Removal Action Completion Report – Shepley’s Hill Landfill Barrier Wall Sovereign Consulting Inc.
Final Version
APPENDIX G
Construction Trench Profiles
MORETRENCH AMERICAN CORPORATION
170.0
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
EL
EV
AT
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
Platform Elevation Record Depth Backfill Depth End Day 8-17 Backfill Depth Start of Day 8-20 Backfill Depth End of Day 8-20
AREA / VOL. BACKFILLED TO
DATE
1778 SF / 198 CY
AREA / VOL. BACKFILLED
THIS DATE
1341 SF / 149 CY
AREA
EXCAVATED
3752 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
EL
EV
AT
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-21-12
Platform Elevation Record Depth Backfill Depth End Day 8-20 Backfill Depth Start of Day 8-22 Backfill Depth End of Day 8-21
AREA / VOL. BACKFILLED TO
DATE
3110 SF / 346 CY
AREA / VOL. BACKFILLED
THIS DATE
1323 SF / 147 CY
AREA
3752 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-22-12
Platform Elevation
Record Depth
Backfill Depth End Day 8-21
Backfill Depth Start of Day 8-23
Backfill Depth End of Day 8-22
AREA / VOL. BACKFILLED TO
DATE
5101 SF / 567 CY
AREA / VOL. BACKFILLED
THIS DATE
1892 SF / 210 CY
AREA
8356 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-23-12
Platform Elevation
Record Depth
Backfill Depth End Day 8-22
Backfill Depth Start of Day 8-24
Backfill Depth End of Day 8-23
AREA / VOL. BACKFILLED TO
DATE
7110 SF / 790 CY
AREA / VOL. BACKFILLED
THIS DATE
2004 SF /223CY
AREA
9786 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-27-12
Platform Elevation
Record Depth
Backfill Depth End Day 8-23
Backfill Depth Start of Day 8-28
Backfill Depth End of Day 8-27
AREA / VOL. BACKFILLED TO
DATE
8971 SF / 997CY
AREA / VOL. BACKFILLED
THIS DATE
1832SF /204CY
AREA
11358 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-28-12
Platform Elevation
Record Depth
Backfill Depth End Day 8-27
Backfill Depth Start of Day 8-29
Backfill Depth End of Day 8-28
AREA / VOL. BACKFILLED TO
DATE
9522 SF / 1058CY
AREA / VOL. BACKFILLED
THIS DATE
551SF /61CY
AREA
12217 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-29-12
Platform Elevation
Record Depth
Backfill Depth End Day 8-28
Backfill Depth Start of Day 8-30
Backfill Depth End of Day 8-29
AREA / VOL. BACKFILLED TO
DATE
11210 SF / 1246CY
AREA / VOL. BACKFILLED
THIS DATE
1661SF /185CY
AREA
14255 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-30-12
Working Platform
Record Depth
Backfill Depth End Day 8-29
Backfill Depth Start of Day 8-31
Backfill Depth End of Day 8-30
AREA / VOL. BACKFILLED TO
DATE
14088 SF / 1565CY
AREA / VOL. BACKFILLED
THIS DATE
1752SF /195CY
AREA
16507 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
8-31-12
Working Platform
Record Depth
Backfill Depth End Day 8-30
Backfill Depth Start of Day 9-4
Backfill Depth End of Day 8-31
AREA / VOL. BACKFILLED TO
DATE
15170 SF / 1686CY
AREA / VOL. BACKFILLED
THIS DATE
1080SF /120CY
AREA
17753 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-4-12
Working Platform
Record Depth
Backfill Depth End Day 8-31
Backfill Depth Start of Day 9-5
Backfill Depth End of Day 9-4
AREA / VOL. BACKFILLED TO
DATE
17618 SF / 1958CY
AREA / VOL. BACKFILLED
THIS DATE
2418 SF /269 CY
AREA
20399 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
6+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-5-12
Working Platform
Record Depth
Backfill Depth End Day 9-4
Backfill Depth Start of Day 9-6
Backfill Depth End of Day 9-5
AREA / VOL. BACKFILLED TO
DATE
18239 SF / 2027CY
AREA / VOL. BACKFILLED
THIS DATE
602 SF /67 CY
AREA
21192 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
6+
6+
6+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-6-12
Working Platform
Record Depth
Backfill Depth End Day 9-5
Backfill Depth Start of Day 9-7
Backfill Depth End of Day 9-6
AREA / VOL. BACKFILLED TO
DATE
19578 SF / 2175 CY
AREA / VOL. BACKFILLED
THIS DATE
1324 SF /147 CY
AREA
22830 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
6+
6+
6+
7+
7+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-7-12
Working Platform
Record Depth
Backfill Depth End Day 9-6
Backfill Depth Start of Day 9-10
Backfill Depth End of Day 9-7
AREA / VOL. BACKFILLED TO
DATE
21022 SF / 2336 CY
AREA / VOL. BACKFILLED
THIS DATE
1426 SF /158 CY
AREA
24610 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
6+
6+
6+
7+
7+
7+
7+
7+
8+
8+
8+
8+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-10-12
Working Platform
Record Depth
Backfill Depth End Day 9-7
Backfill Depth Start of Day 9-11
Backfill Depth End of Day 9-10
AREA / VOL. BACKFILLED TO
24201SF / 2689 CY
AREA / VOL. BACKFILLED
THIS DATE
3099 SF /344 CY
AREA
26967 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
6+
6+
6+
7+
7+
7+
7+
7+
8+
8+
8+
8+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-11-12
Working Platform
Record Depth
Backfill Depth End Day 9-10
Backfill Depth Start of Day 9-12
Backfill Depth End of Day 9-11
AREA / VOL. BACKFILLED TO
26028 SF / 2892 CY
AREA / VOL. BACKFILLED
THIS DATE
886 SF /98 CY
AREA
29762 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
6+
6+
6+
7+
7+
7+
7+
7+
8+
8+
8+
8+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-12-12
Working Platform
Record Depth
Backfill Depth End Day 9-11
Backfill Depth Start of Day 9-13
Backfill Depth End of Day 9-12
AREA / VOL. BACKFILLED TO DATE
28104 SF / 3123 CY
AREA / VOL. BACKFILLED
THIS DATE
2043 SF /227 CY
AREA EXCAVATED
30185 SF
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
0+
0+
0+
0+
0+
1+
1+
1+
1+
1+
2+
2+
2+
2+
2+
3+
3+
3+
3+
3+
4+
4+
4+
4+
4+
5+
5+
5+
5+
5+
6+
6+
6+
6+
6+
7+
7+
7+
7+
7+
8+
8+
8+
8+
E L
E V
A T
IO
N
STATIONS
Shepley's Hill Landfill Devens, MA
9-13-12
Working Platform
Record Depth
Backfill Depth End Day 9-12
Backfill Depth Start of Day 9-14
Backfill Depth End of Day 9-13
AREA / VOL. BACKFILLED TO DATE
30185 SF / 3354 CY
AREA / VOL. BACKFILLED
THIS DATE
2647 SF /294 CY
AREA EXCAVATED
30185 SF
APPENDIX H
Results of Laboratory Backfill Cap Quality Control Testing
Client: Moretrench American Corp.
Project Name: Shepley Landfill Project Location: Devens, MA
GTX #: 11659
Start Date: Tested By: ema End Date: Checked By: jdt Boring #: --- Sample #: Cap 2 Depth: --- Visual Description:
Sample Type: Remolded Permeant Fluid: De-aired Distilled water Orientation: Vertical Cell #: 1/14/23 Sample Preparation:
Height, in Diameter, in Area, in2
Volume, in3
Mass, g Bulk Density, pcf Moisture Content, % Dry Density, pcf Degree of Saturation, %
B COEFFICIENT DETERMINATION
Cell Pressure, psi: 95.0 Pressure Increment, psi: 5.02 Sample Pressure, psi: 90.2 B Coefficient: 0.97
FLOW DATA
Trial Elapsed Time, Permeability K, Temp, Permeability K @ 20 oC, Date # Cell Sample Z1 Z2 Z1-Z2 sec Gradient cm/sec oC Rt cm/sec 11/2 1 90 88 12.0 11.9 0.1 100 29.9 2.6E-08 20 1.000 2.6E-08 11/2 2 90 88 12.0 11.9 0.1 105 29.9 2.5E-08 20 1.000 2.5E-08 11/2 3 90 88 12.0 11.9 0.1 106 29.9 2.5E-08 20 1.000 2.5E-08 11/2 4 90 88 12.0 11.9 0.1 108 29.9 2.4E-08 20 1.000 2.4E-08
Pressure, psi
23.2 88.9
6.25
19.1
Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter by ASTM D 5084
Constant Volume
Initial
12.4
Test specimen compacted with moderate effort at the as-received moisture content . Trimmings moisture content = 22.4%
Final 1.99 2.82
Moist, yellowish brown clayey sand (soil-bentonite mix)
10/31/2012 11/5/2012
PERMEABILITY AT 20o C: 2.5 x 10-8 cm/sec (@ 2 psi effective stress)
Parameter 2.35 2.85 6.38 15.0
Manometer Readings
APPENDIX I
Results of Laboratory Landfill Liner Repair Destructive Testing
Project Location: Devens, MA
Installer: ---
GTX #: 11659
Test Date: 10/19/12
Tested By: meo Report #: 1
Checked By: md Page: 1 of 3
Upper Geomembrane: 40 mil black PVC Testing Machine: Instron 1123
Lower Geomembrane: 30 mil grey PVC Testing Speed: 20 in/min
Seaming Method: Glue Method Grips: ATS pneumatic
Specimen Size: 1 in x 8 in
Sample ID: Liner Sample 1 Machine ID: 66
Seam ID: --- Welder ID: HH
Date Sampled: 10/09/12
Comments:
Shear test halted for HDPE and LMDPE materials once specimen has elongated 50%.
Notes: These results apply only to the sample tested for the specific test conditions. The test procedures employed follow accepted industry practice and the indicated test method. GeoTesting Express has no specific knowledge as to conditioning, origin, sampling procedure or intended use of the material.
Estimate of seam separation visually determined based upon area of separated bond to the nearest
5%.
Rupture mode for specimens with >50% elongation (HDPE and LMDPE) or > machine capacity
(PVC, fPP, LLDPE, VFPE and VLDPE) interpreted as occurring in the membrane that exhibits yielding.
Shear test halted for PVC, fPP, LLDPE, VFPE and VLDPE once specimen has elongated past machine capacity.
--- --- 57 ---35 ---Average --- ---both500%
100% both
600%--- 56 both550%--- 55
59---
100%
1 34
---100% AD34
100%
---AD
100%
34 AD ---
Integrity of Nonreinforced Geomembrane Seams Produced
Using Thermo-Fusion Methods by ASTM D 6392 peel & shear destructive test
Shear Strength
Failure
Type
Elongation, lb./inSpecimen
Number
Peel Strength
Weld A Weld B lb./in Seam
Separation, %
Rupture
Mode lb./in
Seam
Separation, %
Failure
Type
450%
500% both both
AD
AD ------
Form D6392, revision 2
Project Location: Devens, MA
Installer: ---
GTX #: 11659
Test Date: 10/19/12
Tested By: meo Report #: 1
Checked By: md Page: 2 of 3
Upper Geomembrane: 40 mil black PVC Testing Machine: Instron 1123
Lower Geomembrane: 30 mil grey PVC Testing Speed: 20 in/min
Seaming Method: Glue Method Grips: ATS pneumatic
Specimen Size: 1 in x 8 in
Sample ID: Liner Sample 2 Machine ID: 66
Seam ID: --- Welder ID: HH
Date Sampled: 10/09/12
Comments:
Shear test halted for HDPE and LMDPE materials once specimen has elongated 50%.
Integrity of Nonreinforced Geomembrane Seams Produced
Using Thermo-Fusion Methods by ASTM D 6392 peel & shear destructive test
Specimen
Number
Peel Strength
Shear Strength Weld A Weld B lb./in Seam
Separation, %
Failure
Type lb./in
Seam
Separation, %
Failure
Type lb./in
Elongation, Rupture
Mode
--- --- 57 450% both1 32 100% AD ---
--- --- 52 500% both2 29 100% AD ---
--- --- 53 550% both3 26 100% AD ---
--- --- 56 450% both4 21 100% AD ---
--- --- 57 500% both5 18 100% AD ---
Estimate of seam separation visually determined based upon area of separated bond to the nearest
5%.
Shear test halted for PVC, fPP, LLDPE, VFPE and VLDPE once specimen has elongated past machine capacity.
Rupture mode for specimens with >50% elongation (HDPE and LMDPE) or > machine capacity
(PVC, fPP, LLDPE, VFPE and VLDPE) interpreted as occurring in the membrane that exhibits yielding.
Notes: These results apply only to the sample tested for the specific test conditions. The test procedures employed follow accepted industry practice and the indicated test method. GeoTesting Express has no specific knowledge as to conditioning, origin, sampling procedure or intended use of the material.
--- --- 55 --- ---Average 25 --- --- ---
Project Location: Devens, MA
Installer: ---
GTX #: 11659
Test Date: 10/19/12
Tested By: meo Report #: 1
Checked By: md Page: 3 of 3
Upper Geomembrane: 40 mil black PVC Testing Machine: Instron 1123
Lower Geomembrane: 30 mil grey PVC Testing Speed: 20 in/min
Seaming Method: Glue Method Grips: ATS pneumatic
Specimen Size: 1 in x 8 in
Sample ID: Liner Sample 3 Machine ID: 66
Seam ID: --- Welder ID: HH
Date Sampled: 10/09/12
Comments:
Shear test halted for HDPE and LMDPE materials once specimen has elongated 50%.
Integrity of Nonreinforced Geomembrane Seams Produced
Using Thermo-Fusion Methods by ASTM D 6392 peel & shear destructive test
Specimen
Number
Peel Strength
Shear Strength Weld A Weld B lb./in Seam
Separation, %
Failure
Type lb./in
Seam
Separation, %
Failure
Type lb./in
Elongation, Rupture
Mode both
2 31 100% AD --- --- --- 58 700% both
1 27 100% AD --- --- --- 57 650%
both
4 32 100% AD --- --- --- 57 600% both
3 35 100% AD --- --- --- 56 750%
Estimate of seam separation visually determined based upon area of separated bond to the nearest
5%.
Shear test halted for PVC, fPP, LLDPE, VFPE and VLDPE once specimen has elongated past machine capacity.
Rupture mode for specimens with >50% elongation (HDPE and LMDPE) or > machine capacity
(PVC, fPP, LLDPE, VFPE and VLDPE) interpreted as occurring in the membrane that exhibits yielding.
Notes: These results apply only to the sample tested for the specific test conditions. The test procedures employed follow accepted industry practice and the indicated test method. GeoTesting Express has no specific knowledge as to conditioning, origin, sampling procedure or intended use of the material.
both
Average 31 --- --- --- --- --- 57 --- ---
5 31 100% AD --- --- --- 59 700%
APPENDIX J
Contractors Quality Control Reports
(See CD Included Separately)
CONTRACTORS QUALITY CONTROL REPORT (QCR)
DAILY LOG OF CONSTRUCTION
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
23 Jul 2012 - Monday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 68 °F, Max 87 °F; No Precipitation; 5 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Mortrench and it subcontractors. Proivided on-site QC and documentation Mortrech - Provided oversight of its subcontractors WSP Sells and Gatsby Grounds WSP Sells - Pre-contruction Survey Gatsby Grounds - Mowing
Activities in Progress (List by Activity Number) DFW: Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) No QC inspection conducted during the day.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench and their subcontractors. Took photo documentation of exsisting conditions along the barrier wall alignment and work platform areas prior to mowing. Photo IDs: 072312-01 through -51.
Moretrench: Provided oversight of their subcontractors WSP Sells and Gatsby Grounds.
Gatsby Grounds: Conducted mowing activites in area of barrier wall and working platform WSP Sells: Completed pre-construction survey of grade, barrier wall alignment, and off-sets along the working platform area.
After discovering landfill liner in the area to the south / southwest of the current stockpiled soils it was determined by Sovereign and Moretrench to moving the proposed stagging area from this location the area east of the the current stockpiled soils.
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP reviewed and signed.
Gatsby Grounds mowing equipment inspected prior to use.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
23 Jul 2012 - Monday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
Today was the first day on site for the following contractor:
Sovereign
No contractors had their last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech LANDSCAPE CONTRACTOR 1.0 2.0 Moretrech SUPER - CONSTRUCTION 1.0 8.5 Moretrech SURVEYOR 2.0 13.0 Sovereign SUPER - JOB 1.0 9.3
Total 5.0 32.8Total hours worked to date: 32.8
EQUIPMENT HOURS
No equipment hours were Reported today
Total operating hours to date: 0.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
QC REPRESENTATIVE'S SIGNATURE DATE SUPERINTENDENT'S INITIALS DATE
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
24 Jul 2012 - Tuesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 76 °F, Max 86 °F; No Precipitation; 5 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Mortrench. Provided on-site QC and documentation Mortrech - Conducted layout of stagging area.
Activities in Progress (List by Activity Number) DFW: Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) No QC inspection conducted during the day.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Took photo documentation of of pre-contruction conditions along the barrier wall alignment and work platform areas following to mowing and pre-construction survey activites completed on the prior day. Photo IDs:
072412-01 through -29. Continued demobliization of storage container used during pre-construction sub-surface investigation.
Moretrench: Condcuted layout of stagging area to the east of the exsisiting soil stock piles.
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
24 Jul 2012 - Tuesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech SUPER - CONSTRUCTION 1.0 4.0 Sovereign SUPER - JOB 1.0 4.0
Total 2.0 8.0Total hours worked to date: 40.8
EQUIPMENT HOURS
No equipment hours were Reported today
Total operating hours to date: 0.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
25 Jul 2012 - Wednesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 67 °F, Max 73 °F; No Precipitation; 15 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Drllex. Provided on-site QC and documentation.
Drillex - Conducted decomissioning of four (4) EPA piezometers
Activities in Progress (List by Activity Number) DFW: Mobilization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) No QC inspection conducted during the day.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Drillex. Took photo documentation of post abandonment of EPA RSK piezometers along the barrier wall alignment and work platform areas. Photo IDs: 072512-01 through -04.
Drillex: Condcuted abandonment of EPA piezometers RSK-26,-29,-30 and -33. RSK-26,-30 and -30 were unable to be completely removed from the subsurface. RSK-26 and -30 were cut approximately 1 foot below grade surface. RSK-33 was removed down to 5 feet below grade surface by removing the f irst 5 feet of casing. RSK-29 was able to be removed completely from the subsurface.
All piezometers were grouted to surface with Portalnd Cement.
Materials Brought on Site:
Type I/II Portland Cement
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP reviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
No Deficiency items were corrected today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
25 Jul 2012 - Wednesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
Today was the first day on site for the following contractor:
Drillex Env.
Today was the last day on site for the following contractor:
Drillex Env.
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Drillex Env. DRILLER OPERATOR 1.0 2.5 Sovereign SUPER - JOB 1.0 3.5
Total 2.0 6.0Total hours worked to date: 46.8
EQUIPMENT HOURS
No equipment hours were Reported today
Total operating hours to date: 0.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
30 Jul 2012 - Monday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 60 °F, Max 78 °F; No Precipitation; 5 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization
Activities in Progress (List by Activity Number) DFW: Mobilization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) No QC inspection conducted during the day.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench.
Moretrench: Condcuted the fusing of approximately 1,000 linear feet of 6" HDPE pipe.
Materials Brought on Site:
4" and 6" HDPE
Equipment Brought on Site:
Temporary Facilities (port-o-john)
Catapillar 938G Loader
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
30 Jul 2012 - Monday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 8.0 Moretrech LABORERS 1.0 8.0 Moretrech SUPER - CONSTRUCTION 2.0 16.0 Sovereign SUPER - JOB 1.0 8.0
Total 5.0 40.0Total hours worked to date: 86.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Loader 0.50 8.00 Total 0.50 8.00Total operating hours to date: 8.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
31 Jul 2012 - Tuesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 63 °F, Max 83 °F; No Precipitation; 5 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization
Activities in Progress (List by Activity Number) DFW: Mobilization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) No QC inspection conducted during the day.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Took photo documentation of road construction activities. Photo IDs:
07312-01 through -13.
Moretrench: Condcuted the fusing of approximately 1,000 linear feet of 6" HDPE pipe. Cut and graded road out to staging area around exsisting soil stockpiles
Materials Brought on Site:
Geo-tech fabric for road base
Equipment Brought on Site:
John Deere 450J Dozer
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
31 Jul 2012 - Tuesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 8.0 Moretrech LABORERS 1.0 8.0 Moretrech SUPER - CONSTRUCTION 2.0 16.0 Sovereign SUPER - JOB 1.0 8.0
Total 5.0 40.0Total hours worked to date: 126.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Bull Dozer 4.50 4.00 N/A Loader 4.50 4.00
Total 9.00 8.00Total operating hours to date: 16.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
01 Aug 2012 - Wednesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 67 °F, Max 85 °F; No Precipitation; 10 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization
Activities in Progress (List by Activity Number) DFW: Moblization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) Processed gravel inspected upon arrival. No defecencies noted
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
Due to malfunction of hot plate associated with pipe fuser the remaining HDPE pipe was unable be fused during the day.
New hot plate to arrive on 8/3/12 to compelete fusing.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Took photo documentation of road construction. Photo IDs: 080112-01 through -11.
Moretrench: Condcuted the fusing of approximately 450 linear feet of 4" HDPE pipe. Graded and stoned road out to staging area around exsisting soil stockpiles
Materials Brought on Site:
127.08 tons of 1 1/2" MassDOT approved Processed Gravel
Equipment Brought on Site:
None
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
01 Aug 2012 - Wednesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 8.0 Moretrech LABORERS 1.0 8.0 Moretrech SUPER - CONSTRUCTION 2.0 16.0 Sovereign SUPER - JOB 2.0 8.0
Total 6.0 40.0Total hours worked to date: 166.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Bull Dozer 5.50 3.00 N/A Loader 3.50 5.00
Total 9.00 8.00Total operating hours to date: 24.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
02 Aug 2012 - Thursday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused Non-Critical Delay Temperature Min 72 °F, Max 91 °F; No Precipitation; 10 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization
Activities in Progress (List by Activity Number) DFW: Moblization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) Processed gravel inspected upon arrival. No defecencies noted.
All three Alder tanks inspected upon arrival. All clean and no defecencies noted.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
Half an hour delay in work during the day due to observed lighting strikes in the area.
After a half an hour lighting ceased. No precipitation observed on site.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Took photo documentation of construction of laydown area. Photo IDs:
080212-01 through -06.
Moretrench: Finished construction of haul road and laydown area. Improved access road. Began shaking out of f ittings for slurry piping.
Materials Brought on Site:
130.28 tons of 1 1/2" MassDOT approved Processed Gravel
900 (50 lbs) bags of Hydrogel Wyoming Bentonite. Certif ied NSF / ANSI 60
Equipment Brought on Site:
Three (3) Alder Tanks
Moretrech Job Trailer and Tool Trailer.
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
02 Aug 2012 - Thursday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 8.0 Moretrech LABORERS 1.0 8.0 Moretrech PROJECT ENGINEER 1.0 8.0 Moretrech SUPER - CONSTRUCTION 2.0 16.0 Sovereign SUPER - JOB 1.0 8.0
Total 6.0 48.0Total hours worked to date: 214.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Bull Dozer 5.50 3.00 N/A Loader 3.50 5.00
Total 9.00 8.00Total operating hours to date: 32.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
03 Aug 2012 - Friday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 72 °F, Max 91 °F; No Precipitation; 10 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization
Activities in Progress (List by Activity Number) DFW: Moblization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) Silt fence installation was inspected during and after completion. No deficencies noted.
Hay bales to be installed the following work day.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress encountered during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Took photo documentation of silt fence installation activities. Photo IDs:
080312-01 through -06.
Moretrench: Mobilized and began setting up slurry plant, generator, fuel cell, and miscellaneous f ittings and hoses. Wired generator and job trailers. Gatsby Grounds, sub to Moretrench, installed approximately 500 liinear feet of silt fencing east of the barrier wall alignment along the exsisting chain link fence. Silt fence extended from approximately barrier wall station 2+50 to 7+00.
Materials Brought on Site:
500 feet of silt fence
Equipment Brought on Site:
Sovereign job trailer Slurry plant Generator Fuel cell Miscellaneous f ittings, hoses, and pumps.
Crane Mats
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
03 Aug 2012 - Friday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 8.0 Moretrech LABORERS 1.0 8.0 Moretrech LANDSCAPE LABORERS 2.0 10.0 Moretrech PROJECT ENGINEER 1.0 8.0 Moretrech SUPER - CONSTRUCTION 1.0 8.0 Sovereign SUPER - JOB 1.0 8.0
Total 7.0 50.0Total hours worked to date: 264.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Bull Dozer 8.50 0.00 N/A Loader 1.50 7.00
Total 10.00 7.00Total operating hours to date: 39.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
06 Aug 2012 - Monday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 65 °F, Max 85 °F; No Precipitation; 10 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization
Activities in Progress (List by Activity Number) DFW: Moblization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) Hay bales to be inspected upon delivery. No deficencies noted. All materials accepted.
Bentonite 50 pound bags and bulk bags inspected upon delivery. No deficencies noted. All materials accepted.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress encountered during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Cleaned out storage container used during pre-construction sub-surface investigation for removal from site.
Moretrench: Began setting up slurry plant pumps. Continued to fuse HDPE pipe and began to run pipe out from the slurry plant to the hydrant at site entrance on Cook St. Gatsby Grounds, sub to Moretrench, installed 128 bails of hay along the silt fencing east of the barrier wall alignment. Began double staking each hay bail. Errosion control activities to be completed the following day.
Materials Brought on Site:
128 Hay Bails
900 (50 lb) bags of Hydogel Wyoming Bentonite 17 Bulk Bags of Hydogel Wyoming Bentonite
Equipment Brought on Site:
T750 Bob Cat
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
06 Aug 2012 - Monday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 10.0 Moretrech LABORERS 1.0 10.0 Moretrech LANDSCAPE LABORERS 2.0 9.0 Moretrech PROJECT ENGINEER 1.0 10.0 Moretrech SUPER - CONSTRUCTION 1.0 10.0 Sovereign SUPER - JOB 1.0 10.0
Total 7.0 59.0Total hours worked to date: 323.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Bull Dozer 10.00 0.00 N/A Loader 1.00 9.00 N/A Tracked Bobcat 2.00 2.50
Total 13.00 11.50Total operating hours to date: 50.50
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
07 Aug 2012 - Tuesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 63 °F, Max 87 °F; No Precipitation; 10 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization
Activities in Progress (List by Activity Number) DFW: Moblization / Site Preparation in progress
Quality Control Inspections and Activities (List by Feature of Work) Bentonite 50 pound bags and bulk bags inspected upon delivery. No deficencies noted. All materials accepted.
Errosion control installation (silt fence and hail bails) inspected during initial inspection. No deficencies noted
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress encountered during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Conducted photograph documentation Photograph IDs: 080712-01 throuogh 080712-14
Moretrench: Continued setting up pumps and piping for slurry plant and tanks. Continued to guse pipe and completed stretching to hydrant at site entrance on Cook St. Tested piping and f lushed out water line. Began wiring slurry submersible pumps.
Materials Brought on Site:
1800 (50 lb) bags of Hydogel Wyoming Bentonite 17 Bulk Bags of Hydogel Wyoming Bentonite
Equipment Brought on Site:
Recieved backflow preventer and hydrant meter from Devens DPW (United Water)
Verbal Instructions given by Government:
Randy LeCuyer (USACE construction rep) requested Sovereign and Moretrench install secondary containment around fuel cell, generator, and main slurry plant pump consisting of plactic sheeting and berm.
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory inspections were held today
An initial inspection was held today for the following feature:
Mobilization / Site Prep.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
07 Aug 2012 - Tuesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 8.0 Moretrech LABORERS 1.0 8.0 Moretrech PROJECT ENGINEER 1.0 8.0 Moretrech SUPER - CONSTRUCTION 1.0 8.0 Sovereign SUPER - JOB 1.0 8.0
Total 5.0 40.0Total hours worked to date: 363.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Bull Dozer 8.50 0.00 N/A Loader 2.00 6.50
Total 10.50 6.50Total operating hours to date: 57.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report is complete and correct and all equipment and material used and work performed during this Reporting period are in compliance with the contract plans and specifications, to the best of my knowledge, except as noted above.
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
08 Aug 2012 - Wednesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
CONTRACTOR WEATHER
Weather Caused No Delay Temperature Min 70 °F, Max 94 °F; No Precipitation; 5 MPH Wind
Sovereign Consulting Inc.
QC NARRATIVES
Contractor/Subcontractor & Area of Responsibility for work:
Sovereign - Provided oversight of Moretrench. Provided on-site QC and documentation.
Moretrench - Conducted site prep. and mobilization. Began construction of workling platform.
Activities in Progress (List by Activity Number) DFW: Moblization / Site Preparation in progress DFW: Construction of Working Platform
Quality Control Inspections and Activities (List by Feature of Work) No major QC inspections conducted during the day.
Did anything develop that may lead to a Change Order/Claim?
No developments that may lead to a Change Oder during the day.
Were there any Delays in Work Progress today?
No delays in work progress encountered during the day.
General Comments:
Work Completed During the Day:
Sovereign: Provided oversight and on-site QC of Moretrench. Conducted photograph documentation Photograph IDs: 080812-01 throuogh 080812-10. Took all boring cores from previous SHL sub-surface investigates and added them to spoils pile.
Moretrench: Continued to fuse pip and setup piping for slurry plant and tanks. Continued wiring slurry submersible pumps. Setup secondary containment areas around fuel cell, genterator and main slurry plant pump. Began grubbing and grading f irst 300 feet of the working platform
Materials Brought on Site:
No additional materials brought on site during the day.
Equipment Brought on Site:
30 CY Dumpster (Waste Management)
Verbal Instructions given by Government:
No verbal instructions given by the government during the day.
Safety Inspection / Safety Meetings:
Tailgate Safety Meeting held prior to start of day's work activities. Site HASP and applicable AHA's eviewed prior to start of work activties.
PREP/INITIAL DATES (Preparatory and initial dates held and advance notice)
No preparatory or initial inspections were held today
ACTIVITY START/FINISH
No activities were started or finished today
QC REQUIREMENTS
No QC requirements were completed today
REPORT NUMBER
DATE
PROJECT CONTRACT NUMBER
08 Aug 2012 - Wednesday
W912WJ-10-D-0003 0002Shepley's Landfil, Devens Cutoff Wall
QA/QC DEFICIENCY (Describe QC Deficiency items issued, Report QC and QA Deficiency items corrected)
No QC Deficiency items were issued today
No Deficiency items were corrected today
CONTRACTORS ON SITE (Report f irst and/or last day contractors were on site)
No contractors had their first or last day on site today
LABOR HOURS
The following labor hours were Reported today: Number of Hours Employer Labor Classif ication Employees Worked
Moretrech HEAVY-EQUIPMENT OPERATOR 1.0 8.0 Moretrech LABORERS 1.0 8.0 Moretrech PROJECT ENGINEER 1.0 8.0 Moretrech SUPER - CONSTRUCTION 2.0 16.0 Sovereign SAFETY ENGINEER - ON SITE 1.0 5.0 Sovereign SUPER - JOB 1.0 8.0
Total 7.0 53.0Total hours worked to date: 416.8
EQUIPMENT HOURS
The following equipment hours were Reported today: Idle Operating Serial Number Description Hours Hours
N/A Bull Dozer 4.50 4.00 N/A Loader 4.50 4.00
Total 9.00 8.00Total operating hours to date: 65.00
ACCIDENT REPORTING (Describe accidents)
No accidents reported today
CONTRACTOR CERTIFICATION On behalf of the contractor, I certify that this Report…