This file contains architectural and engineering construction drawings for the renovation of Materials Analysis Lab Building 71 at Wright-Patterson Air Force Base. The drawings include detailed floor plans, demolition plans, finish schedules, power plans, and electrical diagrams spanning multiple sectors of the building.

The drawings show renovation work across multiple building areas including 7-Stand, 6-Stand, 5-Stand, and administrative spaces. Key elements include new laboratory spaces, utilities, security offices, administrative areas, and meeting rooms. The electrical plans detail new power distribution systems including transformers, panels, and busways. The finish schedules specify materials like epoxy flooring, carpet tiles, and paint colors for different spaces. Demolition plans indicate removal of existing walls, utilities and equipment to accommodate the new layout. The drawings are dated October 2024 and include recent revisions from December 2024, suggesting this is part of an active construction solicitation package. Notable details include specialized laboratory requirements, security considerations, and extensive electrical system upgrades throughout the facility.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:2

:2

P

M

G-002

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

S H

E E

T I N

D E

X

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

INTERIORS

I-001 GENERAL SHEETS

IN-111 FIRST FLOOR FINISH & SIGNAGE PLAN - SECTOR 1 1 12/06/24

IN-112 FIRST FLOOR FINISH & SIGNAGE PLAN - SECTOR 2 1 12/06/24

IN-113 FIRST FLOOR FINISH & SIGNAGE PLAN - SECTOR 3 1 12/06/24

IN-120 SECOND FLOOR FINISH & SIGNAGE PLAN - COMPOSITE

IN-121 SECOND FLOOR FINISH & SIGNAGE PLAN - SECTOR 1 1 12/06/24

IN-122 SECOND FLOOR FINISH & SIGNAGE PLAN - SECTOR 2 1 12/06/24

IN-123 SECOND FLOOR FINISH & SIGNAGE PLAN - SECTOR 3 1 12/06/24

IF-114 FIRST FLOOR FF&E PLAN - COMPOSITE

IF-115 FIRST FLOOR FF&E PLAN - SECTOR 1

IF-116 FIRST FLOOR FF&E PLAN - SECTOR 2

IF-117 FIRST FLOOR FF&E PLAN - SECTOR 3

IF-124 SECOND FLOOR FF&E PLAN - COMPOSITE

IF-125 SECOND FLOOR FF&E PLAN - SECTOR 1 1 12/06/24

IF-126 SECOND FLOOR FF&E PLAN - SECTOR 2

IF-127 SECOND FLOOR FF&E PLAN - SECTOR 3

I-201 ENLARGED PLANS AND ELEVATIONS 1 12/06/24

I-501 FINISH DETAILS

I-503 FURNITURE DETAILS

I-504 MILLWORK DETAILS

I-505 SIGNAGE DETAILS

I-602 SCHEDULES 1 12/06/24

I-603 SCHEDULES 1 12/06/24

I-604 SCHEDULES

FIRE PROTECTION

FA001 FIRE ALARM / MNS LEGEND AND NOTES 1 12/04/2024

FA002 FIRE ALARM DEMOLITION PLAN - FIRST FLOOR

FA003 FIRE ALARM DEMOLITION PLAN - SECOND FLOOR

FA111 FIRE ALARM FIRST FLOOR PLAN - STANDS 6 & 7 1 12/04/2024

FA112 FIRE ALARM FIRST FLOOR PLAN - STANDS 3, 4, & 5 1 12/04/2024

FA113 FIRE ALARM FIRST FLOOR PLAN - STANDS 1 & 2

FA121 FIRE ALARM SECOND FLOOR PLAN - STANDS 6 & 7

FA122 FIRE ALARM SECOND FLOOR PLAN - STANDS 3, 4, & 5 1 12/04/2024

FA123 FIRE ALARM SECOND FLOOR PLAN - STANDS 1 & 2 1 12/04/2024

FA600 RISER DIAGRAM & MOUNTING DETAIL 1 12/04/2024

FA601 TYPICAL FIRE ALARM AND MNS INPUT/OUTPUT MATRIX 1 12/04/2024

FA602 FIRE ALARM AND MNS AUDIBLE AND VISUAL MESSAGES

FX001 FIRE SUPPRESSION NOTES

FX110 FIRE SUPPRESSION FIRST FLOOR PLAN 1 12/04/2024

FX120 FIRE SUPPRESSION SECOND FLOOR PLAN 1 12/04/2024

FX600 FIRE SUPPRESSION DETAILS

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

ARCHITECTURAL

A-002 GENERAL PROJECT NOTES

A-003 LEGENDS

A-004 LEGENDS

A-005 LEGENDS

A-012 ACCESSIBILITY

A-013 ACCESSIBILITY

A-021 AIR BARRIER - FIRST FLOOR PLAN 1 12/06/24

A-022 AIR BARRIER - SECOND FLOOR PLAN

A-023 AIR BARRIER - BUILDING SECTIONS 1 12/06/24

A-024 AIR BARRIER - BUILDING SECTIONS

A-031 IC TECH SPEC FOR ICD/ICS 705 - FIRST FLOOR

A-032 IC TECH SPEC FOR ICD/ICS 705 - SECOND FLOOR

A-041 UL ASSEMBLIES - FIRST FLOOR

A-042 UL ASSEMBLIES - SECOND FLOOR

A-051 STC ASSEMBLIES - FIRST FLOOR

A-052 STC ASSEMBLIES - SECOND FLOOR

A-091 AREA CALCULATIONS - FIRST FLOOR PLAN

A-092 AREA CALCULATIONS - SECOND FLOOR PLAN

AD110 FIRST FLOOR DEMOLITION PLAN - COMPOSITE

AD111 FIRST FLOOR DEMOLITION PLAN - SECTOR 1 1 12/06/24

AD112 FIRST FLOOR DEMOLITION PLAN - SECTOR 2

AD113 FIRST FLOOR DEMOLITION PLAN - SECTOR 3 1 12/06/24

AD120 SECOND FLOOR DEMOLITION PLAN - COMPOSITE

AD121 SECOND FLOOR DEMOLITION PLAN - SECTOR 1

AD122 SECOND FLOOR DEMOLITION PLAN - SECTOR 2

AD123 SECOND FLOOR DEMOLITION PLAN - SECTOR 3

A-110 FIRST FLOOR PLAN - COMPOSITE

A-111 FIRST FLOOR PLAN - SECTOR 1 1 12/06/24

A-112 FIRST FLOOR PLAN - SECTOR 2 1 12/06/24

A-113 FIRST FLOOR PLAN - SECTOR 3 1 12/06/24

A-120 SECOND FLOOR PLAN - COMPOSITE

A-121 SECOND FLOOR PLAN - SECTOR 1 1 12/06/24

A-122 SECOND FLOOR PLAN - SECTOR 2

A-123 SECOND FLOOR PLAN - SECTOR 3 1 12/06/24

A-130 ROOF PLAN - COMPOSITE 1 12/06/24

A-131 ROOF PLAN - SECTOR 1 1 12/06/24

A-132 ROOF PLAN - SECTOR 2

A-133 ROOF PLAN - SECTOR 3

A-201 EXTERIOR ELEVATIONS

A-211 ENLARGED EXTERIOR ELEVATIONS 1 12/06/24

A-212 ENLARGED EXTERIOR ELEVATIONS 1 12/06/24

A-301 BUILDING SECTIONS 1 12/06/24

A-302 BUILDING SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-313 WALL SECTIONS

A-314 WALL SECTIONS 1 12/06/24

A-315 WALL SECTIONS

A-401 ENLARGED PLANS AND ELEVATIONS

A-407 ENLARGED PLANS AND ELEVATIONS

A-405 ENLARGED PLANS AND ELEVATIONS

A-406 ENLARGED PLANS AND ELEVATIONS

A-402 ENLARGED PLANS AND ELEVATIONS

A-403 THIS SHEET HAS BEEN DELETED 1 12/06/24

A-404 ENLARGED PLANS AND ELEVATIONS

A-504 DETAILS

A-501 DETAILS 1 12/06/24

A-503 DETAILS

A-502 DETAILS

A-508 THIS SHEET HAS BEEN DELETED 1 12/06/24

A-506 DETAILS

A-601 PARTITION SCHEDULE

A-602 PARTITION SCHEDULE

A-611 DOOR SCHEDULE 1 12/04/24

A-710 FIRST FLOOR REFLECTED CEILING PLAN - COMPOSITE

A-720 SECOND FLOOR REFLECTED CEILING PLAN - COMPOSITE

A-711 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 1

A-712 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 2

A-713 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 3

A-721 SECOND FLOOR REFLECTED CEILING PLAN - SECTOR 1

A-722 SECOND FLOOR REFLECTED CEILING PLAN - SECTOR 2

A-723 SECOND FLOOR REFLECTED CEILING PLAN - SECTOR 3

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX 2 12/06/24

G-003 SHEET INDEX 2 12/06/24

GI001 CODE ANALYSIS

GI002 CODE ANALYSIS CONTINUED

GI003 FPLS FORM

GI004 FPLS FORM CONT.

GI010 CODE COMPLIANCE SITE PLAN

GI110 LIFE SAFETY PLAN - FIRST FLOOR 1 12/04/2024

GI120 LIFE SAFETY PLAN - SECOND FLOOR 1 12/04/2024

HAZMAT

HA101 FIRST FLOOR PLAN - COMPOSITE

HA102 SECOND FLOOR PLAN SECTOR - SECTOR 1

CIVIL

GI001 PROJECT LOCATION MAPS

GC101 PROPOSED HAUL ROUTE AND LAYDOWN AREA PLAN

GR101 SITE PHOTO LOCATIONS

GR102 SITE PHOTOS

VF101 EXISTING CONDITIONS PLAN

VF102 SURVEY CONTROL PLAN

CD101 SITE DEMOLITION PLAN

CS101 AERIAL SITE PLAN

CG101 SITE GRADING PLAN

CG102 SITE GRADING PLAN AND PROFILES

CG111 EROSION CONTROL PLAN

CG301 CROSS SECTIONS

CG501 EROSION CONTROL DETAILS

CP101 SITE PLAN

CP401 ENLARGED SITE PLAN

CP501 SITE DETAILS 2 12/06/24

CU101 SITE UTILITY PLAN 2 12/06/24

CU501 SITE UTILITY DETAILS

CU502 SITE UTILITY DETAILS

LS101 LANDSCAPE PLAN

STRUCTURAL

S-001 GENERAL NOTES

S-002 GENERAL NOTES

S-101 FOUNDATION PLAN - SECTOR 1 1 12/04/24

S-102 FOUNDATION PLAN - SECTOR 2 1 12/04/24

S-103 FOUNDATION PLAN - SECTOR 3 1 12/04/24

S-111 FIRST FLOOR FLATWORK PLAN - SECTOR 1 1 12/04/24

S-112 FIRST FLOOR FLATWORK PLAN - SECTOR 2 1 12/04/24

S-113 FIRST FLOOR FLATWORK PLAN - SECTOR 3 1 12/04/24

S-121 STRUCTURAL FLOOR PLAN - SECTOR 1 1 12/04/24

S-123 STRUCTURAL FLOOR PLAN - SECTOR 3 1 12/04/24

S-141 SECOND FLOOR FRAMING PLAN - SECTOR 1 1 12/04/24

S-142 SECOND FLOOR FRAMING PLAN - SECTOR 2 1 12/04/24

S-143 SECOND FLOOR FRAMING PLAN - SECTOR 3 1 12/04/24

S-151 MAIN ROOF FRAMING PLAN - SECTOR 1 1 12/04/24

S-152 MAIN ROOF FRAMING PLAN - SECTOR 2 1 12/04/24

S-153 MAIN ROOF FRAMING PLAN - SECTOR 3 1 12/04/24

S-161 HIGH ROOF FRAMING PLAN - SECTOR 1 1 12/04/24

S-221 MASONRY WALL ELEVATIONS AND DETAILS

S-241 ROOF TOP PLATFORM FRAMING PLAN, ELEVATIONS AND DETAILS 1 12/04/24

S-301 STRUCTURAL SECTIONS

S-501 FOUNDATION DETAILS

S-511 FLATWORK DETAILS

S-541 FRAMING DETAILS 1 12/04/24

S-542 FRAMING DETAILS

S-601 SCHEDULES

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

12/06/24

12/06/24

12/06/242

W

2Q R

R

_P la ns -0

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:2

:5

P

M

G-003

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

S H

E E

T I N

D E

X

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

ELECTRICAL

E-001 ELECTRICAL LEGEND AND ABBREVIATIONS 2 12/06/24

ED100 FIRST FLOOR ELECTRICAL DEMOLITION PLAN - COMPOSITE 1 12/04/24

ED200 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - COMPOSITE

EG500 GROUNDING DETAILS

EP111 FIRST FLOOR POWER PLAN - SECTOR 1 2 12/06/24

EP112 FIRST FLOOR POWER PLAN - SECTOR 2 2 12/06/24

EP113 FIRST FLOOR POWER PLAN - SECTOR 3 2 12/06/24

EP211 SECOND FLOOR POWER PLAN - SECTOR 1 2 12/06/24

EP212 SECOND FLOOR POWER PLAN - SECTOR 2

EP213 SECOND FLOOR POWER PLAN - SECTOR 3 2 12/06/24

EQ121 FIRST FLOOR EQUIPMENT POWER PLAN - SECTOR 1

EQ122 FIRST FLOOR EQUIPMENT POWER PLAN - SECTOR 2

EQ123 FIRST FLOOR EQUIPMENT POWER PLAN - SECTOR 3

EQ221 SECOND FLOOR EQUIPMENT POWER PLAN - SECTOR 1

EQ222 SECOND FLOOR EQUIPMENT POWER PLAN - SECTOR 2

EQ223 SECOND FLOOR EQUIPMENT POWER PLAN - SECTOR 3

EQ321 ROOF EQUIPMENT POWER PLAN - SECTOR 1

EQ322 ROOF EQUIPMENT POWER PLAN - SECTOR 2

EQ323 ROOF EQUIPMENT POWER PLAN - SECTOR 3

EQ600 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

EL001 LIGHTING LEGEND AND SCHEDULES 1 12/04/24

EL121 FIRST FLOOR LIGHTING PLAN - SECTOR 1 1 12/04/24

EL122 FIRST FLOOR LIGHTING PLAN - SECTOR 2

EL123 FIRST FLOOR LIGHTING PLAN - SECTOR 3 1 12/04/24

EL211 SECOND FLOOR LIGHTING PLAN - SECTOR 1 1 12/04/24

EL212 SECOND FLOOR LIGHTING PLAN - SECTOR 2

EL213 SECOND FLOOR LIGHTING PLAN - SECTOR 3 1 12/04/24

EL501 LIGHTING DETAILS

E-600 FEEDER SCHEDULE

E-601A ELECTRICAL ONE-LINE--EXISTING

E-601B ELECTRICAL ONE-LINE DIAGRAM-REMODEL 2 12/06/24

E-601C ELECTRICAL ONE-LINE DIAGRAM - NEW SERVICE 2 12/06/24

E-611 ELECTRICAL SCHEDULES 1 12/04/24

E-612 ELECTRICAL SCHEDULES 1 12/04/24

E-613 ELECTRICAL SCHEDULES 1 12/04/24

E-614 ELECTRICAL SCHEDULES 1 12/04/24

TELECOMMUNICATIONS

T-000 TELECOM GENERAL NOTES, SYMBOLS & ABBREVIATIONS 1 12/04/24

T-010 TELECOMMUNICATIONS SITE PLAN

T-110 FIRST FLOOR TELECOMMUNICATIONS PLAN - COMPOSITE

T-111 FIRST FLOOR TELECOMMUNICATION PLAN - SECTOR 1 1 12/04/24

T-112 FIRST FLOOR TELECOMMUNICATION PLAN - SECTOR 2

T-113 FIRST FLOOR TELECOMMUNICATION PLAN - SECTOR 3 1 12/04/24

T-120 SECOND FLOOR TELECOMMUNICATION PLAN - COMPOSITE

T-121 SECOND FLOOR TELECOMMUNICATION PLAN - SECTOR 1 1 12/04/24

T-122 SECOND FLOOR TELECOMMUNICATION PLAN - SECTOR 2

T-123 SECOND FLOOR TELECOMMUNICATION PLAN - SECTOR 3

T-210 FIRST FLOOR TELECOMMUNICATIONS RCP – COMPOSITE

T-401 TELECOMMUNICATIONS ENLARGED PLANS - A6-103

T-402 TELECOMMUNICATIONS ENLARGED PLANS - A2-105

T-501 TELECOMMUNICATIONS DETAILS

T-502 TELECOMMUNICATIONS DETAILS 1 12/04/24

T-503 TELECOMMUNICATIONS DETAILS 1 12/04/24

T-601 TELECOMMUNICATIONS RISERS

T-701 TELECOMMUNICATIONS BACKBONE DIAGRAM

T-801 TELECOMMUNICATIONS SCHEDULES 1 12/04/24

AUDIO VISUAL

TA000 AUDIO VISUAL SYMBOLS & ABBREVIATIONS

TA120 SECOND FLOOR AUDIO VISUAL PLAN - COMPOSITE

TA121 SECOND FLOOR AUDIO VISUAL PLAN - SECTOR 1

TA123 SECOND FLOOR AUDIO VISUAL PLAN - SECTOR 3

TA401 AUDIO VISUAL ENLARGED PLANS - CONF S2-202

TA402 AUDIO VISUAL ENLARGED PLANS - CONF A6-202

TA501 AUDIO VISUAL DETAILS

SECURITY

TY000 SECURITY SYMBOLS & ABBREVIATIONS

TY110 FIRST FLOOR SECURITY PLAN - COMPOSITE

TY111 FIRST FLOOR SECURITY PLAN - SECTOR 1 1 12/04/24

TY112 FIRST FLOOR SECURITY PLAN - SECTOR 2 1 12/04/24

TY113 FIRST FLOOR SECURITY PLAN - SECTOR 3 1 12/04/24

TY120 SECOND FLOOR SECURITY PLAN - COMPOSITE

TY121 SECOND FLOOR SECURITY PLAN - SECTOR 1 1 12/04/24

TY122 SECOND FLOOR SECURITY PLAN - SECTOR 2

TY123 SECOND FLOOR SECURITY PLAN - SECTOR 3 1 12/04/24

TY401 SECURITY ENLARGED PLAN - A6-103 1 12/04/24

TY402 SECURITY ENLARGED PLAN - A2-105 1 12/04/24

TY500 ACCESS CONTROL DOOR DETAILS

TY501 ACCESS CONTROL DOOR DETAILS 1 12/04/24

TY502 SECURITY DETAILS

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

PLUMBING

P-001 LEGEND AND ABBREVATIONS

PD110 FIRST FLOOR PLUMBING DEMOLITION PLAN - COMPOSITE

PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTOR 1

PD113 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTOR 3

PD120 SECOND FLOOR PLUMBING DEMOLITION PLAN - COMPOSITE

PD121 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTOR 1

PD123 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTOR 3

PP100 UNDERGROUND SANITARY AND VENT - COMPOSITE

PP101 UNDERGROUND SANITARY AND VENT - SECTOR 1 1 12/04/24

PP103 UNDERGROUND SANITARY AND VENT - SECTOR 3

PP110 FIRST FLOOR SANITARY AND VENT - COMPOSITE

PP111 FIRST FLOOR SANITARY AND VENT - SECTOR 1 1 12/04/24

PP113 FIRST FLOOR SANITARY AND VENT - SECTOR 3

PP120 SECOND FLOOR SANITARY AND VENT - COMPOSITE

PP121 SECOND FLOOR SANITARY AND VENT - SECTOR 1 1 12/04/24

PP123 SECOND FLOOR SANITARY AND VENT - SECTOR 3 1 12/04/24

PP210 FIRST FLOOR SUPPLY - COMPOSITE

PP211 FIRST FLOOR SUPPLY - SECTOR 1 1 12/04/24

PP213 FIRST FLOOR SUPPLY - SECTOR 3

PP220 SECOND FLOOR SUPPLY - COMPOSITE

PP221 SECOND FLOOR SUPPLY - SECTOR 1 1 12/04/24

PP223 SECOND FLOOR SUPPLY - SECTOR 3 1 12/04/24

P-501 SCHEDULES 1 12/04/24

P-601 DETAILS

P-701 PLUMBING RISERS - SECTOR 1 1 12/04/24

P-702 PLUMBING RISERS - SECTOR 3 1 12/04/24

MECHANICAL

M-001 LEGEND AND ABBREVIATIONS

MD110 FIRST FLOOR HVAC DEMOLITION PLAN - COMPOSITE

MD113 FIRST FLOOR HVAC DEMOLITION PLAN - SECTOR 3

MD120 SECOND FLOOR HVAC DEMOLITION PLAN - COMPOSITE

MD121 SECOND FLOOR HVAC DEMOLITION PLAN - SECTOR 1

MD123 SECOND FLOOR HVAC DEMOLITION PLAN - SECTOR 3

MD130 ROOF MECHANICAL DEMOLITION PLAN - COMPOSITE

MD131 ROOF MECHANICAL DEMOLITION PLAN - SECTOR 1

MD133 ROOF MECHANICAL DEMOLITION PLAN - SECTOR 3

MD210 FIRST FLOOR PIPING DEMOLITION PLAN - COMPOSITE

MD211 FIRST FLOOR PIPING DEMOLITION PLAN - SECTOR 1

MD213 FIRST FLOOR PIPING DEMOLITION PLAN - SECTOR 3

MD220 SECOND FLOOR PIPING DEMOLITION PLAN - COMPOSITE

MD221 SECOND FLOOR PIPING DEMOLITION PLAN - SECTOR 1

MD223 SECOND FLOOR PIPING DEMOLITION PLAN - SECTOR 3

MH110 FIRST FLOOR HVAC PLAN - COMPOSITE

MH111 FIRST FLOOR HVAC PLAN - SECTOR 1

MH113 FIRST FLOOR HVAC PLAN - SECTOR 3

MH120 SECOND FLOOR HVAC PLAN - COMPOSITE

MH121 SECOND FLOOR HVAC PLAN - SECTOR 1 1 12/04/24

MH123 SECOND FLOOR HVAC PLAN - SECTOR 3 1 12/04/24

M-130 ROOF MECHANICAL PLAN - COMPOSITE

M-131 ROOF MECHANICAL PLAN - SECTOR 1

M-133 ROOF MECHANICAL PLAN - SECTOR 3

MP210 FIRST FLOOR PIPING PLAN - COMPOSITE

MP211 FIRST FLOOR PIPING PLAN - SECTOR 1

MP213 FIRST FLOOR PIPING PLAN - SECTOR 3

MP220 SECOND FLOOR PIPING PLAN - COMPOSITE

MP221 SECOND FLOOR PIPING PLAN - SECTOR 1

MP223 SECOND FLOOR PIPING PLAN - SECTOR 3

M-401 LARGE SCALE UTILITY A3-103 MECHANICAL PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-604 MECHANICAL SCHEDULES

M-701 MECHANICAL SCHEMATICS 1 12/04/24

M-702 MECHANICAL SCHEMATICS

M-801 CONTROL SCHEMATICS 1 12/04/24

M-802 CONTROL SCHEDULES

M-803 RTU/DOAS CONTROL SEQUENCES AND SCHEMATICS

M-804 ROOFTOP UNIT POINTS SCHEDULE

M-805 DOAS POINTS SCHEDULE

M-806 DUCTLESS SPLIT AIR CONDITIONER

SEQUENCE/SCHEMATIC/POINTS SCHEDULE

M-807 CHILLER CONTROL SEQUENCE AND SCHEMATICS 1 12/04/24

M-808 CHILLER POINTS SCHEDULE 1 12/04/24

M-809 ELECTRIC UNIT HEATER CONTROL

SEQUENCE/SCHEMATIC/POINTS SCHEDULE

M-810 SHUTDOWN SWITCH CONTROL SEQUENCE/SCHEMATIC/POINTS

SCHEDULE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

W

2Q R

R

_P la ns -0

ASPHALT PAVEMENT AT CONCRETE CURB & GUTTERF15 NOT TO SCALE

CURB AND GUTTERB15 NOT TO SCALE

SECTION

ASPHALT,

3" BASE PAVEMENT,

2" SURFACE PAVEMENT

AGGREGATE BASE COURSE

5"

SECTION

NEW ASPHALT

NEW BASE COURSE

EXISTING ASPHALT

EXISTING

BASE COURSE

VERTICALLY SAW CUT EXISTING ASPHALT AND

APPLY TACK COAT TO VERTICAL EDGE PRIOR TO

PLACING NEW ASPHALT

EXISTING PAVEMENTNEW PAVEMENT

COMPACTED

SUBGRADE

PAVEMENT TRANSITION NEW TO

EXISTING ASPHALT DETAILM10 NOT TO SCALE

NEW ASPHALT PAVEMENT DETAILJ10 NOT TO SCALE

9.

5"

4"

GEOTEXTILE FABRIC

DRAINAGE COURSE

.5

0'

PAVEMENT MARKING DETAILL16 NOT TO SCALE

4" WIDE WHITE PAINT FOR

TRAILER PARKING MARKINGS

NOTE:

USE NON-REFLECTORIZED WATERBORNE PAINT. THE MAXIMUM ALLOWABLE

VOC CONTENT IS 150 GRAMS PER LITER. PAINT SHALL CONFORM TO ASTM

D6628; FS TT-P-1952, TYPE III.

SECTION

ASPHALT,

3" BASE PAVEMENT,

2" SURFACE PAVEMENT

EXISTING AGGREGATE BASE

COURSE

5"

MILLED ASPHALT PAVEMENT DETAILF10 NOT TO SCALE

VA

R

IE

S

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

K

IN

G

J R

P L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

P2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\4

\2

9.

\T

EC

H

\C

AD

\5

4_

C P5

.D

W G

Pl ot

D at e:

2/ 5/

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

AN

D

ER

SO

N

C .J

O N

ES

O C

TO

BE

R

8, BU

ILD

IN

G

PR

O

JE

C

T N

O

ZH

TV

M

.B U

TL

ER

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

AP

PR

S.

BR

O

ST

EA

U

US Army Corps of Engineers

SI

TE

D

ET

AI

LS

CP501

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

/0

6/

W

2Q R

R

_P la ns -0

E E E

E E

E E

E E

E E E E E E

E

E E E E E E E

E

E E E

E

E

E E

E

E E

E

E

E E

E

LP

G

G

G G

G G

G G

G

FO

FO

FO

SAN SAN SAN SAN SAN

SA

N

SD SD SD SD SD

SAN

E

COMM

COMM

COMM

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD SD SD SD SD SD SD SD

SANSAN

E

E

E E

E E

E E

E E

E E

E E

E E

E

SA

N

SA

N

SAN

SD

E E E E E E E E E E E E E E E E

E E

E E

E

E E

E E E E E E E

E E

E

E

E

SAN

SAN

E E E

LP

E

E E E E

E E E

W W

W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W

W

W

W

W

W

W

G

G

G

G G

G G

G G

G G

G G

G G

G

G G G

G G G G G G G G

G G

G G G

B71

8TH STREET

C S

TR

EE

T

7TH STREET

10+00 11+00 12+00

SA

N

SA

N

4" IE AT BLDG 803.76

SEE NOTE 1

4" IE AT BLDG 803.61

MHS-2

MHS-4

MHS-3

MHS-6

MHS-5

IE=803.61

IE=803.43

SHEET ID

D

ES

IG

N

B Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

D

R M

AR

TI

N L

U

TH

ER

K

IN

G

J R

P L

LO

U

IS

VI

LL

E, K

EN

TU

C

KY

A

W

RI

GH

T-

PA

TT

ER

SO

N

AI

R

FO

RC

E

BA

SE

, O

HI

O

RE

NO

VA

TE

M

AT

ER

IA

LS

A

NA

LY

SI

S

LA

B F/

P2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

Fi le

P at h:

X

:\4

\2

9.

\T

EC

H

\C

AD

\5

4_

C U

1.

D W

G Pl ot D at e:

0/

/2

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

SI

ZE

AN

SI

D

C

ER

TI

FI

ED

F

IN

AL

S U

BM

IT

TA

L

A.

AN

D

ER

SO

N

C .J

O N

ES

O C

TO

BE

R

8, BU

ILD

IN

G

PR

O

JE

C

T N

O

ZH

TV

M

.B U

TL

ER

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

AP

PR

S.

BR

O

ST

EA

U

US Army Corps of Engineers

SI

TE

U

TI

LI

TY

P

LA

N

CU101

SANITARY SEWER

CONTRACTOR WORK LIMIT

SAN

18 TRANSFORMER PAD (SEE ELECTRICAL SHEETS)

21 ADJUST STORM MANHOLE RIM, MH-8 AND MH-9

22 CONNECT 4" TO EXISTING 6" SANITARY PIPE WITH WYE,

FIELD VERIFY INVERT

23 SEE PLUMBING FOR CONTINUATION PP101, PP103

24 15.2 LF OF 4" PVC SANITARY @ 1.0%

25 2- 45 DEGREE BENDS AND 4" CLEANOUT

26 17.5 LF OF 4" PVC SANITARY @ 1.0%

SHEET LEGEND

GENERAL SHEET NOTES

SCALE: 1"=20'-0"

SITE UTILITY PLANA1 20' 40'0

NORTH

SHEET KEYNOTES

1. CONTRACTOR SHALL VERIFY THE SANITARY SEWER LOCATION AND

DEPTH PRIOR TO CONNECTION. REPORT ANY DISCREPANCIES TO COR.

2. MINIMUM SLOPE FOR 4" SANITARY SEWER SHALL BE 1.0%.

3. CONTRACTOR SHALL VERIFY CONDITION OF SANITARY SEWER PRIOR

TO CONNECTIONS.

ABBREVIATIONS

IE INVERT ELEVATION

4. SANITARY SEWER FROM UPSTREAM SIDE OF THE CLEANOUT TO

CONNECTION INSTALLED BY AMERICAN WATER.

R

E V

IS

E

D

IN

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0

6/

W

2Q R

R

_P la ns -0

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS

AND SYMBOLOGY.

4. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

5. REFER TO SHEET S-221 FOR MASONRY SIZE AND REINFORCEMENT,

AND TYPICAL DETAILS NOT REFERENCED ON THIS SHEET.

6. REFER TO SHEET S-601 FOR STRUCTURAL SCHEDULES.

7. GROUT ALL MASONRY SOLID BELOW ELEVATION 100'-0".

8. ALL MASONRY WALL REINFORCEMENT SHALL BE FULL HEIGHT

UNLESS NOTED OR DETAILED OTHERWISE.

9. STRUCTURAL WALL TYPES SHALL REMAIN CONTINUOUS ACROSS

LINTELS AND MASONRY CONTROL JOINTS (MCJ), UNLESS NOTED OR

DETAILED OTHERWISE.

10. PROVIDE L19 LINTEL AT ALL MASONRY OPENINGS (NOT INDICATED

EXCEEDING 1'-0" (4'-0" MAX) IN WIDTH. COORDINATE WITH ALL OTHER

DISCIPLINES FOR LOCATION AND SIZE OF SUCH PENETRATIONS.

11. COORDINATE REQUIRED WALL PENETRATIONS WITH ALL OTHER

DISCIPLINES TO AVOID PENETRATION OF STRUCTURAL MEMBERS AT

LINTELS, TOP OF WALL, AND ANY OTHER STRUCTURAL ELEMENTS IN

THE FIELD OF THE MASONRY OR CONCRETE WALL. NOTIFY

CONTRACTING OFFICER PRIOR TO PENETRATION OF ANY

STRUCTURAL MEMBERS INCLUDING, BUT NOT LIMITED TO, BOND

BEAMS AND PORTIONS OF FULLY GROUTED MASONRY WALLS.

12. ALL NEW SAWCUT OPENINGS IN EXISTING CONCRETE WALLS SHALL

NOT OCCUR WITHIN 2'-0" OF ADJACENT WALL OPENINGS OR OTHER

PENETRATIONS. PROVIDE A MINIMUM OF (3 X DIAMETER) CENTER TO

CENTER SPACING OF CORES AT CORE DRILLED PENETRATIONS FOR

PIPE AND CONDUIT.

13. CONTROL JOINTS IN MASONRY SHALL NOT BE LOCATED CLOSER

THAN 2'-0" TO THE EDGE OF MASONRY OPENINGS, UNLESS NOTED

OTHERWISE.

STRUCTURAL

FLOOR PLAN GENERAL NOTES:

1.A

1.5 1.1

1.B

1.C

1.E

1.F

2.5 2.1

2.A

2.G

2.B

2.C

2.E

2.F

1.4

FACE TO FACE OF CONCRETE

20'-0" (FIELD VERIFY)

1'-2"

FACE TO FACE OF CONCRETE

22'-0" (FIELD VERIFY)

8" 18'-8" 8"

1'-2" 8"

1'-0" 19'-8" 8"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

2 STAND 1 STAND

S-221

H1

1.D

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

3.301

3.303

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/5 /2

:5

:2

P

M

S-123

S T

R U

C T

U R

A L

F L

O O

R P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

KEYED NOTES

3.301 NEW DOOR OPENING CUT IN EXISTING CONCRETE WALL. NO

HEADER REQUIRED.

3.303 ENLARGE EXISTING WALL OPENING AS REQUIRED FOR NEW

DOUBLE DOOR OPENING. NO HEADER REQUIRED.

GRAPHIC SCALE 1/8" = 1'-0"

1/8" = 1'-0"S-123

FIRST FLOOR STRUCTURAL WALL PLAN - SECTOR 3C5

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

E

X

IS

T

IN

G C

O N

C R

E T

E O

P E

N

IN

G

N E

W

M A

S O

N R

Y I N

F

IL

L

2'-6" 18'-0" EXISTING CONCRETE OPENING / NEW MASONRY INFILL 2'-6"

3'-4"12'-0" NEW MASONRY OPENING2'-8"

NEW

MASONRY

OPENING

N

E W

M A

S O

N R

Y O

P E

N

IN

G

32" DEEP BOND BEAM LINTEL

#5 VERTICAL BARS CENTERED AT 32" OC.

REINFORCING ABOVE LINTEL

EX. FIRST FLOOR

100'-0"

A6 S-221

DEMO ENTIRE EXISTING

MASONRY INFILL

EPOXY DOWEL TO EXISTING

CONCRETE AT HEAD, JAMBS, AND

BASE OF NEW MASONRY WALL

(SIMILAR TO A13/S-221)

WINDOW

8" MASONRY INFILL AT

EXISTING WINDOW OPENING

TYP ALL AROUND

6" EMBED

EXISTING MASONRY WALL

(SIMILAR AT CONCRETE)

#5 X 1'-8" BAR AT 16" O.C.

DRILL AND EPOXY INTO

EXISTING HEAD, JAMBS,

AND SILL. GROUT EXISTING

SILL SOLID AS REQUIRED.

DOOR

8" MASONRY INFILL AT

EXISTING DOOR OPENING

TYP AT HEAD AND JAMBS

6" EMBED

EXISTING MASONRY WALL

(SIMILAR AT CONCRETE)

#5 X 1'-8" BAR AT 16" O.C.

DRILL AND EPOXY INTO

EXISTING HEAD, JAMBS,

AND FLOOR SLAB.

E M

B E

D A

T F

L O

O R

(2) #5 BARS

M A

X

F

U L

L Y

G R

O U

T E

D C

O U

R S

E S

12" CMU

EXISTING CONCRETE WALL

23'-0" +/- (FIELD VERIFY)

7'-4" +/- (FV)

IN EXISTING DOOR OPENING

8'-4" +/- (FV) MASONRY INFILL 7'-4" +/- (FV)

IN

E

X

IS

T

IN

G D

O O

R O

P E

N

IN

G

F V

M

A S

O N

R Y

I N

F

IL

L

3'-7"

M.O.

3'-4" 1'-5"

M A

S O

N R

Y O

P E

N

IN

G

EX. FIRST FLOOR

100'-0"

NEW

MASONRY

OPENING

8" CMU INFILL WITH #5

VERTICAL BARS CENTERED

AT 32" OC. PROVIDE (1) BAR

FULL HEIGHT AT JAMBS

AND ENDS OF WALL.

8" BOND BEAM LINTEL

EPOXY DOWEL TO

EXISTING CONCRETE

AT HEAD, JAMBS, AND

BASE OF NEW MASONRY

WALL (SIM. TO A13/S-221)

A9 S-221

EXISTING CONCRETE WALL

21'-9" +/- (FIELD VERIFY)

7'-11" +/- (FV)

IN EXISTING WALL OPENING

8'-0" +/- (FV) MASONRY INFILL 5'-10" +/- (FV)

2'-8"

M.O.

3'-4" 2'-0"

IN

E

X

IS

T

IN

G W

A L

L O

P E

N

IN

G

F V

M

A S

O N

R Y

I N

F

IL

L

M A

S O

N R

Y O

P E

N

IN

G

EX. FIRST FLOOR

100'-0"

NEW

MASONRY

OPENING

8" CMU INFILL

WITH #5 VERTICAL

BARS CENTERED AT

32" OC. PROVIDE (1 )

BAR FULL HEIGHT AT

JAMBS AND ENDS OF

WALL.

8" BOND BEAM LINTEL

EPOXY DOWEL TO EXISTING

CONCRETE AT HEAD, JAMBS,

AND BASE OF NEW MASONRY

WALL (SIMILAR TO A13/S-221)

A9 S-221

WALL THICKNESS

MATCH

M A

X

IM

U M

FULLY GROUTED

MASONRY BOND BEAM

F

U L

L C

O U

R S

E

(2) #5 BARS BOTTOM

EXISTING CONCRETE WALL

17'-1" +/- (FIELD VERIFY)

17'-1" +/- (FV)

M A

S O

N R

Y O

P E

N

IN

G

EX. FIRST FLOOR

100'-0"

8" CMU INFILL

WITH #5 VERTICAL

BARS CENTERED AT

32" OC. PROVIDE (1)

BAR FULL HEIGHT AT

JAMBS AND ENDS OF

WALL.

16" BOND BEAM LINTEL

EPOXY DOWEL TO EXISTING

CONCRETE AT HEAD, JAMBS,

AND BASE OF NEW MASONRY

WALL (SIMILAR TO A13/S-221)

E9 S-221

1'-10" 6'-4" 1'-10"

(FV)

2'-6" +/-

IN EXISTING WALL OPENING

10'-0" +/- (FV) MASONRY INFILL4'-7" +/- (FV)

FULLY GROUTED

MASONRY BOND BEAM

(2) #5 BARS BOTTOM

M A

X

N O

P E

N E

T R

A T

IO

N

S

F

U L

L C

O U

R S

E S

WALL THICKNESS

MATCH

FULLY GROUTED MASONRY

FULLY BEDDED ON BOND BEAM

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/6 /2

:5

:0

P

M

S-221

M A

S O

N R

Y W

A L

L E

L E

V A

T

IO

N S

A N

D D

E T

A

IL

S

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

GRAPHIC SCALE 1/4" = 1'-0"

1/4" = 1'-0"S-121 S-221

7 STAND NORTH ELEVATION (LOOKING SOUTH)H16

N.T.S.S-221

TYPICAL MASONRY WALL INFILLA13

N.T.S.S-221 S-221

32" BOND BEAM LINTELA6

1/4" = 1'-0"S-121 S-221

6 STAND NORTH ELEVATION (LOOKING SOUTH)H11

1/4" = 1'-0"S-121 S-221

6 STAND WEST ELEVATION (LOOKING EAST)H6

N.T.S.S-221 S-221

8" BOND BEAM LINTELA9

1/4" = 1'-0"S-123 S-221

2 STAND NORTH ELEVATION (LOOKING SOUTH)H1

N.T.S.S-221 S-221

16" BOND BEAM LINTELE9

PROVIDE TEMPORARY SHORING OF EXISTING COCRETE WALL

AS REQUIRED FOR INSTALLATION OF NEW MASONRY WALL INFILL.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

1 1 1

W

2Q R

R

_P la ns -0

GUARDRAIL SYSTEM (RAILS, POSTS,

AND BASE PLATE) WITH POST-

INSTALLED CONCRETE ANCHORS

BY RAILING DELEGATED DESIGNER.

#57 STONE DRAINAGE COURSE

WITH FILTER FABRIC (DASHED)

CONCRETE RETAINING WALL

WITH #4 HORIZONTAL BARS

AT 12" OC. CENTERED IN WALL

AND #6 VERTICAL BARS AT

8" OC. PROVIDE HOOK INTO

FOOTING AS SHOWN.

CONCRETE FOOTING WITH

#6 BARS AT 8" OC. TOP AND

BOTTOM. PROVIDE HOOKS

AS SHOWN AT ALL ENDS.

M

IN

A T

F A

C E

O F

W A

L L

M

IN

M A

X

IM

U M

2'-0" 8" 5'-8"

2" PVC PIPE WEEPS AT 48" OC.

SLOPE TO DRAIN ONTO LOWER

GRADE

GRADE

1'-0"

1/2" CHAMFER,

TYPICAL

SEE CIVIL

SEE CIVIL SHEET AND ELEVATIONS

FOR LOCATION OF RETAINING WALL.

#4 TRANSVERSE BARS

AT 12" OC. TOP AND BOTTOM.

M

IN

JOINTS FOR RETAINING WALL SHALL NOT EXCEED 20 FT ON CENTER. PROVIDE

CANT STRIP IN FORMWORK ON EACH FACE TO CREATE WEAKENED PLANE.

BASE COURSE

(ASTM D448; GRADING SIZE 57)

THE GUARDRAIL SYSTEM SHALL BE 42" TALL WITH A TOP RAIL AND MID-HEIGHT

RAIL. RAILS SHALL BE SPACED AS SUCH TO PREVENT THE PASSAGE OF A 21"

DIAMETER SPHERE. THE GUARDRAIL SYSTEM SHALL BE LOCATED WHERE THE

DISTANCE BETWEEN THE TOP OF THE RETAINING WALL AND THE LOWER

GRADE IS MORE THAN 30 INCHES. SEE A1/CG102 FOR THE RETAINING WALL

PROFILE.

ENGINEERED FILL

(ASTM D4920; SUB-BASE)

PREPARED SUB-GRADE

(SECTION 31 00 00.00 06)

M

IN

BASE COURSE

(ASTM D448; GRADING SIZE 57)

T.O. SLAB

SEE FLATWORK PLAN

TO. FOOTING

SEE FOUNDATION PLAN

PIPE COLUMN

(SEE FRAMING PLAN)

COLUMN BASE AND

ANCHORAGE (SEE DETAIL L9/S-541)

CONCRETE SLAB

(SEE FLATWORK PLAN)

CONCRETE FOOTING

(SEE FOUNDATION PLAN)

T.O. SLAB

SEE FLATWORK PLAN

TO. FOOTING

SEE FOUNDATION PLAN

1/2" ISOLATION JOINT MATERIAL

WITH 1/2" FLEXIBLE SEALANT AT TOP

CONCRETE SLAB

(SEE FLATWORK PLAN)

7 STAND ONLY:

PROVIDE 1" VIBRATION JOINT

WITH 1" FLEXIBLE SEALANT IN

LIEU OF 1/2" ISOLATION JOINT

WITH FLEXIBLE SEALANT.

EXISTING CONCRETE WALL

CONCRETE FOOTING

(SEE FOUNDATION PLAN)

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/6 /2

:5

:0

P

M

S-501

F O

U N

D A

T

IO

N D

E T

A

IL

S

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

A p p ro v e r

O C

T O

B E

R

N.T.S.S-501

RETAINING WALL SECTIONA13

N.T.S.S-501

TYPICAL BACKFILL REQUIREMENTS

AT INTERIOR FOUNDATIONE17

N.T.S.S-101 S-501

TYPICAL

INTERIOR COLUMN FOOTINGH17

N.T.S.S-101 S-501

NEW FOOTING AT EXISTING WALLL17

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

GENERAL SHEET NOTES

1. THE CONTRACTOR SHALL FURNISH SIX SIDED AIR BARRIER SURFACE

CALCULATIONS PER SPECIFICATIONS.

2. REFERENCE STANDARD ANSI / ASHRAE / IES STANDARD 90.1 - 2013

ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL

BUILDINGS.

3. REFERENCE SPECIFICATION SECTION 07 27 10 BUILDING AIR BARRIER

SYSTEM.

4. CONSTRUCTION OF THE AIR BARRIER SYSTEM SHALL BE COMPLETED

FOR THE PRESSURE TESTING. AIR BARRIER TESTING IS REQUIRED AS

INDICATED BY THE "AIR BARRIER BOUNDARY LEGEND".

AIR BARRIER BOUNDRY LEGEND

NOT IN SCOPE OF WORK.AIR BARRIER BOUNDRY.

HEATED AND VENTILATED.

NO AIR BARRIER SYSTEM

PRESSURE TESTING FOR

AIR TIGHTNESS. AIR

BARRIER SYSTEM

INSPECTION ONLY.

CONDITIONED SPACE.

NO AIR BARRIER SYSTEM

PRESSURE TESTING FOR

AIR TIGHTNESS.

CONDITIONED SPACE.

AIR BARRIER SYSTEM

PRESSURE TESTING FOR

AIR TIGHTNESS.

AIR BARRIER NOTES

1. PROVIDE THIRD-PARTY REVIEW OF AIR BARRIER DESIGN BY

PROFESSIONALS EXPERIENCED IN AIR BARRIER DESIGN AND

CONSTRUCTION INCLUDING REQUIRED MEETINGS FOR CONSULT.

2. PROVIDE A MINIMUM OF THREE (3) AIR BARRIER CONSTRUCTION SITE

VISITS DURING CONSTRUCTION BY PROFESSIONALS EXPERIENCED IN AIR

BARRIER DESIGN AND CONSTRUCTION TO ENSURE PROPER

INSTALLATION OF AIR BARRIER MATERIALS AND AIR BARRIER

CONSTRUCTION.

3. CONCRETE MATERIAL CAN ACT AS AN AIR / WATER / VAPOR BARRIER FOR

PRE-CAST CONCRETE AND CAST-IN-PLACE CONCRETE. THEREFORE ALL

CONCRETE PENETRATIONS ARE TO BE SEALED.

4. SEAL PLUMBING, MECHANICAL, ELECTRICAL AND FIRE ALARM

PENETRATIONS AND DEVICES.

5. IF AIR BARRIER ENVELOPE ZONES ARE ADJUSTED, THE CONTRACTOR

SHALL PROVIDE NEW ALLOWABLE LEAKAGE RATE. GOVERNMENT

APPROVAL IS REQUIRED FOR ANY DEVIATIONS TO AIR BARRIER ZONES.

6. AS DEFINED BY THE AIR BARRIER ASSOCIATION OF AMERICA (ABAA), ALL

AIR BARRIER MATERIALS MUST HAVE AN AIR PERMEANCE LESS THAN

0.004 CFM / SF AT 75 PA WHEN TESTED IN ACCORDANCE WITH ASTM

E2178.

7. INTAKE, RELIEF, AND EXHAUST DAMPERS ARE TO BE AMCA 511 LEAKAGE

CLASS 1A (3 CFM / SF AT 1 IN W.C.).

5 STAND 5 ADMIN 4 STAND 3 ADMIN7 STAND 6 ADMIN 6 STAND 3 STAND 2 ADMIN 2 STAND 1 STAND 1 ADMIN

HATCHED AREA

INDICATES INCIDENTAL

UPGRADE AND/OR

REPLACEMENT OF ITEMS

OUTSIDE THE PRIMARY

SCOPE OF WORK. REFER

TO OTHER DISCIPLINES

FOR ADDITIONAL

INFORMATION.

HATCHED AREA

INDICATES INCIDENTAL

UPGRADE AND/OR

REPLACEMENT OF ITEMS

OUTSIDE THE PRIMARY

SCOPE OF WORK. REFER

TO OTHER DISCIPLINES

FOR ADDITIONAL

INFORMATION.

KEY PLAN

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B U

IL

D

IN

G

P 2#

: 5

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:2

:4

P

M

A-021

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

A

IR

B A

R R

IE

R

F

IR

S

T F

L O

O R

P

LA

N

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

1/16" = 1'-0"A1

AIR BARRIER

FIRST FLOOR PLAN - COMPOSITE

0 8' 16' 32'

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

W

2Q R

R

_P la ns -0

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

GENERAL SHEET NOTES

1. THE CONTRACTOR SHALL FURNISH SIX SIDED AIR BARRIER SURFACE

CALCULATIONS PER SPECIFICATIONS.

2. REFERENCE STANDARD ANSI / ASHRAE / IES STANDARD 90.1 - 2013

ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL

BUILDINGS.

3. REFERENCE SPECIFICATION SECTION 07 27 10 BUILDING AIR BARRIER

SYSTEM.

4. CONSTRUCTION OF THE AIR BARRIER SYSTEM SHALL BE COMPLETED

FOR THE PRESSURE TESTING. AIR BARRIER TESTING IS REQUIRED AS

INDICATED BY THE "AIR BARRIER BOUNDARY LEGEND".

AIR BARRIER BOUNDRY LEGEND

NOT IN SCOPE OF WORK.AIR BARRIER BOUNDRY.

HEATED AND VENTILATED.

NO AIR BARRIER SYSTEM

PRESSURE TESTING FOR

AIR TIGHTNESS. AIR

BARRIER SYSTEM

INSPECTION ONLY.

CONDITIONED SPACE.

NO AIR BARRIER SYSTEM

PRESSURE TESTING FOR

AIR TIGHTNESS.

CONDITIONED SPACE.

AIR BARRIER SYSTEM

PRESSURE TESTING FOR

AIR TIGHTNESS.

AIR BARRIER NOTES

1. PROVIDE THIRD-PARTY REVIEW OF AIR BARRIER DESIGN BY

PROFESSIONALS EXPERIENCED IN AIR BARRIER DESIGN AND

CONSTRUCTION INCLUDING REQUIRED MEETINGS FOR CONSULT.

2. PROVIDE A MINIMUM OF THREE (3) AIR BARRIER CONSTRUCTION SITE

VISITS DURING CONSTRUCTION BY PROFESSIONALS EXPERIENCED IN AIR

BARRIER DESIGN AND CONSTRUCTION TO ENSURE PROPER

INSTALLATION OF AIR BARRIER MATERIALS AND AIR BARRIER

CONSTRUCTION.

3. CONCRETE MATERIAL CAN ACT AS AN AIR / WATER / VAPOR BARRIER FOR

PRE-CAST CONCRETE AND CAST-IN-PLACE CONCRETE. THEREFORE ALL

CONCRETE PENETRATIONS ARE TO BE SEALED.

4. SEAL PLUMBING, MECHANICAL, ELECTRICAL AND FIRE ALARM

PENETRATIONS AND DEVICES.

5. IF AIR BARRIER ENVELOPE ZONES ARE ADJUSTED, THE CONTRACTOR

SHALL PROVIDE NEW ALLOWABLE LEAKAGE RATE. GOVERNMENT

APPROVAL IS REQUIRED FOR ANY DEVIATIONS TO AIR BARRIER ZONES.

6. AS DEFINED BY THE AIR BARRIER ASSOCIATION OF AMERICA (ABAA), ALL

AIR BARRIER MATERIALS MUST HAVE AN AIR PERMEANCE LESS THAN

0.004 CFM / SF AT 75 PA WHEN TESTED IN ACCORDANCE WITH ASTM

E2178.

7. INTAKE, RELIEF, AND EXHAUST DAMPERS ARE TO BE AMCA 511 LEAKAGE

CLASS 1A (3 CFM / SF AT 1 IN W.C.).

KEY PLAN

FIRST FLOOR-EXISTING

100'-0"

FIRST FLOOR-EXISTING

100'-0"

STEAM TUNNEL-EXISTING

91'-0"

STEAM TUNNEL-EXISTING

91'-0"

SECOND FLOOR-6 STAND

111'-0"

SECOND FLOOR-6 STAND

111'-0"

LABORATORY

PLATFORM

S6-201

LABORATORY

S6-101

FIRST FLOOR-EXISTING

100'-0"

FIRST FLOOR-EXISTING

100'-0"

STEAM TUNNEL-EXISTING

91'-0"

STEAM TUNNEL-EXISTING

91'-0"

SECOND FLOOR-7 STAND

112'-0"

SECOND FLOOR-7 STAND

112'-0"

MAINTENANCE

SHOP

S7-101

STORAGE

S7-201

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B U

IL

D

IN

G

P 2#

: 5

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:2

:3

P

M

A-023

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

A

IR

B A

R R

IE

R

B

U

IL

D

IN

G S

E C

T

IO

N S

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

1/8" = 1'-0"A1

AIR BARRIER

BUILDING SECTION - 6 STAND

1/8" = 1'-0"H1

AIR BARRIER

BUILDING SECTION - 7 STAND

0 4' 8' 16'

0 4' 8' 16'

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

1 1

W

2Q R

R

_P la ns -0

KEY PLAN

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

910 910

901 922

A

A

D

A

A

D

920 920

942942

920 920

910 910

001 922

003 003

003 003

21'-4"

'-4

8'-0"

'-3

17'-4"

5 STAND7 STAND 6 ADMIN 6 STAND

'-4

9'

-3

'-6

20'-0" 23'-0"

019 019

5'-6" 12'-0" 5'-6"

8'-4" 6'-4" 8'-4"

SHEET KEYNOTES

GENERAL SHEET NOTES

1. REFERENCE SHEET A-002 FOR GENERAL DEMOLITION NOTES.

2. REFERENCE SPECIFICATION SECTION 02 41 00 DEMOLITION.

3. REFERENCE OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION

INFORMATION.

4. UNLESS OTHERWISE NOTED, DEMOLISH EQUIPMENT WITHIN THE SCOPE

OF PROJECT.

GRAPHICS LEGEND

EXISTING PARTITION TO BE DEMOLISHED (DASHED).

NEW PARTITION TO BE INSTALLED (CONTINUOUS).

EXISTING PARTITION TO REMAIN (SCREENED).

EXISTING DOOR TO REMAIN (SCREENED).

EXISTING DOOR TO BE DEMOLISHED OR REMOVED (DASHED).

NEW DOOR TO BE INSTALLED (CONTINUOUS).

EXISTING WINDOW TO REMAIN (SCREENED).

EXISTING WINDOW TO BE DEMOLISHED OR REMOVED

(DASHED).

NEW WINDOW TO BE INSTALLED (CONTINUOUS).

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B U

IL

D

IN

G

P 2#

: 5

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:2

:0

P

M

AD111

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

F

IR

S T

F

LO

O R

D E

M O

LI

T

IO

N

P

LA

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

1/8" = 1'-0"A1

FIRST FLOOR DEMOLITION PLAN - SECTOR 1

0 4' 8' 16'

001 EXISTING CAST-IN-PLACE CONCRETE WALL TO REMAIN.

003 EXISTING CAST-IN-PLACE CONCRETE COLUMN TO REMAIN.

004 EXISTING CAST-IN-PLACE CONCRETE STEPS TO REMAIN.

007 EXISTING CAST-IN-PLACE CONCRETE FLOOR OVER STEAM TUNNEL TO

REMAIN.

010 EXISTING CONCRETE MASONRY UNITS (CMU) TO REMAIN.

019 EXISTING PRE-FINISHED METAL DOWNSPOUT TO REMAIN.

022 EXISTING HOLLOW METAL DOOR WITH FRAME TO REMAIN.

024 EXISTING OVERHEAD DOOR TO REMAIN.

026 EXISTING STEEL STAIR TO REMAIN.

027 EXISTING STEEL STAIR HANDRAIL TO REMAIN.

031 EXISTING WINDOW TO REMAIN.

032 EXISTING GLASS BLOCK WINDOW TO REMAIN.

901 DEMOLISH EXISTING CAST-IN-PLACE CONCRETE WALL. REFER TO

STRUCTURAL FOR ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

902 DEMOLISH EXISTING CAST-IN-PLACE CONCRETE FLOOR. REFER TO

STRUCTURAL FOR ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

903 DEMOLISH EXISTING CAST-IN-PLACE CONCRETE LID ABOVE. REFER TO

STRUCTURAL FOR ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

905 DEMOLISH EXISTING CAST-IN-PLACE CONCRETE PAD. REFER TO

STRUCTURAL FOR ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

906 DEMOLISH EXISTING CAST-IN-PLACE CONCRETE PEDESTAL. REFER TO

STRUCTURAL FOR ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

910 DEMOLISH EXISTING CONCRETE MASONRY UNITS (CMU).

912 DEMOLISH EXISTING STEEL COLUMN. REFER TO STRUCTURAL FOR

ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

917 DEMOLISH EXISTING BRIDGE CRANE.

918 DEMOLISH EXISTING ROOF ACCESS LADDER.

920 DEMOLISH EXISTING DOOR GUIDE RAIL.

921 DEMOLISH EXISTING OVERHEAD DOOR.

922 DEMOLISH EXISTING HOLLOW METAL DOOR AND FRAME.

923 DEMOLISH EXISTING HOLLOW METAL DOOR AND FRAME AT ENTRANCE TO

STEAM TUNNEL.

926 DEMOLISH EXISTING STEEL STAIR.

927 DEMOLISH EXISTING STEEL HANDRAIL.

929 DEMOLISH EXISTING WALL BUILD-OUT.

940 DEMOLISH EXISTING FLOOR DRAIN. REFER TO PLUMBING FOR

ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

942 REMOVE STEEL FRAMING AT EXISTING DOOR OPENING.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

W

2Q R

R

_P la ns -0

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

A

A

D

A

A

D

F A

C E

T O

F A

C E

O F

E X

IS

T

IN

G

C O

N C

R E

T E

W A

L L S

'-7

912 912

912 912 912

912 912

912 912

912 912

921 921

922 922

922 922 935

027 027

003 003

001 032

001 001

001001

'-6

'-4

3'-0" 8'-5"

'-4

3 STAND 2 ADMIN 2 STAND 1 STAND 1 ADMIN

20'-0" 22'-0"

'-1

9' -3

'-3

019 019

019019

003 003

3' -4

8'

-0

3'-4" 2'-6"

AREA OF WORK

IN 3 STAND

SHEET KEYNOTES

GENERAL SHEET NOTES

1. REFERENCE SHEET A-002 FOR GENERAL DEMOLITION NOTES.

2. REFERENCE SPECIFICATION SECTION 02 41 00 DEMOLITION.

3. REFERENCE OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION

INFORMATION.

4. UNLESS OTHERWISE NOTED, DEMOLISH EQUIPMENT WITHIN THE SCOPE

OF PROJECT.

GRAPHICS LEGEND

EXISTING PARTITION TO BE DEMOLISHED (DASHED).

NEW PARTITION TO BE INSTALLED (CONTINUOUS).

EXISTING PARTITION TO REMAIN (SCREENED).

EXISTING DOOR TO REMAIN (SCREENED).

EXISTING DOOR TO BE DEMOLISHED OR REMOVED (DASHED).

NEW DOOR TO BE INSTALLED (CONTINUOUS).

EXISTING WINDOW TO REMAIN (SCREENED).

EXISTING WINDOW TO BE DEMOLISHED OR REMOVED

(DASHED).

NEW WINDOW TO BE INSTALLED (CONTINUOUS).

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B U

IL

D

IN

G

P 2#

: 5

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:2

:5

P

M

AD113

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

F

IR

S T

F

LO

O R

D E

M O

LI

T

IO

N

P

LA

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

1/8" = 1'-0"A1

FIRST FLOOR DEMOLITION PLAN - SECTOR 3

0 4' 8' 16'

001 EXISTING CAST-IN-PLACE CONCRETE WALL TO REMAIN.

002 EXISTING CAST-IN-PLACE CONCRETE FLOOR TO REMAIN.

003 EXISTING CAST-IN-PLACE CONCRETE COLUMN TO REMAIN.

007 EXISTING CAST-IN-PLACE CONCRETE FLOOR OVER STEAM TUNNEL TO

REMAIN.

019 EXISTING PRE-FINISHED METAL DOWNSPOUT TO REMAIN.

022 EXISTING HOLLOW METAL DOOR WITH FRAME TO REMAIN.

026 EXISTING STEEL STAIR TO REMAIN.

027 EXISTING STEEL STAIR HANDRAIL TO REMAIN.

032 EXISTING GLASS BLOCK WINDOW TO REMAIN.

901 DEMOLISH EXISTING CAST-IN-PLACE CONCRETE WALL. REFER TO

STRUCTURAL FOR ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

902 DEMOLISH EXISTING CAST-IN-PLACE CONCRETE FLOOR. REFER TO

STRUCTURAL FOR ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

910 DEMOLISH EXISTING CONCRETE MASONRY UNITS (CMU).

912 DEMOLISH EXISTING STEEL COLUMN. REFER TO STRUCTURAL FOR

ADDITIONAL INFORMATION ON EXTENT OF DEMOLITION.

921 DEMOLISH EXISTING OVERHEAD DOOR.

922 DEMOLISH EXISTING HOLLOW METAL DOOR AND FRAME.

926 DEMOLISH EXISTING STEEL STAIR.

927 DEMOLISH EXISTING STEEL HANDRAIL.

930 DEMOLISH EXISTING WINDOW.

931 DEMOLISH EXISTING ACOUSTICAL PANEL CEILING.

933 DEMOLISH EXISTING PRE-FINISHED METAL DOWNSPOUT.

935 DEMOLISH EXISTING GYPSUM BOARD ASSEMBLY.

936 DEMOLISH EXISTING EXTERIOR WALL ASSEMBLY TO THE METAL STUD

FRAMING. THE EXISTING METAL STUD FRAMING SHALL REMAIN.

941 DEMOLISH EXISTING FLOORING.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

W

2Q R

R

_P la ns -0

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

GENERAL SHEET NOTES

1. REFERENCE ELEVATION 100'-0" = USGS ACTUAL ELEVATION FOR

INDICATED LOCATIONS BELOW. ELEVATIONS ARE TAKEN FROM TOP OF

EXISTING CONCRETE ABOVE THE STEAM TUNNEL.

A. FOR 7 STAND, THE USGS ACTUAL ELEVATION IS 805.51'.

B. FOR 6 ADMIN, THE USGS ACTUAL ELEVATION IS 805.49'.

C. FOR 6 STAND, THE USGS ACTUAL ELEVATION IS 805.45'.

2. THE ASSUMED SLAB-ON-GRADE TOP OF CONCRETE ELEVATION = 100'-0"

TYPICAL, UNLESS OTHERWISE NOTED.

3. REFERENCE ARCHITECTURAL SHEET A-601 FOR PARTITION TYPES.

4. REFERENCE ARCHITECTURAL SHEET A-611 FOR DOOR SCHEDULE.

5. REFERENCE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

6. REFERENCE OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

A

A

-1

A

A

-1

MAINTENANCE

SHOP

S7-101

ADMINISTRATIVE

VESTIBULE

A6-101

UTILITY

A6-103

TOILET

A6-102

FACE TO FACE OF EXISTING CONCRETE WALLS

20'-0"

FACE TO FACE OF EXISTING CONCRETE WALLS

23'-0"

F A

C E

T O

F A

C E

O F

E X

IS

IT

N G

C O

N C

R E

T E

W A

L L S

'-1

FACE TO FACE OF EXISTING CONCRETE WALLS

23'-0"

9' -8

/8

8'

-8

/8

'-8

/2

5'-0 3/8" 9'-1 3/8" 8'-10 1/4"

1'-8 1/2" 7'-1 3/4"

131 131

131 131

131 131

150 150

003 003

003 003

003 003

168 168

U P

U P U P

'-3

U P

5 STAND7 STAND 6 ADMIN 6 STAND

6A -1

B

6A -1

A

6S-101D

LABORATORY

S6-101

6S-101A

6S-101B

DN

6A -1

A

7S-101B

6S -1

C

STAIR

A6-104

7S -1

A

6A -1

A

027 027

E3a

E3a

E3a

E3a E3a

E3a

E3a

D3

E3a

D3E3a

D3

E3a D3

F0

E3a E3a

F0

B3a

B3a B3a

D3a

D3

166 166

FOR ENLARGED PLAN OF ROOM A6-102 TOILET REFERENCE SHEET A-401.

019 019

131131 131

D3

D3

E3a

WHERE EXISTING WINDOWS AND GLASS BLOCK WINDOWS (KEYED

NOTES 031 AND 032) ARE TO REMAIN, INSTALL PARTITION TYPE S4a

AT THE INTERIOR SIDE OF EACH TYPE OF WINDOW OPENING.

J3a

S4a S4a

S4a

S4a

ASSUMED: 100'-0"

ACTUAL: 805.51'

ASSUMED: 100'-0"

ACTUAL: 805.49'

ASSUMED: 100'-0"

ACTUAL: 805.45'

S

LO

P E

D O

W N

1"

0'

-0

A S

S U

M E

D F

LA

T

'-0

S

LO

P E

D O

W N

3"

805.26'

805.42'805.42'

805.26'

805.42' 805.42'

805.45' 805.45'

805.50' 805.50'

805.45' 805.45'

805.45'

805.45'

S

LO

P E

D O

W N

1/ 2"

805.42'

105105

105 105

SHEET KEYNOTES

GRAPHICS LEGEND

EXISTING PARTITION TO BE DEMOLISHED (DASHED).

NEW PARTITION TO BE INSTALLED (CONTINUOUS).

EXISTING PARTITION TO REMAIN (SCREENED).

EXISTING DOOR TO REMAIN (SCREENED).

EXISTING DOOR TO BE DEMOLISHED OR REMOVED (DASHED).

NEW DOOR TO BE INSTALLED (CONTINUOUS).

EXISTING WINDOW TO REMAIN (SCREENED).

EXISTING WINDOW TO BE DEMOLISHED OR REMOVED

(DASHED).

NEW WINDOW TO BE INSTALLED (CONTINUOUS).

EXTERIOR FINISH NOTES

1. ALL AREAS OF NEW WORK TO BE PAINTED. PAINT ADJACENT AREAS WITH

VISIBLE DAMAGE FROM DEMOLITION/NEW WORK.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B U

IL

D

IN

G

P 2#

: 5

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:2

:0

P

M

A-111

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

F

IR

S T

F L

O O

R P

LA

N

S

E C

T O

R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

0 4' 8' 16'

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

1/8" = 1'-0"A1

FIRST FLOOR PLAN - SECTOR 1

001 EXISTING CAST-IN-PLACE CONCRETE WALL TO REMAIN.

003 EXISTING CAST-IN-PLACE CONCRETE COLUMN TO REMAIN.

007 EXISTING CAST-IN-PLACE CONCRETE FLOOR OVER STEAM TUNNEL TO

REMAIN.

010 EXISTING CONCRETE MASONRY UNITS (CMU) TO REMAIN.

012 EXISTING CAST-IN-PLACE CONCRETE STEPS TO REMAIN.

019 EXISTING PRE-FINISHED METAL DOWNSPOUT TO REMAIN.

022 EXISTING HOLLOW METAL DOOR WITH FRAME TO REMAIN.

024 EXISTING OVERHEAD DOOR TO REMAIN.

026 EXISTING STEEL STAIR TO REMAIN.

027 EXISTING STEEL STAIR HANDRAIL TO REMAIN.

031 EXISTING WINDOW TO REMAIN.

032 EXISTING GLASS BLOCK WINDOW TO REMAIN.

105 PRE-FINISHED METAL DOWNSPOUT.

131 STRUCTURAL STEEL COLUMN. REFER TO STRUCTURAL FOR ADDITIONAL

INFORMATION.

142 CAST-IN-PLACE CONCRETE SLAB ON GRADE. REFER TO STRUCTURAL

FOR ADDITIONAL INFORMATION.

150 CONCRETE MASONRY UNITS (CMU).

157 INFILL EXISTING OPENING IN WALL.

163 INSULATED HOLLOW METAL DOOR AND FRAME AT ENTRANCE TO STEAM

TUNNEL.

164 INSULATED PAIR OF HOLLOW METAL DOORS WITH FRAME.

165 INSULATED HOLLOW METAL DOOR WITH FRAME.

166 INSULATED 12FT x 12FT VERTICAL LIFT DOOR.

168 HOLLOW METAL DOOR WITH FRAME.

171 STEEL STAIR. REFER TO ENLARGED PLAN A1 ON SHEET A-404.

172 STEEL STAIR. REFER TO ENLARGED PLAN A1 ON SHEET A-405.

173 STEEL STAIR. REFER TO ENLARGED PLAN H1 ON SHEET A-405.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

1 1

1 1

W

2Q R

R

_P la ns -0

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

GENERAL SHEET NOTES

1. REFERENCE ELEVATION 100'-0" - 00.00' USGS ACTUAL ELEVATION.

2. SLAB-ON-GRADE TOP OF CONCRETE ELEVATION = 100'-0" TYPICAL,

UNLESS OTHERWISE NOTED.

3. REFERENCE ARCHITECTURAL SHEET A-601 FOR PARTITION TYPES.

4. REFERENCE ARCHITECTURAL SHEET A-611 FOR DOOR SCHEDULE.

5. REFERENCE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

6. REFERENCE OTHER DISCIPLINES FOR ADDITIONAL INFORMATION.

A

A

-1

A

A

-1

A

A

-1

A

A

-1

U P

5 ADMIN 4 STAND 3 ADMIN

SECURITY

S3-103

UP

UP

U P

U P

U P

U P

3 STAND

AREA OF WORK

IN 3 STAND

SHEET KEYNOTES

GRAPHICS LEGEND

EXISTING PARTITION TO BE DEMOLISHED (DASHED).

NEW PARTITION TO BE INSTALLED (CONTINUOUS).

EXISTING PARTITION TO REMAIN (SCREENED).

EXISTING DOOR TO REMAIN (SCREENED).

EXISTING DOOR TO BE DEMOLISHED OR REMOVED (DASHED).

NEW DOOR TO BE INSTALLED (CONTINUOUS).

EXISTING WINDOW TO REMAIN (SCREENED).

EXISTING WINDOW TO BE DEMOLISHED OR REMOVED

(DASHED).

NEW WINDOW TO BE INSTALLED (CONTINUOUS).

EXTERIOR FINISH NOTES

1. ALL AREAS OF NEW WORK TO BE PAINTED. PAINT ADJACENT AREAS WITH

VISIBLE DAMAGE FROM DEMOLITION/NEW WORK.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B U

IL

D

IN

G

P 2#

: 5

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/6 /2

:3

:0

P

M

A-112

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

F

IR

S T

F L

O O

R P

LA

N

S

E C

T O

R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

1/8" = 1'-0"A1

FIRST FLOOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .