This is a Scope of Work (SOW) for inspection and testing services of lightning protection systems at Fort Leavenworth, Kansas, effective September 8, 2025, and updated August 11, 2026.
The Contractor shall provide comprehensive visual inspections and certified resistance testing of lightning protection systems (LPS) installed on buildings at Fort Leavenworth, verify existing CAD drawing accuracy, and create new CAD drawings where none exist. Work will be performed at government facilities on Fort Leavenworth under a non-personal services contract with a base year of one year plus one option year. The Contractor must accomplish all inspection and testing tasks in accordance with Unified Facilities Criteria 3-575-01, NFPA 780, DA Pam 385-64, UL Lightning Protection Standards, and other applicable regulatory standards. All services must be completed within 30 calendar days of work completion. The Contractor shall furnish all supervision, management, personnel, plant, labor, supplies, tools, equipment, communications devices, transportation, and fuel necessary to perform the work. Standard operations are Monday through Friday, 0900-1600 hours, excluding federal holidays, training holidays, and security shutdowns. Work must be coordinated directly with facility occupants for scheduling, with special attention to secured or restricted-access facilities. The Contractor shall provide inspection and testing schedules to the Contracting Officer and Contracting Officer's Representative at least ten business days prior to commencing work.
Deliverables include comprehensive inspection and testing reports with facility number, LPS system components and their locations, test results, and resistance measurements in ohms; scale isometric projection drawings (minimum ANSI D size 22" x 34" or digital CAD .DWG format) showing LPS systems and individual components clearly labeled and identifying faulty or inadequate installations; photographic documentation of inspected and tested components; and a list of necessary repairs or replacements with itemized component costs. All reports and drawings must be submitted to the COR within 30 calendar days of work completion. Additional requirements include development and submission of a Quality Control Plan prior to work start; submission of employee lists and key personnel information within 30 days of award; completion of OPSEC training, AT Level I training, and iWATCH training by all employees within 30 calendar days of contract award; and submission of Local Access Credential applications for all employees. The Contractor must maintain compliance with security procedures, facility access requirements, parking regulations, OSHA safety standards, environmental requirements, and Fort Leavenworth energy conservation programs. Government key personnel include the Contracting Officer and Contracting Officer's Representative, while the Contractor shall designate a contract manager available telephonically during work hours.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work (SOW)
Inspection and Testing of Lightning Protection
Systems
8 Sep 2025
Updated 11 AUG 2026
This Service Contract SOW was created by the Fort Leavenworth Directorate of Public Works, Service Contract Section, in cooperation and with assistance from, the Garrison CMSO and the
Fort Leavenworth MICC.
i
Table of Contents
Introduction
Requirements
Performance Requirements and Standards
Performance Requirements Summary (PRS) MATRIX
Deliverables
Related Documents
Acronyms
1.0 Introduction. This is a non-personal services contract to perform visual inspections, certified resistance testing of lightning protection systems (LPS), verify existing CAD drawing accuracy and created new CAD drawings of existing systems where drawings are not available.
The Government will not exercise any supervision or control over the contractor service providers or sub-contractors performing the services herein. Such contract service providers shall be accountable solely to the Prime Contractor (“Contractor”) who, in turn is responsible to the Government. The Contractor shall provide all supervision, management, personnel, plant, labor, supplies, tools, equipment, communications devices, transportation, and fuel necessary to perform visual inspections, certified testing of lightning protection systems (LPS), verify or create CAD drawings for facilities at Fort Leavenworth as defined in this Scope of Work
(SOW) and the Technical Exhibits and Attachments, except the materials, property, and equipment specified. The Contractor shall perform to the standards in this contract. All work performed by the Contractor shall be performed in accordance with all this SOW, applicable laws, regulations, Army standards, instructions, current NFPA/UFC and commercial practices;
whichever standard is the most stringent shall prevail.
1.1 Background: Fort Leavenworth is located adjacent to and North of the city of
Leavenworth, Kansas in Leavenworth County. Fort Leavenworth consists of approximately 5600 acres and 2500 buildings. The population base consists of approximately 7500 military and
Government civilian and Contractor personnel, as well as, 5200 resident family members.
1.2 Objectives: Technical Exhibits (TE) identifies which buildings/areas belong to each building type, the approximate square footage of the building/areas roofs, any special security considerations, and any constraints. The Contractor shall ensure all work is accomplished in accordance with requirements as set forth by DA Pam 385-64 and NFPA 780 and the standards set forth in this contract and all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the documents in paragraph 7.
1.3 Mission Statement: The goal of this Contract as outlined with this Scope of Work
(SOW), is to protect DoD facilities and equipment by inspecting and testing lightning protection on facilities identified as having pre-installed lightning protection services under this contract. To meet this goal, close coordination is required between the Contractor and
Contracting Officer’s Representative (COR) to efficiently provide inspections and testing services while minimizing disruptions to operations within the facilities while meeting security requirements. Direct coordination with the facility occupants for the scheduling of these inspection and testing requirements is the Contractor’s sole responsibility for all facilities, with special attention given to scheduling facilities that are secured, or have restricted or controlled access, as noted on the appropriate Technical Exhibit. The COR or Government Representative can assist with this if there are issues scheduling or coordinating with individual facilities as needed.
1.3.1 Climatic/Weather Conditions or Considerations: Fort Leavenworth Kansas is within a weather zone in the United States that can, and does, often see unpredictable weather occurrences throughout the entirety of the year that could potentially impact the performance of this Contract if not planned for accordingly, and with deliberate forethought and intent. It is incumbent upon the contractor to ensure adequate advanced coordination’s, planning and scheduling with the individual facilities for access, is performed in a manner that will reduce or eliminate any delay’s performing tasks as outlined within this SOW, due to forecasted weather conditions.
1.3.2 Reserved
2.0 Requirements.
2.1 Non-Personal Services: This contract shall provide inspections and testing services to l ightning protect ion systems on various ident i f ied buildings and faci l i t ies located on Ft. Leavenworth. Current listings of facilities and schedules for tasks performed are in the respective Technical Exhibits (TE’s). The Government shall not exercise any supervision or control over the contract service providers or sub-contractors performing the services herein.
Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
2.1.1 Scope: The Contractor shall perform inspections and testing services in accordance with this SOW, TEs and appropriate regulatory codes as previously listed and provide the Government with a comprehensive report showing inspections, tests and results therein performed on all facilities a minimum data set is listed in the appropriate TE with a Contractor created CAD structural drawing with overlayed LPS component call-outs labeling each component by name
/symbol for each facility showing the Lightning Protection System (LPS) installed, inspected and tested. The Resistance testing results measured in ohms, may also be placed on the drawings in addition to the testing results deliverable.
2.1.1.1 Changes in Scope of Work: The Government reserves the right during the term of the contract to add or delete one or more buildings or any portion thereof outlined in the SOW and
TEs, through a contract modification. The Government reserves the right to reduce the contractor's payment as reflected by the any deletions/additions with adjustment in the contract price of the remaining building or buildings. Provided, that in the event only a portion of the building or buildings should be deleted, the Contractor shall be paid for the performance of the proportionate sum of the contract price of the remaining building area.
2.1.1.2 If the work cannot be accomplished for reasons beyond the control of the Contractor, or reason of Government interference, the Contractor shall notify the COR in writing by 1600 on the day of the deviation or no later than 0930 the following wor9kday if the work was identified as deviating from scheduled work after 1500. The service shall revert back to its regular schedule as soon as possible and immediate remediation and re-scheduling is performed by the
Contractor to resolve the issue; the COR can assist with remediation if required.
2.1.2 Subcontract Management: The Government does not have a contractual binding agreement with any subcontractor(s).
2.1.3 Other Direct Costs: All cost associated with supplies, equipment, labor and transportation for the needs of completing the duties of this contract are at the cost of the contractor.
2.1.4 General Information/Period of Performance: The base year will be for 1 year.
Additionally there will be 1 option years of 1 year each.
Base Year
Option Year 1
2.1.5 Place of Performance: The work to be performed under this contract will be performed at government facilities on Ft. Leavenworth, KS. The Contractor shall provide the Contracting
Officer (KO) and the designated Contracting Officer’s Representative (COR) a inspection and testing schedule for each facility no later than ten (10) business days prior to commencing work or as changes occur. Schedule shall outline tasks to be performed by specific building and identify the timeline for the task to be accomplished. The KO will provide the Contractor with any special requirements to make changes to the schedule as they occur if needed.
2.1.6 Hours of Operation: Installation hours typically are 0900-1600 hours, Monday through
Friday excluding training holidays, Federal holidays and security shut-downs. The Contractor is responsible for providing services for times listed in the current Building Times (as coordinated with each facility during scheduling coordination).
2.1.7 Recognized / Federal Holidays & Government Closures: Federal holidays or when the unanticipated holidays declared by the President or Post/Garrison Commander, the Government facility is closed due to local or national emergencies, administrative closings, or similar
Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the
Government facility is not closed for the above reasons. In the event of a Government holiday or
Government required closure, the contractor shall alter their schedule of buildings - examples:
Restricted facilities, or facilities that require special access due to access barriers, or are Military
Unit operated, such as the Tactical Vehicle Maintenance Facilities, are typically not accessible the last work day prior to, or immediately after a Federal Holiday; it is incumbent upon the
Contractor to make allowances for these occurrences and inquire about the possibility of such when coordinating for the inspection and testing schedule.
2.1.7.1 Federal holidays (“Holidays”) are:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
Washington’s Birthday Veterans Day
Memorial Day
Juneteenth National Independence Day Thanksgiving Day
Independence Day Christmas Day www.opm.gov publishes observed Federal Holidays on their website for each year at https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=Overview
2.1.7.2 Any of the above holidays falling on a Saturday will be observed on the Friday prior.
Holidays falling on a Sunday will be observed on the following Monday.
2.1.7.3 Training Holidays. Training Holidays are days off awarded to military units to compensate for missed weekends and holidays while performing mission. These days usually coincide with observed Federal Holidays. Some examples are, the Friday after Thanksgiving is usually a Training Holiday. Most Holiday’s that are observed on a Monday, the preceding Friday is a Training Holiday while a Holiday observed on a Friday the following Monday is a Training
Holiday. These Training Holiday’s may result in facilities being inaccessible due to the reduced or absent military manpower, it is critical to schedule any services or work performed at facilities with military manpower around these potential Training Holidays.
2.1.8 Government Key Personnel: The Contracting Officer (KO) has the overall responsibility to ensure that the requirements of law and regulations are followed for government contracts.
The KO is the only person that has the authority to bind, and obligate the government especially with regard to changes in cost, price, estimates or changes in delivery dates. The KO is the only person that has the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: Assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of
Government furnished property, and assist in site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
2.1.8.1 A government facility manager, monitor, or coordinator may be selected or identified at most buildings by the Facility Occupant Authority (FOA). The FOA is defined as the senior most occupant of the facility, or designated Commander, Director, Supervisor or Comptroller of said facility. The Facility Manager or FOA informs the COR of any indications of non-performance of contractor tasks, unauthorized changes in the frequencies of task performance, and/or validation of customer complaints. The FOA only has authority to coordinate access to their respective facilities or areas, they may not alter the terms or conditions of this contract.
http://www.opm.gov/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url%3DOverview
2.1.9 Contractor Key Personnel: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is unavailable shall be designated in writing to the
KO/COR within 30 days of award of this contract or immediately vie electronic means if changed. The contract manager or alternate shall have full authority to act on behalf of the
Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available telephonically between 0900-1600 Monday through
Friday except Federal holidays or when the Government facility is closed for administrative purposes. Direct telephone numbers and email addresses for the Manager’s shall be provided to the KO/COR at the time they are identified by name and position, or when changed. The
‘manager’ or ‘program manager’ can be anyone in the employ of the Contractor that has authority to speak and act on behalf of the Contractor in regards to the execution of this contract.
2.1.9.1 The Contractor shall furnish as many supervisory, administrative, and direct personnel as are needed to accomplish all work required by this SOW.
2.1.10 Contract Administration and Management: The Project Manager or alternate Project
Manager shall meet with the COR monthly when deemed required by the KO or COR (but not limited to) for discussing items of interest or concern in the prosecution of the contract. This meeting maybe performed in person, by phone or by email at the KO or COR’s discretion.
2.1.10.1 The Contractor must send reports electronically. These methods may include e-mail or through the Department of War’s “DOD SAFE” website at https://safe.apps.mil/ , the preference is digital transmission via email, provided that all documentation can be received by the COR and are less than 7 MB in size, in total, and receipt of transmitted documents has been acknowledged in whole, by the COR. If for any reason transmitted documents are not acknowledged by the COR within 5 work days, or have been identified as incomplete or corrupt by the COR, a DOD SAFE transmittal of the deliverables shall be requested by the Contractor for the transfer of digital documents/deliverables of the required documentation to the assigned
COR. The contractor’s computer must be compatible to Microsoft programs (Outlook, Word, &
Excel) and Adobe Acrobat for .pdf files. Contractor must utilize an anti-virus program to ensure that no computer viruses are transmitted via e-mail or DOD SAFE to Government Information
Systems (GIS).
2.1.10.2 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government.
These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
2.1.11 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in https://safe.apps.mil/ accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The KO and Contracting
Officer’s Representative (COR) shall meet periodically with the Contractor to review the
Contractor's performance at the KO’s discretion, or upon written request of the Contractor to the
KO or COR. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
2.1.12 Quality Control: The Contractor shall develop and maintain an effective quality control
Plan (QCP) that details the Contractor’s plans and intent to ensure that services are performed in accordance with this SOW. The Contractor shall develop and implement procedures to identify, prevent, and ensure against recurrence of defective services. The Quality Control Plan (QCP) must be reviewed and accepted by the KO prior to contract work start date. The Contractor may not hire off-duty Government Quality Control Evaluators or any other persons whose employment would result in a conflict with DOD Directive 5500.7-R, “Joint Ethics Regulation”.
2.1.13 Transition (Phase-in/Phase-Out): N/A
2.1.14 Identification of Contractor Employees: All Contractor personnel when answering a
Government supplied telephone shall also clearly identify themselves as a Contractor employee.
All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves in such a manner that they avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all correspondence (documents, emails etc.,) or reports produced by Contractor are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
2.1.14.1 All contract personnel shall wear an identification card (ID)/ badge or uniform in plain view, that clearly delineates them as a Contractor employee. Identification badge shall include the full name of the employee, business or company name under which the Contractor is doing business, and employee's picture. Badges or ID’s shall be plastic laminated at least two by three inches (2" x 3") in size.
2.1.15 Non-Personal Services: Non-personal services. The FAR provides that each contract arrangement be judged in the light of its own facts and circumstances, with the key question always being whether the Government will exercise relatively continuous supervision and control over the Contractor personnel performing the contract. To ensure that services provided under this contract are non-personal in nature, employees performing services under this contract shall be controlled, directed and supervised at all times by management personnel of the
Contractor. The Government will notify the Contractor’s management of all tasks that require completion and the Contractor’s management will assign those tasks to the appropriate
Contractor personnel under this contract. The Contractor's management shall ensure that employees comply with the performance standards outlined in this SOW and as required by the contracting officer or the contracting officer's representative (COR). Contractor employees shall perform independent of and without the supervision of any Government official. Actions of
Contractor employees may not be interpreted or implemented in any manner that results in any
Contractor employee creating or modifying Federal policy, obligating the appropriated funds of the U.S. Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee or otherwise violating the prohibitions set forth in Parts 7.5 and
37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of completed work and tasks.
2.1.16 Standards of Conduct: Contractor personnel’s conduct shall not reflect discredit upon the
Government. The Contractor shall ensure that all personnel present a professional appearance.
The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. Contractor employees shall comply with all DoD and local requirements that establish uniform policies governing smoking in and around Government Owned buildings and vehicles. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive
5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid being improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non-disclosure of sensitive or classified information.
The Contractor shall ensure employee conduct complies with 41 U.S.C. 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no Contractor employees conduct political related activities or events on the installation.
2.1.16.1 The Contractor and Contractor's employees shall, at all times, conduct themselves in a professional and courteous manner when dealing with customers. Validated instances of non-courteous behavior and unprofessional conduct will constitute Contractor nonperformance in that area. When any Contractor employee receives two (2) valid customer complaints in a one-year period, the Contractor shall consider removing such employee from employment under this contract. Removal of employees for such reasons shall not relieve the Contractor of the requirement to provide sufficient personnel to adequately perform services required under this contract. The Contractor shall report to the COR all disputes with customers or other
Government contractors resulting from receiving or providing support. The Contractor shall provide an oral report within two hours after such a dispute occurs. The Contractor shall submit a written report covering facts about the dispute within five (5) business days following oral notification.
2.1.16.2 Attire: The Contractor shall ensure that personnel do not present a derogatory appearance and that their conduct shall not reflect poorly upon this Installation or the Department of the Army. If the Contractor so elects to have uniforms (i.e., hard hats, t-shirts, etc.) their employees are required to wear them while they work.
2.1.17 Organizational Conflict of Interest (OCI): N/A
2.1.18 Government Furnished Property/Utilities/Equipment/Materials: N/A
2.1.18.1 Property Allocation: N/A
2.1.18.2 Parking: Subject to availability: Contractor employees shall not be provided parking space in the vicinity of their work area(s). Contractor employees shall comply with parking regulations contained in CAC & FL Reg. 190-5 "Motor Vehicle Traffic Supervision and
Installation Traffic Control" as supplemented. The KO may designate other spaces as required.
Lifts, booms, generators, or other such special equipment (wheeled, tracked, sled/towed) deemed a necessity to perform direct inspection and testing of LPS installed systems of designated facilities, if required to be placed in an area otherwise not accessible, or designated as general parking, the Contractor shall coordinate with the Fort Leavenworth Provost Marshall/Military
Police Traffic Section OIC at least 4 work days ahead of anticipated need of their services at
(913) 684-3536 between 0900 and 1600 hrs on work days. Parking cones to cordoned off areas for equipment may also be requested of the PMO Traffic Section in advance of work for facilities that have restrictive parking i.e. B. 52 and others.
2.1.18.3 Utilities: N/A. No utilities are supplied by the Government.
2.1.18.4 Equipment: N/A. No equipment is supplied by the Government.
2.1.18.5 Materials: N/A. No equipment is supplied by the Government.
2.1.18.6 Liability: Except as granted by the Federal Tort Claims Act (FTCA), the Government will not be responsible for loss or damages to property or injuries to persons which may arise from or be incident to the use of the facilities by the Contractor, his employees, agents, servants, or others who may be on the said premises at their invitation or the invitation of any one of them, and the Contractor shall hold the Government harmless from any and all such claims.
2.1.19 Contractor Furnished Material/Solutions/Equipment/Tools/Facility/Telephone: The
Contractor shall furnish all materials, equipment, tools, facilities and services required to perform work on-site under this contract.
2.2 Special Requirements: Contractor and all associated sub-contractors’ employees shall comply with applicable garrison, facility, and area commander garrison/facility access and local security policies and procedures (provided by Government representative or applicable FOA).
The Contractor shall also provide all information required for background checks to meet garrison access requirements to be accomplished by garrison Provost Marshal Office, Director of
Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at any individual facility or garrison change, the Government may require changes in Contractor security matters or processes. All personnel shall read, understand, and speak the English language. Removal of employees for any of the reasons stated in this paragraph does not relieve the Contractor of the requirement to provide sufficient personnel to adequately perform services required under this contract.
2.2.1 Criminal Background Checks: Employees will be subject to National Agency check for personal security clearance. Directorate of Emergency Services (DES) has sole authority to determine whether an employee's presence is detrimental to security.
2.2.2 Security Requirements and Access Control Credentials: Due to increased security of Fort
Leavenworth, all personnel entering the Fort must report to the Visitors Control Center (VCC) for a background check and a day pass (or longer period as appropriate) by an authorized investigative personnel. Individuals that are working for an approved contract for the, and work performed on the Federal Installation or Fort, may apply for a Local Access Credential (LAC) card that will give them extended access to the Installation/Fort without having to go thru the
VCC daily. The Contractor shall submit the employees Local Access Credential Application
Form and Fort Leavenworth Installation Access Credential Acknowledgment Statement to the
COR at start of employment. LAC Forms can be found on http://garrison.leavenworth.army.mil/Newcomers---Visitors/Gate-Information.aspx (preferred method of submission/completion is electronically - see below), or please print and fill out in indelible black or blue ink, clearly and legibly as any forms submitted that cannot be read and understood by the security personnel shall be rejected outright, the Contractor shall assume all responsibility for any and all delays caused by inadequate form completion, or rejections by the authorized security personnel. It is preferred that these Adobe Acrobat “pdf” forms be completed on a suitable computer capable of using the Adobe PDF form filler/reader application and submitted to the COR electronically as an attachment. All security access forms submitted to the
COR for processing are only turned in to the VCC once per week on Tuesday’s, unless that
Tuesday falls on an observed Federal holiday or installation closure, then these forms will be turned into the VCC by the COR (Government Rep) on the next work day after the day of closure. It is incumbent upon the contractor to ensure these forms are filled out correctly, accurately, legibly and in a timely enough manner so as not to cause any delay in the performance of the contracted services or work. Standard background checks average turnaround time from submission to the VCC until “Approved/Denied” is two full working weeks. During busy times of the year it can take as long as a full month to process and receive results back from the background check system/authority.
2.2.2.1 Approved applicants shall report to VCC with a proper/acceptable form of ID (as listed on the website - https://home.army.mil/leavenworth/index.php/about/visitor-information) to receive their LAC card. The LAC will allow temporary access to the installation and must be renewed prior to expiration and returned to the VCC upon termination or successful completion of the contract PoP, whichever occurs first.
2.2.2.2 An approved LAC authorizes the individual to access Fort Leavenworth through the regular DoD ID lane, but will not allow them to "escort" other non-DoD Individuals or vehicles being operated or occupied by unapproved or non-DOD personnel.
2.2.2.3 Loss of, or destruction of a LAC (card) by any Contractor personnel shall be immediately reported to the Directorate of Emergency Service/Provost Marshal, Military Police Station (DES) investigative personnel immediately and in person. For location please call (913) 684-2111 the
DES Dispatch Non-Emergency number. Employee must resubmit for a new/replacement LAC card.
http://garrison.leavenworth.army.mil/Newcomers---Visitors/Gate-Information.aspx https://home.army.mil/leavenworth/index.php/about/visitor-information)
2.2.2.4 If termination of position occurs for any Contractor employee or sub-contractor, any issued LAC card must be surrendered to the COR within 1 business day by the Contractor
Manager or Alternate Manager and the contractor terminated employee must be removed from the government installation immediately unless they are otherwise authorized to be on the installation, i.e. Military Dependent, or Retiree with a valid DoD issued identification card authorizing access.
2.2.2.5 Disapproved applicants may be denied from entering the installation.
2.2.3 Vehicle Operation: The Contractor and Contractor employees driving Contractor-owned or privately owned vehicles (POV) on Fort Leavenworth shall possess a valid State driver's license and insurance for either company or private vehicles. Ensure the vehicle has a valid State registration for both company and private vehicles. There will be indication of company name visible on exterior of all company owned or operated vehicles.
2.2.4 Search and Seizure: All Contractor personnel and property are subject to search and seizure upon entering, while on, and leaving the installation. No Contractor employee shall be permitted on the post when such security or background check reveals that his presence would be detrimental to the security of the post or detrimental to the mission of the organization. All personnel shall read, understand, and speak the English language. Removal of employees for any of the reasons stated in this paragraph does not relieve the Contractor of the requirement to provide sufficient personnel to adequately perform services required under this contract.
2.2.5 Operations Security (OPSEC) Training: Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of contract award. All contractor employees must complete annual OPSEC awareness training. The contractor shall submit a OPSEC signed roster for each affected contractor employee and subcontractor employee to the COR showing date of completion. Coordination with the COR will be implemented as changes occur and annotated as needed, as applicable to this Department of the Army requirement.
2.2.6 AT Level I Training: All Contractor employees, to include subcontractor’s employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract award. The
Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR, or to the contracting officer if a COR is not assigned, within
5 calendar days after completion of training by all employees and subcontractor personnel. The contractor shall submit a signed roster for each affected contractor employee and subcontractor employee to the COR. Coordination with the COR will be implemented as changes occur and annotated as needed, as applicable to this Department of the Army requirement.
2.2.7 iWATCH Training: The Contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity
ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The contractor shall submit a signed roster for each affected contractor employee and subcontractor employee to the
COR. This training shall be completed within 30 calendar days of contract award and within 5 calendar days of new employees commencing performance with the results reported to the COR
NLT 30 calendar days after contract award.
2.2.8 Physical Security: The Contractor shall safeguard all Government equipment, information and property provided for Contractor use. The Contractor shall establish and maintain physical security to prevent unauthorized access, vandalism, pilferage, larceny, sabotage, and fire; and to provide internal safeguards for the security of all Government-furnished property and all property in the possession of the Contractor for the performance of required services. The Contractor shall comply with all installation security requirements.
Contractor shall maintain a physical security checklist/log which will be forwarded to the COR on a monthly or quarterly basis, no later than the fifth day of the month or after the quarter ends.
(Insert the following sentence, if performing in a Government facility.) At the close of each work period, Government facilities, equipment, and materials shall be secured.
2.2.8.1 Portions of the work under this contract are performed in secure areas in which contractor personnel will be escorted by the activity personnel. The Contractor shall comply with restricted area procedures and instructions pertaining to each building/area on the contract. Contractor personnel working in restricted areas such as computer rooms, command communication centers, etc., may be required to sign in and out and state the nature of business at the entrance desk.
Work in restricted areas after normal duty hours shall be coordinated with the respective area
Security Officer. If the Contractor must deviate from the time designated on the schedule or perform other work (other than emergency work), the Contractor must provide a 24-hour work day notice to both the COR and the FOA in order to obtain an escort through secure areas.
2.2.9 Coordinating for Access: The Contractor shall arrange for access to any area to be serviced. The Contractor will be furnished a key to the building if needed or an escort with a key will be provided by the Government at the discretion of the, and coordinated beforehand with the
FOA. Contractor personnel shall take necessary steps to secure buildings before leaving by locking all doors and windows under their control. The Contractor shall prohibit the use of
Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR or KO.
2.2.10 Emergency Services: The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor of their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor will, in turn, notify the KO or COR within 60 minutes of the incident if between the authorized work hours, by 1000 hrs the next business day otherwise. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor as the installation does not have emergency medical facilities. If calling 911 for emergency assistance, the Contractor must tell the 911 dispatcher where the emergency is located on and if it is on Fort Leavenworth for timely and appropriate responses. Police and Fire are located on Fort Leavenworth and can be accessed via the community 911 telephone system, be sure to specify that the emergency is on the Fort Leavenworth installation if it is so, and where specifically, to include any other pertinent information that would benefit both the person(s) in need, and responding emergency personnel.
2.2.11 Safety: The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. The Contractor shall be responsible for instructing his employees in safety measures and shall not permit them to place mops, brooms, machines, and other equipment in an unsafe position. The Contractor shall provide and place signs to mark areas that are slippery or unsafe due to the cleaning and working operations. Provide a verbal notification to the KO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact.
Provide a completed copy of required Accident Investigation Reports to the KO within five calendar days of each occurrence. If the Contractor fails or refuses to comply promptly with the above safety requirements, the KO may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of claim for extension of time or for excess costs or damages to the
Contractor.
2.2.12 Fire Prevention: The Contractor's operation shall conform to all applicable portions of
CAC&FL Reg 420-2 “Post Fire Regulation.” The Contractor shall instruct all of their employees in fire prevention procedures and responsibilities, and advise them of any and all requirements as they pertain to this contract. The Contractor shall be subject to fire inspection by the
Government.
2.2.13 Environment and OSHA Requirements: The Contractor shall comply with all local, state, and Federal environmental and occupational safety laws, rules, and regulations. Any apparent conflict between compliance with such local, state and Federal laws, rules and regulations, and compliance with the requirements of the contract shall be immediately brought to the attention of the KO and/or the COR for or of final resolution. The Contractor shall notify the KO and COR in writing in addition to any verbal notification of such conflicts. The Contractor shall be liable for all fines, penalties, and costs which result from violations of, or failure to comply with, all such local state, or Federal laws, rules, and regulations. All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the KO, to halt all Contractor performance with a commensurate deduction of monies due the Contractor until such unsafe conditions are corrected. The Contractor shall take due caution not to endanger personnel during performance of this contract. Upon discovery of any hazard such as, but not limited to, fire, or large fuel spill, the Contractor shall immediately notify the KO or COR.
2.2.13.1 Access to Facilities for Inspection Purposes: The Contractor shall notify the COR within
30 minutes by phone of any known inspection visit by an agent or agents of any regulatory agency. Occupational, Safety, and Health Administration (OSHA) personnel normally do not notify Contractors of impending inspections. The Contractor shall proceed in cooperating with the inspector. The Contractor shall submit to the COR a written report, by close of business of the work day following completion of the inspection or visit, to include the name(s), identification number(s), agency(s) of the inspector(s), and the reason for the visit. The
Contractor shall include a copy of all reports received. If samples are collected by the regulatory agency, the Contractor shall submit details of such samples taken, or results of any laboratory results returned as a result of the samples being taken, to the KO within 10 working days of receipt of such reports.
2.2.14 RESERVED
2.2.15 Energy and Utilities Conservation Programs: Contractor shall participate in Fort
Leavenworth's energy conservation for all government and contractors facilities. The Contractor shall be responsible for instructing his workers in utilities conservation practices. The Contractor shall be subject to unannounced energy conservation inspections by the Government. The
Contractor shall be responsible for operating under conditions which preclude the waste of utilities including, but not necessarily limited to, the following:
2.2.15.1 Instruct personnel in utilities conservation practices, and require them to operate under conditions that preclude waste of Government-furnished utilities.
2.2.15.2 Comply with the Fort Leavenworth Energy Conservation Program IAW AR 420-1
“Army Facilitates Management”, and as directed hereafter.
2.2.15.3 Comply with published rules and regulations issued by the US Department of Energy;
10 CFR 430 “Energy Conservation Programs for Consumer Products”.
2.2.15.4 The electrical equipment required to fulfill the requirements of this contract shall be suitable for operation using the existing outlets in the buildings. It shall be the responsibility of the Contractor to prevent the operation or attempted operation of electrical equipment, which requires capacities exceeding that of existing outlets.
2.2.15.5 Use timing or cycle-control devices to promote energy savings. Turn off equipment after the required usage. Turn off lights upon exiting rooms when there are no other occupants.
http://www.epa.gov/cpg/products
2.2.15.6 Use installed lights and air conditioning only in offices and areas where and when work is actually being performed.
2.2.15.7 Control for heating, ventilation, and air conditioning systems shall be adjusted by authorized personnel only.
2.2.15.8 Minimize energy losses. Add insulation or make other changes for savings.
2.2.15.9 Turn off water faucets or valves after the required usage.
2.2.15.10 The Contractor and his personnel shall report the malfunction of any utility’s control or the misuse of any utility by calling the DPW Work Order at 684-5555.
3.0 Performance Requirements and Standards.
3.1 High Level Objectives: The Contractor shall provide all management, tools, equipment, and labor necessary to ensure that inspection and testing services are performed at Ft.
Leavenworth. The Contractor shall accomplish all inspection and testing tasks IAW the most current publications of the Unified Facilities Criteria 3-575-01, NFPA 780, DA PAM-385-64, UL Lighting Protection Standards and other listed regulatory standards, and services in order to meet the requirements of this SOW. Estimated square footages of and a list of facilities/structures are established in TE’s. All work performed by the Contractor shall be performed in accordance with all applicable laws, regulations, Unified Facilities Criteria, NFPA, Army standards, instructions, and acceptable commercial practices. Contractor shall display the appropriate caution signs or barriers when inspecting, testing or using equipment to perform such work that might pose a risk or injury for any personnel that are present. The contractor shall develop isometric projection diagrams of each facility and inspected/tested system, and develop comprehensive reports from each inspection of and test of, each facility and its respective installed LPS system in its entirety, indicating each inspection and testing result for each system, and facility covered under this contract.
3.2 Facility Inspection and Testing Services: The Contractor shall provide management and labor personnel, equipment, and supplies, except as specified herein as Government-Furnished, to perform inspection and testing services for specified buildings in the TE’s at Fort
Leavenworth, Kansas. Each employee shall be furnished with necessary equipment, materials, tools, and supplies to complete their job in a satisfactory manner. Routine General Service area designated by COR to include but not limited to: lightning protection systems as stated in the
TE’s. Systems shall be inspected and tested in accordance with all regulatory standards previously mentioned. An inspection and testing report shall be developed for each building, listing at a minimum, facility number, brief description of facility type or style (smoke stack, office building, control tower etc.), comprehensive list of installed LPS system(s) and components and their respective locations and coverage of the facility it is installed on, list of all tests performed, satisfactory and unsatisfactory results of the installation of the system or equipment or test results in resistance measurements (ohms). All equipment, materials, tools, and supplies shall be kept out of vehicular and pedestrian traffic lanes or other areas where they might be hazardous and shall be secured at the end of each work period, unless coordination’s have been made with the appropriate Traffic Section personnel ahead of the scheduled work, to allow impediment upon those areas, for the duration of the work being performed. All results of inspections and testing, with reports must be provide to the COR within 30 calendar days of work completion.
3.3 Drawings and Diagrams: The Contractor shall create a scale isometric projection drawing of each facility listed in the TE showing major structure features suitable for a laymen to determine orientation and features unique to the specific structure being represented at a glance, with LPS systems and individual components clearly drawn on the structure representing actual placement, function and names of the LPS system’s component parts, labeled in such a way as each component part can be individually identified and called out in a report as to its function, result of tests and inspections performed on it, and required remedies or solutions, that can be applied to get substandard or deficient identified systems or components back within acceptable standards or specifications. We want a report that can be used to identify faulty or inadequate installations of, or deteriorated, broken, missing, or otherwise unsatisfactory installed parts of the
LPS in order to make informed and required repairs in the future. Each drawing shall be provided Full Scale at ANSI D size 22” inch by 34” inch minimum, or provided in a digital CAD
.DWG file format that can be scaled on a computer without losing definition, resolution or fidelity. All provided drawings must be accessible and viewable on a Microsoft Windows 11 based Operating System and Adobe Acrobat Pro version 2020.009.xxxxx at a minimum. When provided in a digital format, it must be capable of email transmission to the COR, or incases where the size limit for email transmission is exceeded, coordination made for transfer through the DOD SAFE portal. All deliverables must be clearly labelled as to their content with MICC issued contract number, i.e. ‘LPS Drawing ‘C’, Building No. (i.e. B. 52), Contract # W91QF4-
20-P-0000’. All drawings and diagrams, with reports must be provided to the COR within 30 calendar days of work completion.
3.3.1 Photographic documentation. All inspected and tested components of the LPS system shall be photographed prior to any work required in paragraphs 3.4 and 3.4.1 below.
Photography by non-authorized personnel is forbidden of the systems installed within the perimeters of both the United States Disciplinary Barracks (USDB) and the Joint Regional
Confinement Facility (JRCF), advanced coordination with the appropriate security offices for both facilities is required for photography of these systems by confinement personnel. These photographs must be reviewed and approved by security personnel prior to release to the
Contractor. It is advisable that the Contractor schedule these services well in advance so as not to delay any of the required deliverables.
3.4 RESERVED.
3.4.1 Post Inspection/Testing Repairs: Any necessary repairs or replacements of the LPS system or components are to be listed and itemized.
3.4 above shall be compiled into a list for each building/facility and broken down by component matched to the inspection deliverables call-outs, or CAD drawing call-outs with total component costs to repair/replace including labor. This bid sheet/shit will be used by the
Government to determine what shall be repaired/replaced…