About this file

This is a Structural Interior Design (SID) package for renovating the Materials Analysis Lab at Wright-Patterson AFB, Ohio, under solicitation W912QR25R0015. The package details comprehensive interior finishes and furniture specifications for a design-bid-build project managed by the US Army Corps of Engineers Louisville District.

The design includes various finish specifications: carpet tiles (Milliken Coastline) for office spaces with painted walls and acoustical ceiling tiles; porcelain tile for restroom floors and walls with painted gypsum board ceilings; epoxy flooring for lab spaces with epoxy paint walls and exposed painted structure; and sealed concrete for support spaces. The furniture package (FF&E) includes modular desk systems, systems furniture with power/storage, seating, tables and accessories, all specified as Contractor Furnished, Contractor Installed (CFCI). Government furnished items include break room appliances, flat screen TVs/monitors, copiers/printers, and lab equipment. The design incorporates a color scheme of Alabaster (SW7008) field paint, Smoky Azurite (SW9148) accent paint, with solid surface countertops in French Blue Melange and plastic laminate in Harding Oak. The package includes detailed floor plans showing furniture layouts, finish plans, reflected ceiling plans, and material specifications for both first and second floors.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Renovate Materials Analysis Lab Wright-Patterson AFB, OH

P2: 507354

Design-Bid-Build

Structural Interior Design Certified Final Design

XX December 2024

W912QR25R0015-0004

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR25R0015_SID-0004

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME: SHEET ID

D

ES

IG

N

BY

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D

BY

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

U

SV

U

KK

E D

IS

TR

IC

T

D R

M

AR

TI

N

L U

TH

ER

J R

P L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

MA

TE

RI

AL

S

AN

AL

YS

IS

LA

B

F/

BU

ILD

IN

G

P2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

Pl ot D at e:

US Army Corps of Engineers ®

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

PR

O

JE

C

T N

O

ZH

TV

P2#:

VOLUME 1 OF 1

507354

C :\R ev it_

Lo ca l\1

_A R

C H

_B

_C F2

0_ m ic ha el .n ob er t.r vt

/1

3/

:3 9:

P

M

LOUISVILLE DISTRICT

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

RENOVATE MATERIALS ANALYSIS LAB F/20071 -

BUILDING 71 (SLAMER / B71)

35% DESIGN DEVELOPMENT G-001

M N

O

BE

R T

M D

AL

LA

BA

TI

ST

A

D R

ID

EN

O U

R

M B

U

TL

ER

C

O

VE

R S

H

EE

T

D

ES

IG

N

D

EV

EL

O

PM

EN

T

OCTOBER 13, 2023

O C

TO

BE

R

,2

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

A

D

ES

IG

N D

EV

EL

O

PM

EN

T

M B

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION DATE

GENERAL

G-001 COVER SHEET A 20231013

GI001 CODE ANALYSIS A 20231013

GI002 CODE ANALYSIS CONTINUED A 20231013

GI010 CODE COMPLIANCE SITE PLAN A 20231013

GI110 LIFE SAFETY PLAN - FIRST FLOOR A 20231013

GI120 LIFE SAFETY PLAN - SECOND FLOOR A 20231013

CIVIL

C-005 STAGING AND HAUL ROUTES A 20231013

C-011 EXISTING CONDITIONS PLAN A 20231013

CD101 SITE DEMOLITION LAN A 20231013

C-101 SITE PLAN A 20231013

ARCHITECTURAL

AD110 FIRST FLOOR DEMOLITION PLAN - COMPOSITE A 20231013

AD111 FIRST FLOOR DEMOLITION PLAN - SECTOR 1 A 20231013

AD112 FIRST FLOOR DEMOLITION PLAN - SECTOR 2 A 20231013

AD113 FIRST FLOOR DEMOLITION PLAN - SECTOR 3 A 20231013

AD120 SECOND FLOOR DEMOLITION PLAN - COMPOSITE A 20231013

AD121 SECOND FLOOR DEMOLITION PLAN - SECTOR 1 A 20231013

AD122 SECOND FLOOR DEMOLITION PLAN - SECTOR 2 A 20231013

AD123 SECOND FLOOR DEMOLITION PLAN - SECTOR 3 A 20231013

A-110 FIRST FLOOR PLAN - COMPOSITE A 20231013

A-111 FIRST FLOOR PLAN - SECTOR 1 A 20231013

A-112 FIRST FLOOR PLAN - SECTOR 2 A 20231013

A-113 FIRST FLOOR PLAN - SECTOR 3 A 20231013

A-120 SECOND FLOOR PLAN - COMPOSITE A 20231013

A-121 SECOND FLOOR PLAN - SECTOR 1 A 20231013

A-122 SECOND FLOOR PLAN - SECTOR 2 A 20231013

A-123 SECOND FLOOR PLAN - SECTOR 3 A 20231013

A-301 BUILDING SECTIONS A 20231013

A-302 BUILDING SECTIONS A 20231013

INTERIORS

IN-110 FIRST FLOOR FINISH PLAN - COMPOSITE A 20231013

IN-111 FIRST FLOOR FINISH PLAN - SECTOR 1 A 20231013

IN-112 FIRST FLOOR FINISH PLAN - SECTOR 2 A 20231013

IN-113 FIRST FLOOR FINISH PLAN - SECTOR 3 A 20231013

IN-120 SECOND FLOOR FINISH PLAN - COMPOSITE A 20231013

IN-121 SECOND FLOOR FINISH PLAN - SECTOR 1 A 20231013

IN-122 SECOND FLOOR FINISH PLAN - SECTOR 2 A 20231013

IN-123 SECOND FLOOR FINISH PLAN - SECTOR 3 A 20231013

IF-114 FIRST FLOOR FF&E PLAN - COMPOSITE A 20231013

IF-115 FIRST FLOOR FF&E PLAN - SECTOR 1 A 20231013

IF-116 FIRST FLOOR FF&E PLAN - SECTOR 2 A 20231013

IF-117 FIRST FLOOR FF&E PLAN - SECTOR 3 A 20231013

IF-124 SECOND FLOOR FF&E PLAN - COMPOSITE A 20231013

IF-125 SECOND FLOOR FF&E PLAN - SECTOR 1 A 20231013

IF-126 SECOND FLOOR FF&E PLAN - SECTOR 2 A 20231013

IF-127 SECOND FLOOR FF&E PLAN - SECTOR 3 A 20231013

I-501 FINISH DETAILS A 20231013

I-602 SCHEDULES A 20231013

I-603 SCHEDULES A 20231013

FIRE PROTECTION

FA001 FIRE ALARM / MNS LEGEND AND NOTES A 20231013

FA110D FIRE ALARM FIRST FLOOR DEMOLITION PLAN A 20231013

FA120D FIRE ALARM SECOND FLOOR DEMOLITION PLAN A 20231013

FA111 FIRE ALARM FIRST FLOOR PLAN - SECTOR 1 A 20231013

FA112 FIRE ALARM FIRST FLOOR PLAN - SECTOR 2 A 20231013

FA113 FIRE ALARM FIRST FLOOR PLAN - SECTOR 3 A 20231013

FA122 FIRE ALARM SECOND FLOOR PLAN - SECTOR 2 A 20231013

FA123 FIRE ALARM SECOND FLOOR PLAN - SECTOR 3 A 20231013

FA600 TYPICAL FIRE ALARM AND MNS RISER DIAGRAM A 20231013

FA601 TYPICAL FIRE ALARM AND MNS INPUT/OUTPUT MATRIX A 20231013

FA605 FIRE ALARM AND MNS AUDIBLE AND VISUAL MESSAGES A 20231013

FX001 FIRE SUPPRESSION NOTES AND LEGEND A 20231013

FX110 FIRE SUPPRESSION FIRST FLOOR PLAN A 20231013

FX120 FIRE SUPPRESSION SECOND FLOOR PLAN A 20231013

FA121 FIRE ALARM SECOND FLOOR PLAN - SECTOR 1 A 20231013

WRIGHT-PATTERSON AIRFORCE BASE

5135 PEARSON ROAD,WRIGHT-PATTERSON AFB, OH 45433

4205900-231529.01 Structural Interior Design (SID) Package

10.18.2024

02841 Snapshot

SECTION 6

INTERIOR DESIGN

6.1

6.1 General:

The interior design for this project will comply with the design codes and industry standards shown below. These are in addition to the codes and standards provided in Section 1.6 above.

• ANSI/BIFMA Safety and Performance Standards for Furniture (2011)

• ASTM D 2047 - Test for Slip Resistance of Hard Surfaces

• ETL 07-4 – Air Force Carpet Standard

• NFPA 260 – Methods of Tests and Classification System for Cigarette Ignition Resistance of Components (2009)

• NFPA 261 – Method of Test for Determining Resistance of Mock-up Upholstered Furniture Material Assemblies to Ignition by Smoldering Cigarettes (2009)

• NFPA 705 – Field Flame Test for Textiles and Films

• UFC 3-120-01 – Design, Sign Standards, with Change 3, 12 Dec 2017

• UFC 3-120-10 – Interior Design (2018)

• Wyzenbeek Abrasion Resistance Test

• Air Force Reserve Command Handbook 32-1001

6.2 Comprehensive Interior Design:

The Comprehensive Interior Design (CID) package includes Structural Interior Design (SID) and Furniture, Fixture & Equipment (FF&E). The goal of the CID is to provide a functional, durable, visually appealing facility to enhance the User’s working environment, increase morale, and instill a sense of pride. The primary criteria for finish and furniture selections are to create a unified, cohesive facility.

6.3 Structural Interior Design:

Structural interior design includes all building finishes, built-in casework, window coverings at all exterior windows, and signage. Through review of the requirements and discussions at the charrette, the following finishes are proposed for the facility: carpet tiles for the office spaces with painted walls and acoustical ceiling tiles. Restrooms to have porcelain tile floor, porcelain tile wall with painted walls above, and the ceiling is to be painted gypsum board. Epoxy floor for lab space with epoxy paint walls and open to structure painted decking. Sealed concrete for support spaces with painted walls and open to structure painted decking.

6.4 Furniture, Fixtures & Equipment (FF&E):

FF&E for this project includes freestanding modular desk systems, systems furniture with power and storage & filing, seating, tables, and accessories. All desks and workstations have trash and recycle bins. Furniture, Fixtures & Equipment (FF&E) is funded separately from the construction contract, and is Contractor Furnished, Contractor Installed (CFCI). The General Contractor is responsible for all electrical connections from the FF&E to the building, and all telecommunications installation. Government furnished equipment for this project includes break room appliances, flat screen TVs/monitors with brackets, copiers/printers, and lab equipment (GFGI).

02841 Snapshot

KEY PLAN

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

6.3 6.5

6.A

6.C

6.G

6.J

6.4

7.B

7.C

7.D

7.3 7.1

7.A

7.2 1.11.21.31.4

1.A

1.B

1.C

1.D

1.E

1.F

2.12.2

2.A

2.B

2.C

2.D

2.E

2.F

2.G

6.1

6.D

6.B

6.2

6.I

6.H

6.F

6.5.4

6.5B

6.5A

6.5.16.5.26.5.3

HATCHED AREA IS NOT IN

THE SCOPE OF WORK

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:1

A

M

IN-110

FI

RS

T

FL

OO

R

FI

NI

SH

S

IG

NA

GE

P

LA

N -C

OM

PO

SI

TE

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

0 8' 16' 32'

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

1/16" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - COMPOSITE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

GENERAL NOTES

1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH

LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT

THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.

2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH

THE MANUFACTURER'S WRITTEN INSTRUCTIONS.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.

4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.

5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH

U.O.N.

6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.

7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI

GLOSS FINISH U.O.N.

8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;

SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE

EDGES MUST BE COVERED.

9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION

DETAILS.

10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION

AND COLOR.

11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM

FINISHES.

12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.

IN DOOR SCHEDULE.

13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH

SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,

VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.

14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE

SEALED, U.O.N.

15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH

SCHEDULE ON I-602 FOR MORE INFORMATION.

16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.

17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH

WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR

PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.

18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.

19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION

PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING

SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE

SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.

20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND

PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED

BY LOCAL CODE.

21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED

CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /

SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.

22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.

23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.

24. SEE SHEET I-505 FOR SIGNAGE DETAILS.

FINISH ABBREVIATIONS

CG = CORNER PROTECTION

CPT = CARPET

EP = EPOXY

GR = GROUT

MT = METAL TRIM

PL = PLASTIC LAMINATE

PT = PAINT

RB = RUBBER BASE

SC = SEALED CONCRETE

SS = SOLID SURFACE

STR = STAIR TREAD AND RISERS

TL = TILE

FINISH LEGEND

CPT-1

EP-1

SC-1

TL-2

OUT OF SCOPE

A

IN

-1

A

IN

-1

MAINTENANCE

SHOP

S7-101

LABORATORY

S6-101

ADMINISTRATIVE

VESTIBULE

A5-101

UTILITY

A5-103

TOILET

A5-102EP-1

SC-1

EP-1

SC-1

EP-1

EP-1

SC-1

SC-1

EP-1

PT-2

HATCHED AREA IS NOT

IN THE SCOPE OF WORK

I-201 A5

10 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A1

IS-1

IS-2

IS-3

IS-4

IS-5

IS-6

IS-7

IS-8 IS-9

IS-10

IS-11

IS-12

IS-13

IS-14

IS-15 IS-16

6.3 6.5

6.A

6.C

6.G

6.J

6.4

7.B

7.C

7.D

7.3 7.1

7.A

7.2 6.1

6.D

6.B

6.2

6.I

6.H

6.F

6.5.4

6.5B

6.5A

6.5.16.5.26.5.3

10 26 00.A110 26 00.A110 26 00.A1

10 26 00.A1 10 26 00.A110 26 00.A110 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

EP-1

TL-2

10 26 00.A110 26 00.A110 26 00.A110 26 00.A1

10 26 00.A1

10 26 00.A110 26 00.A1

IS-53

IS-52

ELECTRICAL

E1-101

SC-1

10 26 00.A1

10 26 00.A1

10 26 00.A1

TL-210 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A1 10 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A1

MAINTENANCE

SHOP

S7-101

09 65 00.B13

10 26 00.A1

10 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A110 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A1

KEYED NOTES

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:2

A

M

IN-111

FI

RS

T

FL

OO

R

FI

NI

SH

S

IG

NA

GE

P

LA

N -S

EC

TO

R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

0 4' 8' 16'

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

1/8" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - SECTOR 1

09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.

10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

UTILITY

S3-226

NO WORK IN

STAND

NO WORK IN

STAND

6.A

6.C

6.G

6.J

2.A

2.B

2.C

2.D

2.E

2.F

2.G

6.D

6.B

6.I

6.H

6.F

NO WORK IN

STAND

NO WORK IN

STAND

SECURITY

S3-103

CPT-1

PT-2

10 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A1

GENERAL NOTES

1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH

LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT

THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.

2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH

THE MANUFACTURER'S WRITTEN INSTRUCTIONS.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.

4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.

5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH

U.O.N.

6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.

7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI

GLOSS FINISH U.O.N.

8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;

SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE

EDGES MUST BE COVERED.

9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION

DETAILS.

10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION

AND COLOR.

11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM

FINISHES.

12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.

IN DOOR SCHEDULE.

13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH

SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,

VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.

14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE

SEALED, U.O.N.

15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH

SCHEDULE ON I-602 FOR MORE INFORMATION.

16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.

17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH

WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR

PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.

18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.

19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION

PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING

SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE

SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.

20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND

PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED

BY LOCAL CODE.

21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED

CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /

SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.

22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.

23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.

24. SEE SHEET I-505 FOR SIGNAGE DETAILS.

FINISH ABBREVIATIONS

CG = CORNER PROTECTION

CPT = CARPET

EP = EPOXY

GR = GROUT

MT = METAL TRIM

PL = PLASTIC LAMINATE

PT = PAINT

RB = RUBBER BASE

SC = SEALED CONCRETE

SS = SOLID SURFACE

STR = STAIR TREAD AND RISERS

TL = TILE

FINISH LEGEND

CPT-1

EP-1

SC-1

TL-2

OUT OF SCOPE

KEYED NOTES

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:3

A

M

IN-112

FI

RS

T

FL

OO

R

FI

NI

SH

S

IG

NA

GE

P

LA

N -S

EC

TO

R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

0 4' 8' 16'

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

1/8" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - SECTOR 2

10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

A

IN

-1

A

IN

-1

LABORATORY

S2-101

LABORATORY

S1-101

ADMINISTRATIVE

VESTIBULE

A2-101

UTILITY

A2-105

EP-1

EP-1

SC-1

SC-1

TL-2 TL-2

TOILET

A2-102

TOILET

A2-103

EP-1

TL-2

EP-1

TL-2

EP

-1

SC

-1

SC-1

EP-1

PT-2

CPT-1

10 26 00.A1

IS-18

IS-19

IS-20

IS-21

IS-22

IS-23 IS-24

IS-25

IS-26

IS-31

IS-28

IS-29

IS-30

IS-31

IS-32

IS-33 IS-35

IS-34

IS-36

IS-36

IS-37

NO WORK IN

STAND

6.A

6.C

6.G

6.J

1.11.21.31.4

1.A

1.B

1.C

1.D

1.E

1.F

2.12.2

2.A

2.B

2.C

2.D

2.E

2.F

2.G

6.D

6.B

6.I

6.H

6.F

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1 10 26 00.A1

10 26 00.A110 26 00.A110 26 00.A1

10 26 00.A1

10 26 00.A1

CPT-1

EP-1

SC-1

EP-1

IS-48

IS-49

IS-50

IS-51

SECURITY OFFICE

A2-107

CPT-1

SC-1

PT-2

10 26 00.A1

SC

-1

EP

-1

EP-1

IS-54

09 65 00.B13

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A110 26 00.A110 26 00.A110 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A110 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1

10 26 00.A1 10 26 00.A1

10 26 00.A1

I-201 A5 Sim

I-201 A5 Sim

SECURITY

S3-103

CPT-1

PT-2

10 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A1

OPEN OFFICE

A1-102

IS-55

IS-56

SECURITY

VESTIBULE

A2-108

09 65 00.B13

09 65 00.B13

IS-57

10 26 00.A1

10 26 00.A1

10 26 00.A110 26 00.A1

GENERAL NOTES

1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH

LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT

THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.

2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH

THE MANUFACTURER'S WRITTEN INSTRUCTIONS.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.

4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.

5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH

U.O.N.

6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.

7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI

GLOSS FINISH U.O.N.

8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;

SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE

EDGES MUST BE COVERED.

9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION

DETAILS.

10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION

AND COLOR.

11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM

FINISHES.

12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.

IN DOOR SCHEDULE.

13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH

SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,

VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.

14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE

SEALED, U.O.N.

15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH

SCHEDULE ON I-602 FOR MORE INFORMATION.

16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.

17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH

WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR

PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.

18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.

19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION

PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING

SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE

SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.

20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND

PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED

BY LOCAL CODE.

21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED

CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /

SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.

22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.

23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.

24. SEE SHEET I-505 FOR SIGNAGE DETAILS.

FINISH ABBREVIATIONS

CG = CORNER PROTECTION

CPT = CARPET

EP = EPOXY

GR = GROUT

MT = METAL TRIM

PL = PLASTIC LAMINATE

PT = PAINT

RB = RUBBER BASE

SC = SEALED CONCRETE

SS = SOLID SURFACE

STR = STAIR TREAD AND RISERS

TL = TILE

FINISH LEGEND

CPT-1

EP-1

SC-1

TL-2

OUT OF SCOPE

KEYED NOTES

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:4

A

M

IN-113

FI

RS

T

FL

OO

R

FI

NI

SH

S

IG

NA

GE

P

LA

N -S

EC

TO

R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

0 4' 8' 16'

1/8" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - SECTOR 3

09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.

10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

6.3 6.5

6.A

6.C

6.G

6.J

6.4

7.B

7.C

7.D

7.3 7.1

7.A

7.2 1.11.21.31.4

1.A

1.B

1.C

1.D

1.E

1.F

2.12.2

2.A

2.B

2.C

2.D

2.E

2.F

2.G

6.1

6.D

6.B

6.2

6.I

6.H

6.F

6.5.4

6.5B

6.5A

6.5.16.5.26.5.3

HATCHED AREA IS NOT IN

THE SCOPE OF WORK

HATCHED AREA IS NOT IN

THE SCOPE OF WORK

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:5

A

M

IN-120

SE

CO

ND

F

LO

OR

F

IN

IS

H

SI

GN

AG

E

PL

AN

CO

MP

OS

IT

E

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

0 8' 16' 32'

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

1/16" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - COMPOSITE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

A

IN

-1

A

IN

-1

OPEN

TO

BELOW

OPEN

TO

BELOW

STORAGE

S7-201

OPEN OFFICE

A5-201

LABORATORY

PLATFORM

S6-201

CPT-1

EP-1

PT-210 26 00.A1

10 26 00.A1

IS-38

IS-39

IS-40

I-201A1

6.3 6.5

6.A

6.C

6.G

6.J

6.4

7.B

7.C

7.D

7.3 7.1

7.A

7.2 6.1

6.D

6.B

6.2

6.I

6.H

6.F

6.5.4

6.5B

6.5A

6.5.16.5.26.5.3

10 26 00.A1

10 26 00.A1

CPT-1

SC-1

SC-1

10 26 00.A1

10 26 00.A1

NO WORK IN

STAND

MEETING ROOM

A5-202

09 65 00.B13

09 65 00.B13

KEY PLAN

GENERAL NOTES

1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH

LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT

THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.

2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH

THE MANUFACTURER'S WRITTEN INSTRUCTIONS.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.

4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.

5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH

U.O.N.

6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.

7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI

GLOSS FINISH U.O.N.

8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;

SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE

EDGES MUST BE COVERED.

9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION

DETAILS.

10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION

AND COLOR.

11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM

FINISHES.

12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.

IN DOOR SCHEDULE.

13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH

SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,

VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.

14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE

SEALED, U.O.N.

15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH

SCHEDULE ON I-602 FOR MORE INFORMATION.

16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.

17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH

WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR

PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.

18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.

19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION

PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING

SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE

SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.

20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND

PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED

BY LOCAL CODE.

21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED

CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /

SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.

22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.

23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.

24. SEE SHEET I-505 FOR SIGNAGE DETAILS.

FINISH ABBREVIATIONS

CG = CORNER PROTECTION

CPT = CARPET

EP = EPOXY

GR = GROUT

MT = METAL TRIM

PL = PLASTIC LAMINATE

PT = PAINT

RB = RUBBER BASE

SC = SEALED CONCRETE

SS = SOLID SURFACE

STR = STAIR TREAD AND RISERS

TL = TILE

FINISH LEGEND

CPT-1

EP-1

SC-1

TL-2

OUT OF SCOPE

KEYED NOTES

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:4

:0

A

M

IN-121

SE

CO

ND

F

LO

OR

F

IN

IS

H

SI

GN

AG

E

PL

AN

SE

CT

OR

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

0 4' 8' 16'

1/8" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - SECTOR 1

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.

10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

IN

-1

A

IN

-1

A

IN

-1

A

IN

-1

OPEN

TO

BELOW

6.A

6.C

6.G

6.J

2.A

2.B

2.C

2.D

2.E

2.F

2.G

6.D

6.B

6.I

6.H

6.F

NO WORK IN

STAND

NO WORK IN

STAND

NO WORK IN

STAND

NO WORK IN

STAND

10 26 00.A1

NO WORK IN

STAND

09 65 00.B13

KEY PLAN

GENERAL NOTES

1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH

LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT

THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.

2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH

THE MANUFACTURER'S WRITTEN INSTRUCTIONS.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.

4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.

5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH

U.O.N.

6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.

7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI

GLOSS FINISH U.O.N.

8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;

SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE

EDGES MUST BE COVERED.

9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION

DETAILS.

10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION

AND COLOR.

11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM

FINISHES.

12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.

IN DOOR SCHEDULE.

13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH

SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,

VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.

14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE

SEALED, U.O.N.

15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH

SCHEDULE ON I-602 FOR MORE INFORMATION.

16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.

17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH

WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR

PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.

18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.

19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION

PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING

SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE

SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.

20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND

PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED

BY LOCAL CODE.

21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED

CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /

SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.

22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.

23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.

24. SEE SHEET I-505 FOR SIGNAGE DETAILS.

FINISH ABBREVIATIONS

CG = CORNER PROTECTION

CPT = CARPET

EP = EPOXY

GR = GROUT

MT = METAL TRIM

PL = PLASTIC LAMINATE

PT = PAINT

RB = RUBBER BASE

SC = SEALED CONCRETE

SS = SOLID SURFACE

STR = STAIR TREAD AND RISERS

TL = TILE

FINISH LEGEND

CPT-1

EP-1

SC-1

TL-2

OUT OF SCOPE

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:4

:1

A

M

IN-122

SE

CO

ND

F

LO

OR

F

IN

IS

H

SI

GN

AG

E

PL

AN

SE

CT

OR

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

0 4' 8' 16'

1/8" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - SECTOR 2

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

IN

-1

A

IN

-1

OPEN

TO

BELOW

OPEN OFFICE

S2-201

STORAGE

S1-201

CPT-1

SC-1

OPEN

TO

BELOW

CPT-1

CPT-1

PT-2 PT-2

PT-2

CPT-1

OPEN OFFICE

A2-201

10 26 00.A1

10 26 00.A1

10 26 00.A1

IS-41

IS-42

IS-44

IS-45

IS-46

IS-47

I-201G1

6.A

6.C

6.G

6.J

1.11.21.31.4

1.A

1.B

1.C

1.D

1.E

1.F

2.12.2

2.A

2.B

2.C

2.D

2.E

2.F

2.G

6.D

6.B

6.I

6.H

6.F

10 26 00.A1

10 26 00.A1

10 26 00.A1

NO WORK IN

STAND

CONFERENCE

ROOM

S2-202

10 26 00.A1

09 65 00.B13

09 65 00.B13

09 65 00.B13

10 26 00.A1

10 26 00.A110 26 00.A1

10 26 00.A110 26 00.A1

OPEN OFFICE

A1-201

09 65 00.B13

I-201G1

10 26 00.A1

10 26 00.A110 26 00.A1

KEY PLAN

GENERAL NOTES

1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH

LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT

THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.

2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH

THE MANUFACTURER'S WRITTEN INSTRUCTIONS.

3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.

4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.

5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH

U.O.N.

6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.

7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI

GLOSS FINISH U.O.N.

8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;

SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE

EDGES MUST BE COVERED.

9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION

DETAILS.

10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION

AND COLOR.

11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM

FINISHES.

12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.

IN DOOR SCHEDULE.

13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH

SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,

VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.

14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE

SEALED, U.O.N.

15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH

SCHEDULE ON I-602 FOR MORE INFORMATION.

16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.

17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH

WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR

PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.

18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.

19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION

PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING

SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE

SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.

20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND

PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED

BY LOCAL CODE.

21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED

CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /

SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.

22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.

23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.

24. SEE SHEET I-505 FOR SIGNAGE DETAILS.

FINISH ABBREVIATIONS

CG = CORNER PROTECTION

CPT = CARPET

EP = EPOXY

GR = GROUT

MT = METAL TRIM

PL = PLASTIC LAMINATE

PT = PAINT

RB = RUBBER BASE

SC = SEALED CONCRETE

SS = SOLID SURFACE

STR = STAIR TREAD AND RISERS

TL = TILE

FINISH LEGEND

CPT-1

EP-1

SC-1

TL-2

OUT OF SCOPE

KEYED NOTES

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:3

P

M

IN-123

SE

CO

ND

F

LO

OR

F

IN

IS

H

SI

GN

AG

E

PL

AN

SE

CT

OR

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

0 4' 8' 16'

1/8" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - SECTOR 3

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.

10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

2. FURNITURE, FIXTURE & EQUIPMENT (FF&E) IS SHOWN FOR

COORDINATION, AND IS CONTRACTOR FURNISHED CONTRACTOR

INSTALLED (CFCI).

3. VERIFY FIELD CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL

CONNECTIONS TO THE BUILDING, INCLUDING J BOXES TO SUPPORT

FF&E. FURNITURE DEALER IS RESPONSIBLE FOR THE ELECTRICAL

HOOKUP OF ALL FF&E, INCLUDING WHIPS FROM WALL CONNECTIONS TO

THE FURNITURE AND CONNECTIONS TO THE FURNITURE AND

CONNECTION PRE-WIRED PANELS, UP TO AND INCLUDING FACEPLATES.

5. GENERAL CONTRACTOR TO COORDINATE WITH FURNITURE DEALER TO

ALLOW BUILDING ACCESS FOR FIELD CONDITION VERIFICATION.

6. INFORMATION TECHNOLOGY (IT) (PHONE / LAN ETC.) WIRING TO BE

INSTALLED BY CONTRACTOR.

7. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE DESIGN

INTENT OUTLINED IN THE FF&E PACKAGE, AND ASSEMBLE FF&E PER

MANUFACTURER'S WRITTEN INSTRUCTIONS. FF&E PROVIDER MUST

COORDINATE WITH CONTRACTING OFFICER AS REQUIRED TO ENSURE

THAT ALL FF&E IS SUCCESSFULLY INSTALLED AND OPERATIONAL PRIOR

TO OCCUPANCY.

8. AWARDED FURNITURE DEALER TO PROVIDE SHOP DRAWINGS WITH

PANELS AND ELECTRICAL / COMM CONNECTIONS FOR GOVERNMENT

APPROVAL.

9. REFER TO FURNITURE SCHEDULE, SHEET I-603 FOR INFORMATION.

10. REFER TO EQUIPMENT SCHEDULE, SHEET I-603 FOR INFORMATION.

11. REFER TO AV PLANS FOR TELEVISION LOCATION AND INFORMATION.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:4

A

M

I-602

SC

HE

DU

LE

S

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

1MISC. FINISH TYPES

TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES

CG-1 CORNER GUARD KOROGUARD G800 SERIES VINYL

CORNER GUARD/ G815

COMPOSED GRAY

GR-1 GROUT LATICRETE --- 24 NATURAL GREY INSTALL WITH WALL AND FLOOR TILE

PL-1 PLASTIC LAMINATE WILSONART PREMIUM LAMINATE 8258K-05 HARDING OAK

SS-1 SOLID SURFACE MATERIAL WILSONART --- 9024ML FRENCH BLUE MELANGE COUNTERTOPS/BACKSPLASH

CEILING TYPES

CODE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES

ACT-1 ACOUSTIC CEILING TILE ARMSTRONG ULTIMA 1910 LAY IN TILE WHITE 24" X 24"

PT-4 CEILING PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW7007 BRIGHT WHITE FOR EXPOSED CEILINGS AND GYPSUM

CEILINGS.

FLOOR TYPES

TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES

CPT-1 CARPET TILE MILLIKEN COASTLINE AMERICAS LANDSCAPE LND153-144 PAMPAS GRASS 19" x 19" INSTALL IN STRAIGHT LAY

PATTERN.

EP-1 EPOXY - 3 PART SHERWIN WILLIAMS --- LIGHT GRAY RESUFLOR PERFORMANCE HPS, WITH

NON-SKID GRIT. AN INTEGRAL 4" BASE ON

THE WALL.

SC-1 SEALED CONCRETE --- --- ---

STR-1 STAIR TREAD AND RISERS ARMSTRONG FLOORING STAIR TREADS AND LANDING TILES PEBBLE V8FPB USE ALL CORRESPONDING PIECES FOR

STAIRS.

TL-2 FLOOR TILE CROSSVILLE ACCESS POINT WBT04 TRAVERTINE SAND 12" X 24" STRAIGHT LAY

WALL BASE TYPES

TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES

MT-1 METAL TRIM SCHLUTER JOLLY EDGE BRUSHED CHROME ANODIZED

ALUMINUM

MT-2 METAL TRIM SCHLUTER COVE BASE BRUSHED CHROME ANODIZED

ALUMINUM

RB-1 RUBBER WALL BASE JOHNSONITE --- VN2 STONE COTTAGE TRADITIONAL VINYL 1/8", 4" COVE

WALL FINISHES

TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES

PT-1 PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW7008 ALABASTER FIELD PAINT

PT-2 PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW9148 SMOKY AZURITE ACCENT

PT-3 PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW7032 WARM STONE DOORS, STRINGERS, AND TRIM TL-1 WALL TILE CROSSVILLE ACCESS POINT WBT01 TRAVERTINE WHITE 12" X 24" STRAIGHT LAY

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:5

A

M

I-603

SC

HE

DU

LE

S

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB A

p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

FURNITURE SCHEDULE - PHASE 1

TYPE MARK DESCRIPTION MANUFACTURER MODEL COUNT

AC-1 TRASH RECEPTACLE MAGNUSON GROUP TRADA-01 1

AC-2 RECYCLING RECEPTACLE MAGNUSON GROUP TRADA-01 1

AC-3 RECYCLING RECEPTACLE, SMALL MAGNUSON GROUP TR20 6

AC-4 TRASH RECEPTACLE , SMALL MAGNUSON GROUP TR10 6

AV-1 MARKERBOARD CALYX PROFILE MARKERBOARD 1

AV-2 BULLETIN BOARD CALYX CONCEPT TACK BOARD 1

CC-1 CHAIR, CONFERENCE HAWORTH SCC-24-15E,1X_2,TR_F,TR_F,

TR_F

CT-1 CHAIR, TASK HAWORTH ZODY II 6

SC-1 STORAGE, CABINET U-LINE H-7642 8

SC-2 STORAGE, CREDENZA TEKNION GCLL-2672-UMU-FT9N 1

SL-1 STORAGE, LOCKERS SALSBURY 19158-25 1

SS-1 STORAGE, STEEL SHELVING ULINE H-7432 12

TC-1 TABLE, CONFERENCE - SMALL HAWORTH JIVE 1

WS-2 WORKSTATION 6 X 6 - TWO UNITS TEKNION --- 1

WS-4 WORKSTATION 6 X 6 - FOUR UNITS TEKNION --- 1

EQUIPMENT SCHEDULE - PHASE 1

TYPE MARK DESCRIPTION DIMENSION COUNT POWER REQUIREMENT GFGI/CFCI

EQ-1 PRINTER 23 X 20 X 24 1 AC 100 - 240V GFGI

EQ-2 SHREDDER 23 X 20 X 24 1 AC 100 - 240V GFGI

EQ-3 COFFEEMAKER 21.4 x 9 x 24.1 1 120V GFGI EQ-4 REFRIGERATOR 35.5 x 35.63 x 70.13 1 115V CFCI

EQ-5 COUNTERTOP MICROWAVE 15.9 X 20.5 X 12.6 1 115V GFGI

SIGNAGE SCHEDULE - PHASE 1

TYPE MARK ROOM NUMBER ROOM NAME VERBIAGE SIGN TYPE INTERIOR/EXTERIOR

DETAIL

NUMBER

IS-1 A5-103 UTILITY UTILITY S2 INTERIOR D1/I-504

IS-2 A5-102 TOILET UNISEX RESTROOM RR1 INTERIOR A7/I-504

IS-3 S7-101 MAINTENANCE SHOP MAINTENANCE SHOP S2 INTERIOR D1/I-504

IS-4 LABORATORY S2 INTERIOR D1/I-504

IS-5 A5-101 ADMINISTRATIVE VESTIBULE EXIT SIGN SS3 INTERIOR D7/I-504

IS-6 NO SMOKING SIGN SS8 EXTERIOR A11/I-504

IS-7 BUILDING NAME AND NUMBER ES1 EXTERIOR A1/I-504

IS-8 NO SMOKING SIGN SS8 EXTERIOR A11/I-504

IS-9 A5-103 UTILITY UTILITY S2 EXTERIOR D1/I-504

IS-10 A5-103 UTILITY EXIT SIGN SS3 INTERIOR D7/I-504

IS-11 S7-101 MAINTENANCE SHOP MAINTENANCE SHOP S2 EXTERIOR D1/I-504

IS-12 S7-101 MAINTENANCE SHOP EXIT SIGN SS3 INTERIOR D7/I-504

IS-13 S6-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504

IS-14 S6-101 LABORATORY EXIT SIGN SS3 INTERIOR D7/I-504

IS-15 S6-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504

IS-16 S6-101 LABORATORY EXIT SIGN SS3 INTERIOR D7/I-504

IS-38 A5-202 MEETING ROOM EXIT SIGN SS3 INTERIOR D7/I-504

IS-39 EXIT SIGN SS3 INTERIOR D7/I-504

IS-40 A5-201 OPEN OFFICE OPEN OFFICE S2 EXTERIOR D1/I-504

IS-52 A5-101 ADMINISTRATIVE VESTIBULE ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504 IS-53 A5-101 ADMINISTRATIVE VESTIBULE ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504

ROOM FINISH SCHEDULE - PHASE 1

ROOM

NUMBER ROOM NAME

FLOOR

FINISHES

WALL

BASE

WALL FINISHES CEILING

FINISHNORTH EAST SOUTH WEST

A5-101 ADMINISTRATIVE VESTIBULE EP-1 --- PT-1 PT-1 PT-2 PT-1 ACT-1

A5-102 TOILET TL-2 MT-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-4

A5-103 UTILITY SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4

A5-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1

A5-202 MEETING ROOM CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

A6-101 ELECTRICAL SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4

S6-101 LABORATORY EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4

S6-201 LABORATORY PLATFORM EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4

S7-101 MAINTENANCE SHOP EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4

S7-201 STORAGE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:5

A

M

I-604

SC

HE

DU

LE

S

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

C h ec ke r

A p pr o ve r

O C

T O

B E

R

, 2

W

2Q R

D

EQUIPMENT SCHEDULE - PHASE 2

TYPE MARK DESCRIPTION DIMENSION COUNT POWER REQUIREMENT GFGI/CFCI

EQ-1 PRINTER 23 X 20 X 24 7 AC 100 - 240V GFGI

EQ-2 SHREDDER 20 X 20 X 36 6 1.87HP GFGI

EQ-3 COFFEEMAKER 21.4 x 9 x 24.1 2 120V GFGI EQ-4 REFRIGERATOR 35.5 x 35.63 x 70.13 2 115V CFCI

EQ-5 COUNTERTOP MICROWAVE 15.9 X 20.5 X 12.6 2 115V GFGI

FURNITURE SCHEDULE - PHASE 2

TYPE MARK DESCRIPTION MANUFACTURER MODEL COUNT

AC-1 TRASH RECEPTACLE MAGNUSON GROUP TRADA-01 5

AC-2 RECYCLING RECEPTACLE MAGNUSON GROUP TRADA-01 5

AC-3 RECYCLING RECEPTACLE, SMALL MAGNUSON GROUP TR20 27

AC-4 TRASH RECEPTACLE , SMALL MAGNUSON GROUP TR10 27

AV-1 MARKERBOARD CALYX PROFILE MARKERBOARD 7

AV-2 BULLETIN BOARD CALYX CONCEPT TACK BOARD 2

CC-1 CHAIR, CONFERENCE HAWORTH SCC-24-15E,1X_2,TR_F,TR_F,

TR_F

CT-1 CHAIR, TASK HAWORTH ZODY II 32

SC-1 STORAGE, CABINET U-LINE H-7642 60

SC-2 STORAGE, CREDENZA TEKNION GCLL-2672-UMU-FT9N 1

SF-1 LATERAL FILE, FOUR DRAWERS. Teknion BSLFSP18__53 5

SL-1 STORAGE, LOCKERS SALSBURY 19158-25 1

TC-2 TABLE, CONFERENCE - LARGE HAWORTH JIVE 1

WS-1 WORKSTATION 6 X 6 - ONE UNIT TEKNION --- 2

WS-2 WORKSTATION 6 X 6 - TWO UNITS TEKNION --- 2

WS-3 WORKSTATION 6 X 6 - THREE UNITS TEKNION --- 3

WS-4 WORKSTATION 6 X 6 - FOUR UNITS TEKNION --- 1

WS-5 WORKSTATION 6 X 6 - EIGHT UNITS TEKNION --- 1

WS-6 WORKSTATION 30" x 78" - ONE UNIT TEKNION --- 1 WS-7 WORKSTATION 30" x 78" - FOUR UNITS TEKNION --- 1

ROOM FINISH SCHEDULE - PHASE 2

ROOM

NUMBER ROOM NAME

FLOOR

FINISHES

WALL

BASE

WALL FINISHES CEILING

FINISHNORTH EAST SOUTH WEST

A1-101 VESTIBULE EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4

A1-102 OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

A1-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

A2-101 ADMINISTRATIVE VESTIBULE EP-1 --- PT-1 PT-1 PT-2 PT-1 PT-4

A2-102 TOILET TL-2 MT-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-4

A2-103 TOILET TL-2 MT-1 PT-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-4

A2-105 UTILITY SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4

A2-107 SECURITY OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-2 ACT-1

A2-108 SECURITY VESTIBULE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1

A2-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1

S1-101 LABORATORY EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4

S1-201 STORAGE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4

S2-101 LABORATORY EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4

S2-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1

S2-202 CONFERENCE ROOM CPT-1 RB-1 PT-2 PT-1 PT-1 PT-1 ACT-1

S3-103 SECURITY CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1

SIGNAGE SCHEDULE - PHASE 2

TYPE MARK ROOM NUMBER ROOM NAME VERBIAGE SIGN TYPE INTERIOR/EXTERIOR

DETAIL

NUMBER

IS-18 A2-102 TOILET UNISEX RESTROOM RR1 INTERIOR A7/I-504

IS-19 A2-103 TOILET UNISEX RESTROOM RR1 INTERIOR A7/I-504

IS-20 EXIT SIGN SS3 INTERIOR D7/I-504

IS-21 A2-105 UTILITY EXIT SIGN SS3 EXTERIOR D7/I-504

IS-22 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504

IS-23 S1-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504

IS-24 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504

IS-24 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504

IS-24 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504

IS-25 A1-102 OPEN OFFICE OFFICE VESTIBULE S2 INTERIOR D1/I-504

IS-26 A1-102 OPEN OFFICE OFFICE S2 INTERIOR D1/I-504

IS-28 A1-101 VESTIBULE OFFICE VESTIBULE S2 EXTERIOR D1/I-504

IS-29 NO SMOKING SIGN SS3 EXTERIOR A11/I-504

IS-30 S2-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504

IS-31 EXIT SIGN SS3 INTERIOR D7/I-504

IS-31 EXIT SIGN SS3 INTERIOR D7/I-504

IS-32 EXIT SIGN SS3 INTERIOR D7/I-504

IS-33 S2-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504

IS-34 EXIT SIGN SS3 INTERIOR D7/I-504

IS-35 S1-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504

IS-36 NO SMOKING SIGN SS3 EXTERIOR A11/I-504

IS-36 EXIT SIGN SS3 INTERIOR D7/I-504

IS-37 A1-102 OPEN OFFICE OFFICE S2 EXTERIOR D1/I-504

IS-41 S2-201 OPEN OFFICE OPEN OFFICE S2 INTERIOR D1/I-504

IS-42 S2-202 CONFERENCE ROOM CONFERENCE ROOM S2 INTERIOR D1/I-504

IS-44 A2-201 OPEN OFFICE OPEN OFFICE S2 EXTERIOR D1/I-504

IS-45 EXIT SIGN SS3 INTERIOR D7/I-504

IS-46 A1-102 OPEN OFFICE OFFICE S2 EXTERIOR D1/I-504

IS-47 EXIT SIGN SS3 INTERIOR D7/I-504

IS-48 A2-108 SECURITY VESTIBULE SECURITY VESTIBULE S2 INTERIOR D1/I-504

IS-49 A2-107 SECURITY OFFICE SECURITY OFFICE S2 INTERIOR D1/I-504

IS-50 EXIT SIGN S2 INTERIOR D1/I-504

IS-51 A2-108 SECURITY VESTIBULE LABORATORY S2 EXTERIOR D1/I-504

IS-54 ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504

IS-55 S1-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504

IS-56 A2-101 ADMINISTRATIVE VESTIBULE ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504

IS-57 A1-101 VESTIBULE OFFICE S2 INTERIOR D1/I-504

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

A

IF

-1

A

IF

-1

A

IF

-1

A

IF

-1

A

IF

-1

A

IF

-1

A

IF

-1

A

IF

-1

HATCHED AREA IS NOT IN

THE SCOPE OF WORK

HATCHED AREA IS NOT IN

THE SCOPE OF WORK

6.3 6.5

6.A

6.C

6.G

6.J

6.4

7.B

7.C

7.D

7.3 7.1

7.A

7.2 1.11.21.31.4

1.A

1.B

1.C

1.D

1.E

1.F

2.12.2

2.A

2.B

2.C

2.D

2.E

2.F

2.G

6.1

6.D

6.B

6.2

6.I

6.H

6.F

6.5.4

6.5B

6.5A

6.5.16.5.26.5.3

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P at h:

P lo t D at e:

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I

D

P R

O

JE

C T

N O

U .S

. A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

LO

U

IS

V

IL

LE

D

IS

T

R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L

LO

U

IS

V

IL

LE

, K

E N

T U

C K

Y

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

BU

ILD

IN

G

P2

Z H

T V

-2

.0

M H

P R

O

JE

C T

N O

C

R ev it Lo ca l\1

_I

N T

D -C

F

0_ ch ri st in e.

fe rn an de zY

H Q

U G

.r vt

/1

/2

:3

:1

A

M

IF-114

FI

RS

T

FL

OO

R

FF

&E

P

LA

N -C

OM

PO

SI

TE

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

V

R

IO

S M

E D

R A

N O

C

F E

R N

A N

D E

Z

JB M

B

O C

T O

B E

R

, 2

W

2Q R

D

PLAN NORTH

7 S

TA

ND

6 S

TA

ND

5 S

TA

ND

4 S

TA

ND

3 S

TA

ND

2 S

TA

ND

1 S

TA

ND

1 A

DM

IN

2 A

DM

IN

3 A

DM

IN

5 A

DM

IN

6 A

DM

IN

1 E

LE

C

0 8' 16' 32'

1/16" = 1'-0"A1 FIRST FF&E PLAN - COMPOSITE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

2. FURNITURE, FIXTURE & EQUIPMENT (FF&E) IS SHOWN FOR

COORDINATION, AND IS CONTRACTOR FURNISHED CONTRACTOR

INSTALLED (CFCI).

3. VERIFY FIELD CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL

CONNECTIONS TO THE BUILDING, INCLUDING J BOXES TO SUPPORT

FF&E. FURNITURE DEALER IS RESPONSIBLE FOR THE ELECTRICAL

HOOKUP OF ALL FF&E, INCLUDING WHIPS FROM WALL CONNECTIONS TO

THE FURNITURE AND CONNECTIONS TO THE FURNITURE AND

CONNECTION PRE-WIRED PANELS, UP TO AND INCLUDING FACEPLATES.

5. GENERAL CONTRACTOR TO COORDINATE WITH FURNITURE DEALER TO

ALLOW BUILDING ACCESS FOR FIELD CONDITION VERIFICATION.

6. INFORMATION TECHNOLOGY (IT) (PHONE / LAN ETC.) WIRING TO BE

INSTALLED BY CONTRACTOR.

7. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .