This is Amendment 0008 to Solicitation W912WJ26RA007, issued by the W2SD ENDIST New England KO Contracting Division on February 5, 2026. The amendment provides government responses to four questions raised by offerors regarding the Request for Proposals (RFP) and does not extend the offer submission deadline.

The government clarified four technical and submission matters: (1) Drawing M-101 contains three louver locations with specified dimensions (10"x10" intake louver east of column line 17, and two exhaust louvers of 14"x10" and 14"x12" west of column lines 16 and 17, respectively), with corrected keynote text referenced on Sheet A-101; (2) Management Approach, Safety (EMR Rating), and Key Personnel submissions are optional and not required, but if included would be counted against the solicitation's page limitations in Volume 1; (3) the existing security systems for integration are Intrusion Detection: ICIDS V and Access Control: Hearst; and (4) the Contractor is responsible for identifying and obtaining all necessary state, local, and federal permits for the work, with references to specifications section 02 82 00 ASBESTOS REMEDIATION as an area where permits may be required. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
W912WJ26RA007 - Solication.pdf PDF
Amendment 0002.pdf PDF
Amendment 0004.pdf PDF
Amendment 0001.pdf PDF
Amendment 0003.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

Miscellaneous text in this section has been modified to:

AMENDMENT 0008

1. Drawing M101 shows only two of the louvers and they are shown in a different location and sizes then on A101.

GOVERNMENT RESPONSE: 3 louver locations are shown on drawing M-101. See L1/M-101 for intake louver 10"x10" east of column line 17. See C1/M-101 for location of two louvers, 14"x10" west of column line 16, and 14"x12" west of column line 17. Sizes are correctly indicated on M-101.

On Sheet Keynote #3 on A-101, the corrected keynote text is "Install new 14"x10" exhaust louver.

Install bottom of louver at minimum height of 10'-0". Refer to specifications and mechanical sheets for further details"

2. For the submission, is our Managerial Approach, Safety (EMR Rating) and Key Personnel to be included in either Volume 1 or Volume 2?

GOVERNMENT RESPONSE: Management Approach, Safety (EMR Rating), and Key Personnel are not a required submission as part of this solicitation. Should an Offeror include this information as part of their proposal submission, it would be included in Volume 1 and would count against the page limitations cited in the solicitation.

W912WJ26RA0070008

3. For bidding purposes, please provide name or POC of existing security system for integration on this project.

GOVERNMENT RESPONSE: Intrusion Detection: ICIDS V

Access Control: Hearst

4. Please confirm if there are any state, local or federals permits required?

GOVERNMENT RESPONSE: The Contractor is responsible for identifying and obtaining all necessary permits for the work detailed in this RFP. To identify areas where permits or licenses may be required, refer to the specifications, such as section 02 82 00 ASBESTOS REMEDIATION.

W912WJ26RA0070008

IDCode: J
Page: 1
Pages: 3
AmendNo: 0008
EffDate: 05 FEB 2026
ReqNo:
ProjNo: 1970
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

ELIZABETH GLASGOW, EMAIL: ELIZABETH.K.GLASGOW@USACE.ARMY.MIL TELEPHONE: 978-318-8671 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26RA007
SolDate: 09 DEC 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: This amendment is issued to provide responses to Requests for Information (RFIs). All other terms and conditions remain unchanged.
ContNameTitle:
CoNameTitle: ERIN E. BRADLEY
ContDate:
CODate: 05 FEB 2026

File details come from the government source that posted it. Updated .