This document contains an amendment to a solicitation for design-build services for the Vandenberg Gate Complex project. The amendment provides responses to request for information questions from potential offerors. It clarifies that the due date and time for phase one proposals can be found in block 13A of the SF1442, and that an offeror who previously provided technical data for the project is not restricted from participating but must disclose any organizational conflicts of interest. It confirms that experience with other federal agencies satisfies the technical evaluation criteria, though experience with the Army Corps of Engineers or Department of Defense projects would be considered more relevant. No other substantive changes were made to the solicitation terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Part 4_PerformanceTechnicalSpecifications.pdf | ||
| District Design Manual.pdf | ||
| Part2_GeneralRequirements.pdf | ||
| W912WJ20R0001_Solicitation.pdf | ||
| Part5_Attachments.pdf | ||
| Part 3_ProjectProgams-14Apr2020.pdf | ||
| Cover_TOC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide responses to Request for Information (RFIs). All other terms remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20R0001
X 9B. DATED (SEE ITEM 11)
30-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-May-2020
CODE
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ20R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0001 RFI
1. It is understood that this project is a two phase Design-Build solicitation. We are having difficulty determining the Phase 1 Proposal date and time for submission. Please clarify.
GOVERNMENT RESPONSE: Please reference box 13A. of the SF1442 for due date and time of proposal.
2. Please confirm that a vendor who provided any technical data in the Part 5 Attachment is not restricted from participating as a team member for an Offeror.
GOVERNMENT RESPONSE: If an offeror or proposed Team Member currently provides, or has provided services associated with the Vandenberg Gate Complex project within the past 10 years, such offeror must provide the Government with a statement that identifies the current or past work or affiliation, when it occurred, and substance of the work sufficient to allow the Government to determine if an organizational conflict of interest exists. If the offeror has an organizational conflict of interest, it should also present its plan to avoid, minimize or mitigate the conflict: such plan would be considered part of the offeror’s proposal. If an offeror has an organizational conflict of interest that cannot be avoided, minimized or mitigated, the contract award will be withheld from the apparent successful offeror.
Offerors who have had no past affiliation with, or who have performed no work associated with the Vandenberg Gate Complex within the past 10 years must furnish a certificate from an officer of the Offeror (such as President, Vice President, Managing Member of LLC, Owner) to that effect. The statement or certification should be submitted as a separate document along with, but not included in, either volume of the offeror’s proposal. An Offeror that fails to provide either statement or certification, as applicable, may be deemed non-responsible and the proposal will be rejected. The procedure for reviewing any organizational conflict of interest will be in accordance with FAR Part 9.5 et seq.
3. On page 6 of 100 in the SF1442, under Factor 1 – Technical Experience, the second bullet paragraph contains this sentence “Demonstrates Design-Build experience related to Access Control Points (or Entry Control Points) with multiple buildings/structures for Department of Defense Military installations, designed and constructed in accordance with UFC and UFGS criteria”.
Below this bullet paragraph, there is also a note which states “NOTE: Projects completed for the U.S. Army Corps of Engineers may be considered more relevant than those completed for other U.S. Federal Government agencies or private entities.”.
Based on this information, an Offeror may demonstrate the required Access Control Point experience designing and/or installing Active and Passive Vehicle Barriers with other U.S. Federal Government agencies, although projects on USACE and Military DoD locations may be considered more relevant. Please confirm.
GOVERNMENT RESPONSE: Correct.