KC-46A ADAL AIRFIELD PAVEMENTS & HYDRANT SYSTEMS (SZCQ139905)
PEASE ANGB, NEWINGTON, NH
SECTION 33 71 02
UNDERGROUND ELECTRICAL DISTRIBUTION
02/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI SP-66 (2004) ACI Detailing Manual
ASTM INTERNATIONAL (ASTM)
ASTM B1 (2013) Standard Specification for Hard-Drawn Copper Wire
ASTM B3 (2013) Standard Specification for Soft or Annealed Copper Wire
ASTM B8 (2011) Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft
ASTM F512 (2012) Smooth-Wall Poly (Vinyl Chloride) (PVC) Conduit and Fittings for Underground Installation
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 81 (2012) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System
IEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5-7 2013) National Electrical Safety Code
IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions
INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
NETA ATS (2013) Standard for Acceptance Testing Specifications for Electrical Power Equipment and Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI C119.1 (2011) Electric Connectors - Sealed Insulated Underground Connector Systems Rated 600 Volts
1140211 SECTION 33 71 02 Page 1
NEMA RN 1 (2005; R 2013) Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit
NEMA TC 2 (2013) Standard for Electrical Polyvinyl Chloride (PVC) Conduit
NEMA TC 9 (2004) Standard for Fittings for Polyvinyl Chloride (PVC) Plastic Utilities Duct for Underground Installation
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013) National Electrical Code
THE SOCIETY OF CABLE TELECOMMUNICATIONS ENGINEERS (SCTE)
ANSI/SCTE 77 (2013) Specification for Underground Enclosure Integrity
UNDERWRITERS LABORATORIES (UL)
UL 44 (2010) Thermoset-Insulated Wires and Cables
UL 467 (2007) Grounding and Bonding Equipment
UL 486A-486B (2013; Reprint Dec 2013) Wire Connectors
UL 510 (2005; Reprint Jul 2013) Polyvinyl Chloride, Polyethylene and Rubber Insulating Tape
UL 514B (2012) Conduit, Tubing and Cable Fittings
UL 6 (2007; reprint Nov 2010) Electrical Rigid Metal Conduit-Steel
UL 651 (2011; Reprint Mar 2012) Standard for Schedule 40 and 80 Rigid PVC Conduit and Fittings
UL 83 (2008) Thermoplastic-Insulated Wires and Cables
UL 854 (2004; Reprint Sep 2011) Standard for Service-Entrance Cables
1.2 DEFINITIONS
a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in IEEE Stds Dictionary .
b. In the text of this section, the words conduit and duct are used interchangeably and have the same meaning.
1140211 SECTION 33 71 02 Page 2
c. Underground structures subject to aircraft loading are indicated on the drawings.
1.3 SUBMITTALS
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-02 Shop Drawings
Precast underground structures
SD-03 Product Data
Sealing Material
Composite/fiberglass handholes
SD-06 Test Reports
Field Acceptance Checks and Tests
SD-07 Certificates
Directional Boring Certificate of Conformance
1.4 QUALITY ASSURANCE
1.4.1 Precast Underground Structures
Submittal required for each type used. Provide calculations and drawings for precast manholes and handholes bearing the seal of a registered professional engineer including:
a. Material description (i.e., f'c and Fy)
b. Manufacturer's printed assembly and installation instructions
c. Design calculations
d. Reinforcing shop drawings in accordance with ACI SP-66
e. Plans and elevations showing opening and pulling-in iron locations and details
1.4.2 Directional Boring Certificate of Conformance
Provide certification of compliance with the registered Professional Engineer's design requirements for each directional bore, including: HDPE conduit size and type, bend radius, elevation changes, vertical and horizontal path deviations, conductor size and type and any conductor derating due to depth of conduit. Record location and depth of all directional-bore installed HDPE conduits using Global Positioning System (GPS) recording means with "resource grade" accuracy.
1.4.3 Regulatory Requirements
In each of the publications referred to herein, consider the advisory
1140211 SECTION 33 71 02 Page 3 provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship must be in accordance with the mandatory and advisory provisions of IEEE C2 and NFPA 70 unless more stringent requirements are specified or indicated.
1.4.4 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items must be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.4.4.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.4.4.2 Material and Equipment Manufacturing Date
Products manufactured more than 3 years prior to date of delivery to site are not acceptable, unless specified otherwise.
PART 2 PRODUCTS
2.1 CONDUIT, DUCTS, AND FITTINGS
2.1.1 Rigid Metal Conduit
UL 6 .
2.1.1.1 Rigid Metallic Conduit, PVC Coated
NEMA RN 1, Type A40, except that hardness must be nominal 85 Shore A durometer, dielectric strength must be minimum 400 volts per mil at 60 Hz, and tensile strength must be minimum 3500 psi .
2.1.2 Plastic Duct for Concrete Encasement
UL 651 and ASTM F512, NEMA TC 2, Type EPC-40-PVC or as indicated.
2.1.3 Conduit Sealing Compound
Compounds for sealing ducts and conduit must have a putty-like consistency workable with the hands at temperatures as low as 35 degrees F , must neither slump at a temperature of 300 degrees F , nor harden materially when exposed to the air. Compounds must adhere to clean surfaces of fiber or plastic ducts; metallic conduits or conduit coatings; concrete, 1140211 SECTION 33 71 02 Page 4 masonry, or lead; any cable sheaths, jackets, covers, or insulation materials; and the common metals. Compounds must form a seal without dissolving, noticeably changing characteristics, or removing any of the ingredients. Compounds must have no injurious effect upon the hands of workmen or upon materials.
2.1.4 Fittings
2.1.4.1 Metal Fittings
UL 514B .
2.1.4.2 PVC Conduit Fittings
UL 514B , UL 651 .
2.1.4.3 PVC Duct Fittings
NEMA TC 9.
2.2 LOW VOLTAGE INSULATED CONDUCTORS AND CABLES
Insulated conductors must be rated 600 volts and conform to the requirements of NFPA 70 , including listing requirements. Wires and cables manufactured more than 24 months prior to date of delivery to the site are not acceptable. Service entrance conductors must conform to UL 854 , type
USE.
2.2.1 Conductor Types
Cable and duct sizes indicated are for copper conductors and THHN/THWN unless otherwise noted. Conductors No. 10 AWG and smaller must be solid. Conductors No. 8 AWG and larger must be stranded. All conductors must be copper.
2.2.2 Conductor Material
Unless specified or indicated otherwise or required by NFPA 70 , wires in conduit, other than service entrance, must be 600-volt, Type THWN/THHN conforming to UL 83 or Type XHHW or RHW conforming to UL 44 . Copper conductors must be annealed copper complying with ASTM B3 and ASTM B8.
2.2.3 Jackets
Multiconductor cables must have an overall PVC outer jacket.
2.2.4 In Duct
Cables must be single-conductor cable.
2.2.5 Cable Marking
Insulated conductors must have the date of manufacture and other identification imprinted on the outer surface of each cable at regular intervals throughout the cable length.
Identify each cable by means of a fiber, laminated plastic, or non-ferrous metal tags, or approved equal, in each manhole, handhole, junction box, and each terminal. Each tag must contain the following information; cable
1140211 SECTION 33 71 02 Page 5 type, conductor size, circuit number, circuit voltage, cable destination and phase identification.
Conductors must be color coded. Provide conductor identification within each enclosure where a tap, splice, or termination is made. Conductor identification must be by color-coded insulated conductors, plastic-coated self-sticking printed markers, colored nylon cable ties and plates, heat shrink type sleeves,or colored electrical tape. Control circuit terminations must be properly identified. Color must be green for grounding conductors and white for neutrals; except where neutrals of more than one system are installed in same raceway or box, other neutrals must be white with a different colored (not green) stripe for each. Color of ungrounded conductors in different voltage systems must be as follows:
a. 208/120 volt, three-phase
(1) Phase A - black
(2) Phase B - red
(3) Phase C - blue
b. 480/277 volt, three-phase
(1) Phase A - brown
(2) Phase B - orange
(3) Phase C - yellow
c. 120/240 volt, single phase: Black and red
2.3 LOW VOLTAGE WIRE CONNECTORS AND TERMINALS
Must provide a uniform compression over the entire conductor contact surface. Use solderless terminal lugs on stranded conductors.
a. For use with copper conductors: UL 486A-486B .
2.4 LOW VOLTAGE SPLICES
Provide splices in conductors with a compression connector on the conductor and by insulating and waterproofing using one of the following methods which are suitable for continuous submersion in water and comply with ANSI C119.1 .
2.4.1 Heat Shrinkable Splice
Provide heat shrinkable splice insulation by means of a thermoplastic adhesive sealant material applied in accordance with the manufacturer's written instructions.
2.4.2 Cold Shrink Rubber Splice
Provide a cold-shrink rubber splice which consists of EPDM rubber tube
1140211 SECTION 33 71 02 Page 6 which has been factory stretched onto a spiraled core which is removed during splice installation. The installation must not require heat or flame, or any additional materials such as covering or adhesive. It must be designed for use with inline compression type connectors, or indoor, outdoor, direct-burial or submerged locations.
2.5 TAPE
2.5.1 Insulating Tape
UL 510 , plastic insulating tape, capable of performing in a continuous temperature environment of 80 degrees C.
2.5.2 Buried Warning and Identification Tape
Provide detectable tape in accordance with Section 31 00 00 EARTHWORK.
2.6 PULL ROPE
Plastic or flat pull line (bull line) having a minimum tensile strength of 200 pounds .
2.7 GROUNDING AND BONDING
2.7.1 Driven Ground Rods
Provide copper-clad steel ground rods conforming to UL 467 not less than 3/4 inch in diameter by 10 feet in length. Sectional type rods may be used for rods 20 feet or longer.
2.7.2 Grounding Conductors
Stranded-bare copper conductors must conform to ASTM B8, Class B, soft-drawn unless otherwise indicated. Solid-bare copper conductors must conform to ASTM B1 for sizes No. 8 and smaller. Insulated conductors must be of the same material as phase conductors and green color-coded, except that conductors must be rated no more than 600 volts. Aluminum is not acceptable.
2.8 CAST-IN-PLACE CONCRETE
Provide concrete in accordance with Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONRETE. In addition, provide concrete for encasement of underground ducts with 3000 psi minimum 28-day compressive strength.
Concrete associated with electrical work for other than encasement of underground ducts must be 4000 psi minimum 28-day compressive strength unless specified otherwise.
2.9 UNDERGROUND STRUCTURES
Provide precast underground structures. Covers must fit the frames without undue play. Form steel and iron to shape and size with sharp lines and angles. Castings must be free from warp and blow holes that may impair strength or appearance. Exposed metal must have a smooth finish and sharp lines and arises. Provide necessary lugs, rabbets, and brackets.
1140211 SECTION 33 71 02 Page 7
2.9.1 Composite/Fiberglass Handholes and Covers
Provide handholes and covers of polymer concrete, reinforced with heavy weave fiberglass conforming to ANSI/SCTE 77 .
2.10 CABLE TAGS IN MANHOLES
Provide tags for each power cable located in manholes. The tags must be polyethylene. Do not provide handwritten letters. The first position on the power cable tag must denote the voltage. The second through sixth positions on the tag must identify the circuit. The next to last position must denote the phase of the circuit and include the Greek "phi" symbol.
The last position must denote the cable size. As an example, a tag could have the following designation: "11.5 NAS 1-8(Phase A)500," denoting that the tagged cable is on the 11.5kV system circuit number NAS 1-8, underground, Phase A, sized at 500 kcmil.
2.10.1 Polyethylene Cable Tags
Provide tags of polyethylene that have an average tensile strength of 3250 pounds per square inch ; and that are 0.08 inch thick (minimum), non-corrosive non-conductive; resistive to acids, alkalis, organic solvents, and salt water; and distortion resistant to 170 degrees F .
Provide 0.05 inch (minimum) thick black polyethylene tag holder. Provide a one-piece nylon, self-locking tie at each end of the cable tag. Ties must have a minimum loop tensile strength of 175 pounds . The cable tags must have black block letters, numbers, and symbols one inch high on a yellow background. Letters, numbers, and symbols must not fall off or change positions regardless of the cable tags' orientation.
PART 3 EXECUTION
3.1 INSTALLATION
Install equipment and devices in accordance with the manufacturer's published instructions and with the requirements and recommendations of NFPA 70 and IEEE C2 as applicable.
3.2 CABLE INSPECTION
Inspect each cable reel for correct storage positions, signs of physical damage, and broken end seals prior to installation. If end seal is broken, remove moisture from cable prior to installation in accordance with the cable manufacturer's recommendations.
3.3 UNDERGROUND CONDUIT AND DUCT SYSTEMS
3.3.1 Requirements
Run conduit in straight lines except where a change of direction is necessary. Provide numbers and sizes of ducts as indicated. Ducts must have a continuous slope downward toward underground structures and away from buildings, laid with a minimum slope of 3 inches per 100 feet .
Depending on the contour of the finished grade, the high-point may be at a terminal, a manhole, a handhole, or between manholes or handholes.
Short-radius manufactured 90-degree duct bends may be used only for pole or equipment risers, unless specifically indicated as acceptable. The minimum manufactured bend radius must be 24 inches for ducts of less than 3 inch diameter, and 36 inches for ducts 3 inches or greater in diameter.
1140211 SECTION 33 71 02 Page 8 brownd Cloud
Otherwise, long sweep bends having a minimum radius of 25 feet must be used for a change of direction of more than 5 degrees, either horizontally or vertically. Both curved and straight sections may be used to form long sweep bends, but the maximum curve used must be 30 degrees and manufactured bends must be used. Provide ducts with end bells whenever duct lines terminate in structures.
3.3.2 Treatment
Ducts must be kept clean of concrete, dirt, or foreign substances during construction. Field cuts requiring tapers must be made with proper tools and match factory tapers. A coupling recommended by the duct manufacturer must be used whenever an existing duct is connected to a duct of different material or shape. Ducts must be stored to avoid warping and deterioration with ends sufficiently plugged to prevent entry of any water or solid substances. Ducts must be thoroughly cleaned before being laid.
Plastic ducts must be stored on a flat surface and protected from the direct rays of the sun.
3.3.3 Conduit Cleaning
As each conduit run is completed, for conduit sizes 3 inches and larger, draw a flexible testing mandrel approximately 12 inches long with a diameter less than the inside diameter of the conduit through the conduit. After which, draw a stiff bristle brush through until conduit is clear of particles of earth, sand and gravel; then immediately install conduit plugs. For conduit sizes less than 3 inches , draw a stiff bristle brush through until conduit is clear of particles of earth, sand and gravel; then immediately install conduit plugs.
3.3.4 Jacking and Drilling Under Roads and Structures
Conduits to be installed under existing paved areas which are not to be disturbed, and under roads and railroad tracks, must be zinc-coated, rigid steel, jacked into place. Where ducts are jacked under existing pavement, rigid steel conduit must be installed because of its strength. To protect the corrosion-resistant conduit coating, predrilling or installing conduit inside a larger iron pipe sleeve (jack-and-sleeve) is required. For crossings of existing railroads and airfield pavements greater than 50 feet in length, the predrilling method or the jack-and-sleeve method will be used. Separators or spacing blocks must be made of steel, concrete, plastic, or a combination of these materials placed not farther apart than 4 feet on centers.
3.3.5 Multiple Conduits
Separate multiple conduits by a minimum distance of 3 inches . Stagger the joints of the conduits by rows (horizontally) and layers (vertically) to strengthen the conduit assembly. Provide plastic duct spacers that interlock vertically and horizontally. Spacer assembly must consist of base spacers, intermediate spacers, ties, and locking device on top to provide a completely enclosed and locked-in conduit assembly. Install spacers per manufacturer's instructions, but provide a minimum of two spacer assemblies per 10 feet of conduit assembly.
3.3.6 Conduit Plugs and Pull Rope
New conduit indicated as being unused or empty must be provided with plugs on each end. Plugs must contain a weephole or screen to allow water
1140211 SECTION 33 71 02 Page 9 drainage. Provide a plastic pull rope having 3 feet of slack at each end of unused or empty conduits.
3.3.7 Conduit and Duct Without Concrete Encasement
3.3.7.1 Directional Boring
HDPE conduits must be installed below the frostline and as specified herein.
For branch circuit wiring less than 600 volts, depths to the top of the conduit must not be less than 36 inches in pavement- or non-pavement-covered areas.
3.3.8 Duct Encased in Concrete
Construct underground duct lines of individual conduits encased in concrete. Depths to top of the concrete envelope must be not less than 36 inches below finished grade. Do not mix different kinds of conduit in any one duct bank. Concrete encasement surrounding the bank must be rectangular in cross-section and must provide at least 3 inches of concrete cover for ducts. Separate conduits by a minimum concrete thickness of 3 inches . Before pouring concrete, anchor duct bank assemblies to prevent the assemblies from floating during concrete pouring. Anchoring must be done by driving reinforcing rods adjacent to duct spacer assemblies and attaching the rods to the spacer assembly.
Provide steel reinforcing in the concrete envelope as indicated. Provide color, type and depth of warning tape as specified in Section 31 00 00
EARTHWORK.
3.3.8.1 Connections to Existing Concrete Pads
For duct bank connections to concrete pads, break an opening in the pad out to the dimensions required and preserve steel in pad. Cut the steel and extend into bend out to tie into the reinforcing of the duct bank envelope. Chip out the opening in the pad to form a key for the duct bank envelope.
3.3.8.2 Partially Completed Duct Banks
During construction wherever a construction joint is necessary in a duct bank, prevent debris such as mud, and, and dirt from entering ducts by providing suitable conduit plugs. Fit concrete envelope of a partially completed duct bank with reinforcing steel extending a minimum of 2 feet back into the envelope and a minimum of 2 feet beyond the end of the envelope. Provide one No. 4 bar in each corner, 3 inches from the edge of the envelope. Secure corner bars with two No. 3 ties, spaced approximately one foot apart. Restrain reinforcing assembly from moving during concrete pouring.
3.3.8.3 Removal of Ducts
Where duct lines are removed from existing underground structures, close the openings to waterproof the structure. Chip out the wall opening to provide a key for the new section of wall.
3.4 CABLE PULLING
Test existing duct lines with a mandrel and thoroughly swab out to remove
1140211 SECTION 33 71 02 Page 10 foreign material before pulling cables. Pull cables down grade with the feed-in point at the manhole or buildings of the highest elevation. Use flexible cable feeds to convey cables through manhole opening and into duct runs. Do not exceed the specified cable bending radii when installing cable under any conditions, including turnups into switches, transformers, switchgear, switchboards, and other enclosures. Cable with tape or wire shield must have a bending radius not less than 12 times the overall diameter of the completed cable. If basket-grip type cable-pulling devices are used to pull cable in place, cut off the section of cable under the grip before splicing and terminating.
3.4.1 Cable Lubricants
Use lubricants that are specifically recommended by the cable manufacturer for assisting in pulling jacketed cables.
3.5 CABLES IN UNDERGROUND STRUCTURES
Do not install cables utilizing the shortest path between penetrations, but route along those walls providing the longest route and the maximum spare cable lengths. Form cables to closely parallel walls, not to interfere with duct entrances, and support on brackets and cable insulators. Support cable splices in underground structures by racks on each side of the splice. Locate splices to prevent cyclic bending in the spliced sheath. Install cables at middle and bottom of cable racks, leaving top space open for future cables, except as otherwise indicated for existing installations. Provide one spare three-insulator rack arm for each cable rack in each underground structure.
3.5.1 Cable Tag Installation
Install cable tags in each manhole as specified, including each splice.
Tag wire and cable provided by this contract. Install cable tags over the fireproofing, if any, and locate the tags so that they are clearly visible without disturbing any cabling or wiring in the manholes.
3.6 CONDUCTORS INSTALLED IN PARALLEL
Conductors must be grouped such that each conduit of a parallel run contains 1 Phase A conductor, 1 Phase B conductor, 1 Phase C conductor, and 1 neutral conductor.
3.7 LOW VOLTAGE CABLE SPLICING AND TERMINATING
Make terminations and splices with materials and methods as indicated or specified herein and as designated by the written instructions of the manufacturer. Do not allow the cables to be moved until after the splicing material has completely set. Make splices in underground distribution systems only in accessible locations such as manholes, handholes, or aboveground termination pedestals.
3.8 STATIC GROUNDING SYSTEMS
NFPA 70 and IEEE C2 , except provide static grounding systems with a resistance to solid earth ground not exceeding 10,000 ohms.
3.8.1 Grounding Electrodes
Provide cone pointed driven ground rods driven full depth plus 12 inches , 1140211 SECTION 33 71 02 Page 11 installed to provide an earth ground of the appropriate value for the particular equipment being grounded.
If the specified ground resistance is not met, an additional ground rod must be provided in accordance with the requirements of NFPA 70 (placed not less than 6 feet from the first rod). Should the resultant (combined) resistance exceed the specified resistance, measured not less than 48 hours after rainfall, notify the Contracting Officer immediately.
3.8.2 Grounding Connections
Make grounding connections which are buried or otherwise normally inaccessible, by exothermic weld or compression connector.
a. Make exothermic welds strictly in accordance with the weld manufacturer's written recommendations. Welds which are "puffed up" or which show convex surfaces indicating improper cleaning are not acceptable. Mechanical connectors are not required at exothermic welds.
b. Make compression connections using a hydraulic compression tool to provide the correct circumferential pressure. Tools and dies must be as recommended by the manufacturer. An embossing die code or other standard method must provide visible indication that a connector has been adequately compressed on the ground wire.
3.8.3 Grounding Conductors
Provide bare grounding conductors, except where installed in conduit with associated phase conductors. Ground cable sheaths, cable shields, conduit, and equipment with No. 6 AWG. Ground other noncurrent-carrying metal parts and equipment frames of metal-enclosed equipment. Ground metallic frames and covers of handholes and pull boxes with a braided, copper ground strap with equivalent ampacity of No. 6 AWG.
3.8.4 Ground Cable Crossing Expansion Joints
Protect ground cables crossing expansion joints or similar separations in structures and pavements by use of approved devices or methods of installation which provide the necessary slack in the cable across the joint to permit movement. Use stranded or other approved flexible copper cable across such separations.
3.9 EXCAVATING, BACKFILLING, AND COMPACTING
Provide in accordance with NFPA 70 and Section 31 00 00 EARTHWORK.
3.9.1 Reconditioning of Surfaces
3.9.1.1 Unpaved Surfaces
Restore to their original elevation and condition unpaved surfaces disturbed during installation of duct . Preserve sod and topsoil removed during excavation and reinstall after backfilling is completed. Replace sod that is damaged by sod of quality equal to that removed. When the surface is disturbed in a newly seeded area, re-seed the restored surface with the same quantity and formula of seed as that used in the original seeding, and provide topsoiling, fertilizing, liming, seeding, sodding, sprigging, or mulching.
1140211 SECTION 33 71 02 Page 12
3.9.1.2 Paving Repairs
Where trenches, pits, or other excavations are made in existing roadways and other areas of pavement where surface treatment of any kind exists , restore such surface treatment or pavement the same thickness and in the same kind as previously existed, except as otherwise specified, and to match and tie into the adjacent and surrounding existing surfaces.
3.10 CAST-IN-PLACE CONCRETE
Provide concrete in accordance with Section 03 30 53 MISCELLANEOUS
CAST-IN-PLACE CONCRETE.
3.10.1 Concrete Slabs for Equipment
Unless otherwise indicated, the slab must be at least 8 inches thick, reinforced with a 6 by 6 - W2.9 by W2.9 mesh, placed uniformly 4 inches from the top of the slab. Slab must be placed on a 6 inch thick, well-compacted gravel base. Top of concrete slab must be approximately 4 inches above finished grade with gradual slope for drainage. Edges above grade must have 1/2 inch chamfer. Slab must be of adequate size to project at least 8 inches beyond the equipment.
Stub up conduits, with bushings, 2 inches into cable wells in the concrete pad. Coordinate dimensions of cable wells with transformer cable training areas.
3.11 FIELD QUALITY CONTROL
3.11.1 Performance of Field Acceptance Checks and Tests
Perform in accordance with the manufacturer's recommendations, and include the following visual and mechanical inspections and electrical tests, performed in accordance with NETA ATS.
3.11.1.1 Low Voltage Cables, 600-Volt
Perform tests after installation of cable, splices and terminations and before terminating to equipment or splicing to existing circuits.
a. Visual and Mechanical Inspection
(1) Inspect exposed cable sections for physical damage.
(2) Verify that cable is supplied and connected in accordance with contract plans and specifications.
(3) Verify tightness of accessible bolted electrical connections.
(4) Inspect compression-applied connectors for correct cable match and indentation.
(5) Visually inspect jacket and insulation condition.
(6) Inspect for proper phase identification and arrangement.
b. Electrical Tests
(1) Perform insulation resistance tests on wiring No. 6 AWG and larger
1140211 SECTION 33 71 02 Page 13 diameter using instrument which applies voltage of approximately 1000 volts dc for one minute.
(2) Perform continuity tests to insure correct cable connection.
3.11.1.2 Grounding System
a. Visual and mechanical inspection
Inspect ground system for compliance with contract plans and specifications
b. Electrical tests
Perform ground-impedance measurements utilizing the fall-of-potential method in accordance with IEEE 81 . On systems consisting of interconnected ground rods, perform tests after interconnections are complete. On systems consisting of a single ground rod perform tests before any wire is connected. Take measurements in normally dry weather, not less than 48 hours after rainfall. Use a portable megohmmeter tester in accordance with manufacturer's instructions to test each ground or group of grounds. The instrument must be equipped with a meter reading directly in ohms or fractions thereof to indicate the ground value of the ground rod or grounding systems under test.
3.11.2 Follow-Up Verification
Upon completion of acceptance checks and tests, show by demonstration in service that circuits and devices are in good operating condition and properly performing the intended function. As an exception to requirements stated elsewhere in the contract, the Contracting Officer must be given 5 working days advance notice of the dates and times of checking and testing.
-- End of Section --
1140211 SECTION 33 71 02 Page 14
| DIVISION 33 - UTILITIES |
| 33 71 02 - UNDERGROUND ELECTRICAL DISTRIBUTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Precast Underground Structures |
| 1.4.2 Directional Boring Certificate of Conformance |
| 1.4.3 Regulatory Requirements |
| 1.4.4 Standard Products |
| 1.4.4.1 Alternative Qualifications |
| 1.4.4.2 Material and Equipment Manufacturing Date |
| PART 2 PRODUCTS |
| 2.1 CONDUIT, DUCTS, AND FITTINGS |
| 2.1.1 Rigid Metal Conduit |
| 2.1.1.1 Rigid Metallic Conduit, PVC Coated |
| 2.1.2 Plastic Duct for Concrete Encasement |
| 2.1.3 Conduit Sealing Compound |
| 2.1.4 Fittings |
| 2.1.4.1 Metal Fittings |
| 2.1.4.2 PVC Conduit Fittings |
| 2.1.4.3 PVC Duct Fittings |
| 2.2 LOW VOLTAGE INSULATED CONDUCTORS AND CABLES |
| 2.2.1 Conductor Types |
| 2.2.2 Conductor Material |
| 2.2.3 Jackets |
| 2.2.4 In Duct |
| 2.2.5 Cable Marking |
| 2.3 LOW VOLTAGE WIRE CONNECTORS AND TERMINALS |
| 2.4 LOW VOLTAGE SPLICES |
| 2.4.1 Heat Shrinkable Splice |
| 2.4.2 Cold Shrink Rubber Splice |
| 2.5 TAPE |
| 2.5.1 Insulating Tape |
| 2.5.2 Buried Warning and Identification Tape |
| 2.6 PULL ROPE |
| 2.7 GROUNDING AND BONDING |
| 2.7.1 Driven Ground Rods |
| 2.7.2 Grounding Conductors |
| 2.8 CAST-IN-PLACE CONCRETE |
| 2.9 UNDERGROUND STRUCTURES |
| 2.9.1 Composite/Fiberglass Handholes and Covers |
| 2.10 CABLE TAGS IN MANHOLES |
| 2.10.1 Polyethylene Cable Tags |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.2 CABLE INSPECTION |
| 3.3 UNDERGROUND CONDUIT AND DUCT SYSTEMS |
| 3.3.1 Requirements |
| 3.3.2 Treatment |
| 3.3.3 Conduit Cleaning |
| 3.3.4 Jacking and Drilling Under Roads and Structures |
| 3.3.5 Multiple Conduits |
| 3.3.6 Conduit Plugs and Pull Rope |
| 3.3.7 Conduit and Duct Without Concrete Encasement |
| 3.3.7.1 Directional Boring |
| 3.3.8 Duct Encased in Concrete |
| 3.3.8.1 Connections to Existing Concrete Pads |
| 3.3.8.2 Partially Completed Duct Banks |
| 3.3.8.3 Removal of Ducts |
| 3.4 CABLE PULLING |
| 3.4.1 Cable Lubricants |
| 3.5 CABLES IN UNDERGROUND STRUCTURES |
| 3.5.1 Cable Tag Installation |
| 3.6 CONDUCTORS INSTALLED IN PARALLEL |
| 3.7 LOW VOLTAGE CABLE SPLICING AND TERMINATING |
| 3.8 STATIC GROUNDING SYSTEMS |
| 3.8.1 Grounding Electrodes |
| 3.8.2 Grounding Connections |
| 3.8.3 Grounding Conductors |
| 3.8.4 Ground Cable Crossing Expansion Joints |
| 3.9 EXCAVATING, BACKFILLING, AND COMPACTING |
| 3.9.1 Reconditioning of Surfaces |
| 3.9.1.1 Unpaved Surfaces |
| 3.9.1.2 Paving Repairs |
| 3.10 CAST-IN-PLACE CONCRETE |
| 3.10.1 Concrete Slabs for Equipment |
| 3.11 FIELD QUALITY CONTROL |
| 3.11.1 Performance of Field Acceptance Checks and Tests |
| 3.11.1.1 Low Voltage Cables, 600-Volt |
| 3.11.1.2 Grounding System |
3.11.2 Follow-Up Verification