W912QR25R0027_Specs-0003.pdf

PDF 1 MB Posted

Attached to
Renovate Facility 20145 at Wright Patterson Air Force Base
Solicitation number
W912QR25R0027
Issued by

About this file

This is Amendment 0003 to solicitation W912QR25R0027 issued by the U.S. Army Engineer District, Louisville for the renovation of a research facility (Building 20145) at Wright-Patterson Air Force Base, Ohio. The amendment extends the response deadline from August 8, 2025 to August 13, 2025, and revises multiple specification sections including price breakout schedules, static-control flooring, and wall and door protection requirements.

The contract includes base work for facility renovation across basement, first, second, and third floors with extensive asbestos abatement requirements. The base proposal includes primary facility work and multiple asbestos removal line items with estimated quantities ranging from 500 to 9,500 square feet at unit pricing to be determined. Optional work includes furniture and equipment (FF&E) for different floors. The amendment updates technical specifications for static-control flooring requiring specific electrical resistance properties and installation standards, as well as wall and door protection systems using high-impact resistant materials. Multiple architectural drawings and construction documents have been revised, including ceiling plans, wall sections, door details, and interior design specifications for flooring and ceilings.

View the file

Other files

File Type Posted
W912QR25R0027-0004.pdf PDF
W912QR25R0027_CID-0003.pdf PDF
W912QR25R0027_Plans-0003.pdf PDF
W912QR25R0027-0003.pdf PDF
W912QR25R0027-0002.pdf PDF
W912QR25R0027_Specs-0002.pdf PDF
W912QR25R0027_CID-0002.pdf PDF
W912QR25R0027_Plans-0002.pdf PDF
W912QR25R0027-0001.pdf PDF
W912QR25R0027_CID-0000.pdf PDF
W912QR25R0027_Specs_Vol1-0000.pdf PDF
W912QR25R0027_Plans-0000.pdf PDF
W912QR25R0027_Specs_Vol2-0000.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W22W9K50135988

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See continuation page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR25R0027

X 9B. DATED (SEE ITEM 11)

23-Jun-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0003

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2025

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR25R0027_Specs-0003

W912QR25R0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

Summary of Changes Amendment #0003 WPAFB - RENOVATE RESEARCH FACILITY FOR MS&A, BUILDING 20145, WRIGHT-PATTERSON AFB, OH

The following SPECIFICATION SECTIONS have been revised and replace in their entirety:

O1 10 00 PRICE BREAKOUT SCJEDULE

09 62 38 STATIC-CONTROL FLOORING

10 26 00 WALL AND DOOR PROTECTION

The following DOCUMENTS have been revised and replaced in their entirety

A-109 – BASEMENT REFLECTED CEILING PLAN:

A-113 – SPRAY-ON FIREPROOFING PLANS:

A-302 – WALL SECTIONS:

A-401 – ENLARGED WEST BASEMENT STAIR PLAN:.

A-504 – SEISMIC DETAILS:

A-507 – COLUMN DETAILS:

A-511 – DOOR DETAILS:

A-602 - DOOR SCHEDULE AND TYPES:

I-102 – FIRST FLOOR FINISH PLAN:

I-502 – FINISH DETAILS:

I-601 – LEGEND OF COLORS AND FINSHES:

E-504 – DETAILS:

E-505 – GROUNDING DETAIL:

The following SID DOCUMENTS within the CID have been revised and replaced in their entirety

CID - STRUCTURAL INTERIOR DESIGN – FLOORING

CID – STRUCTURAL INTERIOR DESIGN - CEILINGS

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 08-Aug-2025 01:00 PM to 13-Aug-2025 01:00 PM.

The following have been modified:

PRICE BREAKOUT

00 10 00

PRICE BREAKOUT SCHEDULE

OFFEROR'S NAME: ___________________________________________

CONTRACT LINE ITEM SCHEDULE

AMENDMENT0003**************************************************************************************

Line Item No. Description Quantity Unit Amount

BASE PROPOSAL

0001A. Primary Facility – Part 1: All work, materials, and labor required to first floor renovation deck and new basement, first, and second floor and roof structure above 3rd floor: Job $ _____________

0001B. Primary Facility – Asbestos Part 1: All work, materials, equipment and labor required to provide asbestos abatement as indicated in section 01 35 43 GENERAL

ENVIRONMENTAL PROTECTION REQUIREMMENTS

(WPAFB) for Hazardous Materials - White Mastic on Fiberglass Pipe Insulation (not pipe insulation) Removal and Disposal from first floor renovation deck and new basement, first, and second floor and roof structure above 3rd floor. See Note No. 4 Job 3000 SF $/SF_______ $_____________

0001C. Primary Facility – Asbestos Part 1: All work, materials, equipment and labor required to provide asbestos abatement as indicated in section 01 35 43 GENERAL

ENVIRONMENTAL PROTECTION REQUIREMMENTS

(WPAFB) for Hazardous Materials - 12”x12” While Floor Tile with Tan Streaks and Black Mastic Removal and Disposal from first floor renovation deck and new basement, first, and second floor and roof structure above 3rd floor.

See Note No. 4 500 SF $/SF________ $ _____________

0001D. Primary Facility – Asbestos Part 1: All work, materials, equipment and labor required to provide asbestos abatement as indicated in section 01 35 43 GENERAL

ENVIRONMENTAL PROTECTION REQUIREMMENTS

(WPAFB) for Hazardous Materials - White Duct Mastic on Fiberglass Insulation Around Duct (of duct/Air Handling Unit surfaces with duct mastic) Removal and Disposal from first floor renovation deck and new basement, first, and second floor and roof structure above 3rd floor. See Note No. 4 3100 SF $/SF_________ $ _____________

0001E. Primary Facility – Asbestos Part 1: All work, materials, equipment and labor required to provide asbestos abatement as indicated in section 01 35 43 GENERAL

ENVIRONMENTAL PROTECTION REQUIREMMENTS

(WPAFB) for Hazardous Materials - 12”x12” White Floor Tile with Black Streaks and Non-Asbestos-Containing Yellow Mastic in first floor renovation deck and new basement, first, and second floor and roof structure above 3rd floor. See Note No. 4 9500 SF $/SF__________ $ _____________

0002A. Primary Facility – Part 2: All work, materials, and labor required for new 3rd floor. Job $ _____________

Total Base Proposal $ _____________

*************************************************************************************AMENDMENT 0003

OPTIONS

0003. Option 1 - FF&E – Part 1: All work, materials, and labor required to furnish and install furniture for renovation deck and new basement, first, and second floor. Job $ __________

0004. Option 2 - FF&E – Part 2: All work, materials, and labor required to furnish and install furniture for third floor. Job $ __________

AMENDMENT0003**************************************************************************************

*************************************************************************************AMENDMENT 0003

Options may be exercised within 365 calendar days from Notice-to-Proceed.

Total Options $ __________

TOTAL PROPOSAL $ _____________

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items including options of the CLIN Schedule.

Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated for best value to the Government. The basis for award is the trade-off process. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

NOTE NO. 4. CLIN Items as noted are estimates and are subject to the requirements of FAR 51.211-18 Variation in Estimated Quantity. Variations in the actual quantities encountered will be the subject of a contract modification as provided in Clause 52.211-18 Variation in Estimated Quantities.

--END OF CLIN SCHEDULE—

(End of Summary of Changes)

Renovate Research Facility for MS&A - F20145

WPAFB # 496691

SECTION 09 62 38

STATIC-CONTROL FLOORING

08/17, CHG 1: 08/18

AMENDMENT 0003

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E648 (2019a) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source

ASTM F150 (2006; R 2013) Standard Test Method for Electrical Resistance of Conductive and Static Dissipative Resilient Flooring

ASTM F1344 (2021) Standard Specification for Rubber Floor Tile

ASTM F1700 (2020) Standard Specification for Solid Vinyl Floor Tile

ASTM F1861 (2021) Standard Specification for Resilient Wall Base

ASTM F1869 (2016a) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride

ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

CARPET AND RUG INSTITUTE (CRI)

CRI Green Label Plus (2017) Green Label Plus Quality Manual

ELECTROSTATIC DISCHARGE ASSOCIATION (ESD)

ESD S6.1 (2019) Standard for the Protection of Electrostatic Discharge Susceptible Items

– Grounding

SECTION 09 62 38 Page 1 Certified Final Submittal - Amendment 0003

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

RESILIENT FLOOR COVERING INSTITUTE (RFCI)

FLOORSCORE FLOORSCORE IAQ Certification

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SCHEDULING

Schedule static-control flooring work after any other work which would damage the finished surface of the flooring.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-03 Product Data

Static-Control Resilient Flooring

Accessories

Adhesives

Warranty

SD-04 Samples

Static-Control Resilient Flooring

Moldings

Special Treatment Materials

Accessories

SD-06 Test Reports

Fire Resistance

SECTION 09 62 38 Page 2

Moisture, Alkalinity and Bond

Testing

SD-07 Certificates

Qualifications of Applicator

SD-08 Manufacturer's Instructions

Static-Control Resilient Flooring

Accessories

SD-10 Operation and Maintenance Data

Static-Control Resilient Flooring

Accessories

1.3.1 Samples

1.3.1.1 Static-Control Resilient Flooring

Submit three samples of each indicated color and type of flooring, base, moldings, and accessories sized a minimum 2-1/2 by 4 inch .

1.3.1.2 Static-Control Carpet

Submit three "Production Quality" samples 18 by 18 inches of each carpet proposed for use, showing quality, pattern, and color specified.

1.3.1.3 Moldings

Submit three pieces of each type at least 12 inches long.

1.3.1.4 Special Treatment Materials

Submit three samples showing system and installation method.

1.3.1.5 Operations and Maintenance Data

a. Submit Data Package 1 in accordance with Section 01 78 23 OPERATION

AND MAINTENANCE DATA.

b. Submit three copies of manufacturer's maintenance instructions for each type of flooring material describing recommended type of cleaning equipment and materials, spotting and cleaning methods, and cleaning cycles.

1.4 CERTIFICATIONS

1.4.1 Indoor Air Quality Certifications

1.4.1.1 Floor Covering Materials

Provide Static-Dissipative Vinyl Tile and wall base products certified to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification

SECTION 09 62 38 Page 3 or validation by other third-party programs that products meet the requirements of this Section. Provide certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold, CRI Green Label Plus or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body.

1.4.1.2 Adhesives

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body.

AMENDMENT 0003

1.5 EXTRA MATERIALS

Provide extra material from same dye lot for future maintenance. Provide a minimum of 5 percent of total square yards of each flooring and base type, pattern, and color.

AMENDMENT 0003

1.6 QUALITY ASSURANCE

The flooring manufacturer will approve the Qualifications of Applicator and certify that he/she has a minimum of 3 years of experience in the application of the materials to be used.

1.7 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, size, production run, project identification, handling instructions and related information. Observe ventilation and safety procedures specified in the Safety Data Sheets (SDS). Do not store flooring near materials that may off-gas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives.

1.7.1 Static-Control Resilient Flooring

Store materials in a clean, dry, secure, and well-ventilated area with ambient air temperature range as recommended by the manufacturer but not less than 68 degrees F or more than 85 degrees F . Stack materials according to manufacturer's recommendations. Protect materials from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances.

1.8 ENVIRONMENTAL CONDITIONS

Provide temporary ventilation during work of this section.

1.8.1 Static-Control Resilient Flooring

Maintain areas in which resilient flooring is to be installed at a temperature range as recommended by the manufacturer but not less than 68

SECTION 09 62 38 Page 4 degrees F or more than 85 degrees F for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature range as recommended by the manufacturer but not less than 55 degrees F thereafter for the duration of the contract. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.

1.9 WARRANTY

1.9.1 Static-Control Resilient Flooring

Provide manufacturer's standard performance guarantees or warranties including a five year wear warranty and ten year conductivity warranty.

PART 2 PRODUCTS

2.1 STATIC-CONTROL RESILIENT FLOORING

2.1.1 Conductive Resilient Flooring

2.1.1.1 Conductive Vinyl Tile

Conductive vinyl tile must be a homogeneous vinyl product and conform to ASTM F1700. Provide electrical resistance from surface to surface and surface to ground between 25,000 ohms (2.5 x 10 to the 4th) and 1,000,000 ohms (1.0 x 10 to the 6th) when tested in accordance with ASTM F150. Tile must be 12 inches square and 1/8 inch thick. Tile must be pre-grooved for heat welding of seams. As required, provide welding rods as recommended by the manufacturer.

2.1.1.2 Conductive Rubber Tile

Provide conductive rubber tile conforming to ASTM F1344 Class 1 homogeneous, Type B (through mottled) with a smooth or hammered surface.

Provide electrical resistance from surface to surface and surface to ground between 25,000 ohms (2.5 x 10 to the 4th) and 1,000,000 ohms (1.0 x 10 to the 6th) when tested in accordance with ASTM F150. Provide tile 12 inches square and 2.0 mm thick.

Provide Conductive Rubber Tile containing a minimum of 10 percent recycled content.

2.1.2 Static-Dissipative Resilient Flooring

2.1.2.1 Static-Dissipative Vinyl Tile

Static-dissipative vinyl tile must be a homogeneous vinyl product and conform to ASTM F1700. Provide electrical resistance from surface to surface and surface to ground between 1,000,000 ohms (1.0 x 10 to the 6th) and 1,000,000,000 ohms (1.0 x 10 to the 9th) when tested in accordance with ASTM F150. Tile must be 12 inches square and 1/8 inch thick. Tile must be pre-grooved for heat welding of seams. As required, provide welding rods as recommended by the manufacturer.

2.1.2.2 Static-Dissipative Rubber Tile

Static-dissipative rubber tile conforming to ASTM F1344 Class 1 homogeneous, Type A (solid color). Provide a smoothhammered surface.

SECTION 09 62 38 Page 5

Provide electrical resistance from surface to surface and surface to ground between 1,000,000 ohms (1.0 x 10 to the 6th) and 1,000,000,000 ohms (1.0 x 10 to the 9th) when tested in accordance with ASTM F150. Provide tile 12 inches square and 2.0mm thick.

2.2 WALL BASE

2.2.1 Resilient Base

Resilient base must conform to ASTM F1861, Type TS (vulcanized thermoset rubber), Style B (coved - installed with resilient flooring). Provide 4 inch high and a minimum 1/8 inch thick wall base. Provide job formed corners in matching height, shape, and color.

2.2.2 Self-Coving

Self-coving must consist of static-control resilient flooring over a cove stick and must have cove cap as recommended by the manufacturer of the flooring. Self-coving base material must be same as floor material.

2.3 ADHESIVES

Provide conductive adhesive as recommended by the manufacturer of the static-control flooring and self-coving base.

Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (use the office or classoom requirements, regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classoom requirements, regardless of space type) or VOC content requirements of GS-36.

2.4 MOLDINGS

Provide heavy duty tapered moldings of vinyl or rubber and types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide vertical lip on molding of maximum 1/4 inch . Provide bevel change in level between 1/4 and 1/2 inch with a slope no greater than 1:2. Provide color to match.

2.5 ACCESSORIES

Use accessories recommended by the manufacturer of the flooring.

2.6 ELECTRICAL GROUND CONNECTION

Provide an electrical ground connection that meets the requirements of ESD S6.1 . Connection between the static-control floor system and the external grounding system must be provided. Contact with the static-control floor system must be with conductive grounding strip and must have the greater of the following: a minimum contact area of 9 square inch or the dimensions recommended by the manufacturer. Provide the grounding conductor recommended by the manufacturer of the flooring.

Connect and install the grounding conductor as recommend by the flooring manufacturer.

SECTION 09 62 38 Page 6

2.7 MANUFACTURER'S COLOR, PATTERN AND TEXTURE

Provide color, pattern and texture as indicated. Provide flooring in any one continuous area or replacement of damaged flooring in continuous area from same production run with same shade and pattern.

2.8 FIRE RESISTANCE TESTING REQUIREMENTS

Provide a minimum average critical radiant flux of 0.22 watts per square centimeter for flooring in corridors and exits when tested in accordance with ASTM E648.

PART 3 EXECUTION

3.1 SURFACE PREPARATION

Before any work under this section is begun, defects such as rough or scaling concrete, low spots, high spots, and uneven surfaces must be corrected, and damaged portions of concrete slabs must be repaired in accordance with flooring manufacturer's recommended instructions. Floor must be in a level plane with a maximum variation of 1/8 inch every 10 feet , except where indicated as sloped. Repair cracks and irregularities and prepare the subfloor in accordance with flooring manufacturer's recommended instructions. Curing and sealing compounds should not be used on concrete surfaces to receive flooring unless they have been tested and approved by the flooring manufacturer. In addition, remove paint, varnish, oils, release agents, sealers, waxes, and adhesives, as required by the flooring product in accordance with manufacturer's printed installation instructions. If a curing compound is required, it must be coordinated for compatibility with the flooring adhesive.

3.2 MOISTURE, ALKALINITY AND BOND TESTS

Determine the suitability of the concrete subfloor for receiving the flooring with regard to moisture content and pH level by moisture and alkalinity tests. Conduct moisture testing in accordance with ASTM F1869 or ASTM F2170, unless otherwise recommended by the flooring manufacturer.

Conduct alkalinity testing as recommended by the flooring manufacturer.

Determine the compatibility of the flooring adhesives to the concrete floors by a bond test in accordance with the flooring manufacturer's recommendations.

3.3 GENERAL INSTALLATION

Do not install building construction materials that show visual evidence of biological growth.

AMENDMENT 0003

3.4 INSTALLATION OF STATIC-CONTROL RESILIENT TILE FLOORING

Install static-control resilient flooring, ground connections and accessories in accordance with the approved manufacturer's installation instructions. Tile lines and joints must be kept square, symmetrical, tight, and even. Tile at the perimeter of the area to be finished may vary as necessary to maintain full-size tiles in the field, but no perimeter tile may be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Tile must be cut, fitted, and scribed to walls, partitions, and projections after field flooring has

SECTION 09 62 38 Page 7 been applied. Install grounding strips in accordance with manufacturer's installation instructions. Protect edges of flooring material meeting hard surface flooring with molding and install in accordance with the molding manufacturer's printed instructions.

3.5 NOT USED

AMENDMENT

3.6 INSTALLATION OF WALL BASE

3.6.1 Resilient Base

Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at masonry walls with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.

3.6.2 Self-Coving

The static-control resilient flooring must have a self-coving base and must be installed in accordance with the flooring manufacturer's printed installation instructions. Extend the self-cove up the walls, columns and pilasters 4 inches . Terminate the coving with a cove cap. Place a cove stick at the floor-wall junction to support the coving at the bend.

Provide self-cove as indicated.

3.7 CLEANING AND PROTECTION

The flooring must be cleaned in accordance with the manufacturer's recommendations. Flooring must be protected by a covering of heavy-duty building paper before foot traffic is permitted. Lap and secure edges of kraft paper protection to provide a continuous cover. Boardwalks must be placed over flooring in areas where subsequent building operations might damage the floor. Remove and replace flooring that becomes loose, broken, or curled prior to acceptance, or flooring that does not conform to resistance requirements of ASTM F150.

3.8 TESTING

Test the flooring in accordance with and conform to the requirements of

ESD S6.1 .

-- End of Section --

SECTION 09 62 38 Page 8

SECTION 10 26 00

WALL AND DOOR PROTECTION

08/20

AMENDMENT 0003

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D256 (2010; R 2018) Standard Test Methods for Determining the Izod Pendulum Impact Resistance of Plastics

ASTM D543 (2020) Standard Practices for Evaluating the Resistance of Plastics to Chemical Reagents

ASTM D635 (2018) Standard Test Method for Rate of Burning and/or Extent and Time of Burning of Plastics in a Horizontal Position

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)

SAE J1545 (2005; R 2014) Instrumental Color Difference Measurement for Exterior Finishes, Textiles and Colored Trim

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications

UNDERWRITERS LABORATORIES (UL)

UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building

SECTION 10 26 00 Page 1

Materials, Finishes And Furnishings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Corner Guards

Wall Covering and Panels

SD-03 Product Data

Corner Guards

Wall Covering and Panels

Recycled content for aluminum component of corner guards

SD-04 Samples

Corner Guards

Wall Covering and Panels

SD-06 Test Reports

Fire Resistance Rating

SD-07 Certificates

Indoor air quality for adhesives

SD-10 Operation and Maintenance Data

Corner Guards , Data Package 1

Wall Covering and Panels , Data Package 1

1.3 CERTIFICATIONS

1.3.1 Indoor Air Quality

1.3.1.1 Wall Covering and Panels

Provide sheet and high impact resistant resilient materials certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this section. Provide current product certification documentation from certification body.

1.3.1.2 Adhesives and Sealants

Provide products certified to meet indoor air quality requirements by

SECTION 10 26 00 Page 2

UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party program that products meet the requirements of this section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the project site in manufacturer's original unopened containers with seals unbroken and labels and trademarks intact. Keep materials dry, protected from weather and damage, and stored under cover.

Store materials at approximately 70 degrees F for at least 48 hours prior to installation.

1.5 WARRANTY

Provide manufacturer's warranty to repair or replace defective materials and workmanship for a 1 year period of one year from date of final acceptance of the work.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

To the maximum extent possible, provide wall and door protection items that are standard products of a single manufacturer and furnished as detailed. Drawings show general configuration of products required, and items differing in minor details from those shown are acceptable.

Submit detailed shop drawings of each wall and door protection item indicated. Include elevations, dimensions, clearances, details of construction and anchorage, and details of joints and connections.

Submit manufacturers' descriptive product data for each wall and door protection item indicated. Include manufacturers' literature, finishes, profiles and thicknesses of materials.

Submit manufacturers' operations and maintenance data for each wall and door protection item indicated in accordance with Section 01 78 23

OPERATIONS AND MAINTENANCE DATA.

2.1.1 Resilient Material

Provide resilient material consisting of high impact resistant extruded PVC freeacrylic vinyl or injection molded thermal plastic conforming to the following:

2.1.1.1 Minimum Impact Resistance

Minimum impact resistance must be 18 ft-lbs/sq. inch when tested in accordance with ASTM D256, (Izod impact, ft-lbs per sq inch notched).

2.1.1.2 Fire Resistance Rating

Provide the following surface burning characteristics when tested and labeled in accordance with ASTM E84 by a qualified testing agency:

maximum flame spread of 25 and a smoke developed rating of 450 or less.

Provide material rated as self extinguishing when tested in accordance

SECTION 10 26 00 Page 3 with ASTM D635. Provide resilient material used for protection on fire rated doors and frames listed by the qualified testing agency performing the tests. Provide resilient material installed on fire rated wood/steel door and frame assemblies tested on similar type assemblies. Test results of material tested on any other combination of door/frame assembly are not acceptable.

2.1.1.3 Integral Color

Provide colored components having integral color and matched in accordance with SAE J1545 to within plus or minus 1.0 on the CIE-LCH scales.

2.1.1.4 Chemical and Stain Resistance

Provide materials resistant to chemicals and stains reagents in accordance with ASTM D543.

2.1.1.5 Fungal and Bacterial Resistance

Provide materials resistant to fungi and bacteria in accordance with ASTM G21, as applicable.

2.2 CORNER GUARDS

2.2.1 Resilient Corner Guards

Provide surface mounted corner guards, radius formed to profile shown.

Provide corner guards that extend from floor to ceiling. Furnish mounting hardware, cushions, and base plates. Provide assembly consisting of a snap-on corner guard formed from high impact resistant resilient material, mounted on a continuous aluminum retainer. Extruded aluminum retainer conforms to alloy 6063, temper T5 or T6. Provide aluminum components that contain a minimum of 35 percent recycled content. Provide data identifying percentage of recycled content for aluminum component of corner guards . Flush mounted type guards act as a stop for adjacent wall finish material. Furnish factory fabricated end closure caps for top and bottom of surface mounted corner guards. Provide flush mounted corner guards installed in fire rated wall that maintain the rating of the wall.

Manufacturer to provide insulating materials that are an integral part of the corner guard system. Provide exposed metal portions of fire rated assemblies with a paintable surface.

AMENDMENT 0003

2.3 WALL COVERING AND PANELS

Provide wall covering and panels consisting of high impact PVC free resilient material. Provide wall covering material used on the interior of the building (defined as inside of the weatherproofing system) that meets either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) the VOC content requirements of SCAQMD Rule 1168 , or VOC content requirements of GS-36.

AMENDMENT 0003

SECTION 10 26 00 Page 4

2.4 TRIM, FASTENERS AND ANCHORS

Provide vinyl trim, fasteners and anchors for each specific installation as indicated.

2.5 FINISH

Submit samples indicating color and texture of materials requiring color and finish.

2.5.1 Resilient Material Finish

Provide resilient material finish of embossed stipple texture with colors in accordance with SAE J1545 .

2.6 ADHESIVES

Provide adhesive for resilient material in accordance with manufacturers recommendations. Provide sealants and non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) the VOC content requirements of SCAQMD Rule 1168 , or VOC content requirements of GS-36. Provide certification of indoor air quality for adhesives .

2.7 COLOR

Provide color as indicated; colors listed are not intended to limit the selection of equal colors from other manufacturers.

PART 3 EXECUTION

3.1 INSTALLATION

Do not install items that show visual evidence of biological growth.

Install items on surfaces that are clean, smooth, and free of obstructions.

3.1.1 Corner Guards and Wall Guards

a. Mount guards as indicated and in accordance with manufacturer's written installation instructions.

b. For wall guards, space brackets at no more than 3 feet on centers and anchor to the wall in accordance with the manufacturer's written installation instructions.

AMENDMENT 0003

3.1.1.1 Not Used

AMENDMENT 0003

3.1.2 Door Protectors

Install protectors after frames are in place, but prior to hanging of doors, in accordance with manufacturer's written instructions. Apply adhesives in controlled environment in accordance with manufacturer's written instructions. Install protection for fire doors and frames in accordance with NFPA 80.

SECTION 10 26 00 Page 5

3.1.3 Wall Coverings and Panels

Install as indicated in accordance with manufacturer's written instructions.

-- End of Section --

SECTION 10 26 00 Page 6

SF 30
SUMMARY OF CHANGES
00 10 00
PRICE BREAKOUT SCHEDULE
WPAFB F20145_SPECIFICATIONS - Amendment 0003.pdf
WPAFB F20145_SPECIFICATIONS - Amendment 0003
DIVISION 09 - FINISHES
09 62 38 - STATIC-CONTROL FLOORING
PART 1 GENERAL
1.1 REFERENCES
1.2 SCHEDULING
1.3 SUBMITTALS
1.3.1 Samples
1.3.1.1 Static-Control Resilient Flooring
1.3.1.2 Static-Control Carpet
1.3.1.3 Moldings
1.3.1.4 Special Treatment Materials
1.3.1.5 Operations and Maintenance Data
1.4 CERTIFICATIONS
1.4.1 Indoor Air Quality Certifications
1.4.1.1 Floor Covering Materials
1.4.1.2 Adhesives
1.5 EXTRA MATERIALS
1.6 QUALITY ASSURANCE
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Static-Control Resilient Flooring
1.8 ENVIRONMENTAL CONDITIONS
1.8.1 Static-Control Resilient Flooring
1.9 WARRANTY
1.9.1 Static-Control Resilient Flooring
PART 2 PRODUCTS
2.1 STATIC-CONTROL RESILIENT FLOORING
2.1.1 Conductive Resilient Flooring
2.1.1.1 Conductive Vinyl Tile
2.1.1.2 Conductive Rubber Tile
2.1.2 Static-Dissipative Resilient Flooring
2.1.2.1 Static-Dissipative Vinyl Tile
2.1.2.2 Static-Dissipative Rubber Tile
2.2 WALL BASE
2.2.1 Resilient Base
2.2.2 Self-Coving
2.3 ADHESIVES
2.4 MOLDINGS
2.5 ACCESSORIES
2.6 ELECTRICAL GROUND CONNECTION
2.7 MANUFACTURER'S COLOR, PATTERN AND TEXTURE
2.8 FIRE RESISTANCE TESTING REQUIREMENTS
PART 3 EXECUTION
3.1 SURFACE PREPARATION
3.2 MOISTURE, ALKALINITY AND BOND TESTS
3.3 GENERAL INSTALLATION
3.4 INSTALLATION OF STATIC-CONTROL RESILIENT TILE FLOORING
3.5 NOT USED
3.6 INSTALLATION OF WALL BASE
3.6.1 Resilient Base
3.6.2 Self-Coving
3.7 CLEANING AND PROTECTION
3.8 TESTING
DIVISION 10 - SPECIALTIES
10 26 00 - WALL AND DOOR PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 CERTIFICATIONS
1.3.1 Indoor Air Quality
1.3.1.1 Wall Covering and Panels
1.3.1.2 Adhesives and Sealants
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 WARRANTY
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
2.1.1 Resilient Material
2.1.1.1 Minimum Impact Resistance
2.1.1.2 Fire Resistance Rating
2.1.1.3 Integral Color
2.1.1.4 Chemical and Stain Resistance
2.1.1.5 Fungal and Bacterial Resistance
2.2 CORNER GUARDS
2.2.1 Resilient Corner Guards
2.3 WALL COVERING AND PANELS
2.4 TRIM, FASTENERS AND ANCHORS
2.5 FINISH
2.5.1 Resilient Material Finish
2.6 ADHESIVES
2.7 COLOR
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Corner Guards and Wall Guards
3.1.1.1 Not Used
3.1.2 Door Protectors
3.1.3 Wall Coverings and Panels

File details come from the government source that posted it. Updated .