Bid Schedule
| Bid Schedule | |
| Solicitation: | W912TF-17-R-0503 |
| Project Number: | SZCQ139905 & SZCQ152910 |
| Project Title: | KC-46A ADAL AIRFIELD PAVEMENTS AND HYDRANT SYSTEMS & REPAIR AIRCRAFT PARKING APRON PHASE IIIA |
| Offeror Name: | |
| Date Submitted: | |
| CLIN | Description | Quantity | Unit of Measure | Amount |
| 0001 | BASE BID SZCQ139905 | | | |
| Demolition - Pavement | 1 | Job | $ - 0 |
| Demolition - Existing Fuel System | 1 | Job | $ - 0 |
| Hydrant Fuel System | 1 | Job | $ - 0 |
| Pavement Repair/Replacement | 1 | Job | $ - 0 |
| Pavement Markings | 1 | Job | $ - 0 |
| Supporting Facilities | 1 | Job | $ - 0 |
| Temporary Facilities | 1 | Job | $ - 0 |
| | Total Base Bid SZCQ139905 | | $ - 0 |
| 0002 | BASE BID SZCQ152910 | | | |
| Demolition - Pavement | 1 | Job | $ - 0 |
| Pavement Repair/Replacement | 1 | Job | $ - 0 |
| Pavement Markings | 1 | Job | $ - 0 |
| Supporting Facilities | 1 | Job | $ - 0 |
| Temporary Facilities | 1 | Job | $ - 0 |
| | Total Base Bid SZCQ152910 | | $ - 0 |
Base Bid Total $ - 0
| Option CLIN | Description | Quantity | Unit of Measure | Amount |
| 3 | SZCQ139905 Optional Line Item #1 (OLI #1)- Pavement Markings for Extended Main Parking Apron | 1 | Job | $ - 0 |
| 4 | SZCQ152910 Optional Line Item #1 (OLI #1) - Pavement Demolition of Existing Quad Taxiway | 1 | Job | $ - 0 |
| | Option Total | | $ - 0 |
| CMRA CLIN | Description | Quantity | Unit of Measure | Amount |
| 5 | SZCQ139905 Contract Manpower Reporting Act (CMRA) | 1 | Job | $ - 0 |
| 6 | SZCQ152910 Contract Manpower Reporting Act (CMRA) | 1 | Job | $ - 0 |
| | CMRA Total | | $ - 0 |
Note: The Offeror shall apportion overhead, profit, and shared costs proportionatley between CLIN 0001 and CLIN 0002.
| CLIN 0001 – Base Bid SZCQ139905 |
| Demolition - Pavement – Concrete slabs, Joint material, base material, reinforcing steel/dowels, HMA Pavement, HMA Base Course |
| Demolition - Existing Fuel System – Existing Hydrant Fuel Pits, Existing High/Low Point Pits, Grout-filling Abandoned Fuel Line |
| Hydrant Fuel System – Stainless Steel Fuel Pipe, Carbon Steel Containment Pipe, Fuel Hydrant Pits (including Outlet, High/Low Point, Isolation Valve), Cathodic Protection System, Leak Detection System, EFSO, Monitoring, Connections and Valves, Testing, Grounding, Trenching and Backfill |
| Pavement Repair/Replacement – PCC Pavement (Base and Subbase Included), Reinforcing Steel, Load Transfer Dowels, Joint Materials, HMA Pavement (Base and Subbase Included), Static Ground Points, Tie-down/Mooring Points, Prime Coat, Tack Coat |
| Pavement Markings – Pavement markings (including site prep), Pavement messages/signs, Removal of existing pavement markings |
| Supporting Facilities - Utility Adjustments (Electrical Manholes, Stormwater and Groundwater Monitoring Wells) |
| CLIN 0002 – Base Bid SZCQ152910 |
| Demolition – Concrete slabs, Joint material, base material, reinforcing steel/dowels, storm pipe and catch basins |
| Pavement Repair/Replacement – PCC Pavement (Base and Subbase Included), Reinforcing Steel, Load Transfer Dowels, Joint Materials, Storm Pipe, Storm Catch Basins |
| Pavement Markings – Pavement markings (including site prep), Pavement messages/signs, Removal of existing pavement markings |
| Supporting Facilities - Utility Adjustments (Groundwater Monitoring Wells) |
| CLIN 0003 – SZCQ139905 Optional Line Item #1 (OLI #1) |
| OLI #1 - Pavement Markings for Extended Main Parking Apron – Pavement markings (including site prep), Pavement messages/signs, Removal of existing pavement markings |
| CLIN 0004 – SZCQ152910 Optional Line Item #1 (OLI #1) |
| OLI #1 - Pavement Demolition of Existing Quad Taxiway – Concrete slabs, Joint material, base material, reinforcing steel/dowels, HMA Pavement, HMA Base Course |