Attachment 4- Drinking Fountain Locations - Floor Plans.pdf
PDF 3 MB Posted
- Solicitation number
- W91QF426BA010
About this file
This document is a presolicitation containing facility floor plans for the installation of Elkay bottle filling stations at multiple locations within various buildings at Monterey. The presolicitation specifies the required models and quantities for each building location as follows: Tin Barn B518 requires one Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless); B610 requires one unit of the same model; B613 requires a retrofit of an existing fountain with an Elkay LZWSRK Retrofit Bottle Filling Station Kit; B630 requires two units of the EZSDWSSK model; B645, B646, B648, and B649 each require one EZSDWSSK unit; B647 requires two units; and B848 requires one unit. The document notes that B629 has no floor plan available, with the installation location specified as the first floor left hallway ten feet from the main door near the main stairway, with an image to be provided separately.
The presolicitation includes architectural floor plans for each building location marked with "X" or "X X" indicators showing the precise placement of the bottle filling stations. All installations are for the Non-Filtered, Non-Refrigerated Stainless Steel model of the Elkay EZSDWSSK, except for B613 which requires the retrofit kit model LZWSRK. This document appears to be part of preliminary market research to inform potential contractors of the government's requirements prior to formal solicitation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x
Tin Barn B518 first floor Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless)
X
B610 First Floor (UKP) Model EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless) x
B613 First Floor (URU) Model Retrofit existing fountain with an Elkay LZWSRK Retrofit Bottle Filling Station Kit.
xx
B630 First Floor (Barrack) Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless) x 2 x
B645 First Floor (Barrack) Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless) x
B646 First Floor (Barrack) Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless) x x
B647 First Floor (Barrack) Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless) x 2
X
B848 First Floor (UPF) Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless x
B648 First Floor (Barrack) Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless) x
B649 First Floor (Barrack) Model Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless)
Note:
B629: No floor plan available, The location for 629 = 1st floor left hallway, ten feet from the main door (located near the main stairway & an image will be provided) 1 unit - Elkay EZSDWSSK Bottle Filling Station with Single ADA Cooler (Non-Filtered, Non-Refrigerated Stainless).
| 2025-APR-02-POMR-presidio-of-monterey-B518-01 |
| 2025-APR-02-POMR-presidio-of-monterey-B610-01 |
| 2025-APR-02-POMR-presidio-of-monterey-B613-01 |
| 2025-APR-02-POMR-presidio-of-monterey-B630-01 |
| 2025-APR-02-POMR-presidio-of-monterey-B645-01 |
| 2025-APR-02-POMR-presidio-of-monterey-B646-01 |
| 2025-APR-02-POMR-presidio-of-monterey-B647-01 |
| 2025-APR-02-POMR-presidio-of-monterey-B848-01 |
| 2025-APR-04-POMR-presidio-of-monterey-B648-01 |
| 2025-APR-04-POMR-presidio-of-monterey-B649-01 |
File details come from the government source that posted it. Updated .