Conformed Copy_Solicitation Amendment - W91QF426BA0100001.pdf

PDF 6 MB Posted

Attached to
Amendment 0001 - Installation of Equipment- 13 Water Bottle Filling (W91QF426BA010)
Solicitation number
W91QF426BA010
Issued by

About this file

Summary

This is an Invitation for Bid (IFB) solicitation for the installation of thirteen (13) ELKAY water bottle filling stations at the Presidio of Monterey, California. The solicitation number is W91QF426BA0100001, issued by WROG MICC-FT LEAVENWORTH on July 7, 2026, and is designated as a total small business set-aside. The project involves furnishing all labor, equipment, and materials necessary to remove and dispose of existing fountains and plumbing materials, then install the new filtered bottle filling stations with associated plumbing work at eleven buildings across the installation. The work must comply with applicable building codes, plumbing standards (ASME A112.19.3/CSA B45.4, NSF/ANSI certifications), and Army safety requirements including OSHA standards and EM385-1-1. The contract includes two line items: Item 0001 for Plumbing-13 Fountains and Item 0002 for Payment and Performance Bonds, both priced on a firm fixed-price, job basis under NAICS code 238220. Both items are subject to Davis-Bacon wage requirements for Monterey County.

Sealed bids are due by Wednesday, August 12, 2026, at 1:00 p.m. CST and must be submitted to Robert M. Parvin at Fort Leavenworth. Questions must be submitted to Tyerees Sanders by Friday, July 31, 2026. The contractor must begin performance within 10 calendar days of receiving the notice to proceed and complete all work within 365 calendar days. Performance and Payment bonds are required, with a 10-day bonding requirement after award. The contractor is responsible for all installation services including electrical outlets, drainage, and water supply; determining cost-effective methods; quality control; waste management (60% diversion from landfill); utility locates; site-specific safety plans; submittals within 15 days of award; weekly coordination meetings; and providing as-built drawings, O&M manuals, and warranty information. Liquidated damages of $351.45 per calendar day apply for schedule delays. Award will be made to the lowest priced responsible bidder whose bid conforms to the IFB. A bid guarantee of twenty percent of bid price or $500,000, whichever is less, is required.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Patrick.Ferguson Line

Patrick.Ferguson Line

Section A - Solicitation/Contract Form

Installation of Equipment- 13 Water Bottle Filling StationsInstrument Name:

Product Service Code : N046

BID NOTES

Instrument Name: Install Equipment Requirements Contract Instrument Name: Installation of Equipment- 13 Water Bottle Filling Stations

BID NOTES

Information to Bidders:

a) The word "removed" herein shall be understood to mean "remove and dispose of in a lawful manner off the installation".

b) The word "provide" herein shall be understood to mean "furnish and install".

*** END OF NARRATIVE ***

W91QF426BA0100001

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0001 Plumbing- 13 Fountains

Product Service Code: N046

North American Industry Classification System (NAICS):

238220

Pricing Arrangement: Firm Fixed Price

1 Job

0002 Bonds- Payment and Performance Bonds

Product Service Code: N046

North American Industry Classification System (NAICS):

238220

Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

STATEMENT OF WORK

FOR

Deputy Chief of Staff for Personnel and Logistics (DCSPL)

Install 13 Water Bottle Filling Stations

PROJECT NO: W91QF426IFBFY26InstallEquipment Presidio of Monterey, California 10 July 2025 (REV-1)

SW-1 DESCRIPTION OF WORK

a. Overall Scope: The work consists of furnishing all labor, equipment, and materials necessary to complete the construction project in strict accordance with the plans and specifications. This includes the removal and disposal of unnecessary fountain and plumbing materials, followed by the installation of thirteen (13) ELKAY water bottle fillers, as detailed in the or an approved equal, Scope of Work, along with all associated plumbing work.

All work shall be performed in accordance with the standards outlined in this contract, current labor market standards, and applicable building and national plumbing codes. The Contractor will demonstrate the capacity to manage multiple task orders concurrently, encompassing construction scheduling, cost estimation, quality control, and subcontractor coordination.

The Contractor is responsible for ensuring all work results in a complete, functional system and for the proper removal and disposal of all excess and waste materials generated during the project.

All work must be performed in strict accordance with the plans and specifications to remove and dispose of excess and trash material. All work performed by the contractor shall result in a complete, functional system.

b. Location: The work site is located at the Presidio of Monterey, CA, encompassing 11 buildings identified in the award as an attachment.

SW-2 PRINCIPLE FEATURES The work to be performed includes the following principal features:

a. Background: Initial assessment reveals that installing water bottle filling units at the originally requested locations would require significant plumbing modifications. To efficiently improve water access while minimizing construction costs, the Government is seeking the replacement of thirteen

(13) existing fountains with new filtered units and retrofit kits, as identified in the attachment labeled "Drinking Fountain Locations & Models Floor Plans."

The Contractor shall be responsible for all installation services, including providing necessary electrical outlets, drainage, and water supply. The Contractor will determine the most cost-effective methods to fulfill this contract, ensuring all work complies with applicable Federal, State, and local laws and regulations. The Government will provide oversight and inspection of the Contractor's work.

b. Standards: All work shall be performed in accordance with the standards outlined in this contract and the following applicable codes and standards: ADA & ICC A117.1; ASME A112.19.3/CSA B45.

4; CAN/CSA C22.2 No.120; GreenSpec(r); NSF/ANSI 42, 53, 61 (Q1); NSF/ANSI 372 (lead free);

and 401 UL 399.

In the event of conflict between manufacturer's standards and those specified herein, the most stringent requirement shall govern.

c. Work to Done: All works meet or exceed all Army, federal, state, local and industry requirements. The contractor shall not install the new bottle filling stations until the Government approves them. After construction is completed, the contractor shall submit all required closed out submittals such as as-built drawings, O&M Manuals, warranty, etc.

1) The contractor shall coordinate and complete the project in a timely manner to reduce disruption of daily activities. The contractor shall strategically place all required barricades in order to direct traffic around work areas to protect project areas.

2) Allow the Government Contracting Officer Representative (COR) sufficient time to inspect and accept all prep work, the contractor shall notify the Government COR, not later than three (3) working days prior to any completion.

3) All work shall be completed 100% and accepted by the Government COR. It must be tested for the State of California and Federal law requirement for potable water. If it does not meet the standards, additional work must be done.

4) The contractor shall conduct a site meeting with the Government COR prior to any procurement and or site work. The contractor shall also conduct weekly coordination meetings with the Government (COR) when work starts.

5) The contractor shall not commence any removal/demo of existing equipment, until all materials required to complete project are on hand and on site. The contractor shall not commence any work at the site until all necessary permits "notice to proceed" have been received.

6) The contractor shall ensure all material with long lead times are ordered in a timely manner.

7) Prior to installation, the contractor shall submit all products specifications and pictures to the Government for approval.

8) Any changes alterations and/or adjustments to the statement of work and/or the "Proprietary Approval" will be approved by the Government COR prior to proceeding. If such alterations

/adjustments require modification of any permits/approvals, the contractor shall not begin work on the alterations/changes until the modified approvals/notice to proceed are received.

9) The contractor shall verify the existing site conditions and the existing site dimensions prior to bid submittal.

10) The project site shall always be clean and orderly.

11) The contractor is responsible for identifying all latent conditions and shall contact the Government COR to verify latent conditions prior to continuation of work.

12) The contractor is responsible for all required dust protection; protection of existing areas surrounding the project areas and the matching of existing finishes as applicable.

13) The contractor shall develop and provide a proposed work schedule to the Government COR with a proposed work schedule and notify him/her prior to any site work.

d. Clearance For Admission to Work Site: All contractor personnel engaged in performance of work under this contract shall require local background clearance by Presidio of Monterey, Monterey CA.

SW-3 PROJECT INSTRUCTIONS

a. Coordination: Before starting any work, the contractor shall coordinate said work through the Contracting Officer. Written notification shall be given to the Contracting Officer prior to starting work. The Contractor shall take all reasonable measures necessary to minimize the disruption of the occupants during performance of contract work.

b. Weekly Progress Project Meetings: The Contractor's Project Manager shall be available to meet weekly either at a specified location and time to discuss the project status with the Contracting Officer or their designated representative or otherwise informally via teleconference or Microsoft Teams as needed.

Normal Working Hours: The Contractor shall conduct business between the hours of 8:00 AM and 4:00 PM PST, or between 3:45 PM and 10:00 PM PST, Monday through Friday, as directed by Government needs. Work may be excused during Federal holidays or Government-directed facility closures due to local or national emergencies, administrative leave, or similar events.

The Contractor shall maintain an adequate workforce to ensure uninterrupted performance of all tasks defined within this SOW during regularly scheduled operating hours, Monday through Friday, excluding Federal holidays listed below:

LEGAL PUBLIC HOLIDAYS including any designated by Federal Statute, Executive Order, or Presidential proclamation.

Federal Government holidays are:

New Year's Day 1st day of January

Martin Luther King Jr.'s Birthday 3rd Monday of January

Presidents Day 3rd Monday of February

Memorial Day Last Monday of May

Juneteenth Day 19th day of June

Independence Day 4th day of July

Labor Day 1st Monday of September

Columbus Day 2nd Monday of October

Veterans Day 11th day of November

Thanksgiving Day 4th Thursday of November

Christmas Day 25th day of December

NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday.

Holidays falling on a Sunday will be observed on the following Monday.

c. Sustainable Management of Waste: The contractor shall, at his/her own expense, ensure that 60% by weight of the demolition or deconstruction material or construction waste is diverted from landfill disposal. This may be accomplished through recycling, reuse of material (such as crushed concrete or asphalt), diversion (material which may be used on a future project) or waste minimization (accurate planning and ordering, proper material storage and handling, right-sizing).

A consolidated report outlining the amounts of diverted and disposed waste resulting in the 60% diversion shall be provided to the Directorate of Public Works Environmental Division. The contractor shall use the DEBRIS RECOVERY STATEMENT - Post Demolition/ Construction Form located at the end of this Statement of Work. All waste reduction measures must be in full compliance with federal, state and local regulations and in full compliance with material specifications. All measures involving storage of material on the installation or future use of the material by the installation must be coordinated in advance with the Directorate of Public Works.

d. Debris and Rubbish: The contractor shall dispose of all debris and rubbish in an off-post dump site at no additional cost to the Government per Sustainable Management of Waste defined above.

The Government landfill, dumpsters, or containers shall not be used for property disposal. All waste shall be disposed of in accordance with applicable Federal, State, and local laws.

Wastewater from construction activities, such as onsite material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. will not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants. Dispose of the construction related wastewater off-Government property in accordance with all Federal, State, Regional and Local laws, and regulations.

e. Scrap and Salvageable Materials: The Contractor retains right, and control of scrap and salvageable material generated from Government owned facilities unless otherwise defined by this contract. All Scrap and salvaged material retained by the contractor shall be removed from the Post daily at the Contractor's expense. Weights shall be recorded and submitted according to the Sustainable Management of Waste defined above.

f. Workmanship: All work shall be accomplished by workers skilled in the trade involved.

Workmanship shall be equal to the best practices common to the trade, and shall be governed by the International Building Code, National Electrical Code and National Electrical Safety Code. All materials, workmanship, methods, and equipment shall be to complete satisfaction of the Contracting Officer or their designated representative.

g. Payments and Invoicing: Under contract clauses, Payments under the Fixed Price Construction Contracts and Prompt Payment for Construction Contracts, the contractor must submit a "proper" invoice to obtain payment. To prevent errors in the preparation of invoices, along with resulting delays in payment, the contractor shall meet with the Government's Construction Representative 7 calendar days prior to submitting an invoice and reach an agreement on the Schedule of Values (i.

e. quantities and percentage of completion to be billed on the invoice ref H-14 for additional details).

h. As-Built Drawings (as applicable): Contractor is responsible for keeping accurate records of the installation of all new equipment and to provide one set of as-built drawings illustrating all the work performed on this contract. Drawings are to be supplied to the Contracting Officer in the form of (1) paper, hard copy, and (1) digital copy in AutoCAD format upon completion.

i. Operation and Maintenance Manuals: Contractor is responsible to keep accurate records of the installation of all new equipment and to provide operation and maintenance (O&M) manuals for all equipment installed on this contract. O&M manuals are to be supplied in binders to the Contracting Officer in the form of (1) paper, hard copy and digital copies in PDF format upon completion for each Master Division. For example, O&M manuals shall be provided in separate binders for different items, i.e. domestic plumbing items shall be in separate binders from HVAC equipment;

fire alarms should be separated from access control.

j. Preparation of DD Form 1354 (Transfer of Real Property): The Contractor is responsible for submitting a final DD 1354 upon completion of construction. The Government will furnish the Contractor with a DD Form 1354 checklist to use to produce a draft Form 1354. The completed checklist and prepared draft Form DD 1354 shall be submitted to the Government prior to completion of construction for review and comments. The Government shall have two (2) weeks for review of the draft to provide comments back to the Contractor. The Contractor shall make revisions, as necessary, to the DD1354 before final submission upon completion of the construction.

k. Warranty: Provide a list of the material suppliers by Master Division with names and phone numbers for all warranties to the Contracting Officer.

SW-4 SAFETY REQUIREMENTS

The Contractor shall comply with all safety measures outlined in the Occupational Safety and Health Administration (OSHA) safety standards 29 CFR 1910 and 29 CFR 1926 and the Army Corp of Engineers EM385-1-1 used for all construction on Army Installations. The Contractor will also comply with AR 385-10 and DA PAM 385-10 Chapter 4-4 a. thru g. The contractor will have the below listed plans on hand for inspection by the Contracting Officer upon request.

a. Site Specific Safety Plan

b. Activity Hazard Analysis (AHA) EM 385-1-1

c. Position Hazard Analysis (PHA) EM 385-1-1

SW-5 APPROVAL OF MATERIALS, EQUIPMENT & SUBMITTALS

a. Within 15 calendar days of contract award and before installation, the Contractor shall submit for approval all items listed. The Government has 10 working days to review and return submittals once they are received with exception of Historic Properties. For projects pertaining to Historic Properties, to comply with the Section 106 process, the Government shall have 45 days for each submittal as the State Historic Preservation Office has 30 days from receipt to review and provide comment. All submittals shall be approved before work requiring the materials can be used on the project. The contracting officer may request submittals in addition to those listed below when deemed necessary to adequately describe the work covered in this contract.

b. Submittals shall be e-mailed to the Contracting Officer at:

usarmy.leavenworth.acc-micc.mbx.construction@mail.mil

c. Submittals shall be labeled utilizing the keyword "submittal" with the contract number, task order, building number, and submittal short description or number.

(e.g. Submittal_26-C-0001_Bldg_#610_bottlefilling)

Material Safety Data Sheet shall be provided when hazardous chemicals are used.

Construction Schedule - Schedule shall be viewable in PDF

SW-2c 4 - Materials Submittals

SW-3c - Debris Recovery Statement Form

SW-3f - As-Built Drawings

SW-3g - Schedule of Values (SOV)

SW-3i - Operation and Maintenance Manuals

SW-3j - Draft DD 1354 Form & Final DD 1354 Form

SW-3k - Warranty Information

SW-4a-b - Site Specific Safety Plan (including Activity & Position Hazards)

SW-6 - Quality Control Plan

SW-7 - Project Signage

H-7 - Asbestos Abatement, Mold Remediation, Chemical Disposal (as applicable)

[LIST ALL OTHER REQUIRED SUBMITTALS HERE]

SW-6 QUALITY CONTROL

This contract has a requirement for quality control. The Contractor must maintain adequate continuous quality control over each phase of his/her operation. When the Contractor signs the contract, he/she assumes the responsibility for producing the required product within the time stated. The contractor must establish and implement a system for controlling his/her daily operations to comply with this commitment. The Contractor quality control shall include the following items:

a. The Contractor shall provide and maintain an effective Quality Control Program (QC). Sufficient inspections to ensure conformance to the Statement of Work shall be performed on a continuing basis. After the contract is awarded, and prior to starting on-site construction, the Contractor shall meet with the Contracting Officer at a pre-construction conference and discuss the quality control requirements.

b. The Contractor's quality control program shall include three phases of inspection and tests as follows:

1. Preparatory Inspection prior to beginning work on-site shall include but is not limited to performing a physical examination of materials existing conditions of surroundings and equipment to assure that they conform to approved shop drawings or submittal data and that all materials and /or equipment are on hand.

2. Initial Inspection shall be conducted as soon as work begins on a representative portion of work and shall include examination of the quality of workmanship as well as a review of control testing for compliance with contract requirements.

3. Continuing Inspection shall be performed as work Progresses, including control testing, until completion of that feature of the work.

c. A daily inspection report shall be submitted on the first workday following the date covered by the report. The report shall be deemed late at the end of the following workday. The Contractor shall stop work, pending satisfactory correction of any deficiency noted by the quality control staff or by the Contracting Officer or their designated representative. The contractor shall not proceed upon any feature of work containing uncorrected work. Upon any contract discrepancy found by the Contracting Officer or their designated representative, a DA Form 5479-R will be prepared by the CO. Notations on quality control reports will not be acceptable as a substitution for other written reports by the Contractor if required under Contract Clauses. No payment estimate will be processed under this contract until the entire Quality Control Plan has been approved and until overdue daily QC reports are properly executed and furnished.

SW-7 PROJECT SIGNAGE

a. The contractor shall provide all necessary signage to notify installation personnel of construction. If construction signage is damaged due to weather, it will be the contractor's responsibility to replace.

b. Signage shall be 2' x 3'. Signage size may change depending on project and proposed location.

Size changes must be requested through the contracting officer.

c. Signage shall be installed at a minimum 1 week prior to start of construction. If signage is to be placed in the ground, plan adhering to standards as defined by the California MUTCD and other regulations. If possible, install signage on existing structures.

d. Exact verbiage for the signage shall be approved by the contracting officer prior to installation.

All text shall be black and at an appropriate size in proportion to the individual signs. The following are items required as a minimum to be included on the signage:

1. Basic title

2. Purpose of project

3. General time frame of project, i.e. Fall 2026

4. Use phrases such as: Pardon our dust, thanks for your patience or watch for construction equipment when appropriate to the project.

e. If relevant to the project, a picture shall be used to convey the project to the public. DPW can assist with providing an appropriate image for the signage.

*** END OF NARRATIVE ***

Requirements The purchase and installation of thirteen (13) ELKAY bottle filling stations, or an approved equal, including all associated plumbing work, for existing facilities at the Presidio of Monterey, California.

Work includes providing all labor, equipment, and materials in full compliance with the plans and specifications, and removing and lawfully disposing of existing fountain and plumbing components.

Section D - Packaging and Marking

D.1. SHIPPING ADDRESS

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government. The Contractor shall retain full responsibility for the delivery and acceptance of shipments to this installation or elsewhere that are required for the completion of this contract.

D.2. PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government uniquely identifies each contract action through the assignment of a Procurement Instrument Identifier (PIID) at the time of award. The PIID serves as the official, permanent identifier for the resulting contract and shall be used in all contractual documents and official communications beginning upon notice of award.

D.3. PACKAGE MARKING

The packing of deliverables, containers, and packages to be delivered pursuant to the requirements of the contract shall be in accordance with the instructions provided, and shall be marked with the following information:

Contract PIID (example - )W91QF4-26-C-9999 Short title of contract/job order requirement

*** END OF NARRATIVE ***

Section E - Inspection and Acceptance

E.1. QUALITY CONTROL

When the Contractor is ready for final inspection; they shall request final inspection in writing to their assigned Contracting Officer Representative (COR) Inspector. The final inspection shall be requested a minimum of two (2) work days prior to desired final inspection date. Prior to a request for final inspection, the Contractor's Quality Control (QC) representative shall conduct an inspection and insure that all work has been completed and is in compliance with all contract documents. The Contractor's QC representative will provide a copy of their inspection report to the Government's Inspector with a copy of the status of deficiency correction, if applicable.

E.2. INSPECTION PHASES

In the event there are phases of work that will cover or mask a contractor's work, it is the sole responsibility of the contractor to ensure acceptance of that phase of work prior to continuance of the follow-on phase of work. Should the contractor disregard this information, they may be subject to the Contracting Officer's discretion to tear out or remove the covered or masked work completed prior to allow for Government inspection. Should corrections by the contractor be required, the costs for removal and re-installation of the work will be the responsibility of the contractor.

(e.g. drywall installed that covers electrical wiring prior to Government inspection would then have to be removed for Government inspection and subsequently re-installed by the contractor at their costs if the wiring contained deficiencies)

E.3. INSPECTION AND ACCEPTANCE

The Contractor's representative(s) shall be present during final inspection. Any discrepancies noted will be corrected within the time specified by the Contracting Officer or their designated representative and prior to final payment. Inspection and Acceptance point will be at destination specified in the contract.

*** END OF NARRATIVE ***

Overall Contract Inspection/Acceptance Locations

0001 Inspection and Acceptance Location

Both Destination Instructions: COR is to inspect according to SOW

DoDAAC: W912A8 CountryCode: USA

W6CG USAG PRESIDIO

289 FT MERVINE PLACE, BLDG 235

PRESIDIO OF MONTEREY, CA 93944-5006

UNITED STATES

Nahla Al Khayatt

0002 Inspection and Acceptance Location

Both Destination Instructions: COR is to inspect according to SOW

DoDAAC: W912A8 CountryCode: USA

W6CG USAG PRESIDIO

289 FT MERVINE PLACE, BLDG 235

PRESIDIO OF MONTEREY, CA 93944-5006

UNITED STATES

Nahla Al Khayatt

Section F - Deliveries or Performance

0001 1 JobQuantity

Address and POC

Period of Performance From 22 Sep 2026 To 21 Mar 2027

0002 1 JobQuantity

Address and POC

Period of Performance From 22 Sep 2026 To 21 Mar 2027

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative.

1991-12

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

252.236-7000 Modification Proposals--Price Breakdown.

1991-12

DFARS Clauses Incorporated by Full Text

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process Electronic invoicing.

vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF WAWF training.

Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web WAWF methods of document submission.

entry, Electronic Data Interchange, or File Transfer Protocol.

(f) The Contractor shall use the following information when WAWF payment instructions.

submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following Document type.

document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

W912A8 - CONSTRUCTION

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC

HQ0490

Issue By DoDAAC

W91QF4

Admin DoDAAC W91QF4

Inspect By DoDAAC W912A8

Ship To Code W912A8

Service Approver (DoDAAC) W912A8

Service Acceptor (DoDAAC) W912A8

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the Receiving report.

requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

WAWF POC: Nahla Al Khayatt, 831-242-3180, nahla.alkhayatt@dliflc.edu

Contracting Specialist: Tyerees M Sanders, 520-944-1136, tyerees.m.sanders.civ@army.mil

Contracting Officer: Robert M Parvin, 520-944-3389

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Section H - Special Contract Requirements

H-1. WAGE DETERMINATION

The Wage Determination Number applicable to the adjacent county of work located nearest to the Presidio of Monterey (Monterey Country) as contained in the Register of Wage Determinations.

The Construction Wage Determination is contained herein this contract as a separate attachment and is applicable at the time of award.

H-2. RESPONSIBILITY FOR ADMINISTRATION OF CONTRACT

a. The Contracting Officer is responsible for the administration of this contract. The Contracting Officer alone is authorized to the extent indicated in the contract to act on behalf of the government which results in changes in the terms of the contract, including deviations from specifications, details and delivery schedules. Communications pertaining to contractual administrative matters will be addressed to the Contracting Officer. No changes in or deviation from the scope of work shall be affected without a written modification to the contract executed by the Contracting Officer.

b. No oral statement of any person will in any manner or degree, modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer.

c. All matters pertaining to Government administration of this contract should be directed to:

ATTN: ROBERT M. PARVIN

MICC-LEAVENWORTH

535 KEARNY AVE., ROOM 105

FORT LEAVENWORTH, KS 66027-1417

TELEPHONE NUMBER: (913) 684-1624

EMAIL ADDRESS: robert.m.parvin.civ@army.mil

H-3. CONTRACTOR CORRESPONDENCE AND CONTRACTUAL DOCUMENT SUBMISSIONS

All Contractor and subcontractor originated correspondence under this contract shall be on or attached to the Prime Contractor's letterhead, except in the case where pre-printed Government forms are used, shall be typed or handwritten in a legible manner, and shall be submitted in the signed original, with supporting copies as required by the Contracting Officer or their designated representative. All contractual documents shall be submitted to the Government in an electronic format and accessible through the most current version of Microsoft Word/Excel or Adobe Reader (.pdf), unless otherwise stated.

H-4. PRECONSTRUCTION CONFERENCE

A Preconstruction Conference will be scheduled by the Contracting Officer after contract award and prior to the time and date set for commencement of work. The meeting will be held at the Presidio of Monterey Directorate of Public Works office with the COR or other location. At this meeting, the Contractor will be oriented with respect to Government procedures and lines of authority, as well as contractual, administrative, and construction matters. The Contractor is required to furnish:

- Current Certificate of Insurance (Updated certificate is required annually for the base contract)

- Letter appointing the Project Manager and other company key personnel associated with project execution.

- Proposed Project Schedule of Performance (TBD)

- Proposed Schedule of Values (SOV) based upon the planned allocation of construction by division, and/or materials and labor where appropriate shall be submitted at the pre-construction meeting or at a minimum prior to invoicing through Wide Area Workflow (WAWF).

- RFO FAR 28.102, the Contractor shall furnish all payment bonds exceeding $35,000. Both Payment and Performance bonds are required for requirements exceeding $150,000.00.

- Ensure administrative personnel are aware weekly Payrolls are to be sent to the Contracting Officer at the following e-mail address usarmy.leavenworth.acc-micc.mbx.construction@army.mil utilizing the contract number with task order number, building number and payroll end date as the naming convention for both the e-mail subject line and the title of the file. (see below)

(e.g. W91QF4-26-C-9999_Fountain_W-E_21Nov26)

H-5. RESTRICTIVE USE OF CAMERAS, VIDEOS, AND DIGITAL CAMERA DEVICES

Installation security measures prohibit prospective bidders and contractors from taking pictures and /or videos on Post unless prior permission is sought and received from the Contracting Officer.

Permission may be sought by contacting the Contracting Officer verbally or in writing. Use of cameras or other picture taking devices without proper approval may be considered a violation of Installation Security and prosecution of such violations may be subsequently induced.

H-6. RESTRICTED ACCESS TO MILITARY INSTALLATION - COOPERATION WITH FORCE

PROTECTION MEASURES

a. The contractor agrees to abide by and cooperate with Force Protection measures that are implemented on the military installation.

b. The Contractor shall comply with, and in the instance of contractor/sub-contractor employees, shall ensure compliance with the following instructions when access to the Presidio of Monterey installation/facilities are required for contract performance. These local instructions are incorporated in this contract, in order to implement local installation antiterrorism/operations security policies and procedures, and to supplement RFO clause 52.204-9, which, if applicable to this contract, is located in Section I of the contract. In the event of conflict between any portion of this supplement and/or RFO 52.204-9; and any other provision within the SOW, PWS, or specifications; clause 52.204-9 (if listed in Section I) shall take precedence. In the event of conflict between this supplement and any other provision within the SOW, PWS, or specifications, this supplement shall take precedence.

(i) An un-cleared contractor is an individual who falls into one of two categories: (1) CAC-eligible;

and (2)

Non-CAC eligible. The Common Access Card (CAC) is the DoD federal personal identity verification credential. CAC Eligibility is defined in Army Directive 2014-05, dated March 7, 2014.

(ii) Army Directive 2014-05 provides that all contractor and/or subcontractor personnel who do not possess a CAC, another Federal personal identity verification card, or other authorized DoD identification card and who require unescorted access to Army installations must have a validated need for such access and undergo a vetting process to determine their fitness for access.

Accordingly, non-CAC eligible, un-cleared contractor and/or subcontractor personnel requiring access to the Presidio of Monterey installation and facilities, to perform under this contract, will submit personal identity information through the Presidio of Monterey Installation Pass implementation.

c. Contractors and Contract Employees may obtain a Locally Approved Credential (LAC) and/or day or other short term passes for entry through Bolio Gate. See instructions, location, & hours of operation at the following - https://home.army.mil/monterey/index.php/about/presidio-gate-hours.

(The Contracting Officer Representative may coordinate short term passes for convenience -reference post award notes.)

d. Personnel entering the Presidio of Monterey Visitor Control Center must have a Real ID driver's license, registration, and proof of insurance. All passengers must have either a Real ID driver's license or other form of government ID as listed on the website https://home.army.mil/monterey /index.php/about/presidio-gate-hours. Following a routine background check, visitors will receive a Temporary Pass and Instructions allowing them to enter the installation through the Bolio Gate.

H-7. COMPLIANCE WITH ENVIRONMENTAL / OCCUPATIONAL SAFETY AND HEALTH

LAWS

a. The Contractor understands the responsibility for compliance with federal, state, and local laws, rules, and regulations pertaining to environmental protection, occupational health and safety, and transportation, storage, and disposal of hazardous materials and hazardous waste is the sole responsibility of the contractor. This shall include, but not be limited to: all responsibilities of an "owner or operator" of all equipment used by the Contractor and of the areas in which work is being done from the time when the Contractor begins work until the work is accepted and the worksite cleaned up and cleared, and the sole responsibility for compliance with all Army regulations pertaining to hauling and disposal of materials, as well as all federal and California laws and local ordinances regulating the hauling and disposal of hazardous materials and hazardous waste. This clause is meant to supplement, not replace, any requirements pertaining to compliance with the law or safety requirements contained elsewhere in this contract.

b. The Contractor shall be solely responsible for all costs of compliance with all such laws, rules, and regulations, to include all training of personnel, submission of permit and license applications, purchases of materials, payment of applicable fees and taxes, and payment of fines and penalties for noncompliance. The U.S. Government shall not pay fines or penalties resulting from noncompliance and shall not pay fees required to maintain and process required records or permit applications necessary to perform this contract. Should the Government choose to do so, it may, but does not have to, correct violations of environmental and occupational and safety laws which the Contractor fails to correct after reasonable notice; if the Government chooses to correct the violation(s), as opposed to having the Contractor do so, the Contractor shall reimburse to the Government all direct and indirect costs of correcting the violation(s).

c. The Contractor understands that compliance with all environmental and occupational safety and health laws is a part of this contract to which the Government is entitled to strict compliance. The Contractor understands it has no authority to dispose of government waste in absence of the necessary regulatory authorizations. The Contractor further agrees to notify the Government if the Contractor is (1) cited as being in violation of federal, state, or local waste disposal regulations; or

(2) loses its authority to haul or dispose of waste under federal or state laws. Delays caused by the Contractor's need to comply with such laws, or resulting from failure to comply with such laws, shall not result in any equitable adjustments or claims under this contract nor excuse the Contractor's obligation to complete the work under the contract.

d. The Contractor shall notify the Contracting Officer or their designated representative immediately upon discovery of exposure to lead, other hazardous waste or substances, or asbestos to the air, land, or water in any location in which the Contractor is required by law to report the exposure to a regulatory agency. If such exposure is the result of any action of the Contractor, the Contractor will cease work immediately and notify the Contracting Officer. The Contractor understands that there will be no equitable adjustment for time lost or expenses incurred as a result of the need to correct any such exposure which is the result of negligent or intentional acts of Contractor personnel.

e. The Contracting Officer or their designated representative shall be allowed access to Contractor files and Contractor's personnel files as they see fit to ensure compliance with this clause. All regulatory agencies, from any level of government, whose responsibilities includes inspection and appropriate other action, shall be allowed to inspect the worksite to the extent necessary to carry out their responsibilities. A copy of this clause, without changes, shall be inserted into any subcontracts. Performance of the subcontractor, to include compliance with this clause, shall be the responsibility of the Contractor.

f. Asbestos Containing Materials (ACM) and assumed ACM shall be handled according to applicable laws and regulations with an asbestos certified contractor.

g. Notification to the Monterey Bay Air Resources District (MBARD) is required if ACM is to be disturbed and exceeds the reporting thresholds OR if any demolitions are conducted even if there is no asbestos involved (demolitions are defined as the wrecking or removing of load bearing members and need not involve complete destruction of a building). Clarification on thresholds, notifications, and definitions are outlined in Attachment A, Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP) and District Rule 424 Guidance.

h. Prior to commencement of the project, copies of survey results, abatement plans, and contractor certifications shall be submitted to and reviewed by Presidio Environmental Division.

i. At the completion of the project, copies of air monitoring results and completion reports shall be submitted to the Presidio Environmental Division.

j. All ACM related submittals (and any environmental requirements associated with this project) must be sent to Presidio Air Quality Manager (tania.m.leisten.civ@army.mil or 520-592-8469) to include the submittals e-mail noted within Section C paragraph SW-5 b.

k. Volatile Organic Compounds - Monterey Bay Air Resources District Rule 426 provides volatile organic compound (VOC) content limits for a range of coatings that are applied at the site of the structure and its appurtenances. These limits do not apply to coatings used in shops. Coatings covered under this rule include typical primers, sealers, and topcoats for building floors, walls, ceilings, and roofs; antenna coatings; and curb and pavement coatings. The application or solicitation for application of coatings that exceed the VOC limits is prohibited. Coating containers must be closed when not in use. Thinning of coatings must not cause the applicable VOC limit to be exceeded.

l. Aesthetics/Installation Design Guide: For non-historic buildings and/or buildings outside of the historic district, coordination with Presidio Master Planning Division is required to ensure flooring and other materials are consistent with the Installation Design Guide.

m. Avoidance of Sensitive Habitat: All laydown, equipment, and access will be on paved areas.

Any laydown, equipment, and access that needs to be off pavement shall be coordinated with the Presidio Environmental Division prior to initiation of work.

n. Land Restoration: Ensure minimal disturbance to current landscaped and unpaved areas by locating temporary storage, laydown yards, and parking of equipment on pavement/hardscape where possible. Any disturbance or damage to vegetation or surrounding soil must be restored to its original condition or better using Presidio of Monterey, Integrated Natural Resource Management Plan (INRMP) approved plants or seed mix. Contact the Presidio Natural Resources Manager (julie.a.parish3@army.mil) for assistance with approved plants or seeds and include all inquiries to the submittals e-mail noted within Section C paragraph SW-5 b.

o. Hazardous Waste: If ACM, LBP, treated wood, oil-based paints, paint thinners, or other hazardous wastes are generated by the project, they shall be handled by a certified contractor in accordance with applicable laws and regulations. The contractor will prepare hazardous waste manifests to be signed by Presidio of Monterey, Hazardous Waste Office with 3 working days' notice at 831-242-7204 or 831-887-8878.

H-8. COMPLIANCE WITH HAZARDOUS WASTE SHIPMENTS

a. Many contracts onboard the Presidio of Monterey require the contractor to ship his hazardous waste from the post. Prior to shipment, there are a few items that are required prior to the Presidio and releasing the items for transport. These of Monterey Environmental signing the manifest requirements are listed below and must be given to the base environmental at a minimum of 2 working days prior to the desired shipping date.

A licensed transporter must transport waste.

Waste must go to a permitted facility.

Waste must be properly packaged and labeled IAW 40/49 CFR.

Copy of the analysis for the waste/s going out.

Copy of the profile.

Letter from disposal facility allowing waste and profile to be accepted at their facility.

Copy of Manifest

Copy of any land disposal restrictions (LDR).

b. If any Hazardous Waste (HW) is generated during the project, the contractor will be responsible for…

This is the start of the file's text. The full file is on GovTribe.