Cover_TOC.pdf
PDF 174 KB Posted
- Attached to
- DESIGN-BUILD VANDENBERG GATE COMPLEX
- Solicitation number
- W912WJ20R0001
About this file
This document package includes a request for proposal for a design-build project and related attachments. The U.S. Army Corps of Engineers, Engineering District New England is soliciting proposals for the design and construction of a new Vandenberg Gate Complex at Hanscom Air Force Base in Lincoln, Massachusetts. The project includes constructing a new visitor center, commercial vehicle inspection facility, gatehouse, and other site improvements to improve traffic flow and bring the base entrance up to current anti-terrorism standards. The RFP includes requirements for site work, building systems, engineering specifications, sustainable design criteria, and other project details. Proposers must meet submission requirements and performance standards outlined in the various contract sections and technical specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Part 4_PerformanceTechnicalSpecifications.pdf | ||
| District Design Manual.pdf | ||
| Part2_GeneralRequirements.pdf | ||
| W912WJ20R0001_Solicitation.pdf | ||
| Part5_Attachments.pdf | ||
| Part 3_ProjectProgams-14Apr2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912WJ20R0001
Design and Construct Vandenburg Gate Complex
Hanscom Air Force Base
Lincoln, Massachusetts
Design-Build Request for Proposal
September 2019
RFP for Design-Build Vandenberg Gate Complex Hanscom Air Force Base – Massachusetts
TABLE OF CONTENTS
PART 1 – PROPOSAL FORMS & DOCUMENTS (To Be Submitted by Contractor)
PART 2 – GENERAL REQUIREMENTS
SECTION 01 11 00 SUMMARY OF WORK
SECTION 01 22 00 MEASUREMENT AND PAYMENT
SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS
SECTION 01 32 01 PROJECT SCHEDULE
SECTION 01 33 00 SUBMITTAL PROCEDURES
SECTION 01 33 16 DESIGN DATA (DESIGN AFTER AWARD)
SECTION 01 33 29 SUSTAINABILITY REPORTING
SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
SECTION 01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
SECTION 01 45 00.00 QUALITY CONTROL
SECTION 01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
SECTION 01 57 20 ENVIRONMENTAL PROTECTION
SECTION 01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
SECTION 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
SECTION 01 78 00 CLOSEOUT SUBMITTALS
SECTION 01 78 23 OPERATION AND MAINTENANCE DATA
SECTION 01 91 00.15 TOTAL BUILDING COMMISSIONING
SECTION 01 99 00 SUTAINABLE MANAGMENT SYSTEMS
PART 3 - PROJECT PROGRAM
1. PROJECT DESCRIPTION
1.1 GENERAL
1.2 DESIGN/DELIVERABLES
1.3 SPECIFICATIONS
1.4 CONSTRUCTION
1.5 SITE WORK
1.6 ADDITIONAL REQUIRED DOCUMENT SUBMITTAL FOR REVIEW
1.7 HVAC CONTROL REQUIREMENTS
1.8 CYBERSECURITY
2. PROJECT OBJECTIVES
2.1 MISSION STATEMENT
2.2 FACILITY FUNCTION
2.3 PROJECT SPECIFIC PRIORITIES
3. SITE ANALYSIS
3.1 EXISTING SITE CONDITIONS
3.2 NATURAL CONSTRAINTS
3.3 MAN MADE FEATURES
3.4 SITE DEVELOPMENT REQUIREMENTS
3.5 DD FORM 1354
3.6 VEHICULAR ACCESS AND CIRCULATION
3.7 AGENCY REVIEW
3.8 SITE OPTION ITEMS
4. BUILDING REQUIREMENTS
4.1 VISITOR CENTER (VC)
4.2 COMMERCIAL VEHICLE INSPECTION FACILITY
4.3 GATEHOUSE / ID CHECK
4.4 OVERWATCH
4.5 FUTURE MASSACHUSETTS BAY TRANSIT AUTHORITY MBTA BUS STOP
4.6 ANTITERRORISM MEASURES
4.7 SUSTAINABILE DESIGN REQUIREMENTS
5. ROOM REQUIREMENTS
5.1 GENERAL
5.2 INTERIOR SIGNAGE
5.3 INTERIOR FINISHES AND FURNITURE
5.4 ELECTRONIC SECURITY SYSTEMS
5.5 FINAL DENIAL VEHICLE BARRIER
5.6 SITE CAMERAS
5.7 EXTERIOR AND SITE LIGHTING
6. ENGINEERING SYSTEMS REQUIREMENTS
A10 FOUNDATIONS
B10 SUPERSTRUCTURE
B20 EXTERIOR ENCLOSURE
B30 ROOFING
C10 INTERIOR CONSTRUCTION
C30 INTERIOR FINISHES
D20 PLUMBING
D30 HVAC
D40 FIRE PROTECTION
D50 ELECTRICAL
E20 FURNISHINGS
F20 SELECTIVE DEMOLITION
G10 SITE PREPARATION
G20 SITE IMPROVEMENTS
G30 SITE CIVIL/MECHANICAL UTILITIES
G40 SITE ELECTRICAL UTILITIES
PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS
A10 FOUNDATIONS
B10 SUPER STRUCTURE
B20 EXTERIOR ENCLOSURE
B30 ROOFING
C10 INTERIOR CONSTRUCTION
C30 INTERIOR FINISHES
D20 PLUMBING
D30 HVAC
D40 FIRE PROTECTION
D50 ELECTRICAL
E20 FURNISHINGS
F20 SELECTIVE BUILDING DEMOLITION
G10 SITE PREPARATION
G20 SITE IMPROVEMENTS
G30 SITE CIVIL/MECHANICAL UTILITIES
G40 SITE ELECTRICAL UTILITIES
Z10 GENERAL PERFORMANCE TECHNICAL SPECIFICATION
PART 5 - ATTACHMENTS
A. GEOTECHNICAL REPORT
B. EXISTING UTILITY PLAN
C.1 BASE BID SITE PLAN
C.2 SIGN PLAN
C.3 UTILITY PLAN
D.1 EXISTING TRUCK INSPECTION SITE PLAN
D.2 BUILDING 1617 - EXISTING VISITOR CENTER
D.3 BUILDING 1620 - EXISTING GATE HOUSE
D.4 EXISTING COMMERCIAL INSPECTION AREA
E. ARCHITECTURAL PLANS & ELEVATIONS
F.1 MILCON SUSTAINABLE DESIGN SCORESHEET - COMMERCIAL VEHICLE INSPECTION
FACILITY
F.2 MILCON SUSTAINABLE DESIGN SCORESHEET - POV GATE HOUSE
F.3 MILCON SUSTAINABLE DESIGN SCORESHEET - VISITOR CENTER
G. HANSCOM AFB ARCHITECTURAL COMPATIBILITY PLAN
H. HANSCOM AFB ARCHITECTURAL COMPATIBILITY CHECKLIST
I. ENVIRONMENTAL ASSESSMENT REPORT
J.1 HAZARDOUS MATERIAL REPORT
J.2 HAFB ASBESTOS MANAGEMENT AND OPERATING PLAN
J.3 HAFB LEAD BASEED PAINT MANAGEMENT PLAN
K. DD FORM 1391
L. EXCAVATION REQUEST FORM
M. GANNETT FLEMING QUICK AND COMPREHENSIVE TRAFFIC STUDIES
N. DD FORM 1354
O. TOPOGRAPHIC SURVEYS
P. AIR FORCE LIFE CYCLE AND MANAGEMENT CENTER FORCE PROTECTION DIVISION
Q. EASEMENT AGREEMENT
R. DESIGN AND CONSTRUCTION AGREEMENT
Any references to IBC, other ICC-family codes or NFPA 101 in this document or its referenced documents are intended to indicate the 2015 edition and Massachusetts Ninth Edition (2015 IBC Amendments).
| Cover |
| TOC |
| PART 1 – PROPOSAL FORMS & DOCUMENTS PART 2 – GENERAL REQUIREMENTS |
| PART 3 - PROJECT PROGRAM |
| PART 4 – PERFORMANCE TECHNICAL SPECIFICATIONS |
| PART 5 - ATTACHMENTS |
File details come from the government source that posted it. Updated .