Attachment 6 QASP.pdf
PDF 166 KB Posted
- Solicitation number
- W91GDW-10-R-8002
- Issued by
-
Department of the Army
About this file
Attachment 6 QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A 3.pdf | ||
| Q A 2.pdf | ||
| W91GDW-10-R-8002 Amendment 0002.pdf | ||
| KRG LNO PWS 16 Nov Revision 1.pdf | ||
| Questions and Answers 1.pdf | ||
| W91GDW-10-R-8002 Amendment 0001.pdf | ||
| W91GDW-10-R-8002.pdf | ||
| Attach 2 MNF-I OVERARCHING FRAGO 09-109 Complete.pdf | ||
| Annex D Alt 1.xls | XLS spreadsheet | |
| Attachment 1 KRG LNO PWS 16 Nov.pdf | ||
| Attachment 5 PPQ .docx | DOCX document | |
| Important Information to Offerors.pdf | ||
| Attachment 3 Frago 09-1451 Mod.pdf | ||
| Attachment 8 dd0250.pdf | ||
| Annex C - Alt 1.ppt | PPT presentation | |
| ATTACHMENT 7-EFT Forms.doc | DOC document | |
| Attachment 4 PAST PERFORMANCE CONTRACT REFERENCE.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE
PLAN (QASP)
Applicable for
W91GDW-10-R-8002
KURDISTAN REGIONAL LNO
PERSONAL SECURITY DETAIL
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the
Government receives the quality of services called for in the contract and that the
Government only pays for the acceptable level of services received. The amount of surveillance required should be the minimum amount necessary to ensure conformance with contract requirements. This QASP is a living document and should be updated accordingly throughout the life of the contract.
This plan uses periodic inspection, and customer complaints to evaluate the services the
Contractor is required to furnish. This surveillance assures the Government that the
Contractor’s performance is acceptable.
The methods of surveillance recognize that unforeseen and uncontrollable problems and issues do occur. COR’s expected to be objective, fair, and consistent in evaluating
Contractor performance against the standards.
Effective management and use of a contractor generated quality control plan will allow the Contractor to operate within the specified surveillance requirements.
2. AUTHORITY
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in this contract to be accomplished by the Contracting
Officer or his duly authorized representative.
3. SCOPE
To fully understand the roles and the responsibilities of the parties, it is important to first define the distinction in terminology between the Quality Control Plan and the Quality
Assurance Surveillance Plan. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract. The Contractor develops and submits his Quality Control Plan (QCP) for
Government approval in compliance with his contract deliverables. Once accepted, the
Contractor then uses the QCP to guide and to rigorously document the implementation of the required management and quality control actions to achieve the specified results. The
QASP on the other hand, is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s QCP. The Government may provide the
Contractor an information copy of the QASP as an Attachment to the solicitation to support the Contractor’s efforts in developing a QCP that will interrelate with the
Government’s QAS
4. GOVERNMENT RESOURCES
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.
Contracting Officer Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of designation.
5. RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this
QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the
Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance
Contracting Officer Representative (COR) - The COR is responsible for technical administration of the project and assures proper Government surveillance of the
Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.
6. METHODS OF QA SURVEILLANCE
The below listed methods of surveillance shall be used in the administration of this
QASP.
Customer Feedback – Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR.
The COR shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file. The COR shall also keep the tabulated results of all customer satisfaction surveys on file and shall enter the summary results into the Surveillance Activity Checklist.
Periodic inspections may occur on a pre-determined basis (e.g. daily, weekly, monthly) as determined by the COR. The results of periodic inspections may be used as the basis for negative or positive report documentation.
100% inspections may occur each time a deliverable is due. The results of 100% inspections may be used as the basis for negative or positive report documentation.
7. IDENTIFIED COR SURVEILLANCE TASKS
The following PBSC item is identified within the contract Performance Work Statement and is to be monitored under this QASP.
Performance Requirements Matrix – Performance Standards PWS Task
Performance
Standard
Acceptable
Quality Level
Method of Surveillance
No later than the third day of each month, provide actual fuel consumption for contractor owned vehicles for the preivious month (Para
5.1.1.1)
100% 95% of the time 100% Inspection
Each quarter, provide fuel use
“estimates” (Para 5.1.1.2)
100% 95% of the time 100% Inspection
All personnel shall be available within two (2) hours of notification of movement
(Para 6.1.2.1)
100% 95% of the time 100% Inspection
The contractor shall have a set of procedures in place to deal with emergency situations.
(Para 6.1.8)
100% 100% of the time (no deviation)
Periodic Inspection
Maintain the capability, licensing, and requirements to operate throughout all areas of the Kurdistan Region of Iraq, Mosul, Kirkuk, and the Diyala
Provinces. (Para 6.2.2)
100% 100% of the time (no deviation)
Periodic Inspection
Quality Control Procedures
(Para 6.2.3)
100% 98% of procedures are current and effective
Periodic Inspections
Customer Complaints
Monthly Program
Management Reports (Para
7.1)
100% 100% of the time (no deviation)
100% Inspection
In all cases, surveillance shall not be so intrusive as to impact the Contractor’s successful accomplishment of the mission.
8. DOCUMENTATION
The COR will, in addition to providing documentation to the Contracting
Officer, maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of all Surveillance
Activity Checklists. All such records will be retained for the life of this contract. The
COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. UNACCEPTABLE PERFORMANCE
When performance is deemed unacceptable, the COR will so inform the Contractor’s on-site representative, or one of the Contractor managers. Disputes should be referred to the
Contracting Officer for resolution.
If any services do not conform to contract requirements, the Government may require the
Contractor to re-perform the services to conform with contract requirements at no increased cost to the government. When sub-par performance cannot be corrected by re-performance, the Government may:
• Require the contractor to take action necessary to ensure future performance conforms to contract requirements.
• By separate contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or:
Issue Letter of Concern
Issue Cure Notice
Issue Show Cause
Terminate the contract for government convenience
Terminate the contract for cause.
File details come from the government source that posted it. Updated .