SZCQ139905_33_65_00_REVISED.PDF

PDF 85 KB Posted

Attached to
Pease ANGB, Newington NH, KC46A ADAL Airfield Pavements & Hydrant AND Repair Aircraft Parking Apron
Solicitation number
W912TF-17-R-0503
Issued by

About this file

SZCQ139905_33 65 00 REVISED

View the file

Other files

File Type Posted
W912TF17R0503_SZCQ139905__SZCQ152910_-_RFI_Tracker_(As_of_20170524).xlsx XLSX spreadsheet
W912TF-17-R-0503-0004_(Amendment_4).pdf PDF
SZCQ139905_33_71_02_REVISED.PDF PDF
W912TF-17-R-0503-0003_(Amendment_3)_(Conform_Copy).pdf PDF
W912TF17R0503_SZCQ139905__SZCQ152910_-_RFI_Tracker_(As_of_20170522).xlsx XLSX spreadsheet
W912TF-17-R-0503-0003_(Amendment_3).pdf PDF
Pease_Utility_Plans_20161228.pdf PDF
Exhibit_D_Bid_Schedule_W912TF-17-R-0503.xlsx XLSX spreadsheet
W912TF-17-R-0503-0002_(Amendment_2)_(Conform_Copy).pdf PDF
W912TF17R0503_SZCQ139905__SZCQ152910_-_RFI_Tracker_(As_of_20170515).xlsx XLSX spreadsheet
AF_BRAC_Flightline_Groundwater_Monitoring_Zone_Well_Locations_(2012).pdf PDF
SZCQ139905_Geotechnical_Data_Report_20140523.pdf PDF
W912TF-17-R-0503-0002_(Amendment_2).pdf PDF
W912TF17R0503 SZCQ139905 SZCQ152910 - RFI Tracker —
Exhibit D_Bid Schedule_W912TF-17-R-0503.xlsx XLSX spreadsheet
W912TF-17-R-0503-0002 —
AF BRAC Flightline Groundwater Monitoring Zone Well Locations —
SZCQ139905_Geotechnical Data Report_20140523.pdf PDF
W912TF-17-R-0503-0002 —
Pease Utility Plans_20161228.pdf PDF
W912TF17R0503_RFI_Tracker_(As_of_20170427).pdf PDF
W912TF17R0503_RFI_Tracker_(As_of_20170427).xlsx XLSX spreadsheet
W912TF-17-R-0503-0001_(Amendment_1).pdf PDF
Pre-Proposal Conference & Site Visit Sign in Sheet_14 April 2017.pdf PDF
Pre-Proposal Conference & Site Visit Meeting Minutes_14 April 2017.pdf PDF
Pre-Proposal Conference & Site Visit Slides_14 APR 2017.pdf PDF
W912TF-17-R-0503_SZCQ139905_&_SZCQ152910_3_APR_2017.pdf PDF
EXHIBIT_C_W912TF-17-R-0503_3_APR_2017.doc DOC document
EXHIBIT_B_W912TF-17-R-0503_3_APR_2017.doc DOC document
EXHIBIT_A_W912TF-17-R-0503_3_APR_2017.doc DOC document
Bid_Schedule_W912TF-17-R-0503_3_APR_2017.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KC-46A ADAL AIRFIELD PAVEMENTS & HYDRANT SYSTEMS (SZCQ139905)

PEASE ANGB, NEWINGTON, NH

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 40 ENVIRONMENTAL MANAGEMENT

01 45 00.00 10 QUALITY CONTROL

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 26 - ELECTRICAL

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 16 SUBBASES FOR FLEXIBLE PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 11 26 BITUMINOUS BASE COURSE

32 11 34 PORTLAND CEMENT-STABILIZED BASE OR SUBBASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING

32 17 24.00 10 PAVEMENT MARKINGS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP

33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT

33 52 43.13 AVIATION FUEL PIPING

33 52 43.14 AVIATION FUEL CONTROL VALVES

33 52 80 LIQUID FUELS PIPELINE COATING SYSTEMS

33 65 00 CLEANING PETROLEUM STORAGE TANKS

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 brownd Cloud

SECTION 33 65 00

CLEANING PETROLEUM STORAGE TANKS

08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN PETROLEUM INSTITUTE (API)

API RP 2003 (2008; 7th Ed) Protection Against Ignitions Arising out of Static, Lightning, and Stray Currents

API RP 500 (2012; Errata 2014) Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division and Division 2

API Std 2015 (2014) Safe Entry and Cleaning of Petroleum Storage Tanks

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 306 (2014) Standard for Control of Gas Hazards on Vessels

NFPA 70 (2017) National Electrical Code

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH 99-109 (Latest) Certified Equipment List

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. DEPARTMENT OF DEFENSE (DOD)

MIL-A-22262 (1993; Rev B; Am 2 1996) Abrasive Blasting Media Ship Hull Blast Cleaning

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.1025 Lead

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

29 CFR 1910.1200 Hazard Communication

29 CFR 1910.134 Respiratory Protection

1140211 SECTION 33 65 00 Page 1 brownd Cloud

29 CFR 1910.146 Permit-required Confined Spaces

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities

UNDERWRITERS LABORATORIES (UL)

UL 844 (2012; Reprint Mar 2016) UL Standard for Safety Luminaires for Use in Hazardous (Classified) Locations

1.2 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Gasoline-oil-resisting rubber gloves and boots

Cotton coveralls and hard hat

Respiratory protective equipment

Disinfectant

Abrasive for blasting

Submit identification for the items by designated name, specification number, project contracting number, and intended use.

SD-06 Test Reports

Blasting abrasive test

Tank contents tests

Monitoring Results ; G

1140211 SECTION 33 65 00 Page 2

SD-07 Certificates

Qualifications of Marine Chemist

Qualifications of Certified Industrial Hygienist (CIH)

Testing laboratory

Safety plan

Work plan

Hazardous waste disposal plan

Tank certification of safety

Training certification

Respiratory protective equipment

Breathing-air supply source

Combustible gas indicator

Oxygen meter

Velometers

Lighting

First aid kit

Tank exhaust blower

Submit certificates for the items listed. Where equipment or materials are specified to conform with the standards of organizations, such as National Institute for Occupational Safety and Health (NIOSH), Underwriters Laboratories (UL), and American Petroleum Institute (API), include a label or listing indicating compliance. In lieu of the label or listing, the Contractor may submit a test report from an approved testing organization stating that the item has been tested in accordance with the specified organization's test methods and that the item conforms with the organization's standard or code.

SD-11 Closeout Submittals

Safety permits

Submit copies of permits required to comply with local, State, and Federal regulations.

1.3 DEFINITIONS

1.3.1 Certified Industrial Hygienist (CIH)

As used in this section, refers to an Industrial Hygienist employed by the Contractor and is certified by the American Board of Industrial Hygiene in

1140211 SECTION 33 65 00 Page 3 comprehensive practice.

1.3.2 Marine Chemist

The holder of a valid Certificate issued by the National Fire Protection Association in accordance with the "Rules for Certification of Marine Chemists," establishing him as a person qualified to determine whether construction, alteration, repair, or shipbreaking of vessels, which may involve hazards covered by NFPA 306 can be undertaken with safety.

1.3.3 Hazardous Areas

Hazardous areas shall be defined as any area within 100 feet of active aboveground storage tanks, areas within 100 feet of leaking sections of fuel pipelines or other vapor sources, areas within 200 feet of the downwind side of potential vapor emission sources (i.e., pressure-vacuum vents or open vents on active tanks, leaking sections of pipelines), areas within existing tanks, and areas within a dike.

1.3.4 Hot Work Operations

Hot work, for work covered by this section, includes: flame heating, welding, torch cutting, brazing, carbon arc gouging, or any work which produces heat, by any means, of 400 degrees F or more; or in the presence of flammables or flammable atmospheres, other ignition sources such as spark or arc producing tools (except steel hand tools) or equipment, static discharges, friction, impact, open flames or embers, nonexplosion-proof lights, fixtures, motors or equipment.

1.3.5 Personal Monitoring

Sampling of lead concentrations within the breathing zone of an employee to determine the 8-hour time weighted average concentration in accordance with 29 CFR 1910.1025 . Samples shall be representative of the employee's work tasks. Breathing zone shall be considered an area within a hemisphere, forward of the shoulders, with a radius of 6 to 9 inches and the center at the nose or mouth of an employee.

1.3.6 Reproductive Hazard

A reproductive hazard is defined as any occupational stressor (biological, chemical, or physical) that has the potential to adversely affect the human reproductive process. For example, it is well known that central nervous system problems often occur in the offspring of mothers exposed to organic mercury during pregnancy. Therefore, based on the example cited, organic mercury can be classified as a reproductive stressor. Many reproductive hazards also cause other adverse health effects; for example, ethylene oxide is also known to be a carcinogen (i.e., produces cancer).

Certain reproductive stressors can also have adverse effects on the male reproductive system. (If requested by the Contractor, the Contracting Officer will make available the Navy's standard on reproductive hazards.)

1.4 QUALITY ASSURANCE

1.4.1 Modification of References

Except as modified herein, the work shall conform with the recommendations of API RP 500 and API RP 2003 and API Std 2015 . Where the word "should" appears in these publications, substitute "shall."

1140211 SECTION 33 65 00 Page 4

1.4.2 Copies of Standards

Furnish four copies of API RP 500 AND API RP 2003 and API Std 2015 .

1.4.3 Safety Permits and Equipment

Acquire safety permits (specified by the facility safety authorities) and necessary safety equipment.

1.4.4 Regulatory Requirements

a. Obtain permits required to comply with local, State, and Federal regulations.

b. Hazardous wastes, such as water, sediment, and sludge, shall be packaged, labeled, stored, transported, treated and disposed of in accordance with 40 CFR 260 through 40 CFR 266 and State and local regulations. Transporters, sorters, treaters and disposers must be certified and have EPA ID numbers. Payment for disposal of hazardous waste will not be made until a completed hazardous waste manifest from the treatment or disposal facility is returned, and a copy furnished to the Government.

1.4.5 Training

Train each employee performing tank cleaning, waste disposal, and air sampling operations prior to the time of initial job assignment, in accordance with API Std 2015 , 29 CFR 1910.120 , 29 CFR 1910.134 , , and 29 CFR 1910.1200 . The training shall also include counseling of each employee on reproductive hazards involved in the work.

1.4.6 Pre-Construction Conference

Along with the CIH, marine chemist, or gas-free engineer, meet with the Contracting Officer to discuss in detail the tank cleaning work plan, including work procedures and precautions for the work plan.

1.4.7 Certificates

1.4.7.1 Qualifications of Marine Chemist

Submit name, address, and telephone number of the marine chemist selected to perform the required duties. Submit documentation that the marine chemist is certified by the National Fire Protection Association, including the certificate number and date of certification or recertification. The NFPA certification will be acceptable for non-ship work on this contract.

1.4.7.2 Qualifications of Certified Industrial Hygienist (CIH)

Submit name, address, and telephone number of the CIH selected to perform responsibilities in paragraph entitled "CIH Responsibilities." Provide previous experience of the CIH. Submit proper documentation that the Industrial Hygienist is certified by the American Board of Industrial Hygiene in comprehensive practice, including certification number and date of certification/recertification. The CIH shall be familiar with the hazards involved in fuel systems work.

1140211 SECTION 33 65 00 Page 5

1.4.7.3 Testing Laboratory

Submit the name, address, and telephone number of the testing laboratory selected to perform the monitoring, testing, and reporting of airborne concentrations of lead and other contaminants. Provide proper documentation that persons performing the analysis have been judged proficient by successful participation within the last year in the National Institute for Occupational Safety and Health (NIOSH) Proficiency Analytical Testing (PAT) Program. The laboratory shall be accredited by the American Industrial Hygiene Association (AIHA). Provide AIHA documentation along with date of accreditation/reaccreditation.

1.4.7.4 Safety Plan

Submit a safety plan within 45 calendar days after contract award and 30 days prior to commencing work. The safety program shall be reviewed and approved by the safety/health officer of the facility. The safety plan shall meet OSHA requirements and address the following:

a. Identification and evaluation of the hazards and risks associated with each site being studied, including reproductive hazards and precautionary measures to be followed by workers for all hazards.

b. Names and qualifications of each Contractor's representative in charge of the work and present at the job site when tank cleaning and repair work will be performed.

c. Identification of supervisory personnel and alternates responsible for site safety/response operations.

d. Determination of levels of personal protection to be worn for various site operations.

e. List of equipment with adequate nomenclature by item, that will be used at the job site and the date and location where this equipment can be inspected by the Contracting Officer.

f. Establishment of work zones (exclusion area, contamination area, and support area).

g. Establishment of a tank entry and work permit program in accordance with 29 CFR 1910.146 and EM 385-1-1 .

h. Establishment of decontamination methods and procedures.

i. Determination of the number of people required to enter the contamination zones during the initial entries and subsequent operations.

j. Establishment of emergency procedures, such as: escape routes, fire protection, signals for withdrawing work parties from site, emergency communications, wind indicators, including Navy notification.

k. Identification and arrangements with nearest medical facility for emergency medical care for both routine-type injuries and toxicological problems. Submit name, location, and telephone number of this medical facility.

l. Establishment of continual air and personnel monitoring procedures.

1140211 SECTION 33 65 00 Page 6

m. Establishment of procedures for obtaining and handling potentially contaminated samples.

n. Identification of medical monitoring program, including respirator medical qualification examination for each individual at the work site.

o. Identification of training plan to be instituted, including contents of 29 CFR 1910.1200 and 29 CFR 1910.134 ; its training contents; and instructor with appropriate training certification . Training plan shall also include counseling to each employee on reproductive hazards.

p. Establishment of a respiratory protection program conforming to

29 CFR 1910.134 .

q. Establishment of a hazard communication program ( 29 CFR 1910.1200 ).

1.4.7.5 Work Plan

The shut down or interruption to normal operations or traffic shall be listed on the progress schedule and submitted.

1.4.7.6 Hazardous Waste Disposal Plan

Prepare a Hazardous Waste Disposal Plan and submit within 45 calendar days after contract award for approval by the Contracting Officer, or if there are no hazardous wastes indicated by Government tests, submit the plan 21 days after the Contractor's tests indicate hazardous wastes. The Hazardous Waste Disposal Plan shall comply with applicable requirements of Federal, State, and local hazardous waste regulations and shall address the following:

a. Identification of hazardous wastes associated with the work, including a sampling and testing plan for each waste stream, the purpose of each test, and the rationale for evaluating the test results. Indicate the representative sampling and specific testing methods, number of samples, and the name and qualifications of the testing laboratory.

b. Estimated quantities of wastes to be disposed in the cleaning of each tank and a description of arrangements made for storage and disposal.

c. Names and qualifications of each Contractor that will be transporting, storing, treating, and disposing of the wastes. Include the facility location and a 24-hour point of contact. Furnish two copies of hazardous waste permits.

d. Names and qualifications (experience and training) of personnel who will be working on-site with hazardous wastes.

e. List of waste handling equipment to be used in performing the work, to include cleaning, treatment, volume reduction, and transport equipment.

f. Spill prevention, containment, and cleanup contingency measures to be implemented.

g. Work plan and schedule for waste removal and disposal.

h. Cost for hazardous waste disposal according to this plan.

1140211 SECTION 33 65 00 Page 7

1.4.7.7 Tank Certification of Safety

Submit certification, from an NFPA certified "Marine Chemist" or CIH stating that tank is safe for hot work and that special precautionary measures have been taken for workers to enter the tank to perform the work.

1.4.7.8 Training Certification

Submit certifications signed and dated by the CIH specified in the testing plan and by each employee stating that the employee has received training on work practices and received counseling on and fully understands the reproductive hazards involved with lead and toulene exposure and the work.

1.4.8 Test Results

1.4.8.1 Required Test Reports

Submit test results required by MIL-A-22262 , for blasting abrasive .

Submit contractor's independent tests of tank contents (water, sediment, and sludge).

1.4.8.2 Air Monitoring

Submit monitoring results to the Contracting Officer within 2 working days after the samples are taken, signed by the testing laboratory employee performing the air monitoring, the employee that analyzed the sample, and the CIH.

1.5 DELIVERY AND STORAGE

Deliver equipment and materials to the site in an undamaged condition bearing the manufacturer's name and brand designation. Store equipment and materials off the ground to provide proper ventilation, drainage, and protection against dampness. Replace defective and damaged equipment and materials.

1.6 JOB CONDITIONS

1.6.1 Ventilation

Maintain a vapor-free condition throughout the course of the work inside the tank. The air movers shall be non-sparking, explosion-proof, electrically operated or air-driven exhaust type. A rate of one air change per hour shall be the lowest acceptable rate, for tanks under 30,000 BBL . For tanks greater than 30,000 BBL , use 10,000 cfm . Air movers shall be kept in operation whenever workers are in the tanks;

except the air movers shall be shut down 15 minutes before taking tests.

1.7 SCHEDULING AND SEQUENCING

1.7.1 Sequence of Primary Phases of the Cleaning Procedure

a. Planning the operations

b. Preparation for cleaning

c. Vapor-freeing of the tank

d. Cleaning the tank

1140211 SECTION 33 65 00 Page 8

e. Clean-up, residue disposal, inspection, and acceptance.

1.7.2 General Scheduling

Complete the work specified in this section before any other work in the tank is started. The work includes the complete interior cleaning of the storage tanks.

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Abrasive

2.1.1.1 Abrasive for Blasting

Provide sharp, washed, salt-free abrasive material, free from feldspar and other constituents that tend to break down and remain on the surface.

Abrasive shall not contain magnetic materials and shall conform to

MIL-A-22262 , .

2.1.1.2 Recycled Abrasive

Screen and air wash abrasive that is recycled at the job site, to remove dirt and fines. Add new abrasive so that the combined new and recycled abrasive mixture meets specified abrasive requirements for chemical composition, moisture, friability, silica, anchor pattern and oil content.

Do not recycle abrasive which has picked up toxic or hazardous material.

Do not recycle nickel slag.

2.2 EQUIPMENT

Furnish necessary clothing and equipment for the work and protection of people entering the tank. Electrical equipment and wiring shall be in accordance with NFPA 70 , Class 1, Group D, Division 1. Provide any item or items for the protection of these people including but not limited to the following:

a. Gasoline-Oil-Resisting Rubber Gloves and Boots : Gauntlet type and conductive type respectively (acid-proof rubber is an acceptable material); furnished for each person entering or working inside the tank or handling sludge materials on the exterior of the tank, plus one extra pair each for emergency use.

b. Cotton Coveralls and Hard Hat : Light colored; one change per person per day, and an adequate supply of chemical-resistant disposable coveralls to be worn over cotton coveralls.

c. Respiratory Protection: Provide one of the following types of NIOSH-approved respiratory protective equipment for each person working inside the tank, plus one extra for emergency use.

NIOSH 99-109 listing constitutes NIOSH approval.

(1) Self-contained breathing apparatus with a full facepiece operated in a positive pressure mode.

(2) A combination respirator which includes a Type C supplied-air respirator which a full facepiece operated in a positive pressure

1140211 SECTION 33 65 00 Page 9 mode and an auxiliary positive pressure self-contained breathing apparatus.

(3) The CIH may specify airline (Type C) respirator in place of those specified above; however, the decision shall be based on the results of personal monitoring.

(4) Use Type CE respirator for abrasive blasting inside the tank.

(5) CIH shall specify respiratory protection if required for personnel handling sludge material outside of the tank.

d. Safety Harness: For each person working inside tank, plus one extra for outside the tank.

e. One half Inch Diameter Life Rope of Required Length: For each person working inside the tank.

f. Breathing-Air Supply Source : 29 CFR 1910.134 .

g. Combustible Gas Indicator and Oxygen Meter .

h. Shovels, Buckets, Brooms, Wrenches, Scrapers, Squeegees, Wire Brushes, Scrub-Brushes, Ladders, Staging, and Other Tools: Do not use brooms or brushes that have plastic or synthetic bristles.

i. Lighting : UL 844 , explosion-proof, minimum 50 footcandle , floodlight type, or Mining Enforcement and Safety Administration (MESA) approved, explosion-proof, portable battery-powered light.

j. Air Movers for Tank Ventilation: Explosion proof electrically operated or air driven. Nonferrous fan blades. Use velometers for measuring velocity.

k. Disinfectant for Cleaning Face Masks: Cleaner-sanitizer for cleaning and disinfecting respirator facepieces as specified in 29 CFR 1910.134 , Appendix B-2.

l. Soap for Personnel Washing: Non-phosphate type.

m. A.B.C. Fire Extinguishers: UL listed 2A: 40B: C, 2A: 20B: C, or 4A: 30B: C; minimum 15 pound capacity.

n. First Aid Kit : One 16-unit kit for each 25 persons.

PART 3 EXECUTION

3.1 PROJECT CONDITIONS

3.1.1 Permission for Each Entry Into a Tank

Obtain written permission from the Contracting Officer prior to each entry into a tank. Permission will be granted only under the following conditions:

a. The Contractor's qualified supervisor is present.

b. The Contractor's personnel have been briefed by the supervisor on the procedure and role of each employee in the event of an emergency.

1140211 SECTION 33 65 00 Page 10

c. Required equipment is approved and properly located.

d. Personnel are properly equipped with properly fitted protective equipment and have received adequate training from a qualified instructor.

e. The entire area adjacent to the tank is secured.

f. A minimum of two persons outside and two or more persons inside of each tank are provided at all times during cleaning operations.

g. Tank air is monitored and corrective action is taken to ensure that the vapor concentration is less than 10 percent of the lower flammable limit (LFL) and oxygen content is a minimum of 19.5 percent.

h. An NFPA certified "Marine Chemist" or CIH has certified that the tank is safe for hot work, and that the required special precautionary measures have been taken due to the potential health hazard to the worker that still exists, even when the vapor concentration is well below the LFL. The Contractor shall be responsible for reviewing the record drawing(s) of the tank to be cleaned.

i. People entering the area leave smoking materials such as cigarettes and flame-producing devices at a previously determined location.

j. When work involves handling and disposal of hazardous waste, the Contractor has a copy of 40 CFR 260 , 40 CFR 261 , 40 CFR 262 , 40 CFR 263 , 40 CFR 264 , 40 CFR 265 , and 40 CFR 266 in his possession.

k. Permit only personnel authorized in the safety plan within 100 feet of the tank perimeter.

3.1.2 Traffic Control

Direct traffic minimum 200 feet away from the tank cleaning area. Set up road blocks and warning signs. Do not operate vehicles in hazardous areas.

3.1.3 Lavatory Facilities

Arrange for lavatory and toilet facilities .

3.1.4 Miscellaneous

Ensure that the manufacturers have labeled containers holding products involving hazards in use or storage, in accordance with 29 CFR 1910.1200 .

Label containers used to store, transport, or dispose of hazardous waste in accordance with 40 CFR 260 , 40 CFR 261 , 40 CFR 262 , 40 CFR 263 , 40 CFR 264 , 40 CFR 265 , and 40 CFR 266 . Remove small objects of ferrous metal within the working areas to prevent the accidental striking of a spark. Place equipment upwind of tank openings at highest elevation possible; do not place in a spot lower than the surrounding terrain.

Review drawings of the tank to be cleaned and brief workers on the location of pits, sumps, piping, or other tank appurtenances which could be hazardous to personnel. Provide floodlights to illuminate the work area without the need for battery operated handlights. Provide scaffolding, platforms, and ladders for secure, safe accessibility to tank surfaces.

Install electrical equipment in accordance with API RP 500 . Provide floodlights to illuminate the work area without the need for battery

1140211 SECTION 33 65 00 Page 11 operated handlights. Do not use artificial lights inside tank until the tank is vapor-free. Unless otherwise approved by the Contracting Officer, do not heat tanks during winter to provide personnel comfort or melt ice.

3.1.4.1 Grounding and Bonding for Equipment

Provide grounding and bonding for equipment which may generate static electricity. Do not pass the air hose through an area where flammable vapors may exist.

3.1.4.2 Fire Extinguishers

Furnish two carbon-dioxide fire extinguishers of minimum 15 pounds capacity each, in the immediate vicinity of the work. Provide a continuous fire watch. CAUTION: Do not discharge high pressure carbon dioxide extinguishers where explosive vapors exist since the discharge can cause a spark which will ignite the vapors.

3.1.4.3 Disconnection Pipelines

Disconnect pipelines connected to the tank. Insert a solid-plate blind flange between two flanges near the tank, or remove a valve or piece of pipe and install a blind flange to prevent flammable material from entering the tank. Blind flanges shall be of sufficient strength to withstand pressure which might be exerted by the material being blanked off, and shall be gasketed on both sides if blind flange is inserted between two flanges. CAUTION: Do not disconnect piping or valves until it is certain the line has been emptied of fuel.

3.1.4.4 Removal of Ignition Sources

Remove sources of ignition from the cleaning area. Do not permit ignition producing devices, including matches, lighters or cigarettes, within 100 feet upwind and 200 feet downwind of a tank, or inside the tank farm, or within the tank firewall, whichever is farther.

3.1.4.5 Survey of Hazardous Areas

Carefully survey the entire area around the tank to be cleaned to ensure that there are no vapors present in the pit, low places, or hazardous areas and that all unauthorized personnel are cleared from the area.

Ensure that there is no possibility of anyone smoking in the immediate vicinity. Hazardous areas are defined as follows:

a. Interior of tanks.

b. Areas within 100 feet from points having flammable vapor emissions which, for example, are from the exhaust manholes of tanks under repair, open vents or pressure vacuum vents (breather valves) of active tanks in the vicinity of tanks under repairs or cleaning.

CAUTION: Allowance shall be made for 4 or more miles per hour winds by increasing the size of the hazardous area to a minimum of 200 feet on the downward side.

c. For aboveground tanks, all areas within a common impoundment dike up to the height of the dike walls and within 10 feet in all directions of the exterior surfaces of tank shell and roof.

1140211 SECTION 33 65 00 Page 12

3.1.4.6 Exit from a Tank During Emergencies

To permit quick, free exit from a tank during emergencies, keep the area around the tank openings and emergency routes clear of obstructions.

3.2 INSPECTION

3.2.1 Inspection of Equipment

3.2.1.1 Respirators

Respirator users shall inspect their respirators in strict accordance with the instructions provided by the manufacturer.

3.2.1.2 Air Hose from Breathing-Air Supply

If air line respirators are used, ensure that:

a. There are no breaks in outside covering;

b. Condition of gaskets is good;

c. Connections are tight; and

d. There are no restrictions in the hose.

3.2.1.3 Safety Harness and Life Line

Ensure that:

a. There is no frayed or weak material; and

b. Condition of harness is good.

3.2.1.4 Breathing-Air Supply Source

Ensure:

a. Good working condition; and

b. Location in vapor-free area.

c. Compliance with 29 CFR 1910.134 for breathing air quality, frequency of air analysis, and presence of safety devices.

d. Backup air supply source.

3.2.1.5 Monitoring Equipment

Calibrate each day before use:

a. Combustible gas indicator

b. Oxygen meter

3.2.1.6 Other Equipment

Ensure:

1140211 SECTION 33 65 00 Page 13

a. Proper grounding and bonding;

b. Explosion-proof motors; and

c. Explosion-proof lighting.

3.2.2 Personnel Inspection

3.2.2.1 Clothing

Personnel for Proper Attire Commensurate with Hazards Involved: Check for:

a. Clean clothing in good condition (wear freshly laundered clothing at the beginning of the job and at the start of each workday thereafter).

b. Boots and gloves of approved type and in good condition.

3.2.2.2 Breathing-Air Supply

If air line respirators are used, ensure that air is supplied to the facepiece at a rate of 4 to 15 cfm . If self-contained breathing apparatus are use, ensure sufficient number of full replacement cylinders are available to last the duration of the job.

3.2.2.3 Harness and Lifeline

Harness and lifeline shall be in good condition and properly attached.

3.2.2.4 Gum or Tobacco Chewing

Ensure that gum or tobacco chewing is prohibited.

3.2.2.5 Physical Defects or Injuries

Ensure that people have no physical defects or injuries which may prevent their wearing respirators or which may cause rescue to be difficult. No beards, sideburns, or large mustaches shall be allowed on people who must wear respirators.

3.2.2.6 Alcoholic Beverages and Drugs

Ensure that people entering the tank are not under influence of alcoholic beverages and drugs.

3.2.2.7 Counseling on Reproductive Hazards

Ensure that all employees have been counseled on and fully understand the reproductive hazards related to work in contaminated areas or in leaded gasoline or chemically contaminated tanks since they may be seriously affected by organic lead compounds or other chemical contaminants.

3.2.2.8 Hazardous Areas

Check hazardous areas as defined in paragraph entitled "Survey of Hazardous Areas."

3.3 FUEL REMOVAL

All possible fuel will be pumped or otherwise removed from the tank by the

1140211 SECTION 33 65 00 Page 14

Government. Consider remaining fuel contaminated or waste fuel; pump into 55 gallon drums or other suitable containers for disposal in accordance with approved procedures meeting local, State, and Federal regulations.

Dispose of remaining fuel emulsions in accordance with applicable local, State, and Federal regulations. Drums or tanks used for containerizing waste fuel will be furnished by the Contractor.

3.4 TANK CLEANING

For the interior of the tanks, the shell, bottom, columns, roof, roof beams, and interior accessory equipment such as pumps, piping, and ladders, shall be cleaned , free of rust, dirt, scale, loose materials, fuel, oil, grease, sludge, and other deleterious materials. Do not damage sound existing lining material. Remove unsound or loose lining or coating and clean the surfaces exposed thereby to bare metal or concrete as applicable. Immediately notify the Contracting Officer if the lining or coating is deteriorated or loose.

3.4.1 Washing

After water, fuel, and sludge have been removed, thoroughly wash the tank interior. Minimize the use of water; substitute brush blasting when practical. Start washing at the top of the walls and columns and work down to the floor. Wash the floor last starting from the sides and working towards the sump. Wash to remove oil, sludge, wax, tar, and other fuel residue adhering to the surface. Wash by any one or a combination of the following methods:

a. Use only fresh water under pressure.

b. Hand-scrub the surfaces vigorously with long-handled stiff-bristle brushes. Wet the brushes intermittently with fresh during scrubbing process. For heavily oil-soaked areas which still appear to retain some residue after first scrubbing, scrub until clean.

c. Rinse the surfaces thoroughly with fresh water.

d. Brush-off blast clean.

3.4.2 Wash Water, and Sediment Removal

During the washing process, operate a portable pump continuously with suction hose extended to the tank bottom to remove water, dirt, oil, or other loose materials washed off. Following the final rinse, pump, squeegee, and mop the tank dry.

a. Prior to discharge or disposal, test the wash water, sediment, and sludge in accordance with paragraph entitled "Water, Sediment, and Sludge Analysis." The Contractor shall furnish temporary tanks to hold water and detergent solution until testing is completed.

b. The wash water is nonhazardous and can be disposed of in the berm area.

3.4.3 Disposal of Used Blasting Abrasive

Test used abrasive in accordance with 40 CFR 261 to determine if it is a hazardous waste using the EP toxicity test for metals. Handle and dispose

1140211 SECTION 33 65 00 Page 15 of abrasive determined to be hazardous waste in accordance with 40 CFR 260 , 40 CFR 261 , 40 CFR 262 , 40 CFR 263 , 40 CFR 264 , 40 CFR 265 , and 40 CFR 266 .

Dispose of abrasive which is not hazardous waste at a landfill off Government property in accordance with applicable regulations. The contract price will be adjusted if the used abrasive is determined to be hazardous waste. However, payment for disposal of hazardous waste will not be made until a completed manifest from the treatment or disposal facility is returned, and a copy furnished to the Government.

3.4.4 Special Precautions

Special Precautions for Tanks with Pipe Columns and Braces, Pontoons, and Leaking Bottoms:

a. Pipes used for columns and braces, pontoons and leaking bottoms are a potential source of explosive vapors even after the tank is cleaned.

The tank may be determined to be vapor free below 4 percent of lower explosive limit; but after one or two hours, explosive readings must again be obtained from these sources. The Contractor shall take readings at least every half hour when working in tanks after they have been cleaned and each floating roof or pan pontoon shall be checked individually with a combustible gas indicator.

b. If the repair work is to be performed on floating roof tanks, the interior of each pontoon on the roof shall be thoroughly cleaned of fuel, rust, water, and debris.

3.5 FINAL CLEAN-UP

After the Contracting Officer has inspected and accepted the tank cleaning and before final inspection, accomplish the following work:

3.5.1 Stenciling Tank

Stencil on the tank in 3/4 inch letters adjacent to the manhole openings the following data:

Date Cleaned -

Contractor Name -

Address -

3.5.2 Restoration of Site to Original Condition

Replace valves, piping, manhole covers, and similar items which were removed at the start of the job with new gasket material resistant to fuel. Pressure check valves and piping. Remove, from the site, debris and equipment and materials used for the cleaning operations. Restore the site to its original condition.

-- End of Section --

1140211 SECTION 33 65 00 Page 16

PROJECT TABLE OF CONTENTS
DIVISION 33 - UTILITIES
33 65 00 - CLEANING PETROLEUM STORAGE TANKS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.3.1 Certified Industrial Hygienist CIH
1.3.2 Marine Chemist
1.3.3 Hazardous Areas
1.3.4 Hot Work Operations
1.3.5 Personal Monitoring
1.3.6 Reproductive Hazard
1.4 QUALITY ASSURANCE
1.4.1 Modification of References
1.4.2 Copies of Standards
1.4.3 Safety Permits and Equipment
1.4.4 Regulatory Requirements
1.4.5 Training
1.4.6 Pre-Construction Conference
1.4.7 Certificates
1.4.7.1 Qualifications of Marine Chemist
1.4.7.2 Qualifications of Certified Industrial Hygienist CIH
1.4.7.3 Testing Laboratory
1.4.7.4 Safety Plan
1.4.7.5 Work Plan
1.4.7.6 Hazardous Waste Disposal Plan
1.4.7.7 Tank Certification of Safety
1.4.7.8 Training Certification
1.4.8 Test Results
1.4.8.1 Required Test Reports
1.4.8.2 Air Monitoring
1.5 DELIVERY AND STORAGE
1.6 JOB CONDITIONS
1.6.1 Ventilation
1.7 SCHEDULING AND SEQUENCING
1.7.1 Sequence of Primary Phases of the Cleaning Procedure
1.7.2 General Scheduling
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Abrasive
2.1.1.1 Abrasive for Blasting
2.1.1.2 Recycled Abrasive

2.2 EQUIPMENT

PART 3 EXECUTION
3.1 PROJECT CONDITIONS
3.1.1 Permission for Each Entry Into a Tank
3.1.2 Traffic Control
3.1.3 Lavatory Facilities
3.1.4 Miscellaneous
3.1.4.1 Grounding and Bonding for Equipment
3.1.4.2 Fire Extinguishers
3.1.4.3 Disconnection Pipelines
3.1.4.4 Removal of Ignition Sources
3.1.4.5 Survey of Hazardous Areas
3.1.4.6 Exit from a Tank During Emergencies
3.2 INSPECTION
3.2.1 Inspection of Equipment
3.2.1.1 Respirators
3.2.1.2 Air Hose from Breathing-Air Supply
3.2.1.3 Safety Harness and Life Line
3.2.1.4 Breathing-Air Supply Source
3.2.1.5 Monitoring Equipment
3.2.1.6 Other Equipment
3.2.2 Personnel Inspection
3.2.2.1 Clothing
3.2.2.2 Breathing-Air Supply
3.2.2.3 Harness and Lifeline
3.2.2.4 Gum or Tobacco Chewing
3.2.2.5 Physical Defects or Injuries
3.2.2.6 Alcoholic Beverages and Drugs
3.2.2.7 Counseling on Reproductive Hazards
3.2.2.8 Hazardous Areas
3.3 FUEL REMOVAL
3.4 TANK CLEANING
3.4.1 Washing
3.4.2 Wash Water, and Sediment Removal
3.4.3 Disposal of Used Blasting Abrasive
3.4.4 Special Precautions
3.5 FINAL CLEAN-UP
3.5.1 Stenciling Tank
3.5.2 Restoration of Site to Original Condition