USE TAX

The contract price excludes Kansas retailers' sales and compensating (use) taxes on all tangible personal property or services purchased for this project. In accordance with K.S.A. 79-3606(e), the Contracting Officer will, , obtain and furnish the Contractor with a Kansas Project upon request Exemption Certificate. The Contractor and subcontractors must provide this certificate number to all suppliers for invoice integration. Pursuant to Kansas law, the Contractor must retain all project invoices for a period of five years for potential audit by the Kansas Department of Revenue. Upon project completion, the Contractor shall execute a Project Completion Certification, Form PR-77, in duplicate, submitting one copy to the Contracting Officer and the other to the Kansas Department of Revenue.

H.8. CONDUCT OF EMPLOYEES

The contractor is fully responsible for the performance and always conduct of his employees while on post performing under this contract. The contractor shall not allow any employee to perform work under this contract while under the influence of alcohol, drugs, or any other incapacitating agent. Military police and other law enforcement personnel on post have the right to deny entry to post or remove from post any contractor employee for misconduct which endangers the health or safety of people or property or for reasons of security. In addition, the Post Commander may bar any individual from entering the post under the authority of 18 U.S.C. 1382. Removal from post of a contractor employee in accordance with the above shall not relieve the contractor from the requirements to meet all the terms and conditions of the contract; nor shall such removal be grounds for the contractor to file a claim.

H.9. ADVERTISING ON CONTRACTOR VEHICLES

Advertising displayed on Contractor vehicles is permitted provided that the advertising is so worded as not to imply Army or United States Government approval or sanction of the advertised service and is not embarrassing or detrimental to the Government.

To:

Local Instructions

H.1. A copy of the current Wage Determination as contained in the Register of Wage Determinations applicable to this requirement may be accessed at: https://sam.gov/wage-

.determinations

H.2. RESPONSIBILITY FOR ADMINISTRATION OF CONTRACT

a. The Contracting Officer is responsible for the administration of this contract. The Contracting Officer alone is authorized to the extent indicated in the contract to act on behalf of the government which results in changes in the terms of the contract, including deviations from specifications, details and delivery schedules. Communications pertaining to contractual administrative matters will be addressed to the Contracting Officer. No changes in or deviation from the scope of work shall be affected without a written modification to the contract executed by the Contracting Officer.

Delivery/Task orders will be issued by the Contract Administration Division.

b. No oral statement of any person will in any manner or degree, modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer.

c. All matters pertaining to Government administration of this contract should be directed to:

ATTN: ROBERT M. PARVIN - MICC Leavenworth - 731 MCCLELLAN AVE, ROOM 105, FORT

LEAVENWORTH, KS 66027 - TELEPHONE NUMBER - 520-944-3389 - E-MAIL ADDRESS -

robert.m.parvin.civ@army.mil

H.3. PRECONSTRUCTION CONFERENCE

A Preconstruction Conference will be scheduled by the Contracting Officer after contract award and prior to the time and date set for commencement of work. The meeting will be held at Fort Leavenworth. At this meeting, the Contractor will be oriented with respect to Government procedures and lines of authority, as well as contractual, administrative, and construction matters.

The Contractor is required to furnish the following.

a. Current Certificate of Liability Insurance / Construction Bonds due 10 Days after contract award.

b. Letter appointing their Key Personnel to include but not limited to their Superintendent, Quality Control Inspector/Manager(s), Administrative Personnel, and/or as otherwise specified within this contract requirement.

c. Proposed Schedule of Values (SOV) based upon the planned allocation of project execution and labor where appropriate shall be submitted at the Post Award Conference to the Contracting

W91QF426BA0130002

Officer and/or their designated representative or at a minimum prior to invoicing through Wide Area Workflow (WAWF).

d. Ensure administrative personnel are aware weekly Payrolls are to be sent to the Contracting at the following e-mail address usarmy.leavenworth.acc-micc.mbx.construction@army.mil Officer utilizing the contract number with task order number, building number and payroll end date as the naming convention for both the e-mail subject line and the title of the file. (e.g. W91QF4-26-C-

AXXX-LPS-W-E_5FEB26)

H.4. Common Access Card (CAC)

a. The government issued issued credential (CAC) is the property of the U. S. government and shall not be retained upon expiration, replacement, or when the DoD affiliation of the employee has been terminated. The Contractor has a responsibility to ensure the government issued credential (CAC) is returned in accordance with local command or installation procedures.

Unauthorized possession of an official credential, like a CAC, can be prosecuted criminally under section 701, title 18, United States Code.

b. Department of War issued ID card, Locally Approved Credential (LAC), or other Temporary Pass (1 to 30 days) may use Grant or Hancock Gates. See locations and hours of operation at the below listed link.

https://home.army.mil/leavenworth/about/visitor-information/gate-information

c. If a contractor or a contractor's employee does not possess any of the ID cards listed above in paragraph B, the first stop must be at the Fort Leavenworth Visitor Control Center at the corner of Metropolitan Avenue and 4th Street and/or may view web link above in paragraph (b) to apply for a temporary online pass.

d. Personnel entering the Fort Leavenworth Visitor Control Center (VCC) must contain a valid REAL ID Driver's License and proof of vehicle insurance. Other additional form identification that may be used in conjunction with a state non-REAL ID driver's license to request access to the installation such a United States Passport (see the web link above in paragraph (b) for other acceptable forms of ID).

H.5. COMPLIANCE WITH ENVIRONMENTAL AND HEALTH LAWS

a. The Contractor understands the responsibility for compliance with federal, state, and local laws, rules, and regulations pertaining to environmental protection, occupational health and safety, and transportation, storage, and disposal of hazardous materials and hazardous waste is the sole responsibility of the contractor. This shall include, but not be limited to: all responsibilities of an "owner or operator" of all equipment used by the Contractor and of the areas in which work is being done from the time when the Contractor begins work until the work is accepted and the

W91QF426BA0130002

https://home.army.mil/leavenworth/about/visitor-information/gate-information worksite cleaned up and cleared, and the sole responsibility for compliance with all Army regulations pertaining to hauling and disposal of materials, as well as all federal and Kansas laws and local ordinances regulating the hauling and disposal of hazardous materials and hazardous waste. This clause is meant to supplement, not replace, any requirements pertaining to compliance with the law or safety requirements contained elsewhere in this contract.

b. The Contractor shall be solely responsible for all costs of compliance with all such laws, rules, and regulations, to include all training of personnel, submission of permit and license applications, purchases of materials, payment of applicable fees and taxes, and payment of fines and penalties for noncompliance. The U.S. Government shall not pay fines or penalties resulting from noncompliance and shall not pay fees required to maintain and process required records or permit applications necessary to perform this contract. Should the Government choose to do so, it may, but does not have to, correct violations of environmental and occupational and safety laws which the Contractor fails to correct after reasonable notice; if the Government chooses to correct the violation(s), as opposed to having the Contractor do so, the Contractor shall reimburse to the Government all direct and indirect costs of correcting the violation(s).

c. The Contractor understands that compliance with all environmental and occupational safety and health laws is a part of this contract to which the Government is entitled to strict compliance. The Contractor understands it has no authority to dispose of government waste in absence of the necessary regulatory authorizations. The Contractor further agrees to notify the Government if the Contractor is (1) cited as being in violation of federal, state, or local waste disposal regulations; or

(2) loses its authority to haul or dispose of waste under federal or state laws. Delays caused by the Contractor's need to comply with such laws, or resulting from failure to comply with such laws, shall not result in any equitable adjustments or claims under this contract nor excuse the Contractor's obligation to complete the work under the contract.

d. The Contractor shall notify the Contracting Officer immediately upon discovery of exposure to lead, other hazardous waste or substances, or asbestos to the air, land, or water in any location in which the Contractor is required by law to report the exposure to a regulatory agency. In the event that such exposure is the result of any action of the Contractor, the Contractor will cease work immediately and notify the Contracting Officer. The Contractor understands that there will be no equitable adjustment for time lost or expenses incurred as a result of the need to correct any such exposure which is the result of negligent or intentional acts of Contractor personnel.

e. The Contractor Officer or their designated representative shall be permitted access to contractor compliance files as they strictly relate to the Contract Award and can assist the Contracting Officer or their designated representative in determining compliance with contract award.

f. If any Hazardous Waste (HW) is generated during the course of the project, the contractor shall be solely responsible for its proper characterization, packaging, labeling, manifesting, transport, disposal, and all associated costs. All activities must be performed in strict accordance with federal Environmental Protection Agency (EPA) regulations (40 CFR Parts 260-279), Department of Transportation (DOT) Hazardous Materials Regulations (49 CFR Parts 171-180), the Kansas Solid and Hazardous Waste Act (K.S.A. Chapter 65, Article 34), and the Kansas Department of Health and Environment (KDHE) Hazardous Waste Management Standards (K.A.R. Agency 28, Article 31).

- The contractor will provide all containers required to ship any HW using only approved UN shipping containers for the type of waste being shipped.

- Ft. Leavenworth Environmental will be notified when any containers are opened for use and will provide labeling using the HMMS HW tracking system.

- The contractor will be liable for all fines and notice of violations (NOV's) which may occur from either the EPA or KDHE for improper handling of any HW.

- Ft. Leavenworth Environmental are the only persons designated to sign any HW manifests, a copy of all shipments of HW that will require a Bill of Lading will be reviewed by and given to the Environmental Office.

H.6. SAFETY AND ACCIDENT PREVENTION

The Contractor shall take all reasonable steps and precautions to prevent accidents and preserve the life and health of both Contractor and Government personnel performing or in any way meeting the performance of this contract, while also implementing any additional, immediate precautions for safety and accident prevention that the Contracting Officer may reasonably require.

Compliance and adherence to these standards will be continuously monitored by the installation Safety Officer Pursuant to DA PAM 385-10 (27 November 2013), the Contractor is strictly required to develop and submit a site-specific safety plan prior to beginning work. In performing work under this contract, the Contractor shall strictly conform to all contract-specific safety requirements and comply with all safety rules of the Government installation that concern related activities not directly addressed herein.

H. 7. KANSAS SALES AND USE TAX

The contract price excludes Kansas retailers' sales and compensating (use) taxes on all tangible personal property or services purchased for this project. In accordance with K.S.A. 79-3606(e), the Contracting Officer will, , obtain and furnish the Contractor with a Kansas Project upon request Exemption Certificate. The Contractor and subcontractors must provide this certificate number to all suppliers for invoice integration. Pursuant to Kansas law, the Contractor must retain all project invoices for a period of five years for potential audit by the Kansas Department of Revenue. Upon project completion, the Contractor shall execute a Project Completion Certification, Form PR-77, in duplicate, submitting one copy to the Contracting Officer and the other to the Kansas Department of Revenue.

H.8. CONDUCT OF EMPLOYEES

The contractor is fully responsible for the performance and always conduct of his employees while on post performing under this contract. The contractor shall not allow any employee to perform work under this contract while under the influence of alcohol, drugs, or any other incapacitating agent. Military police and other law enforcement personnel on post have the right to deny entry to post or remove from post any contractor employee for misconduct which endangers the health or safety of people or property or for reasons of security. In addition, the Post Commander may bar any individual from entering the post under the authority of 18 U.S.C. 1382. Removal from post of a contractor employee in accordance with the above shall not relieve the contractor from the requirements to meet all the terms and conditions of the contract; nor shall such removal be grounds for the contractor to file a claim.

H.9. ADVERTISING ON CONTRACTOR VEHICLES

Advertising displayed on Contractor vehicles is permitted provided that the advertising is so worded as not to imply Army or United States Government approval or sanction of the advertised service and is not embarrassing or detrimental to the Government.

Section J - List of Attachments

The attachments table has changed from:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0012 z-Attch-12-Qan dA_Lightning_ Protection z-Attch-12- QandA_Lightning_Protection

10 Sep

Attach ment

No

To:

Identifie r

Document Name

Document Description Reference Identifier

Date Line Item Page N umbers

Docum ent Type

Provide d Under Separat e Cover

0012 z-Attch-12-Qan dA_Lightning_ Protection z-Attch-12- QandA_Lightning_Protection

10 Sep

1 Attach ment

No

The following contract documents were added:

z-Attch-12-QandA_Lightning_Protection

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

z-Attch-12-QandA_Lightning_Protection 1

IDCode: J
Page: 1
Pages: 15
AmendNo: 0002
EffDate: 14 SEP 2026
ReqNo:
ProjNo: PANMCC-25-P-0000013461
IssCode: W91QF4
AdmCode:
IssuedBy: W6QM MICC-FT LEAVENWORTH

731 MCCLELLAN AVENUE, FORT LEAVENWORTH KS 66027-0000

FORT LEAVENWORTH, KS 66027-0000

UNITED STATES

ERIC GRANDE, EMAIL: ERIC.P.GRANDE.CIV@ARMY.MIL TELEPHONE: (520) 944-0333

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W91QF426BA013
SolDate: 11 AUG 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: a. Add Question and Answer

b. Change CLIN Structure from Months to Job

c. Schedule of Values (SOV) allocation of project execution included Section H.

d. POP Base Year 30 SEP 2026 - 29 SEP 2027 / OY1 if exercised 30 SEP 2027 - 29 SEP 2028

e. All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: ROBERT M. PARVIN
ContDate:
CODate: 14 SEP 2026