A07_Attachment_1_Engineering_Change_Request_W91CRB-16-R-0010.pdf
PDF 76 KB Posted
- Attached to
- Vital Torso Protection - Full Rate Production Federal contract opportunity
- Solicitation number
- W91CRB-16-R-0010
About this file
This Engineering Change Request (ECR) form is used to request modifications to the Vital Torso Protection full rate production contract between the Army Contracting Command at Aberdeen Proving Ground and contractors. The ECR collects information on the proposed change such as the item and contract affected, cost and schedule impacts, and descriptions of the need for and corrective actions relating to the change. It requires signatures from the Contracting Officer's Representative, Administrative Project Manager, and Procuring Contracting Officer to approve minor, major, and critical changes respectively.
Attachment 1 - Engineering Change Request Form
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PM SPE ENGINEERING CHANGE REQUEST (ECR)
(Vendors – Complete Blocks 2 – 19 and Submit to PM SPE)
1. PM SPE CONTROL NUMBER
2. ORIGINATOR 3. ECR TYPE
a. TYPED NAME (First, Middle Initial, Last)
b. ADDRESS (Street, City, State, Zip Code)
RFD
RFW
4. CLASSIFICATION
5. TITLE OF ECR
6. ITEM DESIGNATION 7. PROCUREMENT ACTIVITY
8. BASELINE AFFECTED
a. MCN / NSN b. MODEL / DESIGN CODE
9. END ITEM NOMENCLATURE 10. CONTRACT NUMBER AND LINE ITEM
11. LOTS / MATERIAL AFFECTED
12. REOCCURING DEVIATION (if Yes, Provide CAR# in Block 12 & Status in Block 18)
13. EFFECT ON COST / PRICE
14. EFFECT ON DELIVERY SCHEDULE
15. OTHER SYSTEMS / CONFIGURATION ITEMS / INTERFACES AFFECTED
16. DESCRIPTION OF ECR
17. NEED FOR ECR
18. CORRECTIVE ACTION TAKEN
19. SUBMITTING ACTIVITY
a. TYPED NAME (FIRST, MIDDLE INITIAL, LAST)
c. SIGNATURE
b. TITLE / ORGANIZATION
d. DATE (YYYYMMDD)
PM SPE FORM 1 (ECR), JULY 15 Page 1
PM SPE CONTROL NUMBER
TITLE OF ECR
20. PM SPE JUSTIFICATION
21. ATTACHMENTS
22. COR (APPROVAL AUTHORITY FOR MINOR ECRS) / PM SPE TECHNICAL STAFF APPROVAL / DISAPPROVAL FOR MAJOR OR CRITICAL ECRS)
a. APPROVAL
b. SIGNATURE
c. DATE SIGNED
(YYYYMMDD)
23. APM APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR MAJOR ECRs)
24. PM SPE APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR CRITICAL ECRs)
PM SPE FORM 1 (ECR), JULY 15 Page 2
PM SPE CONTROL NUMBER
TITLE OF ECR
PM SPE FORM 1 (ECR), JULY 15 Page 3