W912WJ19R0003.pdf
PDF 669 KB Posted
- Solicitation number
- W912WJ19R0003
About this file
Solicitation
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
handcarried, in the depository located in 696 Virginia Rd, Concord, MA until 01:00 PM local time 28 Mar 2019
A B
X C D
EX
X G F 39 - 45
46 - 55 X H 56 - 72
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 72
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912WJ 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
BEN HOELL 9783188084
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
2 - 15 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 18 - 22 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
23 - 37
PART II - CONTRACT CLAUSES
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9783188084
978-318-8207FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
25 Feb 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912WJ19R0003
Section C - Descriptions and Specifications
GENERAL INFORMATION
This contract is a Single Award Indefinite Delivery Indefinite Quantity (IDIQ) Service Contract.
The contract shall have a 5 year ordering period and the total amount of the contract shall not exceed $20,000,000.
After award of the base contract, work will be issued through negotiated task orders on a firm fixed price basis. Specific task and pricing information for work to be performed under this contract shall be included in each negotiated Task Order.
Certain pricing data and information will be required to be provided with your proposal. Pricing shall be provided in accordance with the applicable wage rates. Binding Rates shall become part of the contract and used in developing task orders under this contract.
The Government is obligated to satisfy a minimum guaranteed amount of not less than $25,000 over the life of the contract. The Seed Task Order will be awarded after the base IDIQ contract award.
Contractors are to complete and submit a Certificate of Corporate Authority of the signing representative with their proposal.
**NOTE** In accordance with FAR 4.1102(a), all Offerors must have an ACTIVE SAM.gov registration prior to proposal submission. Joint Ventures must be registered and active as the Joint Venture in SAM prior to proposal submission. Offerors not registered at the time of submission will be rejected and will not be reviewed.
PERFORMANCE WORK STATEMENT
Performance Work Statement For Indefinite Delivery/Indefinite Quantity
Environmental Services and Remedial Action Operations for BRAC Legacy Sites Former Fort Devens, Devens, Massachusetts
February 2019
1.0 Site History
This is a non-personal services firm-fixed price contract to provide environmental remediation services for multiple cleanup sites under the Base Realignment and Closure (BRAC) Environmental Restoration Program (ERP) at the former Fort Devens Army Installation and Former Sudbury Training Annex.
Former Fort Devens is located approximately 35 miles northwest of Boston, Massachusetts (MA). Originally a temporary cantonment area known as Camp Devens, the post came into existence on September 5, 1917. In 1932, the camp was declared a permanent installation and it was formally dedicated as Fort Devens. Fort Devens included a Main Post, North Post and South Post consisting of 9,300 acres.
The former Sudbury Training Annex, which is located 22 miles south of Former Fort Devens within the towns of Hudson, Stow, Maynard and Sudbury, Massachusetts, was annexed by Fort Devens in 1982 for training and included 2,300 acres.
In 1991, theBRAC Office recommended that Fort Devens’ active duty mission be eliminated and a small reserve enclave and training area be maintained for use by the Reserve and National Guard. On March 31, 1996, Fort Devens was no longer an active duty installation and was renamed Devens Reserve Training Facility. In May 1996, the Army closed portions of the Main and North Posts.
The Installation was placed on the National Priorities List (NPL) on November 21, 1989. In accordance with Section 120 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a Federal Facility Agreement (FFA) was entered into by the Army and EPA in 1991 and amended in 1996. The FFA contains the basis on which all environmental investigations and remedial actions are required to be undertaken at Devens. The FFA establishes roles and responsibilities for both the U.S. Environmental Protection Agency (USEPA) and the Army and lays out a procedural framework and timetable for developing, implementing, and monitoring appropriate response actions at Devens in accordance with CERCLA. The Commonwealth of Massachusetts opted to take a “participatory role” in the Devens remediation efforts and is represented by the Massachusetts Department of Environmental Protection (MADEP).
The contamination at Devens is associated with historic underground storage tanks/fuel depots and contaminated soils containing petroleum products and chemicals. In 2016, Per- and polyfluoroalkyl substances (PFAS), an emerging contaminant of concern, was detected in groundwater at some of the North Post and Main Post sites and its presence is also being evaluated at South Post and the Former Sudbury Training Annex. The Indefinite Delivery Indefinite Quantity (IDIQ) Contract will also include any CERCLA work required to address this emerging contaminant, which may include remedial investigations, feasibility studies, and implementation of remedial actions.
Since its placement on the NPL, approximately 4,000 acres of the former Main Post and North Post have been conveyed to the Massachusetts Government Land Bank/ Massachusetts Development and Finance Agency, Devens Commerce Center (MDFA), subsequently renamed and presently known as MassDevelopment (MassDev). South Post was renamed the Fort Devens Reserve Forces Training Area and is currently an active army facility used for munitions training by the Army and law enforcement agencies.
The Former Sudbury Training Annex, was listed on the NPL in February 1990 and later removed in January 2002. In 2002, the land was transferred to other government agencies including U.S. Fish and Wildlife Service (USFWS), U.S. Air Force, and the Federal Emergency Management Agency with the majority of the land received by the USFWS and is currently a national wildlife refuge.
2.0 Contract Procurement Objectives and Overview
The Contractor will be responsible for fully executing firm fixed-price Task Orders under Indefinite Delivery/Indefinite Quantity Type Environmental Services Contract with the New England District (CENAE), U.S. Army Corps of Engineers (USACE). This work is being performed on behalf of the Army under BRAC.
The Contractor shall perform all the necessary services required to successfully meet all performance objectives of this Performance Work Statement (PWS) and subsequent task orders. The Contractor shall comply with all applicable Federal, State, and local laws and regulations in order to successfully complete all performance objectives of each PWS in a manner that is consistent with any applicable orders and permits and relevant Department of Defense (DOD) and Army policies for the duration of this IDIQ Contract.
The contract awarded will include firm-fixed price task orders for consulting services for environmental services. These services may include, but are not limited to:
• Preparing sampling plans and quality assurance project plans and updating long-term monitoring maintenance plans
• Completing investigation work including record reviews, utility locating, drilling, soil logging, installation of monitoring well, soil gas probes, and any other techniques for field investigation
• Operation & Maintenance (O&M) activities including routine repair of well monitoring network, rehabilitating wells, replacing damaged wells or wells not producing water, maintaining discharge leachate system, mowing of landfill, maintaining fences, securing fences, tree removal
• Environmental monitoring (semi-annual and annual long-term groundwater monitoring for all required environmental media)
• Remedial actions including annual substrate injections at Area of Contamination (AOC) 50
• Implementation and monitoring of land-use controls
• Aquifer hydraulic monitoring
• Laboratory analysis and data validation
• Environmental database management including working with existing database contractor to load all field and laboratory data in the system and update the website (https://ftdevens.org/)
• Performing human health and ecological risk assessments
• Groundwater Modeling
• Reporting (e.g., investigation reports, remedial investigation, feasibility study, and annual reports;
five-year reviews)
• Preparation, attendance and presentations at project team, regulatory and public meetings
• Public relations and community outreach
• Conducting landfill inspection including soil gas surveys
• Preparing five-year review reports
• Site closeout/decision documents;
• Public relations and community outreach support;
• Future project programming and scheduling support.
Work will fall under task orders using a Performance Work Statement (PWS). The description of work stated herein provides a general understanding of the Contractor functions to be performed; individual task orders will contain the specific requirements. Technical requirements described herein in no way limit the activities that may be required under the terms of this contract. Exclusive of the program and/or project management functions, the Contractor may utilize subcontractors or consultants identified in the accepted proposal or subsequently approved by the CENAE Contracting Officer to perform any of the functions required within the specific task orders.
The Contractor shall also use the references listed below (and default to most recent version if different) when preparing the proposal and executing the work:
Engineer Manual (EM) 1110-1-4007 Safety and Health Aspects of Hazardous, Toxic, and Radioactive Waste Remediation Technologies, USACE, 2003.(https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_111 0-1-4007.pdf)
EM 200-1-3, Requirements for the Preparation of Sampling and Analysis Plans, USACE, 01 Feb.
2001(https://apps.dtic.mil/dtic/tr/fulltext/u2/a402224.pdf)
ER 1110-1-263, Chemical Data Quality Management for Hazardous, Toxic, Radioactive Waste
Remedial Activities, USACE, 30 Apr 1998 (https://apps.dtic.mil/dtic/tr/fulltext/u2/a404361.pdf)
EM 200-1-6, Chemical Quality Assurance for HTRW Projects, USACE, 10 Oct. 1997 (https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_200-1- 6.pdf)
DOD Quality Systems Manual (QSM), for Environmental Laboratories, Revision 5.1 dated January 2017(https://www.denix.osd.mil/edqw/documents/documents/qsm-version-5-1-final/)
Intergovernmental Data Quality Task Force Uniform Federal policy for Quality Assurance Project Plans (UFP for QAPP), Evaluating, Assessing and Documenting Environmental Data Collection and Program Use, Part 1 and Part 2, Final version 1, DoD/EPA/DOE, March 2005 (https://www.epa.gov/sites/production/files/documents/ufp_qapp_v1_0305.pdf)
Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project
Plans Optimized UFP-QAPP Worksheets, DoD/EPA/DOE, March 2012 (https://www.epa.gov/sites/production/files/documents/ufp_qapp_worksheets.pdf.)
Region 1- EPA New England Environmental Data Review Program Guidance. June 2018.(https://www.epa.gov/sites/production/files/2018-06/documents/r1-dr-program-guidance-june-2018.pdf)
Region 1 - EPA New England Environmental Data Review Supplement for Region 1 Data Review Elements and Superfund Specific Guidance/Procedures. June 2018.(https://www.epa.gov/sites/production/files/2018-06/documents/r1-dr-supplement-june- 2018.pdf)
DoD General Data Validation Guidelines, Environmental Data Quality Workgroup, February 9, 2018 (https://www.denix.osd.mil/edqw/documents/documents/general-data-validation-guidelines-final/)
USEPA, January 2017. National Functional Guidelines for Organic Superfund Methods Data Review. EPA-540-R-2017-002.(https://www.epa.gov/sites/production/files/2017- 01/documents/national_functional_guidelines_for_organic_superfund_methods_data_review_013 072017.pdf)
USEPA, January 2017. National Functional Guidelines for Inorganic Superfund Methods Data
Review. EPA-540-R-2017-001.(https://www.epa.gov/sites/production/files/2017- 01/documents/national_functional_guidelines_for_inorganic_superfund_methods_data_review_01 302017.pdf)
USEPA, January 2009. Guidance for Labeling Externally Validated Laboratory Analytical Data for Superfund Use. EPA-540-R-08- 005.(https://nepis.epa.gov/EPA/html/DLwait.htm?url=/Exe/ZyPDF.cgi/P1002WWF.PDF?Dockey=
P1002WWF.PDF)
EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual
(2014)(https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf)
EM 1110-1-4000, Monitoring Well Design, Installation, and Documentation at Hazardous Toxic, and Radioactive Waste Sites, USACE, Dated November 1, 1998.
(https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_1110-1- 4000.pdf)
42 U.S. Code Chapter 103 – Comprehensive Environmental Response, Compensation, and
Liability.(http://uscode.house.gov/view.xhtml?path=/prelim@title42/chapter103&edition=prelim)
USEPA Guidance on Systematic Planning Using the Data Quality Objectives Process (EPA
QA/G-4). EPA/240/B-06/001, February 2006.(https://www.epa.gov/sites/production/files/2015- 06/documents/g4-final.pdf)
Department of Defense Unified Facilities Guide Specifications (UFGS) Section 01 45 00.00 10
Quality Control. (http://www.wbdg.org/FFC/DOD/UFGS/UFGS%2001%2045%2000.00%2010.pdf)
USEPA, 1998. Technical Protocol for Evaluating Natural Attenuation of Chlorinated Solvents in Groundwater Water. EPA-600-R-98- 128.(https://nepis.epa.gov/EPA/html/DLwait.htm?url=/Exe/ZyPDF.cgi/30003ONO.PDF?Dockey=3
0003ONO.PDF)
USEPA, 2001. Comprehensive Five-Year Review Guidance, EPA-540-R-Ol-007. June.
(http://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=2000IRKW.PDF)
USEPA, 2004. Performance Monitoring of MNA Remedies for VOCs in Ground Water. April.
OSWER. EPA-600-R-04-
027.(https://nepis.epa.gov/EPA/html/DLwait.htm?url=/Exe/ZyPDF.cgi/10004FKY.PDF?Dockey=10
004FKY.PDF)
USEPA, 2015. Test Methods for Evaluating Solid Waste, Physical/Chemical Methods, EPA publication SW‐846, Third Edition, Final Updates I (1993), II (1995), IIA (1994), IIB (1995), III (1997), IIIA (1999), IIIB (2005), IV (2008), and V (2015).(https://www.epa.gov/hw-sw846/sw-846-compendium)
USEPA, 2011. Groundwater Road Map Recommended Process for Restoring Contaminated Groundwater at Superfund Sites. July. OSWER 9283.1-34.
(https://nepis.epa.gov/EPA/html/DLwait.htm?url=/Exe/ZyPDF.cgi/P100EKSZ.PDF?Dockey=P100E
KSZ.PDF)
USEPA, 2015. Use of Monitored Natural Attenuation for Inorganic Contaminants in Groundwater at Superfund Sites. August. OSWER 9283.1- 36.(http://semspub.epa.gov/src/document/HQ/177087)
3.0 Types of Services Required
This contract includes the following types of environmental services as authorized under the basic contract:
Site Characterization/Investigation Studies and Reports Monitoring Remedial Design and Action Munitions and Explosive Constituents (MEC) Support (recognition only and notification to Army for removal for disposal)
4.0 Contract Type
___ Cost Plus Fixed Fee _X_ Firm-Fixed Price ___ Fixed Price with Award Fee
5.0 Performance Objectives and Standards
This Contract is a results-based contract with intent to successfully complete all performance objectives as defined in Task Order PWS. All tasks will be Firm Fixed Price (FFP). The Contractor shall furnish all labor, materials and equipment necessary to successfully complete all performance objectives identified in the Task Order PWS in accordance with the Performance Requirement Summary Tables specified in the PWS.
6.0 Task Order Contract Requirements
The Contractor shall provide all labor, materials, facilities and equipment and perform all work identified in each individual task order. The Contractor may be required to perform work under multiple task orders at different sites simultaneously. The Contractor shall be cognizant of all appropriate laws, regulations, and guidance. The Contractor shall ensure that all work activities performed by his personnel, subcontractors and suppliers are executed as required by these laws and regulations. Any incident of noncompliance noted by the Contractor shall immediately be brought to the attention of the Contracting Officer (KO) and/or the Contracting Officer's Representative (COR) by written notice. Nothing in this contract shall relieve the Contractor of his responsibility to comply with these laws and regulations. Any conflicts between laws/regulations and contract/task order requirements shall be brought to the attention of the CO and/or COR.
7.0 Additional Requirements
7.1 Environmental Requirements
The Contractor shall identify applicable Federal, State and Local laws, regulations, and Project specific orders or agreements and perform all work in accordance with said authorities. The Contractor shall ensure that all activities performed by its personnel, subcontractors and suppliers are executed in accordance with said authorities. Any incident of noncompliance noted by the Contractor shall immediately be brought to the attention of the KO via telephone, followed by written notice. Nothing in each PWS shall relieve the Contractor of its responsibility to comply with applicable laws and regulations.
The Contractor shall investigate the requirements for and obtain all permits, licenses, approvals, and/or certificates necessary to accomplish the work specified. When the work to be performed requires clearances, such as digging or drilling permits, the Contractor shall obtain such clearances and/or permits, with the assistance of the facilities/site point of contact, prior to initiation of any drilling or excavating operations. The Contractor shall coordinate all excavating with CENAE prior to performing work. Contractors on environmental sites are required to perform their own utility checks. The Contractor shall comply with all USACE or site-specific time and procedural requirements (federal, state, and local) described in the permits obtained. The CENAE will continue to independently review Contractor work to ensure compliance with all applicable requirements.
The Contractor shall perform all work in a manner that minimizes the pollution of air, water or land and develop contingency measures for cleanup of any spills that may occur during performance of this contract. The Contractor shall control noise and dust within reasonable limits or limits established by applicable federal, state, and local laws and regulations. A site survey may be required to identify any wetlands, endangered species, special habitat or other protected areas.
7.2 Protection of Property
The Contractor shall be responsible for any damage that may be caused to property by the activities of the Contractor under each PWS. Additionally, the contractor shall exercise due diligence in the protection of all property located on the premises against fire or damage from any and all other causes. Any property damaged or destroyed by the Contractor incident to the exercise of the privileges herein granted shall be promptly repaired or replaced by the Contractor to a condition satisfactory to the KO or reimbursement shall be made therefore by the Contractor in an amount necessary to restore or replace the property to a condition satisfactory to the KO in accordance with Federal Acquisition Regulation (FAR) Clause 52.237-2.
7.3 Health and Safety Requirements
The Contractor shall produce and implement a written Safety and Health Program meeting the requirements of all applicable federal, state, and local laws and regulations, and approved by the KO. The Contractor shall ensure that its subcontractors, suppliers and support personnel follow all safety and health provisions established in the approved Site Safety and Health Plan (SSHP), APP and/or AHA. The USACE reserves the right to stop work under this contract for any violations at no additional cost to the USACE. Once the USACE verifies that corrective action has been implemented, the Contractor will be able to continue performance under the contract. As a minimum, the SSHP shall contain the following elements: site description and contaminant characterization, safety and health hazard(s) assessment and risk analysis, safety and health staff organization and responsibilities, site specific training and medical surveillance parameters, personal protective equipment (PPE) and decontamination facilities with documented procedures to be used for same, monitoring and sampling requirements, safety and health work precautions and procedures, site control measures, on-site first aid and emergency equipment, emergency response plans and contingency procedures (on-site and off-site), logs, reports, and record keeping.
7.4 Quality Control Testing
Appropriate documentation of Chemical Quality Control shall be provided whenever sampling or analysis for chemical constituents is required in order to meet the PWS objectives. Quality control for traditional soils, geophysical, geochemical, or geotechnical testing shall also be included. The laboratory(ies) to be used by the Contractor shall be accredited by the DoD Environmental Laboratory Accreditation Program (ELAP), details of which can be found at http://www.navylabs.navy.mil/. The Contractor may also establish an on-site testing laboratory at the project site if determined necessary by the Contractor.
However, this on-site testing shall meet the requirements of USEPA and any specific state regulator requirements. The Contractor shall also comply with all requirements of the DoD Quality Systems Manual, Final Version 4, dated March 19, 2009 or more recent version.
7.4.1 Electronic Chemistry Data Deliverables
Analytical Laboratory Services and Data Validation
The Contractor shall procure analytical services from a certified analytical laboratory which has been accredited by the DoD Environmental Laboratory Accreditation Program (DoD ELAP). Details of the DoD ELAP certification process and a listing of certified laboratories can be found at the following web site:
http://www.denix.osd.mil/edqw/index.cfm. The subcontractor laboratory shall also comply with the requirements of the DoD Quality Systems Manual, Version 5.1, dated 2017.
For all analytical services procured through a subcontractor laboratory under this contract, the laboratory shall report data using the CHEMLAB format. The minimum requirement for the laboratory is the delivery of an error free CHEMLAB EDD and a pdf document file of the laboratory’s final data report. The subcontractor laboratory shall make available any supplemental information (e.g. chromatograms, instrument calibrations, additional EDDs) upon request.
The contractor shall prepare and submit a project eQAPP in the database which is fully compliant with the project QAPP, incorporating all methods, sample types, and quality control requirements for the respective project. The eQAPP shall be supplied to the subcontractor laboratory for screening CHEMLAB EDDs. All electronic data submitted by the subcontracted laboratory is required to be error-free, and in complete agreement with the hardcopy data. The EDD must be submitted/certified (error-free) before loading the pdf to the library.
Unless approved by USACE, the contractor shall use the Automated Data Review (ADR) function within the database. The contractor will ensure that a qualified chemist reviews the ADR output against the PDF report, (if specified in the project QAPP) supplements the ADR output with a manual review, and generates a written data validation report. Upon successful loading of the electronic data deliverable to the database, an Automated Data Review (ADR) process is automatically initiated, which compares the EDD to project guidance (also called an eQAPP). The ADR performs a Stage 2A electronic data review (USEPA data validation code S2AVE) based on criteria specified in the eQAPP. Following the ADR, a data validator shall perform a Stage 2B electronic and manual data validation (USEPA data validation code S2BVEM), which includes comparing the ADR Detail Report against the PDF laboratory report to 1) verify/modify the ADR qualification of the sample results and to 2) supplement the ADR review with a manual review of QC elements that were not included in the ADR review. Once the mark up changes are accepted, the final ADR Data Validation Report is submitted in the library and approved.
You can also contact the USACE, New England District Chemist, Yixian Zhang at 978-318-8730 for further direction.
Database and Website Requirements
The Contractor shall be responsible with working with a separate contractor who has developed a web-based database to manage the information and data collected for the environmental work at Former Fort Devens. The database is a tool for the contractor to generate reports and provide timely reporting of information to regulatory agencies. The database can also be used at meetings to display data in google earth in real time. Thus, the Contractor must be actively engaged in updating and using the database as discussed in this PWS. In addition to the creation of eQAPP and setting up the event planning in the database prior to the field work, the Contractor will be required to upload all field forms to the database per the time requirements established in the approved project schedule.
A website has been established for Former Fort Devens (https://ftdevens.org/). The website is also maintained by the database contractor. Under this seed task order, the Contractor will be responsible to upload all required reports and announcements to the website and modify content of the website as required to keep the website current with 48 hours of request by USACE.
7.5 Regulatory Involvement
With the direction and approval of the KO, the Contractor shall provide the necessary support to initiate, schedule, and address all regulatory involvement activities of the project (e.g., organizing discussions with regulators concerning site response objectives and completion requirements, obtaining regulator comments on site documents and appropriately addressing them, and obtaining written documentation, as necessary, of remediation completion from the regulators for all of the sites identified in each PWS).
Generally, the KO, or their designee, shall attend and represent the USACE at all meetings with the regulators. With the approval of the KO, the contractor may also informally discuss remediation issues with regulators and provide an after-action report back to the KO. The Contractor may not contact regulators without prior approval of the KO. The USACE will be the signature authority for all regulatory agreements and remediation documentation.
7.6 Project Stakeholders
A list of specific stakeholders and requirements for document delivery will be provided on a task order basis.
7.7 Deliverable Requirements
Documents requirements such as number of submissions, number, and type (electronic or hard copy) of documents and schedule for delivery will be defined on a task order basis. Deliverables for fieldwork and investigations may include, but are not limited to, permanent or temporary field installations (e.g., monitoring wells), data packages, reports, databases, logs, maps, drawings, field notes, and sketches.
Analysis and interpretation of data shall be performed as appropriate to accomplish the intent of the individual task order. Data from these activities may be required to be incorporated into geographical information systems (GIS).
Surveys and mapping services may include, but are not limited to:
a. topographic survey and horizontal/vertical control
b. orthomosaic and aerial photography (both new flights and historical photo searches)
c. boundary surveys and land owner/property searches,
d. monitoring/baseline surveys
e. use of GIS.
Surveys and mapping deliverables may be required to be submitted in computer aided drafting design output.
Unless otherwise directed by USACE the Contractor shall utilize Geographic Information Systems (GIS), to generate location maps, vicinity maps, and site maps. Specific requirements for GIS and CADD will be provided in each Task Order PWS.
7.8 Expertise and Related Personnel
The Contractor shall provide the necessary personnel and equipment to successfully execute each PWS.
The Contractor is responsible for determining the requirements for licensed professionals and certifications. The Contractor shall furnish all plant, labor, materials and equipment necessary to meet the site objectives identified in each PWS. The Contractor shall provide personnel possessing necessary training required by the Occupational Safety and Health Administration (OSHA) and all other applicable federal and state regulations. The Contractor shall provide all support activities necessary to ensure the safe and effective accomplishment of all work. The Contractor must ensure that the quality of all work performed or produced under this contract meets Army approval. Quality control/assurance plans must be prepared and approved by the Contracting Officer prior to performance of physical work.
7.9 Certification and Approval of Project Performance Standards, Milestones, and Deliverables
The KO shall perform contract management, inspection, oversight, review, and approval activities.
Certification and approval of project performance standards, milestones & deliverables by the KO is necessary before distribution of progress payments. Final acceptance of performance standards, milestones & deliverables completion will include appropriate acceptance and approval of necessary site remediation documentation by regulators, consistent with CERCLA/NCP and other applicable regulations.
7.10 Travel
All travel costs proposed on task orders shall be in accordance with the FAR 31.205-46.
7.11 USACE Furnished Resources
The USACE shall make available the following resources to the Contractor:
o Records, reports, data, analyses, and information, in their presently available format (e.g., paper copy, electronic, tape, disks, CDs), to facilitate development of a complete and accurate assessment of current, former, and historical site activities and operations; waste generation and contaminant characteristics; parameters of interest; and site environmental conditions.
o Access to DoD and USACE policy and guidance documents.
7.12 Rights of Entry
U.S. Army is responsible for obtaining all Rights of Entry (ROE) for access or notifying property owners where the deed to their property indicates that the Army has reserved the right to reenter their property to address environmental issue at the Former Fort Devens Site. Contractor responsibilities in support of Rights of Entry will be defined in Task Orders.
The Contractor shall not enter any property not under the control of the Army without an approved Right of Entry or permission of USACE or the Army. The Contractor shall be required to comply with all conditions specified in the Right of Entry or Notification Letter.
7.13 Contractor Furnished Resources
The Contractor will be responsible for the following:
o Coordination with the USACE in order to get access to the Site, as required for execution of each
PWS.
o Coordination with the USACE in order to gain access to available infrastructure and utilities as required for execution of each PWS. The Contractor will be responsible for job trailers and storage, electricity, and other utilities as required to accomplish the work defined in Task Orders.
o The provision and cost of the utilities associated with implementation of remedies, including installation of individual meters for necessary utilities and will be defined in each Task Order
PWS.
o All waste generated under this contract will be the responsibility of the Contractor.
7.14 Government Rights
Prior to completion of each work element or task order, the Contractor shall transmit all project deliverables in native format and data for all phases of work on the task order, to the Government in electronic format.
Note: All data produced on task orders shall be subject to FAR 52.227-17 – Rights in Data – Special Works.
7.15 Stop Work Authority
All Contractor and authorized USACE personnel have the authority and responsibility to stop work immediately if the work is considered to be a serious threat to the safety or health of workers, other personnel, or to the environment. Authorized USACE personnel include USACE safety officers, USACE project personnel, and other personnel with responsibility for overall operations. When work is stopped due to a hazard/threat to worker safety, health, or the environment, the situation and resolution must be documented and submitted to the KO. Work must be stopped whenever chemical and biological warfare agents, radiological materials, or MEC are discovered. In addition, the KO has the authority to temporarily stop work on a project following a 24-hour (one working day) written notification to the Contractor. Stop work notices may be related to nonconformance to project specifications, lack of performance by the Contractor, financial considerations, funding considerations, and other circumstances outlined in the contract.
7.16 HEALTH AND SAFETY REQUIREMENTS
7.16.1 Accident Prevention Plan
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include an Activity Hazard Analysis (AHA) as described in 7.16.2 below. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385-1-1, most recent edition), and all applicable federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at Headquarters USACE website under publications using the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State and local safety and health laws, rules, and regulations.
The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference. Special attention shall focus on the requirements of EM 385-1- 1, specifically Section 01.A.12 through 01.A.14, 01.A.16, 01.A.17, Figure 1-2 AHA, and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). The APP shall be developed by a qualified person.
The contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project.
As part of the APP the contractor must prepare a Site Safety and Health Plan (SSHP) that that covers the 14 elements identified in EM385-1-1, Section 33.B.02. The SSHP shall be attached to the APP as an appendix. SSHP elements adequately covered elsewhere in the APP need not be duplicated again in the
SSHP.
The APP shall interface with the Contractor's overall safety and health program. Portions of the Contractor's overall safety and health program utilized in the APP shall be included and not just referenced in the APP element and shall be site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
The Contractor shall conduct a safety meeting at the project site on the first day of work, whenever a new activity or phase of work begins, or at least weekly during the progress of work. All safety meetings shall be documented. The attached safety meeting form or a similar contractor-prepared form shall be used.
Records of the safety briefings shall be submitted to the GDA weekly. See PWS Attachment A.
7.16.2 Activity Hazard Analysis
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHA has been accepted by the GDA. A preparatory meeting shall be conducted by the contractor to discuss the AHA contents with all engaged in the activity. The preparatory meeting shall be conducted by the prime contractor and shall include all subcontractors and Government on-site representatives. The AHA shall be continuously reviewed and revised to address changing site conditions or operations as appropriate.
7.16.3 Accident Reporting
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the GDA within 24 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the GDA. ENG Form 3394 shall be completed and submitted to the GDA within five working days of the incident. See PWS Attachment B.
The Contractor shall complete the attached “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 5th calendar day of the following month. The method of transmission by the prime contractor to the GDA shall be electronically. See PWS Attachment C.
7.16.4 Site Safety and Health Officer (SSHO
The Contractor shall designate one individual as the SSHO who shall have the qualifications as specified in EM 385-1-1, Section 01.A.17. Documentation of SSHO qualifications shall be submitted to the GDA for approval prior to initiating work. The SSHO shall have no other duties than site safety and health unless prior approval from GDA is obtained. The SSHO may not be the Contractor’s Site Superintendent.
7.1.6.5 MEC Awareness and Training
Munitions and explosives of concern (MEC) may be found during the course of executing this contract based on site history. Should MEC be encountered, the Contractor should stop work and secure the area and notify the USACE and Army. This response will be conducted in accordance with the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the National Oil and Hazardous Substances Contingency Plan (NCP), applicable state and federal regulations, and applicable Department of Defense (DOD), and U.S. Army regulations, policies and procedures.
Personnel completing intrusive activities at the former North and Main Posts must obtain a brief 1-hour MEC training at the Devens Fire Department. Another contractor is completing work at Former South Post (Fort Devens Reserves Forces Training Area). However, should any work under this IDIQ require tasks at Former South Post, personnel will need prior approval of range control; training by range control; compliance with range control requirements for performing work; and a MEC escort arranged by the Contractor.
7.17 Performance Evaluation
The Contractor will be subject to a performance evaluation annually and upon completion of all work under each task order. Incomplete and poor quality submittals (not meeting the requirements of this task order or not meeting professional standards), design errors made apparent during the construction phase, and failure to meet required schedules will affect this evaluation.
7.18 Sustainability Requirements
The Contractor shall review and fully understand "Planning for Federal Sustainability in the Next Decade” dated 19 March 2015, Section 16(b) in particular those requirements pertaining to environmental management system (EMS).
The Contractor shall consider and implement green response/remediation strategies and applications to maximize sustainability, reduce energy and water usage, promote carbon neutrality, promote industrial materials reuse and recycling, and protect and preserve land resources, consistent with DOD and EPA Policies on Green and Sustainable Remediation Practices in the EPA Federal Superfund Program (https://www.epa.gov/superfund/superfund-green-remediation). The contractor shall present green remediation options and approaches in its work plans, maintain records of “green-related” activities, and report this information to the KO in its project status reports.
The contractor shall meet the recycled content requirements set forth by EPA for the products identified in the following link: http://www3.epa.gov/epawaste/conserve/tools/cpg/products/).
The contractor shall meet the Bio-Preferred Program requirements set forth by USDA for the products identified in the following link:
http://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml) for updates.
All deliverables shall be printed double sided on paper that contains post-consumer fiber.
7.19 Manifesting, Transporting and Disposal Requirement
The Contractor shall review and/or develop information and implement the necessary manifesting, transportation and disposal criteria, procedures, and practices sufficient to protect personnel, the environment, and potential receptors from the chemical, physical, and/or biological hazards. The Contractor is responsible for certification of all manifests and total management of their transportation and disposal procedures including scheduling, control, and reporting. The Contractor's on-site person responsible for certification shall be trained as per 49 CFR 172.700.
8.0 Project Documents
ARCADIS U.S., Inc./G&M, Inc. (ARCADIS), 2005. Remedial Action Work Plan, AOC 50, Devens, Massachusetts. June.
Harding Environmental, Science & Engineering, 2001. Record of Decision, Area of Contamination 57, Devens Reserve Forces Training Area, Devens, Massachusetts.
September.
HLA, 1999. Record of Decision, Devens Consolidation Landfill, Devens, Massachusetts. July.
HGL, 2010. 2010 Five-Year Review Report, Former Fort Devens Army Installation, Devens, Massachusetts. September.
Horne Environmental Services, Inc., 2001. Record of Decision for the Defense Reutilization and Marketing Office Yard (AOC 32) and Petroleum, Oil, and Lubricants Storage Area (AOC 43A), Devens, Massachusetts. February.
KOMAN Government Solutions (KGS), 2015. Five Year Review for Former Fort Devens BRAC Legacy Sites. September.
KGS, 2016a. Quality Assurance Project Plan (QAPP) for the Annual Long-Term Monitoring (LTM) Program, Former Fort Devens Army Installation, Devens, Massachusetts. June.
KGS, 2016b. Five Year Review Report for Former Sudbury Training Annex, Sudbury, Massachusetts.
September.
KGS, 2017. Draft Final 2017 Long-Term Monitoring and Maintenance Plan, AOC 50. (Draft Final approved as final November 2017).
KGS, 2018a. Addendum to the Long-Term Monitoring and Maintenance Plan for Shepley’s Hill Landfill (SHL). January 25.
KGS, 2018b. Draft 2017 Annual Long-Term Monitoring Report – Main Post, Former Fort Devens Army Installation BRAC Legacy Sites, Devens, MA. April.
KGS, 2018c. 2017 Annual Long-Term Monitoring and Maintenance Report, Area of Contamination A7, Former Sudbury Training Annex, Sudbury. June.
KGS, 2018d. Area of Contamination (AOC) 50, 2018 Injection Program Summary, Former Fort Devens, Devens, MA. June 11.
KGS, 2018e. Draft Final 2017 Annual Long-Term Monitoring and Maintenance Report Area of Contamination Former Moore Army Airfield. August.
KGS, 2018f. Summary of Changes to LTMMP to the LTMMP for Area of Contamination A7, Former Sudbury Training Annex, October 27.
KGS, 2018g. Draft Final 2017 Annual Long-Term Monitoring and Maintenance Report, Area of
Contamination Shepley’s Hill Landfill. September. (Draft Final Approved as final).
O.H. Materials Remediation Services Corp., 1995. Record of Decision - Source Control Operable Unit, AOC A7, the Old Gravel Pit Landfill, AOC A9, the POL Burn Area, Fort Devens Sudbury Training Annex, Sudbury, Massachusetts. September.
Sovereign/HGL, 2015. Long Term Monitoring and Maintenance Plan for Former Fort Devens and Sudbury Annex. Final. March.
Sovereign, 2013. Explanation of Significant Differences (ESD) for Land Use Controls to Restrict Groundwater Use. Former Fort Devens, Devens, MA. December.
Sovereign, 2014. Land Use Control Implementation Plan (LUCIP) Former Fort Devens, Devens, MA.
August.
Sovereign, 2015. Long-Term Monitoring and Maintenance Plan Update, Shepley’s Hill Landfil, Former Fort Devens, Devens, MA. August.
U.S. Army Corps of Engineers (USACE), 2004. Final Record of Decision, AOC 50, Devens, Massachusetts. January.
U.S. Army BRAC Environmental Division, Army Garrison Fort Devens, 2011. Land-use Control Implementation Plan, Grant Housing Area and 37-mm Impact Area, Former Fort Devens Army Installation, Devens, Massachusetts. May. (LUCIP Addendum pending to include Oak and Maple Housing Area: latest version March 2017)
United States Environmental Protection Agency (USEPA) and U.S. Army, 1991. Final Federal Facilities Agreement Under CERCLA Section 120 for the Fort Devens Army Installation. November 15.
USEPA, 2016. Letter from Lynne Jennings, Chief, Superfund Federal Facility to William J. O’Donnell, Chief Reserve, Department of the Army Industrial and Medical Branch, Assistant Chief of Staff for Installation Management regarding “Former Fort Devens Informal Dispute Resolution 2015 Devens Five Year Review Report and Attachment 1 Scope of Work Former Fort Devens Pursuant to Section 19.3 and
33.2 of the Federal Facilities Agreement.” February 24.
U.S. Army, 2007. Real Property Management Plan for Devens Reserve Forces Training Area; Addendum, September.
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
52.242-15 Stop-Work Order AUG 1989
Section H - Special Contract Requirements
CMRA
CMRA
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract to include all task orders and modifications. The contractor is required to completely fill in all the information in the format described at the following web address: www.ecmra.mil. This website address includes links to a helpdesk and a user’s manual.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.