W912QR25R0015_SID-0004.pdf
PDF 9 MB Posted
- Solicitation number
- W912QR25R0015
About this file
This is a Structural Interior Design (SID) package for renovating the Materials Analysis Lab at Wright-Patterson AFB, Ohio, under solicitation W912QR25R0015. The package details comprehensive interior finishes and furniture specifications for a design-bid-build project managed by the US Army Corps of Engineers Louisville District.
The design includes various finish specifications: carpet tiles (Milliken Coastline) for office spaces with painted walls and acoustical ceiling tiles; porcelain tile for restroom floors and walls with painted gypsum board ceilings; epoxy flooring for lab spaces with epoxy paint walls and exposed painted structure; and sealed concrete for support spaces. The furniture package (FF&E) includes modular desk systems, systems furniture with power/storage, seating, tables and accessories, all specified as Contractor Furnished, Contractor Installed (CFCI). Government furnished items include break room appliances, flat screen TVs/monitors, copiers/printers, and lab equipment. The design incorporates a color scheme of Alabaster (SW7008) field paint, Smoky Azurite (SW9148) accent paint, with solid surface countertops in French Blue Melange and plastic laminate in Harding Oak. The package includes detailed floor plans showing furniture layouts, finish plans, reflected ceiling plans, and material specifications for both first and second floors.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Renovate Materials Analysis Lab Wright-Patterson AFB, OH
P2: 507354
Design-Bid-Build
Structural Interior Design Certified Final Design
XX December 2024
W912QR25R0015-0004
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR25R0015_SID-0004
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME: SHEET ID
D
ES
IG
N
BY
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D
BY
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
U
SV
U
KK
E D
IS
TR
IC
T
D R
M
AR
TI
N
L U
TH
ER
J R
P L
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
A
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
MA
TE
RI
AL
S
AN
AL
YS
IS
LA
B
F/
BU
ILD
IN
G
P2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
Fi le
P at h:
Pl ot D at e:
US Army Corps of Engineers ®
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
SI
ZE
AN
SI
D
PR
O
JE
C
T N
O
ZH
TV
P2#:
VOLUME 1 OF 1
507354
C :\R ev it_
Lo ca l\1
_A R
C H
_B
_C F2
0_ m ic ha el .n ob er t.r vt
/1
3/
:3 9:
P
M
LOUISVILLE DISTRICT
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
RENOVATE MATERIALS ANALYSIS LAB F/20071 -
BUILDING 71 (SLAMER / B71)
35% DESIGN DEVELOPMENT G-001
M N
O
BE
R T
M D
AL
LA
BA
TI
ST
A
D R
ID
EN
O U
R
M B
U
TL
ER
C
O
VE
R S
H
EE
T
D
ES
IG
N
D
EV
EL
O
PM
EN
T
OCTOBER 13, 2023
O C
TO
BE
R
,2
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
A
D
ES
IG
N D
EV
EL
O
PM
EN
T
M B
SHEET INDEX
SHEET
NUMBER SHEET NAME REVISION DATE
GENERAL
G-001 COVER SHEET A 20231013
GI001 CODE ANALYSIS A 20231013
GI002 CODE ANALYSIS CONTINUED A 20231013
GI010 CODE COMPLIANCE SITE PLAN A 20231013
GI110 LIFE SAFETY PLAN - FIRST FLOOR A 20231013
GI120 LIFE SAFETY PLAN - SECOND FLOOR A 20231013
CIVIL
C-005 STAGING AND HAUL ROUTES A 20231013
C-011 EXISTING CONDITIONS PLAN A 20231013
CD101 SITE DEMOLITION LAN A 20231013
C-101 SITE PLAN A 20231013
ARCHITECTURAL
AD110 FIRST FLOOR DEMOLITION PLAN - COMPOSITE A 20231013
AD111 FIRST FLOOR DEMOLITION PLAN - SECTOR 1 A 20231013
AD112 FIRST FLOOR DEMOLITION PLAN - SECTOR 2 A 20231013
AD113 FIRST FLOOR DEMOLITION PLAN - SECTOR 3 A 20231013
AD120 SECOND FLOOR DEMOLITION PLAN - COMPOSITE A 20231013
AD121 SECOND FLOOR DEMOLITION PLAN - SECTOR 1 A 20231013
AD122 SECOND FLOOR DEMOLITION PLAN - SECTOR 2 A 20231013
AD123 SECOND FLOOR DEMOLITION PLAN - SECTOR 3 A 20231013
A-110 FIRST FLOOR PLAN - COMPOSITE A 20231013
A-111 FIRST FLOOR PLAN - SECTOR 1 A 20231013
A-112 FIRST FLOOR PLAN - SECTOR 2 A 20231013
A-113 FIRST FLOOR PLAN - SECTOR 3 A 20231013
A-120 SECOND FLOOR PLAN - COMPOSITE A 20231013
A-121 SECOND FLOOR PLAN - SECTOR 1 A 20231013
A-122 SECOND FLOOR PLAN - SECTOR 2 A 20231013
A-123 SECOND FLOOR PLAN - SECTOR 3 A 20231013
A-301 BUILDING SECTIONS A 20231013
A-302 BUILDING SECTIONS A 20231013
INTERIORS
IN-110 FIRST FLOOR FINISH PLAN - COMPOSITE A 20231013
IN-111 FIRST FLOOR FINISH PLAN - SECTOR 1 A 20231013
IN-112 FIRST FLOOR FINISH PLAN - SECTOR 2 A 20231013
IN-113 FIRST FLOOR FINISH PLAN - SECTOR 3 A 20231013
IN-120 SECOND FLOOR FINISH PLAN - COMPOSITE A 20231013
IN-121 SECOND FLOOR FINISH PLAN - SECTOR 1 A 20231013
IN-122 SECOND FLOOR FINISH PLAN - SECTOR 2 A 20231013
IN-123 SECOND FLOOR FINISH PLAN - SECTOR 3 A 20231013
IF-114 FIRST FLOOR FF&E PLAN - COMPOSITE A 20231013
IF-115 FIRST FLOOR FF&E PLAN - SECTOR 1 A 20231013
IF-116 FIRST FLOOR FF&E PLAN - SECTOR 2 A 20231013
IF-117 FIRST FLOOR FF&E PLAN - SECTOR 3 A 20231013
IF-124 SECOND FLOOR FF&E PLAN - COMPOSITE A 20231013
IF-125 SECOND FLOOR FF&E PLAN - SECTOR 1 A 20231013
IF-126 SECOND FLOOR FF&E PLAN - SECTOR 2 A 20231013
IF-127 SECOND FLOOR FF&E PLAN - SECTOR 3 A 20231013
I-501 FINISH DETAILS A 20231013
I-602 SCHEDULES A 20231013
I-603 SCHEDULES A 20231013
FIRE PROTECTION
FA001 FIRE ALARM / MNS LEGEND AND NOTES A 20231013
FA110D FIRE ALARM FIRST FLOOR DEMOLITION PLAN A 20231013
FA120D FIRE ALARM SECOND FLOOR DEMOLITION PLAN A 20231013
FA111 FIRE ALARM FIRST FLOOR PLAN - SECTOR 1 A 20231013
FA112 FIRE ALARM FIRST FLOOR PLAN - SECTOR 2 A 20231013
FA113 FIRE ALARM FIRST FLOOR PLAN - SECTOR 3 A 20231013
FA122 FIRE ALARM SECOND FLOOR PLAN - SECTOR 2 A 20231013
FA123 FIRE ALARM SECOND FLOOR PLAN - SECTOR 3 A 20231013
FA600 TYPICAL FIRE ALARM AND MNS RISER DIAGRAM A 20231013
FA601 TYPICAL FIRE ALARM AND MNS INPUT/OUTPUT MATRIX A 20231013
FA605 FIRE ALARM AND MNS AUDIBLE AND VISUAL MESSAGES A 20231013
FX001 FIRE SUPPRESSION NOTES AND LEGEND A 20231013
FX110 FIRE SUPPRESSION FIRST FLOOR PLAN A 20231013
FX120 FIRE SUPPRESSION SECOND FLOOR PLAN A 20231013
FA121 FIRE ALARM SECOND FLOOR PLAN - SECTOR 1 A 20231013
WRIGHT-PATTERSON AIRFORCE BASE
5135 PEARSON ROAD,WRIGHT-PATTERSON AFB, OH 45433
4205900-231529.01 Structural Interior Design (SID) Package
10.18.2024
02841 Snapshot
SECTION 6
INTERIOR DESIGN
6.1
6.1 General:
The interior design for this project will comply with the design codes and industry standards shown below. These are in addition to the codes and standards provided in Section 1.6 above.
• ANSI/BIFMA Safety and Performance Standards for Furniture (2011)
• ASTM D 2047 - Test for Slip Resistance of Hard Surfaces
• ETL 07-4 – Air Force Carpet Standard
• NFPA 260 – Methods of Tests and Classification System for Cigarette Ignition Resistance of Components (2009)
• NFPA 261 – Method of Test for Determining Resistance of Mock-up Upholstered Furniture Material Assemblies to Ignition by Smoldering Cigarettes (2009)
• NFPA 705 – Field Flame Test for Textiles and Films
• UFC 3-120-01 – Design, Sign Standards, with Change 3, 12 Dec 2017
• UFC 3-120-10 – Interior Design (2018)
• Wyzenbeek Abrasion Resistance Test
• Air Force Reserve Command Handbook 32-1001
6.2 Comprehensive Interior Design:
The Comprehensive Interior Design (CID) package includes Structural Interior Design (SID) and Furniture, Fixture & Equipment (FF&E). The goal of the CID is to provide a functional, durable, visually appealing facility to enhance the User’s working environment, increase morale, and instill a sense of pride. The primary criteria for finish and furniture selections are to create a unified, cohesive facility.
6.3 Structural Interior Design:
Structural interior design includes all building finishes, built-in casework, window coverings at all exterior windows, and signage. Through review of the requirements and discussions at the charrette, the following finishes are proposed for the facility: carpet tiles for the office spaces with painted walls and acoustical ceiling tiles. Restrooms to have porcelain tile floor, porcelain tile wall with painted walls above, and the ceiling is to be painted gypsum board. Epoxy floor for lab space with epoxy paint walls and open to structure painted decking. Sealed concrete for support spaces with painted walls and open to structure painted decking.
6.4 Furniture, Fixtures & Equipment (FF&E):
FF&E for this project includes freestanding modular desk systems, systems furniture with power and storage & filing, seating, tables, and accessories. All desks and workstations have trash and recycle bins. Furniture, Fixtures & Equipment (FF&E) is funded separately from the construction contract, and is Contractor Furnished, Contractor Installed (CFCI). The General Contractor is responsible for all electrical connections from the FF&E to the building, and all telecommunications installation. Government furnished equipment for this project includes break room appliances, flat screen TVs/monitors with brackets, copiers/printers, and lab equipment (GFGI).
02841 Snapshot
KEY PLAN
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
6.3 6.5
6.A
6.C
6.G
6.J
6.4
7.B
7.C
7.D
7.3 7.1
7.A
7.2 1.11.21.31.4
1.A
1.B
1.C
1.D
1.E
1.F
2.12.2
2.A
2.B
2.C
2.D
2.E
2.F
2.G
6.1
6.D
6.B
6.2
6.I
6.H
6.F
6.5.4
6.5B
6.5A
6.5.16.5.26.5.3
HATCHED AREA IS NOT IN
THE SCOPE OF WORK
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:1
A
M
IN-110
FI
RS
T
FL
OO
R
FI
NI
SH
S
IG
NA
GE
P
LA
N -C
OM
PO
SI
TE
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
0 8' 16' 32'
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
1/16" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - COMPOSITE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
GENERAL NOTES
1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH
LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT
THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.
2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH
THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.
4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.
5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH
U.O.N.
6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.
7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI
GLOSS FINISH U.O.N.
8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;
SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE
EDGES MUST BE COVERED.
9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION
DETAILS.
10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION
AND COLOR.
11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM
FINISHES.
12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.
IN DOOR SCHEDULE.
13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH
SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,
VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.
14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE
SEALED, U.O.N.
15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH
SCHEDULE ON I-602 FOR MORE INFORMATION.
16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.
17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH
WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR
PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.
18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.
19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION
PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING
SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE
SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.
20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND
PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED
BY LOCAL CODE.
21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED
CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /
SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.
22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.
23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.
24. SEE SHEET I-505 FOR SIGNAGE DETAILS.
FINISH ABBREVIATIONS
CG = CORNER PROTECTION
CPT = CARPET
EP = EPOXY
GR = GROUT
MT = METAL TRIM
PL = PLASTIC LAMINATE
PT = PAINT
RB = RUBBER BASE
SC = SEALED CONCRETE
SS = SOLID SURFACE
STR = STAIR TREAD AND RISERS
TL = TILE
FINISH LEGEND
CPT-1
EP-1
SC-1
TL-2
OUT OF SCOPE
A
IN
-1
A
IN
-1
MAINTENANCE
SHOP
S7-101
LABORATORY
S6-101
ADMINISTRATIVE
VESTIBULE
A5-101
UTILITY
A5-103
TOILET
A5-102EP-1
SC-1
EP-1
SC-1
EP-1
EP-1
SC-1
SC-1
EP-1
PT-2
HATCHED AREA IS NOT
IN THE SCOPE OF WORK
I-201 A5
10 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A1
IS-1
IS-2
IS-3
IS-4
IS-5
IS-6
IS-7
IS-8 IS-9
IS-10
IS-11
IS-12
IS-13
IS-14
IS-15 IS-16
6.3 6.5
6.A
6.C
6.G
6.J
6.4
7.B
7.C
7.D
7.3 7.1
7.A
7.2 6.1
6.D
6.B
6.2
6.I
6.H
6.F
6.5.4
6.5B
6.5A
6.5.16.5.26.5.3
10 26 00.A110 26 00.A110 26 00.A1
10 26 00.A1 10 26 00.A110 26 00.A110 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
EP-1
TL-2
10 26 00.A110 26 00.A110 26 00.A110 26 00.A1
10 26 00.A1
10 26 00.A110 26 00.A1
IS-53
IS-52
ELECTRICAL
E1-101
SC-1
10 26 00.A1
10 26 00.A1
10 26 00.A1
TL-210 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A1 10 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A1
MAINTENANCE
SHOP
S7-101
09 65 00.B13
10 26 00.A1
10 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A110 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A1
KEYED NOTES
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:2
A
M
IN-111
FI
RS
T
FL
OO
R
FI
NI
SH
S
IG
NA
GE
P
LA
N -S
EC
TO
R
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
0 4' 8' 16'
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
1/8" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - SECTOR 1
09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.
10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
UTILITY
S3-226
NO WORK IN
STAND
NO WORK IN
STAND
6.A
6.C
6.G
6.J
2.A
2.B
2.C
2.D
2.E
2.F
2.G
6.D
6.B
6.I
6.H
6.F
NO WORK IN
STAND
NO WORK IN
STAND
SECURITY
S3-103
CPT-1
PT-2
10 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A1
GENERAL NOTES
1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH
LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT
THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.
2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH
THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.
4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.
5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH
U.O.N.
6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.
7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI
GLOSS FINISH U.O.N.
8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;
SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE
EDGES MUST BE COVERED.
9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION
DETAILS.
10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION
AND COLOR.
11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM
FINISHES.
12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.
IN DOOR SCHEDULE.
13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH
SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,
VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.
14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE
SEALED, U.O.N.
15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH
SCHEDULE ON I-602 FOR MORE INFORMATION.
16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.
17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH
WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR
PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.
18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.
19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION
PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING
SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE
SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.
20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND
PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED
BY LOCAL CODE.
21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED
CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /
SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.
22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.
23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.
24. SEE SHEET I-505 FOR SIGNAGE DETAILS.
FINISH ABBREVIATIONS
CG = CORNER PROTECTION
CPT = CARPET
EP = EPOXY
GR = GROUT
MT = METAL TRIM
PL = PLASTIC LAMINATE
PT = PAINT
RB = RUBBER BASE
SC = SEALED CONCRETE
SS = SOLID SURFACE
STR = STAIR TREAD AND RISERS
TL = TILE
FINISH LEGEND
CPT-1
EP-1
SC-1
TL-2
OUT OF SCOPE
KEYED NOTES
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:3
A
M
IN-112
FI
RS
T
FL
OO
R
FI
NI
SH
S
IG
NA
GE
P
LA
N -S
EC
TO
R
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
0 4' 8' 16'
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
1/8" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - SECTOR 2
10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
A
IN
-1
A
IN
-1
LABORATORY
S2-101
LABORATORY
S1-101
ADMINISTRATIVE
VESTIBULE
A2-101
UTILITY
A2-105
EP-1
EP-1
SC-1
SC-1
TL-2 TL-2
TOILET
A2-102
TOILET
A2-103
EP-1
TL-2
EP-1
TL-2
EP
-1
SC
-1
SC-1
EP-1
PT-2
CPT-1
10 26 00.A1
IS-18
IS-19
IS-20
IS-21
IS-22
IS-23 IS-24
IS-25
IS-26
IS-31
IS-28
IS-29
IS-30
IS-31
IS-32
IS-33 IS-35
IS-34
IS-36
IS-36
IS-37
NO WORK IN
STAND
6.A
6.C
6.G
6.J
1.11.21.31.4
1.A
1.B
1.C
1.D
1.E
1.F
2.12.2
2.A
2.B
2.C
2.D
2.E
2.F
2.G
6.D
6.B
6.I
6.H
6.F
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1 10 26 00.A1
10 26 00.A110 26 00.A110 26 00.A1
10 26 00.A1
10 26 00.A1
CPT-1
EP-1
SC-1
EP-1
IS-48
IS-49
IS-50
IS-51
SECURITY OFFICE
A2-107
CPT-1
SC-1
PT-2
10 26 00.A1
SC
-1
EP
-1
EP-1
IS-54
09 65 00.B13
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A110 26 00.A110 26 00.A110 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A110 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1
10 26 00.A1 10 26 00.A1
10 26 00.A1
I-201 A5 Sim
I-201 A5 Sim
SECURITY
S3-103
CPT-1
PT-2
10 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A110 26 00.A1
OPEN OFFICE
A1-102
IS-55
IS-56
SECURITY
VESTIBULE
A2-108
09 65 00.B13
09 65 00.B13
IS-57
10 26 00.A1
10 26 00.A1
10 26 00.A110 26 00.A1
GENERAL NOTES
1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH
LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT
THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.
2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH
THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.
4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.
5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH
U.O.N.
6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.
7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI
GLOSS FINISH U.O.N.
8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;
SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE
EDGES MUST BE COVERED.
9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION
DETAILS.
10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION
AND COLOR.
11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM
FINISHES.
12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.
IN DOOR SCHEDULE.
13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH
SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,
VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.
14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE
SEALED, U.O.N.
15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH
SCHEDULE ON I-602 FOR MORE INFORMATION.
16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.
17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH
WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR
PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.
18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.
19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION
PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING
SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE
SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.
20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND
PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED
BY LOCAL CODE.
21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED
CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /
SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.
22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.
23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.
24. SEE SHEET I-505 FOR SIGNAGE DETAILS.
FINISH ABBREVIATIONS
CG = CORNER PROTECTION
CPT = CARPET
EP = EPOXY
GR = GROUT
MT = METAL TRIM
PL = PLASTIC LAMINATE
PT = PAINT
RB = RUBBER BASE
SC = SEALED CONCRETE
SS = SOLID SURFACE
STR = STAIR TREAD AND RISERS
TL = TILE
FINISH LEGEND
CPT-1
EP-1
SC-1
TL-2
OUT OF SCOPE
KEYED NOTES
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:4
A
M
IN-113
FI
RS
T
FL
OO
R
FI
NI
SH
S
IG
NA
GE
P
LA
N -S
EC
TO
R
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
0 4' 8' 16'
1/8" = 1'-0"A1 FIRST FLOOR FINISH AND SIGNAGE PLAN - SECTOR 3
09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.
10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
6.3 6.5
6.A
6.C
6.G
6.J
6.4
7.B
7.C
7.D
7.3 7.1
7.A
7.2 1.11.21.31.4
1.A
1.B
1.C
1.D
1.E
1.F
2.12.2
2.A
2.B
2.C
2.D
2.E
2.F
2.G
6.1
6.D
6.B
6.2
6.I
6.H
6.F
6.5.4
6.5B
6.5A
6.5.16.5.26.5.3
HATCHED AREA IS NOT IN
THE SCOPE OF WORK
HATCHED AREA IS NOT IN
THE SCOPE OF WORK
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:5
A
M
IN-120
SE
CO
ND
F
LO
OR
F
IN
IS
H
SI
GN
AG
E
PL
AN
CO
MP
OS
IT
E
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
0 8' 16' 32'
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
1/16" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - COMPOSITE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
A
IN
-1
A
IN
-1
OPEN
TO
BELOW
OPEN
TO
BELOW
STORAGE
S7-201
OPEN OFFICE
A5-201
LABORATORY
PLATFORM
S6-201
CPT-1
EP-1
PT-210 26 00.A1
10 26 00.A1
IS-38
IS-39
IS-40
I-201A1
6.3 6.5
6.A
6.C
6.G
6.J
6.4
7.B
7.C
7.D
7.3 7.1
7.A
7.2 6.1
6.D
6.B
6.2
6.I
6.H
6.F
6.5.4
6.5B
6.5A
6.5.16.5.26.5.3
10 26 00.A1
10 26 00.A1
CPT-1
SC-1
SC-1
10 26 00.A1
10 26 00.A1
NO WORK IN
STAND
MEETING ROOM
A5-202
09 65 00.B13
09 65 00.B13
KEY PLAN
GENERAL NOTES
1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH
LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT
THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.
2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH
THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.
4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.
5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH
U.O.N.
6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.
7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI
GLOSS FINISH U.O.N.
8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;
SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE
EDGES MUST BE COVERED.
9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION
DETAILS.
10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION
AND COLOR.
11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM
FINISHES.
12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.
IN DOOR SCHEDULE.
13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH
SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,
VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.
14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE
SEALED, U.O.N.
15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH
SCHEDULE ON I-602 FOR MORE INFORMATION.
16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.
17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH
WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR
PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.
18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.
19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION
PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING
SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE
SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.
20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND
PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED
BY LOCAL CODE.
21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED
CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /
SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.
22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.
23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.
24. SEE SHEET I-505 FOR SIGNAGE DETAILS.
FINISH ABBREVIATIONS
CG = CORNER PROTECTION
CPT = CARPET
EP = EPOXY
GR = GROUT
MT = METAL TRIM
PL = PLASTIC LAMINATE
PT = PAINT
RB = RUBBER BASE
SC = SEALED CONCRETE
SS = SOLID SURFACE
STR = STAIR TREAD AND RISERS
TL = TILE
FINISH LEGEND
CPT-1
EP-1
SC-1
TL-2
OUT OF SCOPE
KEYED NOTES
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:4
:0
A
M
IN-121
SE
CO
ND
F
LO
OR
F
IN
IS
H
SI
GN
AG
E
PL
AN
SE
CT
OR
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
0 4' 8' 16'
1/8" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - SECTOR 1
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.
10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
IN
-1
A
IN
-1
A
IN
-1
A
IN
-1
OPEN
TO
BELOW
6.A
6.C
6.G
6.J
2.A
2.B
2.C
2.D
2.E
2.F
2.G
6.D
6.B
6.I
6.H
6.F
NO WORK IN
STAND
NO WORK IN
STAND
NO WORK IN
STAND
NO WORK IN
STAND
10 26 00.A1
NO WORK IN
STAND
09 65 00.B13
KEY PLAN
GENERAL NOTES
1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH
LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT
THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.
2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH
THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.
4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.
5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH
U.O.N.
6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.
7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI
GLOSS FINISH U.O.N.
8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;
SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE
EDGES MUST BE COVERED.
9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION
DETAILS.
10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION
AND COLOR.
11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM
FINISHES.
12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.
IN DOOR SCHEDULE.
13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH
SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,
VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.
14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE
SEALED, U.O.N.
15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH
SCHEDULE ON I-602 FOR MORE INFORMATION.
16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.
17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH
WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR
PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.
18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.
19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION
PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING
SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE
SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.
20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND
PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED
BY LOCAL CODE.
21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED
CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /
SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.
22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.
23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.
24. SEE SHEET I-505 FOR SIGNAGE DETAILS.
FINISH ABBREVIATIONS
CG = CORNER PROTECTION
CPT = CARPET
EP = EPOXY
GR = GROUT
MT = METAL TRIM
PL = PLASTIC LAMINATE
PT = PAINT
RB = RUBBER BASE
SC = SEALED CONCRETE
SS = SOLID SURFACE
STR = STAIR TREAD AND RISERS
TL = TILE
FINISH LEGEND
CPT-1
EP-1
SC-1
TL-2
OUT OF SCOPE
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:4
:1
A
M
IN-122
SE
CO
ND
F
LO
OR
F
IN
IS
H
SI
GN
AG
E
PL
AN
SE
CT
OR
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
0 4' 8' 16'
1/8" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - SECTOR 2
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
IN
-1
A
IN
-1
OPEN
TO
BELOW
OPEN OFFICE
S2-201
STORAGE
S1-201
CPT-1
SC-1
OPEN
TO
BELOW
CPT-1
CPT-1
PT-2 PT-2
PT-2
CPT-1
OPEN OFFICE
A2-201
10 26 00.A1
10 26 00.A1
10 26 00.A1
IS-41
IS-42
IS-44
IS-45
IS-46
IS-47
I-201G1
6.A
6.C
6.G
6.J
1.11.21.31.4
1.A
1.B
1.C
1.D
1.E
1.F
2.12.2
2.A
2.B
2.C
2.D
2.E
2.F
2.G
6.D
6.B
6.I
6.H
6.F
10 26 00.A1
10 26 00.A1
10 26 00.A1
NO WORK IN
STAND
CONFERENCE
ROOM
S2-202
10 26 00.A1
09 65 00.B13
09 65 00.B13
09 65 00.B13
10 26 00.A1
10 26 00.A110 26 00.A1
10 26 00.A110 26 00.A1
OPEN OFFICE
A1-201
09 65 00.B13
I-201G1
10 26 00.A1
10 26 00.A110 26 00.A1
KEY PLAN
GENERAL NOTES
1. MANUFACTURERS AND COLORS LISTED ARE INTENDED TO ESTABLISH
LEVEL OF QUALITY, COLOR & FINISH, AND ARE NOT INTENDED TO LIMIT
THE SELECTION OF OTHER MANUFACTURERS FOR EQUAL PRODUCTS.
2. ALL FINISHES ARE TO BE INSTALLED / APPLIED IN ACCORDANCE WITH
THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
3. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH MATERIALS.
4. GYPSUM BOARD WALLS ARE TO HAVE A LIGHT ORANGE PEEL TEXTURE.
5. PAINTED GYPSUM BOARD WALLS MUST HAVE AN EGGSHELL FINISH
U.O.N.
6. PAINTED GYPSUM CEILINGS ARE TO HAVE A FLAT FINISH U.O.N.
7. DOORS AND FRAMES SCHEDULED TO BE PAINTED MUST HAVE A SEMI
GLOSS FINISH U.O.N.
8. WHEN INSTALLING TILE, USE ALL APPLICABLE MATCHING TRIM PIECES;
SUCH AS INSIDE AND OUTSIDE CORNERS AND EDGES. ALL EXPOSED TILE
EDGES MUST BE COVERED.
9. ALL FLOORING TRANSITIONS TO OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY, OR CEILING U.O.N. SEE SHEET I-501 FOR TRANSITION
DETAILS.
10. REFER TO FINISH SCHEDULE, SHEET I-602 FOR MATERIAL SELECTION
AND COLOR.
11. REFER TO ROOM FINISH SCHEDULE, SHEET I-603 FOR ALL ROOM
FINISHES.
12. ALL INTERIOR HM DOOR FRAME FINISHES SHALL BE PAINTED PT-3 U.O.N.
IN DOOR SCHEDULE.
13. PAINT ALL EXPOSED ITEMS ON THE CEILING AND WALL TO MATCH
SURROUNDING SURFACE I.E. LINEAR DIFFUSERS, LOUVERS, DUCTS,
VENTILATORS, STACKS, AND TRANSFORMER CASES, U.O.N.
14. ALL CONCRETE FLOORS NOT TO RECEIVE ADDITIONAL FINISH SHALL BE
SEALED, U.O.N.
15. STAIR FINISH IF NOT KEYNOTED TO BE CONCRETE STAIRS, SEE FINISH
SCHEDULE ON I-602 FOR MORE INFORMATION.
16. SIGNAGE LOCATION / PLACEMENT TO MEET ABAAS REQUIREMENTS.
17. PROVIDE SNAP-IN SIGN MODULES OF INDICATED HEIGHT AND WIDTH
WITH GRAPHICS AND FEATURES AS INDICATED, INCLUDING CLEAR
PROTECTORS TO ACCOMODATE LASER PRINTED MESSAGE CARDS.
18. ALL SIGNAGE TO COMPLY WITH UFC 3-120-01 STANDARDS.
19. ROOM NUMBERS SHOWN ON PLANS ARE FOR CONSTRUCTION
PURPOSES, NOT NECESSARILY THE USER'S PREFERRRED NUMBERING
SYSTEM. COORDINATE ALL ROOM NUMBERS AND VERBIAGE FOR THE
SIGNS WITH THE CONTRACTING OFFICER PRIOR TO FABRICATION.
20. KNOWN SIGNAGE IS DOCUMENTED ON THESE DRAWINGS, VERIFY AND
PROVIDE ANY ADDITIONAL REGULATORY SIGNAGE / GRAPHICS REQUIRED
BY LOCAL CODE.
21. ENSURE THAT ALL SIGN INSERTS CAN BE EASILY REMOVED / REPLACED
CONSIDER INSTALLATION OF SIGNS IN TIGHT CORNERS AND ALCOVES /
SIDELIGHTS TO ENSURE THAT SIGN INSERT IS ACCESSIBLE.
22. MOUNT ALL ALIKE SIGNS AT THE SAME HEIGHT.
23. SEE SHEET I-603 FOR SIGNAGE SCHEDULE.
24. SEE SHEET I-505 FOR SIGNAGE DETAILS.
FINISH ABBREVIATIONS
CG = CORNER PROTECTION
CPT = CARPET
EP = EPOXY
GR = GROUT
MT = METAL TRIM
PL = PLASTIC LAMINATE
PT = PAINT
RB = RUBBER BASE
SC = SEALED CONCRETE
SS = SOLID SURFACE
STR = STAIR TREAD AND RISERS
TL = TILE
FINISH LEGEND
CPT-1
EP-1
SC-1
TL-2
OUT OF SCOPE
KEYED NOTES
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:3
P
M
IN-123
SE
CO
ND
F
LO
OR
F
IN
IS
H
SI
GN
AG
E
PL
AN
SE
CT
OR
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
0 4' 8' 16'
1/8" = 1'-0"A1 SECOND FLOOR FINISH AND SIGNAGE PLAN - SECTOR 3
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
09 65 00.B13 STR-1, SEE FINISH SCHEDULE FOR MORE INFORMATION.
10 26 00.A1 CG-1 CORNER GUARD, SEE FINISH SCHEDULE FOR MORE INFORMATION.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS
INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED
FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF
DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO
PROCEEDING.
2. FURNITURE, FIXTURE & EQUIPMENT (FF&E) IS SHOWN FOR
COORDINATION, AND IS CONTRACTOR FURNISHED CONTRACTOR
INSTALLED (CFCI).
3. VERIFY FIELD CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL
CONNECTIONS TO THE BUILDING, INCLUDING J BOXES TO SUPPORT
FF&E. FURNITURE DEALER IS RESPONSIBLE FOR THE ELECTRICAL
HOOKUP OF ALL FF&E, INCLUDING WHIPS FROM WALL CONNECTIONS TO
THE FURNITURE AND CONNECTIONS TO THE FURNITURE AND
CONNECTION PRE-WIRED PANELS, UP TO AND INCLUDING FACEPLATES.
5. GENERAL CONTRACTOR TO COORDINATE WITH FURNITURE DEALER TO
ALLOW BUILDING ACCESS FOR FIELD CONDITION VERIFICATION.
6. INFORMATION TECHNOLOGY (IT) (PHONE / LAN ETC.) WIRING TO BE
INSTALLED BY CONTRACTOR.
7. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE DESIGN
INTENT OUTLINED IN THE FF&E PACKAGE, AND ASSEMBLE FF&E PER
MANUFACTURER'S WRITTEN INSTRUCTIONS. FF&E PROVIDER MUST
COORDINATE WITH CONTRACTING OFFICER AS REQUIRED TO ENSURE
THAT ALL FF&E IS SUCCESSFULLY INSTALLED AND OPERATIONAL PRIOR
TO OCCUPANCY.
8. AWARDED FURNITURE DEALER TO PROVIDE SHOP DRAWINGS WITH
PANELS AND ELECTRICAL / COMM CONNECTIONS FOR GOVERNMENT
APPROVAL.
9. REFER TO FURNITURE SCHEDULE, SHEET I-603 FOR INFORMATION.
10. REFER TO EQUIPMENT SCHEDULE, SHEET I-603 FOR INFORMATION.
11. REFER TO AV PLANS FOR TELEVISION LOCATION AND INFORMATION.
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:4
A
M
I-602
SC
HE
DU
LE
S
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
1MISC. FINISH TYPES
TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES
CG-1 CORNER GUARD KOROGUARD G800 SERIES VINYL
CORNER GUARD/ G815
COMPOSED GRAY
GR-1 GROUT LATICRETE --- 24 NATURAL GREY INSTALL WITH WALL AND FLOOR TILE
PL-1 PLASTIC LAMINATE WILSONART PREMIUM LAMINATE 8258K-05 HARDING OAK
SS-1 SOLID SURFACE MATERIAL WILSONART --- 9024ML FRENCH BLUE MELANGE COUNTERTOPS/BACKSPLASH
CEILING TYPES
CODE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES
ACT-1 ACOUSTIC CEILING TILE ARMSTRONG ULTIMA 1910 LAY IN TILE WHITE 24" X 24"
PT-4 CEILING PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW7007 BRIGHT WHITE FOR EXPOSED CEILINGS AND GYPSUM
CEILINGS.
FLOOR TYPES
TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES
CPT-1 CARPET TILE MILLIKEN COASTLINE AMERICAS LANDSCAPE LND153-144 PAMPAS GRASS 19" x 19" INSTALL IN STRAIGHT LAY
PATTERN.
EP-1 EPOXY - 3 PART SHERWIN WILLIAMS --- LIGHT GRAY RESUFLOR PERFORMANCE HPS, WITH
NON-SKID GRIT. AN INTEGRAL 4" BASE ON
THE WALL.
SC-1 SEALED CONCRETE --- --- ---
STR-1 STAIR TREAD AND RISERS ARMSTRONG FLOORING STAIR TREADS AND LANDING TILES PEBBLE V8FPB USE ALL CORRESPONDING PIECES FOR
STAIRS.
TL-2 FLOOR TILE CROSSVILLE ACCESS POINT WBT04 TRAVERTINE SAND 12" X 24" STRAIGHT LAY
WALL BASE TYPES
TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES
MT-1 METAL TRIM SCHLUTER JOLLY EDGE BRUSHED CHROME ANODIZED
ALUMINUM
MT-2 METAL TRIM SCHLUTER COVE BASE BRUSHED CHROME ANODIZED
ALUMINUM
RB-1 RUBBER WALL BASE JOHNSONITE --- VN2 STONE COTTAGE TRADITIONAL VINYL 1/8", 4" COVE
WALL FINISHES
TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES
PT-1 PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW7008 ALABASTER FIELD PAINT
PT-2 PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW9148 SMOKY AZURITE ACCENT
PT-3 PAINT SHERWIN WILLIAMS EGGSHELL FINISH SW7032 WARM STONE DOORS, STRINGERS, AND TRIM TL-1 WALL TILE CROSSVILLE ACCESS POINT WBT01 TRAVERTINE WHITE 12" X 24" STRAIGHT LAY
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:5
A
M
I-603
SC
HE
DU
LE
S
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB A
p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
FURNITURE SCHEDULE - PHASE 1
TYPE MARK DESCRIPTION MANUFACTURER MODEL COUNT
AC-1 TRASH RECEPTACLE MAGNUSON GROUP TRADA-01 1
AC-2 RECYCLING RECEPTACLE MAGNUSON GROUP TRADA-01 1
AC-3 RECYCLING RECEPTACLE, SMALL MAGNUSON GROUP TR20 6
AC-4 TRASH RECEPTACLE , SMALL MAGNUSON GROUP TR10 6
AV-1 MARKERBOARD CALYX PROFILE MARKERBOARD 1
AV-2 BULLETIN BOARD CALYX CONCEPT TACK BOARD 1
CC-1 CHAIR, CONFERENCE HAWORTH SCC-24-15E,1X_2,TR_F,TR_F,
TR_F
CT-1 CHAIR, TASK HAWORTH ZODY II 6
SC-1 STORAGE, CABINET U-LINE H-7642 8
SC-2 STORAGE, CREDENZA TEKNION GCLL-2672-UMU-FT9N 1
SL-1 STORAGE, LOCKERS SALSBURY 19158-25 1
SS-1 STORAGE, STEEL SHELVING ULINE H-7432 12
TC-1 TABLE, CONFERENCE - SMALL HAWORTH JIVE 1
WS-2 WORKSTATION 6 X 6 - TWO UNITS TEKNION --- 1
WS-4 WORKSTATION 6 X 6 - FOUR UNITS TEKNION --- 1
EQUIPMENT SCHEDULE - PHASE 1
TYPE MARK DESCRIPTION DIMENSION COUNT POWER REQUIREMENT GFGI/CFCI
EQ-1 PRINTER 23 X 20 X 24 1 AC 100 - 240V GFGI
EQ-2 SHREDDER 23 X 20 X 24 1 AC 100 - 240V GFGI
EQ-3 COFFEEMAKER 21.4 x 9 x 24.1 1 120V GFGI EQ-4 REFRIGERATOR 35.5 x 35.63 x 70.13 1 115V CFCI
EQ-5 COUNTERTOP MICROWAVE 15.9 X 20.5 X 12.6 1 115V GFGI
SIGNAGE SCHEDULE - PHASE 1
TYPE MARK ROOM NUMBER ROOM NAME VERBIAGE SIGN TYPE INTERIOR/EXTERIOR
DETAIL
NUMBER
IS-1 A5-103 UTILITY UTILITY S2 INTERIOR D1/I-504
IS-2 A5-102 TOILET UNISEX RESTROOM RR1 INTERIOR A7/I-504
IS-3 S7-101 MAINTENANCE SHOP MAINTENANCE SHOP S2 INTERIOR D1/I-504
IS-4 LABORATORY S2 INTERIOR D1/I-504
IS-5 A5-101 ADMINISTRATIVE VESTIBULE EXIT SIGN SS3 INTERIOR D7/I-504
IS-6 NO SMOKING SIGN SS8 EXTERIOR A11/I-504
IS-7 BUILDING NAME AND NUMBER ES1 EXTERIOR A1/I-504
IS-8 NO SMOKING SIGN SS8 EXTERIOR A11/I-504
IS-9 A5-103 UTILITY UTILITY S2 EXTERIOR D1/I-504
IS-10 A5-103 UTILITY EXIT SIGN SS3 INTERIOR D7/I-504
IS-11 S7-101 MAINTENANCE SHOP MAINTENANCE SHOP S2 EXTERIOR D1/I-504
IS-12 S7-101 MAINTENANCE SHOP EXIT SIGN SS3 INTERIOR D7/I-504
IS-13 S6-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504
IS-14 S6-101 LABORATORY EXIT SIGN SS3 INTERIOR D7/I-504
IS-15 S6-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504
IS-16 S6-101 LABORATORY EXIT SIGN SS3 INTERIOR D7/I-504
IS-38 A5-202 MEETING ROOM EXIT SIGN SS3 INTERIOR D7/I-504
IS-39 EXIT SIGN SS3 INTERIOR D7/I-504
IS-40 A5-201 OPEN OFFICE OPEN OFFICE S2 EXTERIOR D1/I-504
IS-52 A5-101 ADMINISTRATIVE VESTIBULE ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504 IS-53 A5-101 ADMINISTRATIVE VESTIBULE ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504
ROOM FINISH SCHEDULE - PHASE 1
ROOM
NUMBER ROOM NAME
FLOOR
FINISHES
WALL
BASE
WALL FINISHES CEILING
FINISHNORTH EAST SOUTH WEST
A5-101 ADMINISTRATIVE VESTIBULE EP-1 --- PT-1 PT-1 PT-2 PT-1 ACT-1
A5-102 TOILET TL-2 MT-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-4
A5-103 UTILITY SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4
A5-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1
A5-202 MEETING ROOM CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1
A6-101 ELECTRICAL SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4
S6-101 LABORATORY EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4
S6-201 LABORATORY PLATFORM EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4
S7-101 MAINTENANCE SHOP EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4
S7-201 STORAGE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:5
A
M
I-604
SC
HE
DU
LE
S
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
C h ec ke r
A p pr o ve r
O C
T O
B E
R
, 2
W
2Q R
D
EQUIPMENT SCHEDULE - PHASE 2
TYPE MARK DESCRIPTION DIMENSION COUNT POWER REQUIREMENT GFGI/CFCI
EQ-1 PRINTER 23 X 20 X 24 7 AC 100 - 240V GFGI
EQ-2 SHREDDER 20 X 20 X 36 6 1.87HP GFGI
EQ-3 COFFEEMAKER 21.4 x 9 x 24.1 2 120V GFGI EQ-4 REFRIGERATOR 35.5 x 35.63 x 70.13 2 115V CFCI
EQ-5 COUNTERTOP MICROWAVE 15.9 X 20.5 X 12.6 2 115V GFGI
FURNITURE SCHEDULE - PHASE 2
TYPE MARK DESCRIPTION MANUFACTURER MODEL COUNT
AC-1 TRASH RECEPTACLE MAGNUSON GROUP TRADA-01 5
AC-2 RECYCLING RECEPTACLE MAGNUSON GROUP TRADA-01 5
AC-3 RECYCLING RECEPTACLE, SMALL MAGNUSON GROUP TR20 27
AC-4 TRASH RECEPTACLE , SMALL MAGNUSON GROUP TR10 27
AV-1 MARKERBOARD CALYX PROFILE MARKERBOARD 7
AV-2 BULLETIN BOARD CALYX CONCEPT TACK BOARD 2
CC-1 CHAIR, CONFERENCE HAWORTH SCC-24-15E,1X_2,TR_F,TR_F,
TR_F
CT-1 CHAIR, TASK HAWORTH ZODY II 32
SC-1 STORAGE, CABINET U-LINE H-7642 60
SC-2 STORAGE, CREDENZA TEKNION GCLL-2672-UMU-FT9N 1
SF-1 LATERAL FILE, FOUR DRAWERS. Teknion BSLFSP18__53 5
SL-1 STORAGE, LOCKERS SALSBURY 19158-25 1
TC-2 TABLE, CONFERENCE - LARGE HAWORTH JIVE 1
WS-1 WORKSTATION 6 X 6 - ONE UNIT TEKNION --- 2
WS-2 WORKSTATION 6 X 6 - TWO UNITS TEKNION --- 2
WS-3 WORKSTATION 6 X 6 - THREE UNITS TEKNION --- 3
WS-4 WORKSTATION 6 X 6 - FOUR UNITS TEKNION --- 1
WS-5 WORKSTATION 6 X 6 - EIGHT UNITS TEKNION --- 1
WS-6 WORKSTATION 30" x 78" - ONE UNIT TEKNION --- 1 WS-7 WORKSTATION 30" x 78" - FOUR UNITS TEKNION --- 1
ROOM FINISH SCHEDULE - PHASE 2
ROOM
NUMBER ROOM NAME
FLOOR
FINISHES
WALL
BASE
WALL FINISHES CEILING
FINISHNORTH EAST SOUTH WEST
A1-101 VESTIBULE EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4
A1-102 OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1
A1-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1
A2-101 ADMINISTRATIVE VESTIBULE EP-1 --- PT-1 PT-1 PT-2 PT-1 PT-4
A2-102 TOILET TL-2 MT-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-4
A2-103 TOILET TL-2 MT-1 PT-1 PT-1 / TL-1 PT-1 / TL-1 PT-1 / TL-1 PT-4
A2-105 UTILITY SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4
A2-107 SECURITY OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-2 ACT-1
A2-108 SECURITY VESTIBULE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1
A2-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1
S1-101 LABORATORY EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4
S1-201 STORAGE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-4
S2-101 LABORATORY EP-1 --- PT-1 PT-1 PT-1 PT-1 PT-4
S2-201 OPEN OFFICE CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1
S2-202 CONFERENCE ROOM CPT-1 RB-1 PT-2 PT-1 PT-1 PT-1 ACT-1
S3-103 SECURITY CPT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACT-1
SIGNAGE SCHEDULE - PHASE 2
TYPE MARK ROOM NUMBER ROOM NAME VERBIAGE SIGN TYPE INTERIOR/EXTERIOR
DETAIL
NUMBER
IS-18 A2-102 TOILET UNISEX RESTROOM RR1 INTERIOR A7/I-504
IS-19 A2-103 TOILET UNISEX RESTROOM RR1 INTERIOR A7/I-504
IS-20 EXIT SIGN SS3 INTERIOR D7/I-504
IS-21 A2-105 UTILITY EXIT SIGN SS3 EXTERIOR D7/I-504
IS-22 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504
IS-23 S1-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504
IS-24 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504
IS-24 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504
IS-24 S2-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504
IS-25 A1-102 OPEN OFFICE OFFICE VESTIBULE S2 INTERIOR D1/I-504
IS-26 A1-102 OPEN OFFICE OFFICE S2 INTERIOR D1/I-504
IS-28 A1-101 VESTIBULE OFFICE VESTIBULE S2 EXTERIOR D1/I-504
IS-29 NO SMOKING SIGN SS3 EXTERIOR A11/I-504
IS-30 S2-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504
IS-31 EXIT SIGN SS3 INTERIOR D7/I-504
IS-31 EXIT SIGN SS3 INTERIOR D7/I-504
IS-32 EXIT SIGN SS3 INTERIOR D7/I-504
IS-33 S2-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504
IS-34 EXIT SIGN SS3 INTERIOR D7/I-504
IS-35 S1-101 LABORATORY LABORATORY S2 EXTERIOR D1/I-504
IS-36 NO SMOKING SIGN SS3 EXTERIOR A11/I-504
IS-36 EXIT SIGN SS3 INTERIOR D7/I-504
IS-37 A1-102 OPEN OFFICE OFFICE S2 EXTERIOR D1/I-504
IS-41 S2-201 OPEN OFFICE OPEN OFFICE S2 INTERIOR D1/I-504
IS-42 S2-202 CONFERENCE ROOM CONFERENCE ROOM S2 INTERIOR D1/I-504
IS-44 A2-201 OPEN OFFICE OPEN OFFICE S2 EXTERIOR D1/I-504
IS-45 EXIT SIGN SS3 INTERIOR D7/I-504
IS-46 A1-102 OPEN OFFICE OFFICE S2 EXTERIOR D1/I-504
IS-47 EXIT SIGN SS3 INTERIOR D7/I-504
IS-48 A2-108 SECURITY VESTIBULE SECURITY VESTIBULE S2 INTERIOR D1/I-504
IS-49 A2-107 SECURITY OFFICE SECURITY OFFICE S2 INTERIOR D1/I-504
IS-50 EXIT SIGN S2 INTERIOR D1/I-504
IS-51 A2-108 SECURITY VESTIBULE LABORATORY S2 EXTERIOR D1/I-504
IS-54 ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504
IS-55 S1-101 LABORATORY LABORATORY S2 INTERIOR D1/I-504
IS-56 A2-101 ADMINISTRATIVE VESTIBULE ADMINISTRATIVE VESTIBULE S2 INTERIOR D1/I-504
IS-57 A1-101 VESTIBULE OFFICE S2 INTERIOR D1/I-504
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
A
IF
-1
A
IF
-1
A
IF
-1
A
IF
-1
A
IF
-1
A
IF
-1
A
IF
-1
A
IF
-1
HATCHED AREA IS NOT IN
THE SCOPE OF WORK
HATCHED AREA IS NOT IN
THE SCOPE OF WORK
6.3 6.5
6.A
6.C
6.G
6.J
6.4
7.B
7.C
7.D
7.3 7.1
7.A
7.2 1.11.21.31.4
1.A
1.B
1.C
1.D
1.E
1.F
2.12.2
2.A
2.B
2.C
2.D
2.E
2.F
2.G
6.1
6.D
6.B
6.2
6.I
6.H
6.F
6.5.4
6.5B
6.5A
6.5.16.5.26.5.3
SHEET ID
D E
S
IG
N B
Y
D R
A W
N B
Y
C H
E C
K E
D B
Y
S U
B M
IT
T
E D
B Y
A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
F ile
P at h:
P lo t D at e:
US Army Corps of Engineers ®
IS
S
U E
D A
T E
S O
L
IC
IT
A
T
IO
N N
O
C O
N T
R A
C T
N O
S
IZ
E
A N
S I
D
P R
O
JE
C T
N O
U .S
. A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
LO
U
IS
V
IL
LE
D
IS
T
R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
LO
U
IS
V
IL
LE
, K
E N
T U
C K
Y
W
RI
GH
T-
PA
TT
ER
SO
N
AI
R
FO
RC
E
BA
SE
, O
HI
O
RE
NO
VA
TE
M
AT
ER
IA
LS
A
NA
LY
SI
S
LA
B F/
BU
ILD
IN
G
P2
Z H
T V
-2
.0
M H
P R
O
JE
C T
N O
C
R ev it Lo ca l\1
_I
N T
D -C
F
0_ ch ri st in e.
fe rn an de zY
H Q
U G
.r vt
/1
/2
:3
:1
A
M
IF-114
FI
RS
T
FL
OO
R
FF
&E
P
LA
N -C
OM
PO
SI
TE
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
V
R
IO
S M
E D
R A
N O
C
F E
R N
A N
D E
Z
JB M
B
O C
T O
B E
R
, 2
W
2Q R
D
PLAN NORTH
7 S
TA
ND
6 S
TA
ND
5 S
TA
ND
4 S
TA
ND
3 S
TA
ND
2 S
TA
ND
1 S
TA
ND
1 A
DM
IN
2 A
DM
IN
3 A
DM
IN
5 A
DM
IN
6 A
DM
IN
1 E
LE
C
0 8' 16' 32'
1/16" = 1'-0"A1 FIRST FF&E PLAN - COMPOSITE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS
INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED
FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF
DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO
PROCEEDING.
2. FURNITURE, FIXTURE & EQUIPMENT (FF&E) IS SHOWN FOR
COORDINATION, AND IS CONTRACTOR FURNISHED CONTRACTOR
INSTALLED (CFCI).
3. VERIFY FIELD CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
4. GENERAL CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL
CONNECTIONS TO THE BUILDING, INCLUDING J BOXES TO SUPPORT
FF&E. FURNITURE DEALER IS RESPONSIBLE FOR THE ELECTRICAL
HOOKUP OF ALL FF&E, INCLUDING WHIPS FROM WALL CONNECTIONS TO
THE FURNITURE AND CONNECTIONS TO THE FURNITURE AND
CONNECTION PRE-WIRED PANELS, UP TO AND INCLUDING FACEPLATES.
5. GENERAL CONTRACTOR TO COORDINATE WITH FURNITURE DEALER TO
ALLOW BUILDING ACCESS FOR FIELD CONDITION VERIFICATION.
6. INFORMATION TECHNOLOGY (IT) (PHONE / LAN ETC.) WIRING TO BE
INSTALLED BY CONTRACTOR.
7. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE…
This is the start of the file's text. The full file is on GovTribe.