This federal contract solicitation seeks design-build proposals for the Vandenberg Gate Complex project at Hanscom Air Force Base. Key requirements include replacing the existing main entrance gate with a new access control facility that meets current antiterrorism standards and improves traffic flow. Offerors must design and construct permanent facilities such as a visitor control center, commercial vehicle inspection facility, and gatehouse/ID check areas in accordance with standards for high performance and sustainable building, antiterrorism, and security engineering. The selected contractor will provide design services, permitting, construction, and related infrastructure work. The completion date will be established upon award. Proposals are due by the specified closing date.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Part 4_PerformanceTechnicalSpecifications.pdf PDF
District Design Manual.pdf PDF
Part2_GeneralRequirements.pdf PDF
W912WJ20R0001_Solicitation.pdf PDF
Cover_TOC.pdf PDF
Part5_Attachments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART 3 – PROJECT PROGRAM

RFP for Design-Build Vandenberg Gate Complex Hanscom Air Force Base – Massachusetts

PART 3 – CHAPTER 1 / PROJECT DESCRIPTION

1. PROJECT DESCRIPTION

1.1 GENERAL

The “Project Program” consists of items 1 through 6 of Part 3 – Project Program. The project Scope of Work (SOW) includes the design and construction of the new Entry Control Facility (ECF) at the existing Vandenberg Gate. The new construction of the ECF is to replace the existing ECF; located at approximately the same area.

1.2 DESIGN/DELIVERABLES

The Design-Build Contractor (DB) will provide all architecture, engineering, planning and other design services, environmental investigations, geotechnical services, all permitting, engineering investigations including, but not limited to, establishment and verification of existing conditions, as well as the requisite materials and equipment. The DB Contractor shall be responsible for all design quality control, and material submittals. The Design provided is required to meet Unified Facilities Criteria and NFPA Life Safety Code.

The DB Contractor shall provide surveys prepared and provided to the COE in AutoCAD 2016.

The DB Contractor shall utilize Building Information Management (BIM) Software for this project.

The DB Contractor shall prepare and submit all Civil, Architectural, Structural and MEP/FP Design submissions, all Construction Document submissions and As-Built drawing with compatible AutoDesk products as described is Specification Section 01 33 16. Disregard the Microstation requirement as identified in Hanscom’s Architectural Compatibility Plan. Design submittals and final as-built shall be in .pdf format and shall be provided to the COE. All documents provided to the COE stated, shall be in both electronic and hard copy format.

The DB Contractor shall utilize the ProjNet program for all review comments to required design submittals.

As-Built drawings shall be prepared in accordance with the applicable provision of the “Tri-Service Architectural, Engineering, Construction (AE/C) Computer Aided Design and Drafting Standards (Release 6.0). Standard drawings size shall be 22 inches by 34 inches and the Government’s standard file-naming convention shall be used. A/E.C CAD Standards can be downloaded at https://cadbimcenter.erdc.dren.mil/

1.3 SPECIFICATIONS

The DB Contractor shall prepare specifications by tailoring Unified Facilities Guide Specifications (UFGS), as appropriate, to incorporate specific requirements of this project.

Where there are duplicate versions of the same numbered guide specification section, the order of preference shall be:

1. Air Force specific UFGS identified by a fifth level section number prefix of “30”

2. Non-agency specific UFGS (no fifth level prefix

3. Other DoD agency specific UFGSs identified by the following prefixes: “10’ for Army specific specifications and “20” for Navy specific specifications.

4. UFGS specific to a non-DoD agency (NASA UFGS identified with a prefix of “40”. Unified Facilities Guide Specifications (UFGS) are available on the internet at the Whole Building Design Guide web site http://www.wbdg.org/ccb/ccb.php.

https://cadbimcenter.erdc.dren.mil/ http://www.wbdg.org/ccb/ccb.php

PART 3 – CHAPTER 1 / PROJECT DESCRIPTION

1.4 CONSTRUCTION

The DB Contractor shall provide all materials and methods for new construction to include, but is not limited to, civil, structural, architectural, electrical, mechanical and plumbing systems. In addition, all utilities, communication, fire protection and alarms, Anti-Terrorism and Force Protection, and storm drainage requirements must be fulfilled. The DB Contractor shall be responsible for all construction quality control measures, construction phasing plan to maintain vehicular traffic to Massport, Old Bedford Road, and Hanscom Air Force Base at all times and the construction schedule.

1.5 SITE WORK

Site Work associated with this project will include; environmental permitting, environmental protection, grading and excavation, modified and new utilities, new pavements, new parking lot, vehicular and pedestrian access from new roadway to new ECF, and new landscaping. A Geotechnical Data Report is included as Attachment A, an Existing Utilities Plan as Attachment B, and Base Bid Site Plan (Attachment C.1) to assist Offerors in preparing proposals. The successful Design-Build Contractor is required to verify and supplement as necessary all topography, utility, soils information and other features as part of the project design.

1.6 ADDITIONAL REQUIRED DOCUMENT SUBMITTAL FOR REVIEW

The following documents shall be submitting in addition to other documents mentioned in this RFP and as directed in the Easement Agreement (Attachment Q) and the Design and Construction Agreement (Attachment R) . The DB Contractor shall adhere to the MassDOT Project Development and Design Guide when developing these plans. These documents shall be submitted for review at required milestone design submissions.

• Highway Easement Plan

• Highway Management Plan

• Traffic Management Plan

• Traffic Sign Plan

• Construction Phasing Plan (including sign plan to direct traffic during construction)

• Document requirements for Obstruction Evaluation/Airport/Airspace (OE/AAA) if warranted

1.7 HVAC CONTROL REQUIREMENTS

The following criteria shall be followed and met by the DB Contractor when designing the HVAC control system.

• The DB Contractor is required that the DDC system be integrated with the existing base-wide EMCS. The existing base-wide EMCS is Johnson Controls Metasystem.

• The DB Contractor is required to review the existing Johnson Controls Metasystem from EMCS Master Control Room in Building 1810; and provide a baseline report before connecting the new system.

• The DB Contractor is required that the controls be installed and tested by a technician who is qualified and certified by the DDC vendor. Performance verification testing of the system is required.

• The DB Contractor is required to provide complete controls instructions and the instructions are labelled, framed and mounted in a well-lighted area in the mechanical rooms.

• The DB Contractor is required that all meters to be tested, calibrated and fully connected to the EMCS Master Control Room in Building 1810, and controls be 100% compatible with existing Johnson Controls.

PART 3 – CHAPTER 1 / PROJECT DESCRIPTION

• The DB Contractor is required the D-B to provide remote programmable thermostats with overrides for this facility and that the new system shall respond to the occupants and facility requirements.

• The DB Contractor is required to program the operational schedules in the EMCS for the entire facility and adjust the operation of the HVAC schedules for each system to serve the mission and respond to the seasonal temperature and climate variations.

• Prior to Government review, the DB Contractor is required to coordinate all proposed mechanical equipment with the existing base-wide EMCS vendor (Johnson Controls) to ensure that the selected design will properly integrate.

• The DB Contractor is required to coordinate all on-site HVAC equipment and systems phasing, installation, testing, balancing, performance verification, and commissioning with the existing base-wide EMCS vendor (Johnson Controls).

• As part of UMCS integration, provide all necessary hardware and labor to connect project buildings via single mode fiber via the existing Visitors Center building through to Building 1612, including fiber termination, patching, combining and testing of each fiber leg and the entire circuit(s), and from Building 1612 to Building 1810. Provide appropriate patch cables to connect fiber terminated in building 1612 to existing Fiber Switch. Provide media converters with minimum 1000 Mbit, fiber optic connectors, managed switches compatible with base cyber tools, or other hardware/ software as required. Configure existing fiber switch in Building 1612 in concert with Base Communications as required to communicate across the fiber network between the buildings. Show that communications are functioning properly from project buildings to building 1810 (Metasys front end building), and correct and resolve any communications issues.

1.8 CYBERSECURITY

The DB Contractor will execute cybersecurity hardening and configuration of the HVAC system in accordance with the existing base-wide HVAC system. The existing system does not have an approved ATO, so the D-B contractor will coordinate with Hanscom for secure configuration preferences. The contractor will provide applicable artifacts as proof of their hardening and configuration activities to include but not limited to SCAP Scans, STIG Checklists, ACAS/NESSUS Scans, and any POA&M documenting deviations to support the future ATO. The contractor will provide the following artifacts to supplement the future ATO or authorization documentation: Hardware and Software Lists, Network Diagram, Dataflow Diagram, and Ports Protocols and Services List. The D-B Contractor shall comply with UFC 4-010-06: Cybersecurity of Facility-Related Control Systems.

PART 3 – CHAPTER 2 / PROJECT OBJECTIVES

2. PROJECT OBJECTIVES

2.1 MISSION STATEMENT

The objective of this project is to replace the existing ECF with a new ECF that complies with current UFC Standards. The Vandenberg Gate must remain open for commercial vehicle and personal owned vehicle access during construction. Traffic must remain open to Massport and Old Bedford Road during construction.

2.2 ENTRY CONTROL FACILITY FUNCTION

Hanscom AFB is proposing significant security upgrades and improved traffic flow through the existing Vandenberg Gate Entry Control Facility (ECF). The existing Vandenberg Gate ECF, located on the west side of Hanscom AFB in Lincoln, Massachusetts, operates as both the commercial vehicle gate as well as the personally owned vehicle (POV) gate. The existing gate does not comply with current Anti-Terrorism Standards. A new entry control facility is necessary to improve traffic flow into Hanscom AFB and enhance the operation of the installation’s main ECF and bring the gate into compliance with current Anti-Terrorism and ECF standards.

2.3 PROJECT SPECIFIC PRIORITIES

The design of the new ECF shall be based on design documents located in Appendix C Base Bid Site Plan and Appendix E Architectural Plans and Elevations.

The Base Bid Site Plan has fulfilled requirement that traffic from the west, north, and south are all able to access the ECF in order to enter the Base. An additional requirement was to allow northbound traffic to be able to bypass the ECF in order to continue north to the MassPort air terminal or west onto Old Bedford Road. As a result of this project, the public transportation component must be functionally equivalent or superior to the existing conditions along Old Bedford Road and Hanscom Drive. The preferable way of achieving this was by constructing a roundabout intersection. The roundabout shown in the Base Bid Site Plan reflects approximate parameters and is not representative of a final design configuration. All new construction shall be contained within Federally owned property.

A preliminary traffic study has been completed by the Government (Appendix M FLEMING QUICK AND COMPREHENSIVE TRAFFIC STUDY). It shall be the responsibility of the D-B contractor to obtain any and all data necessary to support the design. The D-B Contractor shall be responsible for determining traffic estimates for the site, evaluating the impact of said estimate on the existing traffic patterns and identifying any traffic issues.

In order to provide the necessary delay required between the detection point of a threat vehicle (at ID Check) and the final denial barriers, it is necessary for traffic entering the Base from the north or west to proceed through the roundabout and south on Hanscom Drive before turning to the east and proceeding back through the ECF.

The required parameters for the ECF include provision of at least 18 parking stalls for the Visitor Control Center (VCC) privately owned vehicles. The GateHouse will have two ID check lanes with tandem processing capability of 4 ID check positions. The first lane will have two ID Check Booths (one attached to the GateHouse building and one free standing. The second lane will have two ID Check Booths which are option items (as noted on the site plan C1A). An option, as noted on the site plan C1A, is an added third lane at the GateHouse. The D-B Contractor is to utilize the existing Commercial Vehicle Inspection area in the base bid, with the exception of the existing Commercial Vehicle Inspection building, which will be demolished. The new Commercial Vehicle Inspection Facility is included in Attachment E with queuing/holding capability for 12 commercial vehicles. The requirement is for the Commercial Vehicle Inspection area to have enough queuing/holding capacity so that the waiting vehicles do not back up on Hanscom Drive. These parameters need to be verified/confirmed during design by AFCEC. The ECF corridor shall provide an appropriate roadway length, roadway geometry, and passive vehicle barrier configuration to result in at least 9 seconds of delay from the point of detection to the final denial barrier. In order to provide detection of a threat vehicle attempting to enter the Base in the outbound lanes, wrong way detection will be required in the roundabout and/or the outbound lane approaching the roundabout.

It is essential that the design of the ECF allows the unimpeded access of traffic to the MASSPORT terminal to the north, for west-bound traffic to Old Bedford Road and unimpeded access must also be provided to Hansom AFB. All traffic movements need to be accommodated by the design and during construction of the ECF.

The placement of the active vehicle barriers is desired to be placed to accommodate the retention of the existing drive into the parking lot to Building B1630 (just east of existing ECF).

The exterior façade of the VCC and the Commercial Inspection Facility building shall adhere to the requirements in the architectural design documents (Attachment E). The new VCC and Commercial Vehicle Inspection Facility buildings have an aesthetic theme that is of colonial or neo-colonial style characterized by clean, simple, forms for major building masses, and primary building materials of wood grained exterior walls, double hung windows, and sloped shingle roof. The CheckHouse / ID Check and its (2) ID Check (Option item) and Overwatch shall comply with the Architectural Compatibility Plan for Hanscom Air Force Base, Dated January 2013 provided as Attachment G in this RFP, unless otherwise indicated. A complete Hanscom Air Force Base Architectural Compatibility Checklist, included with this RFP as Attachment H, shall be submitted for review for each required design submission.

1. Sustainable Design

In accordance with Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings and other pertinent directives, integrate sustainable principles into the design, development, and construction of the project. Reduce the total cost of ownership of the facility using a whole building, life-cycle approach.

Provide integrated sustainable design strategies and features to minimize the energy consumption of the facility; conserve resources; minimize adverse effects to the environment;

and improve occupant productivity, health, and comfort. The facility and all site features shall be designed and constructed to meet the requirements of UFC 1-200-02 High Performance and Sustainable Buildings (HPSB) and shall register for Guiding Principles Compliance certification using the DoD version of either USGBC/GBCI or the GBI rating system and shall achieve verification of meeting the Federal requirements as detailed in UFC 1-200-02.

The DB Contractors Project Delivery Team shall include as part of their proposal submission of the project which new work that must comply with UFC requirements relevant to the scope of the project/work. Structures that are part of this project must comply with UFC requirements relevant to the scope of the project/work (as noted in UFC 1-200-02 Table 1-1 Compliance Requirements/Thresholds) Other documents to utilize are: Engineering Technical Letter (ETL) 08-13: Incorporating Sustainable Design and Development (SDD) and Facility Energy Attributes in the Air Force Construction Program. The explanation of compliance should correlate with the Air Force Sustainable Requirements Scoresheet and Federal Mandate directives as per the Air Force Federal Mandates Quick Reference Guide.

All new vertical and horizontal construction for this project shall meet the requirements of Air Force Sustainable Design and Development Implemented Guidance (June 2011) and shall fully incorporate federal requirements for UFC 01-200-03 High Performance and Sustainable Buildings (HPSB),and shall validate sustainability conformance in accordance with ECB 2016-30 Air Force Sustainability Guidance for Third-Party Certification. To meet the Air

Force’s commitment to low impact development, the project shall implement the DUSD (I&E), DoD implementation of Storm Water Requirements under Section 438 of Energy Independence and Security Act (EISA) policy for O&M and MlLCON projects. In exceptional circumstances where project considerations may affect the practicability of implementing the DoD guidance in MlLCON projects, low impact development design strategies will continue to be consistent with existing applicable Air Force design.

Per UFC 01-200-02, the DB Contractor is responsible to track compliance with High Performing and Sustainable Building requirements using the Air Force Sustainability Requirements Scoresheet. The most up to date version can be found here, http://www.wbdg.org/ffc/af- afcec/sustainable-design-development-sdd/. Sustainability-tracking-reporting

2. Energy Conservation

This building within the new ECF shall comply with UFC 01-200-02 and conform to ASHRAE/IESNA Standard 90.1-2013 and achieving a 30% reduction from baseline.

3. Building Commissioning

Provide commissioning to meet requirements identified in Specification Section 01 33 29 Sustainability Reporting, Specification Section 01 45 00 Quality Control, Specification Section 01 91 00 Total Building Commissioning and UFC 1-200-02 High Performance and Sustainable Building Requirements, ASHRAE 189.1 Section 10.3.1.2, ASHRAE 189.1 Section 10.3.1.2 and UFC 1-200-03 High Performance Sustainable Buildings (HPSB).

4. Anti-Terrorism Standards

UFC 4-010-01 DoD Minimum Anti-terrorism Standards for Buildings: Except for the Visitors Control Center (VCC) all the buildings in the ECF are considered to be Low Occupancy Buildings as defined in UFC 4-010-01, and therefore under section 1-9.1 of UFC 4-010-01 are exempt from all provisions of the UFC. Due to occupancy levels, the VCC is considered to be an Inhabited Building as defined by the UFC and is therefore required to meet all applicable provisions of the Minimum AT Standards. According to section 1-8.9 of UFC 4- 010-01, VCCs at Entry Control Facilities will be considered to be outside of the controlled perimeter, and standoff distance or building hardening must be designed accordingly.

UFC 4-022-01 Security Engineering: Entry Control Facilities/Access Control Points, UFC 4- 022-02 Selection and Application of Vehicle Barriers, UFC 4-022-03 Security Fences and Gates: The ECF concept layout was designed in accordance with the above United Facilities Criteria and SDDC-TEA pamphlet 55-15. The Threat paths that were used in determining the layout where supplemented by the following OPMG prescribed threat paths from the Access Control Point (ACP) Army Standard:

1. Vehicle Threat Scenario #1. Threat vehicle enters the ACP in the inbound or outbound lane(s) at the maximum speed attainable at the ACP entrance and then immediately accelerates at its maximum acceleration rate through the ACP.

2. Vehicle Threat Scenario #2. Threat vehicle enters the ACP in the inbound or outbound http://www.wbdg.org/ffc/af-%20afcec/sustainable-design-development-sdd/ lane(s} at or under the posted ACP Speed Limit and then, later at some point further in the Approach Zone, accelerates at its maximum acceleration rate through the rest of the

ACP.

3. Vehicle Threat Scenario #3. Threat vehicle feigns compliance and stops in lane. The Guard detects threat behavior or criminal status through observation or electronic means and moves to ID Check to initiate denial process. Threat vehicle occupants’ attempt to force entry (tactics include potential use of direct fire weapons and acceleration through the ACP).

4. Vehicle Threat Scenario #4. Similar to Threat Scenario 3 above, except the driver of the denied vehicle drives toward the Turn-around or Search Area at the ACP Speed Limit as if complying with guard instructions, but then fails to turn and instead accelerates at its maximum acceleration rate.

During design, the D-B Contractor shall confirm that the proposed layout is capable of defeating the Four Threat Scenarios identified in UFC 4-022-01 dated July 2017.

5. Accessibility Design

The VCC including all site features shall be in accordance with all accessible requirements in UFC-4-510-01 and the Architectural Barriers Act (ABA) Guidelines for Accessibility, Chapters 1 through 10.

6. Easement Document Requirements

1. Design and construction of the portion of the project that will serve the general public (i.e., outside of the area behind the security perimeter) must comply with all applicable federal, state, and local laws and regulations, plans and specifications.

2. Design and construction of the improvements associated with the portion of the project that will serve the general public must comply with the MassDOT Project Development and Design Guide, MassDOT Standards for Highways and Bridges, MassDOT Supplemental Standard Specifications for Highway and Bridges, and MassDOT Interim Supplemental Standards for Highways and Bridges.

3. Contractor will be responsible for obtaining at its expense all permits and approvals from all federal, state, municipal, and other government bodies necessary for the construction of the improvements, to include a highway access permit from MassDOT.

4. Contractor will be responsible for preparing and submitting design documents for review by MassDOT at each design stages. MassDOT has 30 days to respond to each design submission.

5. MassDOT may assign a field engineer to observe and inspect the progress of the construction of the portion of the project that will serve the general public. Their observations will be for the purposes of confirming that the improvements are being constructed according with the designs submissions that were previously reviewed by MassDOT.

6. The contractor will prepare and submit as-built drawings in hardcopy and in AutoCAD Civil 3D electronic format to MassDOT for the portion of the project that will serve the general public.

7. The contractor will prepare a plan in recordable form showing the portion of the project that will revert to MassDOT jurisdiction as an easement. Contractor will also prepare a legal description of the proposed easement.

8. The D-B Contractor is to conduct a post construction survey to obtain all information needed for required Easement documents.

9. The contractor and the Designer of record shall list MassDOT as an additional insured on applicable insurance policies.

2.3.7 Public Outreach and Coordination

Public outreach will be required as needed to coordinate the reconfiguration of a state roadway. USACE will lead the public outreach and coordination. The Contractor will be responsible for minimizing public traffic impacts in their construction phasing plan. The contractor may also be expected to attend coordination meetings with stakeholders to communicate potential traffic impacts.

PART 3 – CHAPTER 3 / SITE ANALYSIS

3 SITE ANALYSIS

3.1 EXISTING SITE CONDITIONS

3.1.1. Photographs of Existing Site Conditions

Site photographs are available upon request.

3.1.2. Site Plans

See Attachment B. for existing utilities plan, Attachment D.1 for existing commercial inspection site plan.

3.1.3. Unsuitable Soil

The Contractor can expect to encounter unsuitable soil in the form of peat, boulders, stumps, and other unsuitable materials. Unsuitable soil shall be removed from Hanscom AFB and be replaced with satisfactory soil materials in accordance with UFGS Specification Section 31 00 00, “Earthwork”. The Designer of Record is required to submit the edited specification section as a part of the design submittal for the project. Additionally, over-excavation, ground improvement, or deep foundations may be required to mitigate unsuitable foundation soils.

No additional compensation will be allowed for the removal and disposal of unsuitable soil or over-excavation for removal of unsuitable foundation materials. The Offerors shall thoroughly review the information provided in the Geotechnical Data Report included in PART 5, Attachment A. of the RFP.

3.2 NATURAL CONSTRAINTS

3.2.1. Topography

Hanscom AFB is located approximately 18 miles Northwest of Boston, Massachusetts. The topography of the base consists largely of rolling hills typical for this region of Massachusetts.

In addition, there is relatively level ground, heavily forested areas, steep sloped areas, and wetland areas on the base.

The Vandenberg Gate Complex site is approximately 22 acres in size and is a grass-covered area adjacent to Hanscom Drive and access road of the existing ECF. The grades are relatively flat, sloping in elevation from west to east.

3.2.2. Vegetation/Landscaping:

The site is mainly natural wild grass and plants with bituminous access drives and a few trees and shrubs that will need to be removed.

3.2.3. Wildlife:

Hanscom AFB is classified as a Category II Installation and as such is exempt from many of the planning and staffing requirements of the Sikes Act (16 USC 67 A-1(b)). The base is also exempt from developing hunting, fishing, and trapping programs. The Great Meadows National Wildlife Refuge is located two miles North-West of Hanscom AFB. The Refuge is the habitat of several current and historically rare plants and animal species in which exist under the protection of the National Refuge. Undeveloped portions of the base provide a relatively undisturbed habitat for native fauna. Additional information on wildlife on the base is available in the Comprehensive Ecological Analysis, Hanscom AFB, February 1997.

3.2.4. Climatology:

The climate conditions at Hanscom AFB are typical for this region. Weather patterns vary daily and seasonally from year to year because of the prevailing winds. The maximum 24 hour precipitation for the area is 8.7 inches with average annual rainfall of 44 inches. The maximum 24 hour snowfall for the area is 16.5 inches with average annual snowfall of 56.5 inches.

Site Location: Latitude – 42.457711; Longitude - -71.285625

Summer outdoor design dry-bulb temperature: 88 deg F (temperature based on a seasonal value 2.5% occurrence value per ASHRAE).

Summer outdoor design mean coincident wet-bulb temperature: 73 deg F (temperature based on a seasonal value 2.5% occurrence value per ASHRAE).

Winter outdoor design dry-bulb temperature: 1 deg F. (temperature based on a winter seasonal value 97.5% occurrence value per ASHRAE).

3.2.5. Wetlands:

A Wetland Delineation was completed for the project area in April-May 2017. A wetland was identified on the east side of Hanscom Drive. DB Contractor shall complete the necessary permitting to confirm the wetland line with the Lincoln conservation Commission in accordance with the Massachusetts Wetland Protection Act. The DB Contractor must comply with the Environmental Assessment (EA). Per the EA (Attachment I) para 3.11.2, “Construction activities that will remove, fill, dredge or alter ponds, wetland or buffer zones, are prohibited without first obtaining a permit from the Lincoln Conservation Commission.”

3.2.6. Radon Mitigation

Hansom is known to have elevated levels of radon. The D-B contractor must design and construction building foundations to accommodate passive radon mitigation measures.

3.2.7. Geotechnical Soils Report:

A Geotechnical Data Report is included in this RFP as Attachment A to assist Offerors in preparing proposals. The successful Design-Build Contractor is required to provide their own Geotechnical Engineering Report as part of the project design.

The DB Contractor’s Geotechnical Report shall include, but not be limited to Soil Borings, calculations, and geotechnical engineering recommendations for design and construction.

It is anticipated that some cut materials will be available for use as general fill or structural fill. While the quantity of the cut material will not be very significant, the cut material will be available to construct foundations, pavement base courses and bedding for subsurface utilities. Based on the topographic information and subsurface exploration materials provided, new foundations and roadways will bear on outwash deposit material. These outwash deposit materials are considered suitable bearing materials for proposed building and roadway areas. The contractor should expect to encounter large boulders during construction, which will require excavation and off-site disposal. The contractor can expect that excavated granular material such as sand, gravel, cobbles, and boulders may be suitable for reuse to construct foundations, pavement base courses and bedding for subsurface utilities. Based on the geotechnical report, the contractor can expect to encounter cut materials with silt contents greater than

10 percent, in which case these cut materials will not be suitable for reuse without supplementary measures. Where silt content is greater than 10 percent, special measures would be required to facilitate the drying of wet soils prior to compaction.

3.2.8. Topographic Survey:

A Topographic Survey CAD files are available on request from Contracting Officer to assist Offerors in preparing proposals and to be used as a reference only.

The awarded DB Contractor shall provide a survey showing required tie in to the Base Mass Grid Coordination System and confirming horizontal and vertical data topography provided.

3.3 MAN MADE FEATURES

3.3.1. Existing Vehicular Access Circulation:

The existing gate access, commercial vehicle inspection and VCC parking existing on the site.

3.3.2. Site Utilities:

There are no existing utilities connections for the new buildings to be built with the exception of the commercial vehicle inspection facility. The existing temporary facility has utility line and as-build drawings are available and will be provided as needed. The DB Contractor will have to provide utility work to bring utilities to the buildings and relocate existing utilities that may be in conflict with the proposed building. Connection operation for utilities shall be coordinated with the Contracting Officer’s Representative and appropriate personnel at Hanscom AFB.

There is an existing overhead communications line adjacent to the current ECF entrance.

The DB Contractor is required to relocate this line as part of the new communication infrastructure work to be conducted under this RFP.

There is an existing fiber optic cable which runs along Hanscom drive, adjacent to the existing commercial vehicle inspection facility and onto Hasncom AFB. The Contractor must protect this cable at all times.

The following utilities are Government owned and operated:

Water Electrical Steam Site Storm Drainage Sanitary sewer Communications Telephone Security Landscape irrigation system

The following building utilities are privately owned and operated. Contact information for these private utilities is as follows:

Natural Gas: National Grid, eric.szulak@us.ngrid.com or pderosa@keyspanenergy.com Telecommunications: Verizon, matthew.i.king@verizon.com or kimberly.dillon@verizon.com mailto:eric.szulak@us.ngrid.com mailto:pderosa@keyspanenergy.com mailto:matthew.i.king@verizon.com mailto:kimberly.dillon@verizon.com

3.3.3. Site Drainage:

The building site grades are relatively flat, sloping from approximately elevation 130 to elevation 126 from west to east. The site drains to an existing depression in the grassy area. All other drainage flows to a series of catch basins in the existing parking lot.

3.3.4. Site Drainage and Storm Water Runoff:

Within the proposed project site there are numerous locations for grass depressions to collects run-off. See Base Bid Site Plan included in this RFP as Appendix C.

3.3.5. Hazardous Materials:

Hazardous materials shall be disposed of in a manner congruent with all applicable state and federal standards and guidelines.

3.3.6. Adjacent Land Use:

The site is not located in a Development Zone as indicated in the Architectural Compatibility Study. Some close proximity facilities to the site include housing, community-based buildings and administrative buildings.

3.4 SITE DEVELOPMENT REQUIREMENTS

3.4.1 Site Footprint:

The site footprint is approximately 22 acres in size.

3.4.2 Pavement Design

DB Contractor shall review UFC 3-201-01, UFC 3-250-01FA and UFC 3-250-03 for necessary criteria for pavement design

3.4.3 Parking Lot:

The proposed parking for all ECF buildings have been identified on Base Bid Site Plan see attachment C.

DB Contractor shall design parking lots in compliance with Anti-Terrorism Standards requirements unless otherwise specifically waived by the Contracting Officer.

DB Contractor shall use pervious pavement or other traditional methods to meet EISA Section 438 and other drainage requirements.

The DB Contractor shall haul pavement and other demolition materials off the Base and dispose of materials according to local, state and federal requirements.

The DB Contractor shall maintain access to the existing parking VCC lot until new VCC is accessible.

The DB Contractor shall provide a parking and striping plan that safely and efficiently provides for traffic flow between the lots and ECF road layout.

Parking spaces are required to be 90 degrees and a minimum size of 9’ x 18’ and provide accessible parking spaces as required by code.

3.4.4 Pedestrian Access and Circulation:

Pedestrian access to all new ECF buildings shall be provided to their associated parking areas and to the network of sidewalks within the new ECF site. Sidewalks must connect the

Visitor Control Center to the guard booth because Guards will check the credentials of pedestrians (non-vehicle access) at the guard booth to provide authorization for access. The sidewalk network shall connect the new MBTA bus stop with the Visitor Control Center. The sidewalk network shall connect the new MBTA bus stop with Massport Property. New sidewalks shall align and meet with existing sidewalks which are located outside of the site boundary.

3.4.5 Landscaping:

Emphasis shall be placed on creating attractive and functional entry points while adhering to safety guidelines and to UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings, including Change 1, and the Air Force Design Guide. The design shall reflect appropriate groupings and street tree plantings to define the open spaces and to ensure a complete landscaped project. All areas not in planting beds will be mowed lawn.

The landscape design shall comply with the Hanscom AFB Landscape Design Guidance August 2009.

DB Contractor shall provide a planting design including native trees and plants which include:

Deciduous trees, evergreen trees, ornamental trees, shrubs, groundcover, perennial flower and grasses. DB Contractor shall ensure the design in prepared by a professional landscape architect who is an integral part of the design team.

3.4.6 Exterior Signage:

Exterior signage shall be provided in accordance with UFC 3-120-01, Air Force Sign Standard and UFC 1-200-01 Design: General Building Requirements – and the Manual on Uniform Traffic Control Devices. Exterior signage style and configuration shall be as directed by the Base Exterior Architectural Plan (BEAP) and shall be in locations as directed by the Contracting Officer’s Representative.

Vehicular wayfinding and additional traffic directional signage is identified on Attachment C.1b Base Bid Signage Plan. All vehicular signage shall also comply with MassDOT standards.

3.4.7 Site Drainage and Runoff:

Storm water management controls shall be provided such that there will be a net decrease in stormwater rate and volume by 10% over the existing condition for the 2, 10 and 100 year storm events. This shall be achieved by using underground infiltration, pervious pavement or other means. The DB Contractor’s site design shall include Storm Water Management Controls. The controls shall result in at least a ten percent net decrease in runoff via an equivalent increase in detention or groundwater recharge (or combination thereof) upon completion of construction. This analysis can be done for the entire project, taking int account areas where impervious surfaces are replaced with pervious surfaces including areas of demolition. The DB Contractor shall prepare a Storm Water Pollution Prevention Plan and a Storm Water Control Site Plan in accordance with AFETL 14-01 and review UFC 3-201-01 to determine necessary criteria for surface drainage.

Finish grading at all areas adjacent to ECF buildings shall direct storm water away from the buildings. The DB Contractor is required to set all finished floor elevation a minimum of one foot above the FEMA Base Flood Elevation for the site or the computed maximum stage resulting from the 100-year frequency storm event, whichever is higher. The DB Contractor shall prepare a Storm Water Pollution Prevention Plan and a Storm Water Control Site Plan in accordance with AFETL 03-01. The design of the surface drainage system shall be based on rainfall of a 10-year, 24 hour storm event. Additionally, the storm drainage system design and site grading shall be checked to ensure that no flooding of the new facility’s finished floor

PART 3 – CHAPTER 3 / SITE ANALYSIS

elevation occurs for a 100-year frequency event.

The DB Contractor shall review and verify all existing storm drains that are within and outside the project boundaries to utilize them in this project.

The new parking lots shall have a typical catch basin and manhole system that may incorporate underground detention. Underground infiltration is an acceptable method to meet the 10% stormwater rate and volume reduction criteria.

The DB Contractor shall review UFC 3-201-01 and UFC 3-230-06A for necessary criteria for subsurface drainage design in paved areas.

3.4.8 Dewatering:

The DB Contractor shall determine the need for dewatering based on their own geotechnical testing.

3.4.9 Site Demolition:

Demolition includes site demolition for the proposed ECF and the demolition of three existing buildings, Existing VCC Building 1617 see Attachment D.2, Existing Gate House Building 1620 see Attachment D.3 and Existing Commercial Inspection Building.

For the building site, demolition includes removal of soil, vegetation, pavement, light poles, sidewalks and other features as shown on Attachment B

Site Demolition plan should clearly show items to be protected in place, transplanted and to be removed. No equipment or materials will be permitted or stockpiled within the protected area throughout the construction period. Erosion and sediment control devices shall be installed prior to any site demolition and remain in place until project end and as required in environmental permits to be obtained by the DB Contractor. Heavy demolition work shall be done during hours specified in Section 01 14 00.05 20 Work Restrictions for Design-Build.

Erosion and sediment control devices shall be installed prior to any site clearing and will remain in place until project end.

3.4.10 Site Clearing:

Erosion and sediment control devices shall be installed prior to any site demolition and remain in place until project end and as required in environmental permits to be obtained by the DB Contractor.

3.4.11 Construction Access / Staging Area:

DB Contractor shall determine required construction access and staging area location and its extent of area. DB Contractor shall review plan with Contracting Officer’s Representative.

The placement of the active vehicle barriers needs to accommodate the retention of the existing drive into the parking lot to Building B1630 (east of the existing ECF).

3.4.12 Permits:

MASSACHUSSETS WETLAND PROTECTION ACT PERMIT: The proposed improvements include work within the 100’ buffer to the wetland that is to the south of the site. The work within this area includes primary electric service and likely a gas line. This work may require a filing of a Notice of Intent (NOI) or other permit with the Massachusetts Department of Environmental Protection and the Town of Lincoln Conservation Commission.

PART 3 – CHAPTER 3 / SITE ANALYSIS

CONSTRUCTION GENERAL PERMIT: The DB Contractor will be required to fill out and file a Construction General Permit to cover the project requirements. This requires the contractor to file a Notice of Intent and the General Permit requires the contractor to prepare a site specific Storm Water Pollution Prevention Plan. In Massachusetts the NPDES permit program is managed by the Region I EPA.

CONSTRUCTION DEWATERING PERMIT: A separate construction dewatering permit shall be required if the groundwater is extracted. The permit can be included in the Notice of Intent for the Construction General Permit.

EXCAVATION PERMIT: The DB Contractor will be required to fill out and file an Excavation Permit from the HAFB BCE Office. See Attachment L.

Base Civil Engineering Digging Request: Preparing, processing and obtaining approvals prior to digging shall be the responsibility of the contractor. A copy of the form is found in Attachment R.

DIG SAFE Permit number: The contractor will be required to obtain a Dig Safe permit number prior to obtaining Base clearance for excavation. Dig Safe can be reached at 888-DIG-SAFE (344-7233).

FEDERAL AVIATION ADMINISTRATION (FAA): The project site is in close proximity to the Hanscom runways. The DB Contractor is required to obtain any required FAA permits and required documents for the FAA to conduct an Obstruction Evaluation /airport / Airspace (OE/AAA) if warranted.

The design intent of all building in the ECF is to be one story in height. If in the event should any new building in the ECF has been changed to be over one story in height, the DB design team, HAFB shall re-coordinate with the National Park Service.

CONFINED SPACE PERMIT (COMMUNICATIONS MANHOLES): All personnel entering/working in any Confine Space Permit deemed areas of Hanscom Air Force Base will adhere to all mandatory laws and regulations of the following OSHA 29 CFR 1910.146 / AFI 91-203 / Hanscom Base Communications CSE program. No one will enter any telecommunications manholes/CSE deemed locations without preapproved confine space entry permit issued.

3.4.13 Sustainable Development:

The goal of the project is to meet the standards set in the Air Force Sustainable Design and Development Implementing Guidance dated June 2, 2011 (or as updated) and UFC 3-210-10 Low Impact Development February 2016.

3.4.14 Anti- Terrorism Standards:

The design shall incorporate all Antiterrorism Standards requirements for setbacks and site features in compliance with UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings including Change 1, 1 October 2013.

PART 3 – CHAPTER 3 / SITE ANALYSIS

A draft DD Form 1354 shall be submitted with the 95% design submittal and updated at the 100% submittal based upon review comments.

3.6 VEHICULAR ACCESS AND CIRCULATION

The DB Contractor shall reduce impacts and maintain existing pedestrian and vehicular access to Building 1630 during construction.

3.7 AGENCY REVIEW

Contracting Officer’s Representative and Government shall review all design submittals for conformance with the technical requirements of the solicitation. All colors, finishes, samples, designs and Life Safety Information will be submitted to reviewed by the Contractor Officer’s Representative prior to acceptance of the design.

3.8 SITE OPTION ITEMS

The following items shall be option pricing by the DB Contractor (all are noted on site plan).

1. Third vehicle lane at Gatehouse (design and construction)

2. POV GateHouse Canopy over third vehicle lane (design and construction)

3. ID Check Booths (2) (design and construction)

4. Asphalt Bike Lane (design and construction): The exact location of the optional bike lane will be confirmed during the design phase of this project. The Bike lane is intended for the MassDOT roadway, and not for access to the ECP. The option item is the entire bike lane network within the work area.

5. Emergency Generator (construction)

The DB Contractor shall prepare DD Form 1354 – Transfer and Acceptance of Military Real Property in accordance with Form instructions and direction from CENAE and Hanscom Air Force Base.

3.5 DD FORM 1354

The facility shall be designed in compliance with the Architectural Barriers Act (ABA) Guidelines for Accessibility Chapters 1-10, and UFC 1-200-01 Design General Building Requirements, whichever is more stringent, for all aspects of building and landscape design and construction.

3.4.15 ABA

PART 3 – CHAPTER 4 / BUILDING REQUIREMENTS

4 BUILDING REQUIREMENTS

4.1 VISITOR CONTROL CENTER (VCC)

The Visitor Control Center (VCC) shall be a 1-story building with a maximum of 1,840 Gross Square Feet (171 SM). The DB Contractor shall not exceed the authorized square footage. See attachments E of this RFP for architectural floor plans, elevations and aesthetic guidelines. Refer to Air Force Civil Engineering Center – Facilities Dynamic Prototypes Design: entry control Facilities/Installation Access Control Points (ECF/IACP) Sheet A-101 for additional details and functionality of the features shown in the architectural floor plans.

The building floor plans, elevations and details as shown in Attachment E in this RFP, have been developed to show the design intent. With approval from the Contracting Officer, the DB Contractor may be permitted to deviate from the design of the layout in order to meet accessibility, life safety, and architectural compatibility requirements as well as more efficiently meet AT blast requirements.

4.2 COMERCIAL VEHICLE INSPECTION FACILITY

The commercial vehicle Facility shall be a 1-story structure with two components: the Commercial Vehicle Inspection Bay and the Commercial Vehicle Gatehouse with a maximum of 1,700 Gross Square Feet (157 SM). The DB Contractor shall not exceed the authorized square footage. See attachment E of this RFP for architectural floor plans, elevations and aesthetic guidelines. Refer to Air Force Civil Engineering Center – Facilities Dynamic Prototypes Design: entry control Facilities/Installation Access Control Points (ECF/IACP) Sheet A-111 for additional details and functionality of the features shown in the architectural floor plans.

The building floor plans, elevations and details as shown in Attachment E in this RFP, have been developed to show the design intent. With approval from the Contracting Officer, the DB Contractor may be permitted to deviate from the design of the layout and exterior façade in order to meet accessibility, life safety, and architectural compatibility requirements.

4.3 GATEHOUSE / ID CHECK

4.3.1 The Gatehouse with an attached ID Check and a standalone ID Check has a maximum of

489 Gross Square Feet (46 SM). The building floor plans, elevations and details as shown in Attachment E in this RFP, have been developed to show the design intent.

Refer to Air Force Civil Engineering Center – Facilities Dynamic Prototypes Design: entry control Facilities/Installation Access Control Points (ECF/IACP) Sheet A-105 for additional details and functionality of the features shown in the architectural floor plans.

Refer to UFC 4-022-01 for minimum ID Check landing areas, island dimensions, clearances, and other requirements.

The building floor plans, elevations and details as shown in Attachment E in this RFP, have been developed to show the design intent. With approval from the Contracting Officer, the DB Contractor may be permitted to deviate from the design of the layout and exterior façade in order to meet accessibility, life safety, and architectural compatibility requirements.

4.3.2 Metal Canopy to cover the facility, dimensions as noted on Attachment E.

4.3.3 (OPTION ITEM) (2) ID Check are prefabricated structures with a maximum of 36 Gross

Square Feet (4 SM) each. The DB Contractor, under no circumstances, shall be allowed to exceed the authorized square footage.

4.3.4 (OPTION ITEM) A third lane for the Gatehouse.

4.3.5 (OPTION ITEM) metal canopy to cover the third lane.

4.4 OVERWATCH

The overwatch shall be a single small structure with a maximum of 49 Gross Square Feet (5 SM).

The DB Contractor shall not exceed the authorized square footage.

The building floor plans, elevations and details as shown in Attachment E in this RFP, have been developed to show the design intent. Refer to Air Force Civil Engineering Center – Facilities Dynamic Prototypes Design: entry control Facilities/Installation Access Control Points (ECF/IACP) Sheet A-113 for additional details and functionality of the features shown in the architectural floor plans.

The building floor plans, elevations and details as shown in Attachment E in this RFP, have been developed to show the design intent. With approval from the Contracting Officer, the DB Contractor may be permitted to deviate from the design of the layout and exterior façade in order to meet accessibility, life safety, and architectural compatibility requirements.

4.5 FUTURE MASSACHUESETTS BAY TRANSIT AUTHOROTY (MBTA) BUS STOP

The size of the concrete pad shall be five feet by 8 feet and 10 inches thick. DB Contractor shall verify with MBTA and its design manual for size of concrete pad.

4.6 ANTI-TERRORISM MEASURES

The Visitors Control Center (VCC) shall be designed to the Minimum Anti-Terrorism Standards per UFC 4-010-1.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .