Exhibit D_Bid Schedule_W912TF-17-R-0503.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Pease ANGB, Newington NH, KC46A ADAL Airfield Pavements & Hydrant AND Repair Aircraft Parking Apron
Solicitation number
W912TF-17-R-0503
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
W912TF17R0503_SZCQ139905__SZCQ152910_-_RFI_Tracker_(As_of_20170524).xlsx XLSX spreadsheet
SZCQ139905_33_65_00_REVISED.PDF PDF
W912TF-17-R-0503-0004_(Amendment_4).pdf PDF
SZCQ139905_33_71_02_REVISED.PDF PDF
W912TF-17-R-0503-0003_(Amendment_3)_(Conform_Copy).pdf PDF
W912TF17R0503_SZCQ139905__SZCQ152910_-_RFI_Tracker_(As_of_20170522).xlsx XLSX spreadsheet
W912TF-17-R-0503-0003_(Amendment_3).pdf PDF
Pease_Utility_Plans_20161228.pdf PDF
Exhibit_D_Bid_Schedule_W912TF-17-R-0503.xlsx XLSX spreadsheet
W912TF-17-R-0503-0002_(Amendment_2)_(Conform_Copy).pdf PDF
W912TF17R0503_SZCQ139905__SZCQ152910_-_RFI_Tracker_(As_of_20170515).xlsx XLSX spreadsheet
AF_BRAC_Flightline_Groundwater_Monitoring_Zone_Well_Locations_(2012).pdf PDF
SZCQ139905_Geotechnical_Data_Report_20140523.pdf PDF
W912TF-17-R-0503-0002_(Amendment_2).pdf PDF
W912TF17R0503 SZCQ139905 SZCQ152910 - RFI Tracker —
Exhibit D_Bid Schedule_W912TF-17-R-0503.xlsx XLSX spreadsheet
W912TF-17-R-0503-0002 —
AF BRAC Flightline Groundwater Monitoring Zone Well Locations —
SZCQ139905_Geotechnical Data Report_20140523.pdf PDF
W912TF-17-R-0503-0002 —
Pease Utility Plans_20161228.pdf PDF
W912TF17R0503_RFI_Tracker_(As_of_20170427).pdf PDF
W912TF17R0503_RFI_Tracker_(As_of_20170427).xlsx XLSX spreadsheet
W912TF-17-R-0503-0001_(Amendment_1).pdf PDF
Pre-Proposal Conference & Site Visit Sign in Sheet_14 April 2017.pdf PDF
Pre-Proposal Conference & Site Visit Meeting Minutes_14 April 2017.pdf PDF
Pre-Proposal Conference & Site Visit Slides_14 APR 2017.pdf PDF
W912TF-17-R-0503_SZCQ139905_&_SZCQ152910_3_APR_2017.pdf PDF
EXHIBIT_C_W912TF-17-R-0503_3_APR_2017.doc DOC document
EXHIBIT_B_W912TF-17-R-0503_3_APR_2017.doc DOC document
EXHIBIT_A_W912TF-17-R-0503_3_APR_2017.doc DOC document
Bid_Schedule_W912TF-17-R-0503_3_APR_2017.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Bid Schedule
Solicitation:W912TF-17-R-0503
Project Number:SZCQ139905 & SZCQ152910
Project Title:KC-46A ADAL AIRFIELD PAVEMENTS AND HYDRANT SYSTEMS & REPAIR AIRCRAFT PARKING APRON PHASE IIIA
Offeror Name:
Date Submitted:
CLINDescriptionQuantityUnit of MeasureAmount
0001BASE BID SZCQ139905
Demolition - Pavement1Job$ - 0
Demolition - Existing Fuel System1Job$ - 0
Hydrant Fuel System1Job$ - 0
Pavement Repair/Replacement1Job$ - 0
Pavement Markings1Job$ - 0
Supporting Facilities1Job$ - 0
Temporary Facilities1Job$ - 0
Total Base Bid SZCQ139905$ - 0
0002BASE BID SZCQ152910
Demolition - Pavement1Job$ - 0
Pavement Repair/Replacement1Job$ - 0
Pavement Markings1Job$ - 0
Supporting Facilities1Job$ - 0
Temporary Facilities1Job$ - 0
Total Base Bid SZCQ152910$ - 0

Base Bid Total $ - 0

Option CLINDescriptionQuantityUnit of MeasureAmount
3SZCQ139905 Optional Line Item #1 (OLI #1)- Pavement Markings for Extended Main Parking Apron1Job$ - 0
4SZCQ152910 Optional Line Item #1 (OLI #1) - Pavement Demolition of Existing Quad Taxiway1Job$ - 0
Option Total$ - 0
CMRA CLINDescriptionQuantityUnit of MeasureAmount
5SZCQ139905 Contract Manpower Reporting Act (CMRA)1Job$ - 0
6SZCQ152910 Contract Manpower Reporting Act (CMRA)1Job$ - 0
CMRA Total$ - 0

Note: The Offeror shall apportion overhead, profit, and shared costs proportionatley between CLIN 0001 and CLIN 0002.

CLIN 0001 – Base Bid SZCQ139905
Demolition - Pavement – Concrete slabs, Joint material, base material, reinforcing steel/dowels, HMA Pavement, HMA Base Course
Demolition - Existing Fuel System – Existing Hydrant Fuel Pits, Existing High/Low Point Pits, Grout-filling Abandoned Fuel Line
Hydrant Fuel System – Stainless Steel Fuel Pipe, Carbon Steel Containment Pipe, Fuel Hydrant Pits (including Outlet, High/Low Point, Isolation Valve), Cathodic Protection System, Leak Detection System, EFSO, Monitoring, Connections and Valves, Testing, Grounding, Trenching and Backfill
Pavement Repair/Replacement – PCC Pavement (Base and Subbase Included), Reinforcing Steel, Load Transfer Dowels, Joint Materials, HMA Pavement (Base and Subbase Included), Static Ground Points, Tie-down/Mooring Points, Prime Coat, Tack Coat
Pavement Markings – Pavement markings (including site prep), Pavement messages/signs, Removal of existing pavement markings
Supporting Facilities - Utility Adjustments (Electrical Manholes, Stormwater and Groundwater Monitoring Wells)
CLIN 0002 – Base Bid SZCQ152910
Demolition – Concrete slabs, Joint material, base material, reinforcing steel/dowels, storm pipe and catch basins
Pavement Repair/Replacement – PCC Pavement (Base and Subbase Included), Reinforcing Steel, Load Transfer Dowels, Joint Materials, Storm Pipe, Storm Catch Basins
Pavement Markings – Pavement markings (including site prep), Pavement messages/signs, Removal of existing pavement markings
Supporting Facilities - Utility Adjustments (Groundwater Monitoring Wells)
CLIN 0003 – SZCQ139905 Optional Line Item #1 (OLI #1)
OLI #1 - Pavement Markings for Extended Main Parking Apron – Pavement markings (including site prep), Pavement messages/signs, Removal of existing pavement markings
CLIN 0004 – SZCQ152910 Optional Line Item #1 (OLI #1)
OLI #1 - Pavement Demolition of Existing Quad Taxiway – Concrete slabs, Joint material, base material, reinforcing steel/dowels, HMA Pavement, HMA Base Course