Cover_TOC.pdf

PDF 174 KB Posted

Attached to
DESIGN-BUILD VANDENBERG GATE COMPLEX
Solicitation number
W912WJ20R0001
Issued by

About this file

This document package includes a request for proposal for a design-build project and related attachments. The U.S. Army Corps of Engineers, Engineering District New England is soliciting proposals for the design and construction of a new Vandenberg Gate Complex at Hanscom Air Force Base in Lincoln, Massachusetts. The project includes constructing a new visitor center, commercial vehicle inspection facility, gatehouse, and other site improvements to improve traffic flow and bring the base entrance up to current anti-terrorism standards. The RFP includes requirements for site work, building systems, engineering specifications, sustainable design criteria, and other project details. Proposers must meet submission requirements and performance standards outlined in the various contract sections and technical specifications.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Part 4_PerformanceTechnicalSpecifications.pdf PDF
District Design Manual.pdf PDF
Part2_GeneralRequirements.pdf PDF
W912WJ20R0001_Solicitation.pdf PDF
Part5_Attachments.pdf PDF
Part 3_ProjectProgams-14Apr2020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912WJ20R0001

Design and Construct Vandenburg Gate Complex

Hanscom Air Force Base

Lincoln, Massachusetts

Design-Build Request for Proposal

September 2019

RFP for Design-Build Vandenberg Gate Complex Hanscom Air Force Base – Massachusetts

TABLE OF CONTENTS

PART 1 – PROPOSAL FORMS & DOCUMENTS (To Be Submitted by Contractor)

PART 2 – GENERAL REQUIREMENTS

SECTION 01 11 00 SUMMARY OF WORK

SECTION 01 22 00 MEASUREMENT AND PAYMENT

SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS

SECTION 01 32 01 PROJECT SCHEDULE

SECTION 01 33 00 SUBMITTAL PROCEDURES

SECTION 01 33 16 DESIGN DATA (DESIGN AFTER AWARD)

SECTION 01 33 29 SUSTAINABILITY REPORTING

SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

SECTION 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

SECTION 01 45 00.00 QUALITY CONTROL

SECTION 01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

SECTION 01 57 20 ENVIRONMENTAL PROTECTION

SECTION 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

SECTION 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

SECTION 01 78 00 CLOSEOUT SUBMITTALS

SECTION 01 78 23 OPERATION AND MAINTENANCE DATA

SECTION 01 91 00.15 TOTAL BUILDING COMMISSIONING

SECTION 01 99 00 SUTAINABLE MANAGMENT SYSTEMS

PART 3 - PROJECT PROGRAM

1. PROJECT DESCRIPTION

1.1 GENERAL

1.2 DESIGN/DELIVERABLES

1.3 SPECIFICATIONS

1.4 CONSTRUCTION

1.5 SITE WORK

1.6 ADDITIONAL REQUIRED DOCUMENT SUBMITTAL FOR REVIEW

1.7 HVAC CONTROL REQUIREMENTS

1.8 CYBERSECURITY

2. PROJECT OBJECTIVES

2.1 MISSION STATEMENT

2.2 FACILITY FUNCTION

2.3 PROJECT SPECIFIC PRIORITIES

3. SITE ANALYSIS

3.1 EXISTING SITE CONDITIONS

3.2 NATURAL CONSTRAINTS

3.3 MAN MADE FEATURES

3.4 SITE DEVELOPMENT REQUIREMENTS

3.5 DD FORM 1354

3.6 VEHICULAR ACCESS AND CIRCULATION

3.7 AGENCY REVIEW

3.8 SITE OPTION ITEMS

4. BUILDING REQUIREMENTS

4.1 VISITOR CENTER (VC)

4.2 COMMERCIAL VEHICLE INSPECTION FACILITY

4.3 GATEHOUSE / ID CHECK

4.4 OVERWATCH

4.5 FUTURE MASSACHUSETTS BAY TRANSIT AUTHORITY MBTA BUS STOP

4.6 ANTITERRORISM MEASURES

4.7 SUSTAINABILE DESIGN REQUIREMENTS

5. ROOM REQUIREMENTS

5.1 GENERAL

5.2 INTERIOR SIGNAGE

5.3 INTERIOR FINISHES AND FURNITURE

5.4 ELECTRONIC SECURITY SYSTEMS

5.5 FINAL DENIAL VEHICLE BARRIER

5.6 SITE CAMERAS

5.7 EXTERIOR AND SITE LIGHTING

6. ENGINEERING SYSTEMS REQUIREMENTS

A10 FOUNDATIONS

B10 SUPERSTRUCTURE

B20 EXTERIOR ENCLOSURE

B30 ROOFING

C10 INTERIOR CONSTRUCTION

C30 INTERIOR FINISHES

D20 PLUMBING

D30 HVAC

D40 FIRE PROTECTION

D50 ELECTRICAL

E20 FURNISHINGS

F20 SELECTIVE DEMOLITION

G10 SITE PREPARATION

G20 SITE IMPROVEMENTS

G30 SITE CIVIL/MECHANICAL UTILITIES

G40 SITE ELECTRICAL UTILITIES

PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS

A10 FOUNDATIONS

B10 SUPER STRUCTURE

B20 EXTERIOR ENCLOSURE

B30 ROOFING

C10 INTERIOR CONSTRUCTION

C30 INTERIOR FINISHES

D20 PLUMBING

D30 HVAC

D40 FIRE PROTECTION

D50 ELECTRICAL

E20 FURNISHINGS

F20 SELECTIVE BUILDING DEMOLITION

G10 SITE PREPARATION

G20 SITE IMPROVEMENTS

G30 SITE CIVIL/MECHANICAL UTILITIES

G40 SITE ELECTRICAL UTILITIES

Z10 GENERAL PERFORMANCE TECHNICAL SPECIFICATION

PART 5 - ATTACHMENTS

A. GEOTECHNICAL REPORT

B. EXISTING UTILITY PLAN

C.1 BASE BID SITE PLAN

C.2 SIGN PLAN

C.3 UTILITY PLAN

D.1 EXISTING TRUCK INSPECTION SITE PLAN

D.2 BUILDING 1617 - EXISTING VISITOR CENTER

D.3 BUILDING 1620 - EXISTING GATE HOUSE

D.4 EXISTING COMMERCIAL INSPECTION AREA

E. ARCHITECTURAL PLANS & ELEVATIONS

F.1 MILCON SUSTAINABLE DESIGN SCORESHEET - COMMERCIAL VEHICLE INSPECTION

FACILITY

F.2 MILCON SUSTAINABLE DESIGN SCORESHEET - POV GATE HOUSE

F.3 MILCON SUSTAINABLE DESIGN SCORESHEET - VISITOR CENTER

G. HANSCOM AFB ARCHITECTURAL COMPATIBILITY PLAN

H. HANSCOM AFB ARCHITECTURAL COMPATIBILITY CHECKLIST

I. ENVIRONMENTAL ASSESSMENT REPORT

J.1 HAZARDOUS MATERIAL REPORT

J.2 HAFB ASBESTOS MANAGEMENT AND OPERATING PLAN

J.3 HAFB LEAD BASEED PAINT MANAGEMENT PLAN

K. DD FORM 1391

L. EXCAVATION REQUEST FORM

M. GANNETT FLEMING QUICK AND COMPREHENSIVE TRAFFIC STUDIES

N. DD FORM 1354

O. TOPOGRAPHIC SURVEYS

P. AIR FORCE LIFE CYCLE AND MANAGEMENT CENTER FORCE PROTECTION DIVISION

Q. EASEMENT AGREEMENT

R. DESIGN AND CONSTRUCTION AGREEMENT

Any references to IBC, other ICC-family codes or NFPA 101 in this document or its referenced documents are intended to indicate the 2015 edition and Massachusetts Ninth Edition (2015 IBC Amendments).

Cover
TOC
PART 1 – PROPOSAL FORMS & DOCUMENTS PART 2 – GENERAL REQUIREMENTS
PART 3 - PROJECT PROGRAM
PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS
PART 5 - ATTACHMENTS

File details come from the government source that posted it. Updated .