This is Amendment 0004 to solicitation W912WJ26RA007, issued by the U.S. Army Corps of Engineers (USACE), New England District, on January 30, 2026. The amendment provides government responses to thirteen Requests for Information (RFIs) submitted by offerors regarding a construction renovation project. The amendment does not extend the offer receipt deadline, and all other terms and conditions remain unchanged.
The RFI responses address technical specifications and clarifications for the project, including: interior metal doors must meet Level 1 Standard Duty Door requirements with Level 2 continuously welded steel frames; wood doors require factory finish matching Wilsonart Boardwalk Oak 7983; door hardware specifications reference section 08 71 00 with specific function sets (F01, F02, F07) and finishes; no preferred manufacturers are required for STC-rated openings or doors and frames, which must simply meet contract document requirements; existing furniture must be removed and demolished prior to construction; no adjacent space working restrictions apply; temporary heating must be provided by the contractor during demolition when no mechanical systems operate; interior signage specified in section 10 14 00 is not required for this project; and the finish schedule for conference room 32 and offices 30A, 30B, and 30C north walls should be PNT1 (paint), not CPT1 (carpet). The contracting officer is Elizabeth Glasgow, and the amendment is administered by the KO Contracting Division in Concord, Massachusetts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0007.pdf | ||
| Amendment 0008.pdf | ||
| Amendment 0009.pdf | ||
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| W912WJ26RA007 - Solication.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Amendment 0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 4
0004 30 JAN 2026 1970
W912WJ
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
ELIZABETH GLASGOW, EMAIL: ELIZABETH.K.GLASGOW@USACE.ARMY.MIL
TELEPHONE: 978-318-8671
SCD: PAS:
W912WJ26RA007
09 DEC 2025
SEE SECTION G - CONTRACT ADMINISTRATION DATA
This amendment is issued to provide responses to Request for Information (RFIs). All other terms and conditions remain unchanged.
ERIN E. BRADLEY
28 JAN 2026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
Miscellaneous text in this section has been modified to:
Amendment 0004 RFIs
1. Can the government clarify if submission of Section 00 45 00 - Representations and Certifications is required with the proposal, or if current and active SAM.gov Representations and Certifications satisfy the solicitation requirements? If required, please indicate where the completed Section 00 45 00 should be included in the proposal.
GOVERNMENT RESONSE: See response to Amendment 2 Question 15. If submitting with proposal, it should be included in Volume II.
2. Can the government confirm whether a brief introductory page to the Past Performance Narratives is permitted within Volume I, provided it is within the 20-page limit?
GOVERNMENT RESONSE: Offerors can include any pages they wish provided it remains within the 20-limit specified in the solicitation.
3. Hollow Metal Doors: A specification has been provided but does not narrow down the requirements for this project. Please provide the required properties for interior and exterior doors & frames (A-40/A-60, KD, Face Welded or Continuously Welded, Door core, etc.).
GOVERNMENT RESONSE: Exterior door frames are not required for this project. Interior metal doors and frames: Provide Level 1 Standard Duty Doors. (08 11 13 - 2.1.1.1). Provide Level 2 steel frames, Continuously welded frames (08 11 13 = 2.6, 2.6.1).
4. Is De La Fontaine an approved manufacturer for hollow metal doors and frames?
GOVERNMENT RESONSE: Door manufacturer approval is not a requirement of the specifications. Doors and frames must meet the requirements of the contract documents.
5. Wood Doors: What is the required veneer, species, and finish?
GOVERNMENT RESONSE: Wood doors are to be factory finished, match manufacturer Wilsonart Boardwalk Oak 7983. (See Drawings; Sheet I-001 Note 6).
6. The STC rated openings need to be supplied as complete assemblies. Please provide your preferred manufacturers for these units.
GOVERNMENT RESONSE: There is no requirement for a preferred manufacturer.
7. Door Hardware: Please provide manufacturer item numbers and finishes required to complete the hardware schedule on Drawing A-601.
GOVERNMENT RESONSE: USACE does not specify manufactured products. For door hardware, Hinges: See (08 71 00 - 2.3.1), Mortise Locks and Latches (08 71 00
- 2.3.5.1). Hardware Set 1 Function F01. Hardware Set 2 Function F02. Hardware Set 3, Function 07 w/ Cypher Lock. Hardware Set 4, Function F07.Hardware Set 5, Function F07. For finishes see (08 71 00 - 2.5)
8. Are there any existing furniture/equipment that needs to be removed by the contractor prior to demolition?
GOVERNMENT RESONSE: Yes, existing furniture will need to be removed and demolished (Sheet note #8, AD101).
9. Are there any existing furniture/equipment that needs to be relocated or removed and reinstalled upon completion of the renovation?
GOVERNMENT RESONSE: No.
10. Are there any working restrictions with the occupied spaces adjacent to the work area?
GOVERNMENT RESONSE: No.
11. Will temporary heating/cooling be required during the construction activities?
GOVERNMENT RESONSE: Demolition will result in no heating or cooling in the work area. Contractor should provide temporary heating in the spaces as required to execute the work.
12. The Specifications include Section 10 14 00 Interior Signage. The drawings don't include a Signage Schedule. Is Interior Signage required?
GOVERNMENT RESPONSE: Interior signage is not required for this project.
13. Reference Attachment E Drawings Sample TO drawing sheet A-101 FINISH SCHEDULE: The Finish Schedule indicates Carpet (CPT1) Finish for the North Walls at Conference Room 32, Work Room 30A, Office 30B and Office 30C. Is that correct?
GOVERNMENT RESPONSE: North wall of rooms 32, 30A, 30B, and 30C finish will be PNT1, not CPT1.