W91QF424R0025.pdf
PDF 974 KB Posted
- Attached to
- DLPT5 Full Range Test Item Development
- Solicitation number
- W91QF24R0025
About this file
This document is a solicitation for a multiple award indefinite-delivery, indefinite-quantity (IDIQ) contract for the creation of Defense Language Proficiency Test (DLPT5) test items for the Defense Language Institute Foreign Language Center (DLIFLC). The DLPT5 is used to assess the foreign language proficiency of military and government linguists.
The solicitation seeks contractors to develop reading and listening comprehension test items covering a range of Interagency Language Roundtable (ILR) proficiency levels from 0 to 4 across approximately 450 languages and dialects. The government anticipates an annual demand of 5,000 to 7,500 test items. The contract will have a 5-year period of performance with a $7,500 minimum guarantee. The solicitation is set aside for 100% small business and proposals are due by October 16, 2024. The government will award multiple contracts and the specific number of awards is contingent on the eligible proposals received. Pricing will be on a firm-fixed-price basis per test item developed, with separate CLINs for travel and SAM reporting.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 16 Oct 2024
X
A X B X C X D
EX
X
G F 58 - 62
63 - 72 H 73 - 79 edward.w.wojtan2.civ@army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 79
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W911S0 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
EDWARD W. WOJTAN III 757-501-8435
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3 4 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
14 - 42
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
45 - 46
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 47 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
48 - 57
PART II - CONTRACT CLAUSES
MICC - FORT EUSTIS
705 WASHINGTON BLVD
FORT EUSTIS VA 23604
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
16 Sep 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W91QF424R0025
Section A - Solicitation/Contract Form
DLIFLC
TITLE: Defense Language Institute Foreign Language Center (DLIFLC) Defense Language Proficiency Test (DLPT5) Full Range Test Items Development
Multiple Award indes Indefinite Delivery Indefinite Quantity (IDIQ)
2. PERIOD OF PERFORMANCE (BASE PERIOD + FOUR OPTION YEARS):
10/31/2024 – 10/30/2029 Base Year 10/31/2024 – 10/30/2025 Option Year 1 10/31/2025 – 10/30/2026 Option Year 2 10/31/2026 – 10/30/2027 Option Year 3 10/31/2027 – 10/30/2028 Option Year 4 10/31/2028 – 10/30/2029
3. NAICS CODE: 611710 SIZE STANDARD: $24.0 M
4. PROCUREMENT SET-ASIDE: 100% Small Business
5. This will be an IDIQ contract. It is the intent of the Government to award this IDIQ contract to multiple offerors. The specific number of awards to be made is contingent upon the number of eligible proposals received and the best interests of the Government. Specific work will be placed by means of FAR 16.505.
6. The Minimum Guarantee for this contract is $7,500.00, which must be satisfied during the Base Year. The Government will obligate the Minimum Guarantee upon award of each Base Contract. The contract cumulative ceiling for the IDIQ shared amongst all base contract holders will be 35,000 Test Items over the life of the contract. The IDIQ ceiling is based on estimated annual quantities of 5000 Test Items during the Base Year and 7500 Test Items during each option year. These estimated quantities for each Period of Performance are used to calculate the cumulative IDIQ ceiling and do not service as ceiling quantities for each period.
7. PROPOSALS ARE DUE BY: October 16, 2024, 10:00 AM Eastern (see SF33 block 9). Technical questions are due by September 23, 2024, 10:00 AM Eastern (see Section L – Instructions to Offerors).
8. See Section L and M of this solicitation for proposal submission requirements and the basis for award.
9. Contract Line Item Numbers (CLINs) 0001, 0002, 1001, 1002, 2001, 2002, 3001, 3002, 4001 and 4002, Labor: Per unit pricing for each Test Item associated with a particular period of performance will serve as ceiling rates for follow-on task orders.2
10. CLINs 0003, 1003, 2003, 3003, and 4003, Travel: The purpose of the Travel CLIN is to reimburse the Contractor for authorized travel required in accordance with the requirements outlined in the Performance Work Statement. The Offerors are not to enter any pricing information for these CLINs as part of their proposal. A pricing estimate has been filled in by the Government. Offerors are asked to fill-in (if any) their fixed administrative fee for processing travel for each Period of Performance.
11. CLINs 0004, 1004, 2004, 3004, and 4004, Systems for Award Management Reporting (SAM): The purpose of the SAM is to collect labor hours and costs used in the performance of service contracts from contractors providing the services to the Department of the Army. Instructions, including the contractor and subcontractor User Guides, are available at http://www.SAM.gov. For each SAM CLIN, please enter the proposed amount associated with the effort in completing the SAM report for each reporting period. If the Offeror wishes not to charge for this item for any or all reporting periods, please enter “0” in the Unit Price for the respective SAM CLIN(s).
12. This procurement is being awarded by the Mission Installation Contracting Command, Fort Eustis, VA and administered by, Mission Installation Contracting Command, Fort Leavenworth, KS, in support of the DLIFLC, Monterey, CA.
13. Point of Contact for this solicitation is Contracting Officer, Edward W Wojtan, edward.w.wojtan2.civ@army.mil (757) 501-8149.
14. This solicitation is issued in accordance with FAR Part 15 and is a non-commercial purchase.
(End of Section A - Solicitation/Contract Form)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 2,500 Job Base Year: Reading Comprehension Test It
FFP
Develop and deliver Reading Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government FOB: Destination
PSC CD: U008
NET AMT
0002 2,500 Job Base Year: Listening Comprehension Test
FFP
Develop and deliver Listening Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
0003 Lot Base Year: Travel
COST
Travel IAW PWS, paragraph C.12. All travel costs must be approved prior to expenditure. Travel costs for activities associated with the PWS will be on a cost reimbursable basis.
The contractor will be reimbursed for allowable travel costs.
This is a NOT-TO-EXCEED CLIN. OFFERORS - DO NOT RE-PRICE THIS CLIN. This is a "COST - Not To Exceed" CLIN including a fixed administrative fee of ________%. The fixed administrative fee is inclusive of all potential G&A and other handling fees.
ESTIMATED COST
0004 1 Each Service Contract Reporting (SCR)
FFP
The contractor shall submit a Service Contract Reporting (SCR) in System for Award Management (SAM) NLT October 31st of each year. The contractor shall report the total dollar amount invoiced for services performed during the previous Government fiscal year under the order, the number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year, and data reported by subcontractors when applicable. This information shall be submitted via the internet at www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
1001 2,500 Job OPTION Reading Comprehension Test It
FFP
Develop and deliver Reading Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
1002 2,500 Job OPTION Listening Comprehension Test
FFP
Develop and deliver Listening Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
1003 Lot OPTION Travel
COST
Travel IAW PWS, paragraph C.12. All travel costs must be approved prior to expenditure. Travel costs for activities associated with the PWS will be on a cost reimbursable basis.
The contractor will be reimbursed for allowable travel costs.
This is a NOT-TO-EXCEED CLIN. OFFERORS - DO NOT RE-PRICE THIS CLIN. This is a "COST - Not To Exceed" CLIN including a fixed administrative fee of ________%. The fixed administrative fee is inclusive of all potential G&A and other handling fees.
1004 1 Each OPTION Service Contract Reporting (SCR)
FFP
The contractor shall submit a Service Contract Reporting (SCR) in System for Award Management (SAM) NLT October 31st of each year. The contractor shall report the total dollar amount invoiced for services performed during the previous Government fiscal year under the order, the number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year, and data reported by subcontractors when applicable. This information shall be submitted via the internet at www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each
2001 2,500 Job OPTION Reading Comprehension Test It
FFP
Develop and deliver Reading Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
2002 2,500 Job OPTION Listening Comprehension Test
FFP
Develop and deliver Listening Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
2003 Lot OPTION Travel
COST
Travel IAW PWS, paragraph C.12. All travel costs must be approved prior to expenditure. Travel costs for activities associated with the PWS will be on a cost reimbursable basis.
The contractor will be reimbursed for allowable travel costs.
This is a NOT-TO-EXCEED CLIN. OFFERORS - DO NOT RE-PRICE THIS CLIN. This is a "COST - Not To Exceed" CLIN including a fixed administrative fee of ________%. The fixed administrative fee is inclusive of all potential G&A and other handling fees.
2004 1 Each OPTION Service Contract Reporting (SCR)
FFP
The contractor shall submit a Service Contract Reporting (SCR) in System for Award Management (SAM) NLT October 31st of each year. The contractor shall report the total dollar amount invoiced for services performed during the previous Government fiscal year under the order, the number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year, and data reported by subcontractors when applicable. This information shall be submitted via the internet at www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each
3001 2,500 Job OPTION Reading Comprehension Test It
FFP
Develop and deliver Reading Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
3002 2,500 Job OPTION Listening Comprehension Test
FFP
Develop and deliver Listening Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
3003 Lot OPTION Travel
COST
Travel IAW PWS, paragraph C.12. All travel costs must be approved prior to expenditure. Travel costs for activities associated with the PWS will be on a cost reimbursable basis.
The contractor will be reimbursed for allowable travel costs.
This is a NOT-TO-EXCEED CLIN. OFFERORS - DO NOT RE-PRICE THIS CLIN. This is a "COST - Not To Exceed" CLIN including a fixed administrative fee of ________%. The fixed administrative fee is inclusive of all potential G&A and other handling fees.
3004 1 Each OPTION Service Contract Reporting (SCR)
FFP
The contractor shall submit a Service Contract Reporting (SCR) in System for Award Management (SAM) NLT October 31st of each year. The contractor shall report the total dollar amount invoiced for services performed during the previous Government fiscal year under the order, the number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year, and data reported by subcontractors when applicable. This information shall be submitted via the internet at www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each
4001 2,500 Job OPTION Reading Comprehension Test It
FFP
Develop and deliver Reading Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
4002 2,500 Job OPTION Listening Comprehension Test
FFP
Develop and deliver Listening Comprehension Test Items in accordance with the Performance Work Statement (PWS), paragraph C.5.3. Payment for item development will be upon final item approval by the government
4003 Lot OPTION Travel
COST
Travel IAW PWS, paragraph C.12. All travel costs must be approved prior to expenditure. Travel costs for activities associated with the PWS will be on a cost reimbursable basis.
The contractor will be reimbursed for allowable travel costs.
This is a NOT-TO-EXCEED CLIN. OFFERORS - DO NOT RE-PRICE THIS CLIN. This is a "COST - Not To Exceed" CLIN including a fixed administrative fee of ________%. The fixed administrative fee is inclusive of all potential G&A and other handling fees.
4004 1 Each OPTION Service Contract Reporting (SCR)
FFP
The contractor shall submit a Service Contract Reporting (SCR) in System for Award Management (SAM) NLT October 31st of each year. The contractor shall report the total dollar amount invoiced for services performed during the previous Government fiscal year under the order, the number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year, and data reported by subcontractors when applicable. This information shall be submitted via the internet at www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each
Section C - Descriptions and Specifications
SECTION C
Performance Work Statement DLPT5 Full Range Test Item Development Multiple Award IDIQ
C.1. INTRODUCTION
The Defense Language Institute Foreign Language Center (DLIFLC) has a need for the creation of test items. DLIFLC has developed a reading and listening test, the Defense Language Proficiency Test (DLPT5), to assess the foreign language proficiency of military and Government linguists.
C.2. SCOPE
C.2.1. The Contractor will develop DLPT5 test items that conform to DLPT item development specifications (see Technical Exhibits 6 through 18) and that cover multiple Interagency Language Roundtable language proficiency (ILR) levels, from level 06 through level 4, during each year: the base year, option year 1, option year 2, option year 3, and option year 4. For a list of languages and language dialects see section C.2.2 of the contract. The government has the right to add ten (10) additional languages that are currently not on the list. The government will determine whether the test format will be in Multiple Choice or Constructed Response for each language and dialect. The quantities of test items developed are subject to the limitations of the base contract ordering clauses and individual Task Order Requests (TOR).
C.2.1.1. Due to unforeseen geopolitical events, the Government may substitute languages by modification to this contract. In such a case, the Government reserves the right to reallocate the total number of required items among the other languages on the original delivery schedule in order to accommodate the total number for the substitute language. The Government will notify the Contractor at least 60 business days in advance before a change is made.
C.2.1.2 Type of Contract. Multi-Award IDIQ, Firm Fixed Price
C.2.1.3 Place of Performance. Determined at the task order level
C.2.1.4 Period of Performance. Base year plus four Option Years
C.2.2. List of languages and dialects
Language list Language list cont. 1 Language list cont. 2
ACHINESE
ACHOLI
HAYA
HAZARAGI
PAPUAN
PERSIAN-AFGHAN
ADIGEY
AFRIKAANS
AFRO-ASIAN
AKAN
AKPOSSO
ALBANIAN
ALBANIAN-GHEG
ALBANIAN-TOSK
ALEUT
AMASHI
AMHARIC
APACHE
ARABIC (MODERN
STANDARD)
ARABIC-EGYPTIAN
ARABIC-GULF
ARABIC-LIBYAN
ARABIC-SAUDI
ARABIC-SUDANESE
ARABIC-TUNISIAN
ARABIC-ALGER IAN
ARABIC-CHADIAN
ARABIC-CLASSICAL
ARABIC-
HASSANIYYA
ARABIC-IRAQI
ARABIC-JORDANIAN
ARABIC-LEBANESE
ARABIC-LEVANTINE
ARABIC-MAGHREBI
ARABIC-MOROCCAN
ARABIC-SYRIAN
ARABIC-YEMENI
ARAMAIC
ARMENIAN
ARTIFICIAL
ASSAMESE
ASSYRIAN
AVAR
AVESTAN
AYMARA
AZERBAIJANI
BAHNAR
BAKWERI
BALINESE
BALOCHI
HEBREW
HEBREW-ANCIENT
HERERO
HILIGAYNON
HINDI
HINDUSTANI
HMONG
HO
HOPI
HUNGARIAN
IBAN
IBANAG
ICELANDIC
IJAW
ILA-TONGA
ILOCANO
INDIC
INDONESIAN
IRISH
ITALIAN
ITALIAN-
NEAPOLITAN
ITALIAN-SARDI
NIAN
ITALIAN-SICILIAN
JAPANESE
JARAI
JAVANESE
KABRE
KABYLE
KACHIN
KADAZAN-OUSUN
KAMBA
KAMBATTA
KANARESE
KANURI
KAPINGAMARANGI
KARACHAl-
BALKHAR
KAREN
KASHMIR
KASHUBIAN
KAZAKH
KERES
KHERWARI
KIKUYU
PERSIAN-IRANIAN
PIDGIN ENGLISH
PIZAR MALAY
POLISH
PONAPEAN
PORTUGUESE
PORTUGUESE-BRAZILIAN
PORTUGUESE-EUROPEAN
PROVENCAL
PULAP
PUNJABI
PUNJABI-WESTERN
QUECHUA
QUECHUA- NORTHERN PASTAZA
QUECHUA-CALDERON HIGHLAND
QUECHUA-CANAR HIGHLAND
QUECHUA-CHIMBORAZO
HIGHLAND
QUECHUA-IMBABURA HIGHLAND
QUECHUA-LOJA HIGHLAND
QUECHUA-NAPO LOWLAND
QUECHUA-SALASACA HIGHLAND
QUECHUA-SANTIAGO DEL ESTERO
QUECHUA-TENA LOWLAND
RAJASTHANI
REJANG
RHADE
RHAETO-ROMANCE
ROMANCE
ROMANIAN
ROMANY
ROROTONGAN
RUSSIAN
RYUKYUAN
SAMA
SAMOAN
SANGO
SANSKRIT
SANTALI
SAOTOMENSE
SARA
SASAK
SCOTCH-GAELIC
SEDANG
SEMITIC
BALTIC
BANTU
BASHKIR
BASQUE
BASSA
BATAK
BAULE
BEJA
BELORUSSIAN
BEMBA
BENGALI
BERBER
BHILI
BICOL
BIHARI
BINI
BOSNIAN
BRAHUI
BRETON
BUGINESE-
MAKASSARESE
BURMESE
BURUSHASKI
CAJUN
CAMBODIAN
CATALAN
CEBUANO
CHALDEAN
CHAVACANO
CHECHEN
CHEROKEE
CHIGA
CHINESE-AMOY
CHINESE-ANHWEI
CHINESE-
CANTONESE
CHINESE-FUCHOW
CHINESE-FUKIENESE
CHINESE-GAN
CHINESE-HAKKA
CHINESE-HSIANG
CHINESE-MANDARIN
CHINESE-SWATOW
CHINESE-TOISHAN
CHINESE-WU
CHOCTAW
KIMBUNDU
KINYARWANDA
KIRGHIZ
KIRIBATI
KIRUNDl
KISSI
KITUBA
KlKONGO
KONKANIS
KOREAN
KPELLE
KRIO
KUMBO
KURDISH-KURMANJI
KURDISH-SORANI
KURUKH
KUSAIE
LADINO
LAHNDA
LAHU
LAKOTA
LAMBA
LAMNSO
LAMPUNG
LANDSMAL
LANNA
LAO
LAPP
LATIN
LATIN-
ECCLESIASTIC
LATVIAN
LINGALA
LISU
LITHUANIAN
LOLO
LOMA
LOMONGO
LOMWE
LUBA KATANGA
LUBA-KASAI
LUBU
LUGANDA1
LUNDA
LUO
LURI
SENA
SERBIAN
SERBO-CROATIAN
SERER
SETI
SHAN
SHLUH
SHONA
SIDAMO
SINDHI
SINGHALESE
SINO-TIBETAN
SLAVIC
SLOVAK
SLOVENIAN
SOGA
SOMALI
SONGE
SONINKE
SOTHO
SOUTH AMERICAN
SOUTH ASIAN
SPANISH
SPANISH-CARIBBEAN
SPANISH-CASTILIAN
SPANISH-CREOLE
SUB SAHARA AFR ICAN
SUKUMA-NYAMWEZI
SUMERIAN
SUNDANESE
SUSU
SWAHILI
SWATI
SWEDISH
SYLHETTI
SYRIAC
TADJIK
TAGALOG
TAHITIAN
TAKI-TAKI
TAMACHEK
TAMAZIGHT
TAMIL
TAPACHULA
TARIFT
TATAR
CHOKWE
CHUKCHI
CHUVASH
COMORIAN
CONTINENTAL
EURASIAN
COPTIC
CORNISH
CREE
CROATIAN
CZECH
DAKOTA
DANISH
DIMLI
DINKA
DIVEH I
DJERMA-SONGHAI
DOGRl-KANGRI
DUALA
DUTCH
DUTCH-CREOLE
DZONGKHA
EFIK
ESKIMO
ESPERANTO
ESTONIAN
EWE
EWONDO
FANA
FANG
FAROESE
FIJIAN
FINNISH
FON
FORMOSAN
FRENCH
FRENCH-CREOLE
FRISIAN
FULANI
FUTNIAN
FUUTA JALON
GA
GALICIAN
GALLA
GEORGIAN
GERMAN
LUVALE
LUYIA
MACEDONIAN
MADURESE
MAGINDANAON
MAKASSAR
MAKUA
MALAGASY
MALAY
MALAY PATIANI
MALAYALAM
MALTESE
MANDINGO-
BAMBARA
MANDINGO-DIOULA
MANDINGO-
MALINKE
MANX
MAORI
MARANAO
MARATHI
MARSHALESE
MASAI
MAYA
MAZANDERANI
MEITHEI
MENDE
MERU
MINANGKABAU
MISKITO
MONGOLIAN
MORO
MOROVIN
MORTLOCKESE
MOSSI
MPONGWE
MUONG
MUSKOGEE
NAHUATL
NAURUAN
NAVAJO
NDEBELE
NEPALESE
NGBANI
NIUE
NORWEGIAN
TAUSUG
TELUGU
TEMNE
TETUM
THAI
THO
TIBETAN
TIGRE
TIGRINYA
TIV
TOKELAUAN
TONGA
TRUKESE
TSONGA
TSWA
TSWANA
TULU
TUMBUKA
TUNGUSU
TUPI
TURKISH
TURKOMAN
TUVULAN
UIGHUR
UKRAINIAN
ULITHI
UMBUNDU
URDU
UZBEK
VAI
VIETNAMESE-CENTRAL
VIETNAMESE-HANOI
VIETNAMESE-SAIGON
VISAYAN
VOLAPUK
WA
WALAMO
WALLISIAN
WARAY-WARAY
WELSH
WENDISH
WESCOS
WEST EUROPEAN
WESTER N KRAHN
WOLEAI
WOLOF
GERMAN-BAVARIAN
GERMANIC
GERMAN-SWISS
GILAKI
GOGO
GONDI
GOTHIC
GREEK
GREEK-DEMOTIC
GREEK-
KATHAREVOUSA
GREEK-ANCIENT
GUAMANIAN
GUARANI
GUJARATI
GUSll
HADIYYA
HAITIAN-CREOLE
HAUSA
HAWAIIAN
HAWAIIAN-CREOLE
NUBIAN
NUNG
NUPE
NYANJA
NYANKOLE
NYORO
OGIBWA
OLD NORSE
OLD SLAVONIC
ORIYA
OSSETIC
OTETELA
PACIFIC ISLANDS
PAHARI
PAKTAI
PALAUAN
PALI
PAMPANGAN
PANGASINAN
PAPIAMENTO
PAPAGO-PIMA
PASHTU
PASHTU-AFGHAN
PASHTU-
PESHAWARI
XHOSA
YAKAN
YAKUT
YAO (CHINA)
YAO (MALAWI& MOZAMBIQUE)
YAPPESE
YIDDISH
YORUBA
ZANDE
ZAPOTECO
ZENAGA
ZERBA
ZULU
ZUNI
C.3. APPLICABLE DOCUMENTS
Exhibit Number Description of Exhibit # of Pages in Exhibit
Technical Exhibit 1 Delivery Schedule (Task Order Requests only) 1 pg. per
TOR
Technical Exhibit 2 Defense Language Proficiency Testing 5 Framework 86
Technical Exhibit 3 Contract Discrepancy Reports 2
Technical Exhibit 4 Defense Language Proficiency Test 5 Presentation 44
Technical Exhibit 5 NDA-Test Security/Confidentiality Agreement 7
Technical Exhibit 6 Text Modes &Text Typology and Item Rating - A 2
Technical Exhibit 7 Text Modes &Text Typology and Item Rating – B 66
Technical Exhibit 8 Very Low Range Multiple Choice Test Specifications
Technical Exhibit 9 Lower Range Multiple Choice Test Specifications 34
Technical Exhibit 10 Upper Range Multiple Choice Test Specifications 30
Technical Exhibit 11 Abbreviated DLPT Style Guide 50
Technical Exhibit 12 Multiple Choice Rendering Guidelines 12
Technical Exhibit 13 Rules for Writing Multiple Choice DLPT items 6
Technical Exhibit 14 Consolidated Item Review Criteria- MC 5
Technical Exhibit 15 IBS Manual A 18
Technical Exhibit 16 IBS Manual B 15
Technical Exhibit 17 IBS Manual E 84
Technical Exhibit 18 Test Specs-FLO-Language Specs 2
Technical Exhibit 19 Domino - A - DOMINO Contract Orientation 13
Technical Exhibit 20 Domino - B - Domino for contract managers 9
Technical Exhibit 21 Domino - C - Domino for contract test item writers 15
C.4. DEFINITIONS
Document Description
Sensitive & FOUI Information
Broadly defined, sensitive information includes all information that has or could have commercial value or other utility in the business in which the Government is engaged in, and all information of which the unauthorized disclosure would be detrimental to the interests of the Government, whether or not such information is identified as sensitive information by the Government.
DLPT
Defense Language Proficiency Test. A high-stakes proficiency test used by the Department of Defense to assess reading and listening comprehension in a language.
ILR Scale
Interagency Language Roundtable (ILR) language proficiency scale that provides descriptions of language proficiency levels.
Levels range from “0” (no proficiency) to “5” (equivalent to a highly educated native speaker).
Test Material
Test material refers to elements that are essential in a test and its accompanying scoring rubrics. It includes but is not limited to target-language passages, renderings, transcriptions, audio files, item sets, information regarding the origin of the target-language passages, and copyright permissions for use of the target-language passages.
Passage
The written or spoken text on which the test items are based. For reading tests, passages consist of printed text in the target language as it is customarily written. For listening tests, passages are audio files as they will be heard by examinees.
Proprietary Information
All information and any idea in whatever form, tangible or intangible, pertaining in any manner to the business of the Government or the Contractor or Subcontractor, which was produced by any Contractor or subcontractor employee in the course of the employees’ employment or otherwise produced or acquired by or on behalf of the Government.
Rendering
A rendering is a coherent communication in English of the target language passage. The English text follows, as closely as possible, the lexical and grammatical structure of the target language, yet also adheres to rules of English grammar. Explanations in English are provided for target language meanings, words, and/or grammatical structures rendered that are unfamiliar to a native-speaker of English.
Test Item The task for which the examinee provides a response, and the means for evaluating the response. For a multiple-choice test: one stem (i.e., question) and four response choices.
Item Set The combination of orientation statement, target language passage, English rendering, all related stems, and all options (MC only) or key ideas and credit scheme (CRT only).
Target Language The language being tested.
Range of Passages Number of passages required per language, per level and skill.
Multiple-Choice
A multiple-choice (MC) item contains a stem and a set of options.
Examinees are required to select the best answer or answers from the set of options. In the context of DLPT5 tests, an MC item contains a stem and 4 options, one of which is the best answer or key to the question posed.
Constructed- Response
A constructed-response (CR) item contains a stem and requires examinees to generate their own response. In the context of DLPT5 test items, the response can range from a short phrase to a couple of short sentences. A list of potential Key Ideas is developed for scoring, and a Credit Scheme is included to show scorers what is required.
C.5. TASKS AND TECHNICAL REQUIREMENTS
C.5.1. Development of DLPT5 Items.
C.5.1.1. The contractor shall develop and submit target-language passages, DLPT5 test items, English renderings, and ILR ratings for DLPT5s in any language requested by the government.
C.5.1.2. The Contractor shall follow the item development specifications and language-specific information about accent, dialect, and typeface/font provided by DLIFLC. The Contractor shall also follow the specifications listed in the ILR descriptors and Child’s text mode for ILR rating of the target-language passages and items. (See Technical Exhibit 6.)
C.5.2. Item development team and qualifications.
C.5.2.1. The Contractor shall employ a qualified and experienced item development team to perform all required work and tasks involved in the contract. The team may include but not be limited to the following personnel: Target Language Experts (TLEs), Item Writers, Editors, and Project Managers.
C.5.2.2. The Contractor shall submit documentation of the qualifications for all team members listed in section C.5.2.1. to the Government for approval, which may include resumes and/or curriculum vitae.
C.5.2.3. Target Language Proficiency. TLEs must be proficient at an ILR level equivalent to level 4 or above in reading and listening in the target language. For Arabic dialects, TLEs must possess local socio-cultural knowledge and demonstrate the speaking and listening proficiency level of a native speaker specific to the dialect of the target country.”
C.5.2.4. English Language Proficiency. TLEs must be proficient at an ILR level equivalent to level 3 or above in listening, reading, and writing in English.
C.5.2.5. Item Writing Experience. Item writers must have at least 2 years of experience in item writing for language proficiency testing. Familiarity with the ILR scale is preferred.
C.5.2.6. English Editor Qualifications. The Contractor shall employ qualified English Editors as part of the item development team. The English Editors must have expertise in English grammar, usage, and mechanics.
C.5.2.6.1. English Editor Editing Experience. An English Editor must have at least two years of formal/systematic English editing experience.
C.5.2.7. The Contractor’s item development team must be technologically capable of searching the Internet, using Microsoft Office applications and simple database programs, and entering text and audio into Domino.
C.5.2.8. Item development team must be technologically capable of recording and editing sound files using software.
C.5.2.9. Key Personnel: The following personnel are considered key personnel by the Government: The contractor shall provide a Project Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer.
The project manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The project manager or alternate shall be available between 8:00 a.m. to 4:30p.m. PDT, Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below in section C.5.2.10. The Contractor shall submit documentation of the qualifications of the Project Manager(s) for Government approval, which may include resumes and/or curriculum vitae.
C.5.2.10. Project Manager(s) Experience. Project Managers must have at least five years of experience in item writing for language proficiency testing. Familiarity with the ILR scale is preferred. Project Managers must also have at least two years of experience in item development project management.
C.5.3. Item Development.
C.5.3.1. Multiple-Choice, Reading Comprehension
The Contractor shall provide the required number of reading passages and multiple-choice items as summarized in the table below. Passages and items shall conform to item development specifications.
Reading Comprehension Specifications
ILR Level Max. Length of a Passage (in words)* Range of Items per Passage / Desired
06 Up to 60 1 10 Up to 100 1– 2 / 2 16 Up to 100 1– 2 / 2 20 Up to 300 2-4 / 3 26 Up to 300 2-4 / 3 30 Up to 450 3-4 / 4 36 Up to 450 4-5 / 5 40 Up to 550 4-5 / 5
*Note: The number of words refers to the number of words in the English rendering of the passage (this is so as not to have large differences between agglutinating and isolating languages). Refer to C.5.4.5. for more details regarding the rendering.
Listening Comprehension Specifications
ILR
Level
Max. length of a Passage (seconds):
(monologues/dialogs*)
Range of Items per Passage
06 20 30 1 10 30 45 1 16 45 60 1–2 20 60 80 2 26 80 100 2 30 100 120 2 36 120 140 2-3 40 140 160 2-3
*Note: Dialogs refer to passages that contain at least two clearly identifiable voices, both of which contribute substantively to the core content of the passage.
C.5.4. Test Material Requirements.
C.5.4.1. The Contractor is required to provide passages and items that conform to the specifications and criteria defined by the Government in the technical exhibit documents and during the orientation session.
C.5.4.2. Items submitted by the contractor that do not conform to the specifications and criteria defined by the Government will be rejected.
C.5.4.3. The Contractor is solely responsible for submitting the required number of passages and/or items in accordance with the delivery schedule by 10:00 AM, Pacific Standard Time
(PST).
C.5.4.4. Copyright permission must be obtained from the content owner. Proof of secured copyright permission for each passage, or in lieu of permission, evidence of attempts to obtain permission from the rights holder, shall be included in a separate document and submitted to the COR with each batch delivery. The first request for obtaining copyright permission should be sent to the owner of the material at least two weeks before the scheduled batch delivery date.
C.5.4.5. The Contractor shall provide an English rendering for each target language passage. The rendering must be a coherent communication in English of the target language. The English text must follow, as closely as possible, the lexical and grammatical structure of the target language, yet also adhere to rules of English grammar. Explanations in English shall be provided for target language meanings, words, and/or grammatical structures rendered that are unfamiliar to a native speaker of English. Cognates and borrowings from English shall be marked as [REC]; idioms shall be translated literally and their meaning shall follow in brackets. (See Technical Exhibits 13 and 14 for detailed guidance.)
C.5.4.6. The Contractor shall provide an orientation statement in English for each listening and reading passage. (See Technical Exhibits 15 and 16 for Rules for Writing Items.) For listening items, the contractor is not required to provide spoken orientation statements and shall not add spoken orientation statements as part of the item sound file.
C. 5.4.7. The Contractor shall provide complete and accurate written transcriptions of the original audio texts.
C.5.4.8. For Listening Comprehension passages at Level 06, Level 10, and Level 16, ", a maximum of 50%, per language, of listening passages may be produced in a recording studio using unscripted scenarios developed by the item development team.
Authentic or authentic-edited passages are required for all other levels.
C.5.4.9. For Reading Comprehension passages at Level 06, Level 10, and Level 16 , a maximum of 50%, per language, of reading passages may be purpose-written texts created by the item development team.
Authentic or authentic-edited passages are required for all other levels.
C.6. Audio Files.
C.6.1. Sound clarity, background noise, and interference in audio files shall follow and conform to the specifications listed in the ILR descriptors. (See Technical Exhibit 6.)
C.6.2. Audio files shall be extracted from the Internet, radio, television, or recordings of live discourse intended for communicative purposes.
C.6.3. All audio shall be free of any static or gaps in the audio. Authentic content may include background music, or other noise, which is factored into the assessment of the level. No video files are permitted, however, the audio portion of a video clip may be used if it is a good quality recording and the understanding or meaning of the content does not rely on the video. All audio passages shall play within a specific volume range. All audio files will be two‐channel, stereo audio and the two tracks will be in‐phase. The peak audio level will be no lower than ‐24 dB (decibels) and no higher than ‐6 dB, there will be no clipped peaks, and any DC offset (common in iPod recorded audio) will be removed. Equalization should be flat with no bass boost added.
All audio materials shall contain an audio check to ensure proper volume.
C.6.5. Test Material Delivery.
C.6.5.1. The Contractor shall deliver test material in electronic format, using a Content Management System, DOMINO, administered by the Government.
C.6.5.2. The government Content Management System, DOMINO will be accessible by individual user login account for adjudicated Contractor parties.
C.6.5.3. Test material shall be posted to the Content Management System, DOMINO by the Contractor as submissions for Government review.
C.6.5.4. For listening comprehension passages, the Contractor shall submit one audio file per item set of the passage in Wav format for the initial submission and subsequent resubmissions.
C.6.6. For reading comprehension passages that are taken from an authentic source, the Contractor shall submit the source passage.
C.6.6.1. Items that are rejected by the Government can be revised and replaced by the Contractor within 30 business days of receipt of feedback.
C.6.6.2. The Government shall allow the Contractor one (1) opportunity to resubmit or replace an item, and/or item set that was rejected by the Government. In such an instance, the Contractor shall resubmit or replace the rejected item and/or item set within 30 business days of receipt of Government feedback. For resubmitted items and replaced items, the Government is not bound to the 60-day feedback commitment. Any resubmitted or replaced item and/or item set that is rejected by the Government shall be removed from the Contract. The Contractor may deliver more items than the total number of items rejected so long as the number of additional items delivered does not exceed 20 percent (20%) of the total number of rejected items.
C.6.6.3. All items scheduled for a given deadline shall be delivered as specified in the Delivery Schedule (See Technical Exhibit 1). The Contractor may deliver more items than the total number of items specified in the Delivery Schedule so long as the number of additional items delivered does not exceed 5 percent (5%) of the total number of items specified in the Delivery Schedule.
C.7. DELIVERABLES
C.7.1. Pre-performance Meeting.
A meeting, in person or by telephone, between the Government and the Contractor will take place within ten (10) business days of the award of the contract. At the meeting, the two parties will review contract deliverables, proposed milestones, and implementation issues.
C.7.2. Additional Meetings.
Additional meetings, in person or by telephone, between the Government and the Contractor may take place as needed to review contract deliverables, proposed milestones, and implementation issues. The need for such meetings will be determined by the Government and the Contracting office.
C.7.3. Procedural Orientation for Base Period.
Upon contract award, the Contractor shall coordinate with the Government to send key item development personnel (a minimum of 3 and a maximum of 20 personnel) to attend an initial orientation session lasting a minimum of three to a maximum of five (5) business days. Date and location of orientation session will be discussed, and the Government will make the final decision on the date and location. All attendees must attend 100% of the orientation. The initial orientation session will be completed no later than 45 business days after contract award. The session includes procedural orientation, ILR text typology norming, introduction to DLPT5 item-writing guidelines, and detailed explanation of test specifications and technical exhibits. These Contractor members will then provide the same orientation information to any additional members of item development teams at the Contractor’s site. The Contractor shall take notes throughout the entire orientation session and then provide the Government a copy of those notes within seven (7) business days after the orientation session ends.
One additional session with contract item development personnel may be conducted via telephone, on site or using Web conferencing tools if the Government determines that additional extensive discussion of test development issues is needed.
C.7.3.1. Procedural Orientation for Option Period.
Orientation for the Option Periods is not mandatory. The orientation will only be held if deemed necessary by the Government and the Contractor: Upon start of option periods, the Contractor shall coordinate with the Government, if orientation is necessary, to send key item development personnel (a minimum of 3 and a maximum of 20 personnel) to attend an orientation session a lasting a minimum of three to a maximum of five (5) business days. Date and location of orientation session will be discussed, and the Government will make the final decision on the date and location. All attendees must attend 100% of the orientation. The orientation session will be completed no later than 45 business days after start of option period. The session includes procedural orientation, ILR text typology norming, introduction to DLPT5 item-writing guidelines, and detailed explanation of test specifications and technical exhibits. These Contractor members will then provide the same orientation information to any additional members of item development teams at the Contractor’s site. The Contractor shall take notes throughout the entire orientation session and then provide the Government a copy of those notes within seven (7) business days after the orientation session ends.
One additional session with contract item development personnel may be conducted via telephone, on site or using Web conferencing tools if the Government determines that additional extensive discussion of item development issues is needed.
C.7.4. Documentation of processes.
The Contractor shall submit documentation for item development and quality control within 45 business days of contract award for Government approval.
C.7.4.1. Item Development Process.
The Contractor shall submit a flowchart or narrative detailing the process it will use to develop passages, renderings, and items. The Contractor shall submit a checklist that reflects these processes.
C.7.4.2. Quality Control Plan.
The contractor shall implement a quality control plan (QCP) at the beginning of the period of performance (POP) and maintain the plan throughout the POP. The initial plan shall be submitted to the Contracting Officer for review and approval no later than forty-five (45) business days after contract award. All revisions shall be subject to written approval by the Contracting Officer, upon receipt of which the contractor shall document and record the plan number, distribute revised plans and communicate changes to affected contractor and Government personnel. The contractor shall furnish all changes to the Contracting Officer and the appropriate Contracting Officer’s Representative (COR) at least three (3) business days prior to the effective date of the change.
The contractor’s QCP shall establish performance indicators to ensure deliverables are within established tolerance limits. Initial quality control requirements will be administered by the Project Manager. QCP shall include:
C.7.4.2.1 Performance Indicators (e.g., management goals relative to cost, schedule, and quality of technical and administrative service provided) C.7.4.2.2 Inspection and test methods (e.g., accepted techniques and procedures) C.7.4.2.3 Deficiency identification (e.g., areas exceeding acceptable tolerance limits) C.7.4.2.4 Deficiency correction (e.g., establishes and implements corrective actions) C.7.4.2.5 Documentation and en-forcement (e.g., document/enforce corrective actions) C.7.4.2.6 Trend analysis (e.g., evaluates and record trends in performance results) C.7.4.2.7 Surveillance methods (e.g., collect real time, on-line performance metrics) C.7.4.2.8 Customer complaint program (e.g., respond to valid customer complaints)
The QCP shall be the basis of the contractor’s Quality Control (QC) Program, a basic tenet of which shall be continuous quality improvement. The QCP shall also:
C.7.4.2.9 QC staff should be independent of the contractor’s production and supervisory staff and to report directly to management.
C.7.4.210 Contain methods of direct and indirect communication with the Government regarding performance, to include regular and formal meetings with the Government, review and analyses of key process indicators, analyses of process deficiencies, and problem resolution.
C.7.4.2.10. Contain process control and process performance measurement procedures to include how the contractor plans to effect preventive actions and corrective actions, as opposed to reliance on Government or customer identification of deficiencies prior to resolving the problem.
C.7.4.2.11. Contain a customer issue tracking ticketing system for identification and correction of validated complaints and to provide feedback.
C.7.4.2.12 Establish procedures to document and record all inspections or tests conducted by the contractor and any corrective actions taken, and their effectiveness, during the performance period.
The Contractor shall submit a QCP to the Contracting Officer within Forty-five (45) business days of award.
The Contracting Officer shall review and approve/disapprove the QCP within 15 business days of submission.
C.7.4.3. Item Development.
The Contractor shall deliver passages, renderings, orientations, and items according to the tables in paragraphs C.5.3. above in accordance with schedules established by the Test Development Division at DLIFLC. (See Technical Exhibit 1: Delivery Schedule.)
C.7.4.4. Quality Control Documentation for Item Development.
For each item delivered, the Contractor shall submit the quality-control documentation for that item, including the quality-control documentation for the passage when the item is delivered.
Quality-control documentation shall include, at a minimum, the review checklists that were approved in the Quality Control Plan. The completed checklists shall indicate whether the item has successfully passed all contractor-required stages of review.
C.7.4.5. Inventories of Test Material.
The Contractor shall submit monthly inventory reports of test material, following Government specifications.
C.7.4.6 Certificates of Destruction or Transfer of Test Materials.
The Contractor shall submit written certification that all test material have been cleared as defined in US DoD 5220. 22-M, Clearing and Sanitization Matrix, and that all electronic data pertaining to DLPT materials were wiped from the Contractor’s servers and backups at the conclusion of the period of performance.
C.7.4.7. Contract Monthly Status Reports.
The Contractor shall submit by the 10th of each following month, a report for the prior month listing all pertinent contract activities/deliverables accomplished, planned activities for the following month, issues encountered, and any other information pertinent to each task order.
C.7.5. Schedule of deliverables.
C.7.5.1. Refer to Technical Exhibit 1 issued with each Task Order Request (TOR) for a detailed schedule. All passages and corresponding items must be at the same ILR level. Any item that is not rated at the same ILR level as the passage will be rejected.
C.7.5.2. Test Items and quality control checklist shall be delivered per the scheduled delivery dates per Technical Exhibit 1.
C.7.5.3. All items scheduled for a given deadline shall be delivered as specified in the Delivery Schedule (See Technical Exhibit 1).
C.7.5.4. Passages and items will be reviewed by the Government per the Review Criteria. (See Technical Exhibits 17 & 18) The Government will provide feedback within 60 business days.
The 60-day period shall begin one day after delivery.
C.7.5.5. Items submitted other than those listed on the delivery schedule shall not be bound to the 60-day feedback commitment, this includes resubmitted items.
C.7.6. Security of Deliverables:
C.7.6.1. The Contractor shall employ personnel and shall implement procedures to safeguard the security and confidentiality of all deliverables. The Contractor shall comply with Army Regulation 611-5 (2015 revision), paragraphs 3-1 and 3-2. See https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/r611_5.pdf
C.7.6.2. See DFARS 252.227-7020 for license rights requirement related to all deliverables under this contract.
C.7.7 General Security:
C.7.7.1. Adjudicated Access to Government Network Information System (if required).
Designated Contract employees who require adjudicated access to the network information system must be able to favorably pass a federal background investigation.
The level of investigation will be commensurate with the appropriate level of IT privileges.
C.7.7.2. The COR will provide the contractor with security worksheet for the Contract employee will complete and return the security worksheet to the COR. The COR will then submit the completed security worksheet to the Government Security Office.
C.7.7.3. Once the security office receives the worksheet; contact will be established with the contract employee. Proof of US citizenship or legal status will be requested from the contract employee. If the contract employee is unwilling to provide, the process will cease. Personnel without US-issued social security numbers will not be investigated.
C.7.7.4. Security initiates the investigation request. The contract employee will be provided instructions for completion of the security questionnaire via email.
C.7.7.5. Contract employees will be directed to a fingerprinting location based on the employees’…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .