This appears to be a technical plans/drawings file based on the filename (Plans-0004.pdf) related to renovations of the Materials Analysis Lab F/20071 at Wright Patterson Air Force Base. Without access to the actual contents of the file, I cannot provide specific details about the construction plans, specifications, or technical drawings it may contain. The file is associated with a Design/Bid/Build renovation project being managed by the U.S. Army Corps of Engineers Louisville District for work at Wright Patterson AFB in Dayton, Ohio under solicitation number W912QR25R0015.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/3 /2

:5

:5

A

M

G-002

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

S H

E E

T I N

D E

X

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

INTERIORS

I-001 GENERAL SHEETS

IN-111 FIRST FLOOR FINISH & SIGNAGE PLAN - SECTOR 1

IN-112 FIRST FLOOR FINISH & SIGNAGE PLAN - SECTOR 2

IN-113 FIRST FLOOR FINISH & SIGNAGE PLAN - SECTOR 3

IN-120 SECOND FLOOR FINISH & SIGNAGE PLAN - COMPOSITE

IN-121 SECOND FLOOR FINISH & SIGNAGE PLAN - SECTOR 1

IN-122 SECOND FLOOR FINISH & SIGNAGE PLAN - SECTOR 2

IN-123 SECOND FLOOR FINISH & SIGNAGE PLAN - SECTOR 3

IF-114 FIRST FLOOR FF&E PLAN - COMPOSITE

IF-115 FIRST FLOOR FF&E PLAN - SECTOR 1

IF-116 FIRST FLOOR FF&E PLAN - SECTOR 2

IF-117 FIRST FLOOR FF&E PLAN - SECTOR 3

IF-124 SECOND FLOOR FF&E PLAN - COMPOSITE

IF-125 SECOND FLOOR FF&E PLAN - SECTOR 1

IF-126 SECOND FLOOR FF&E PLAN - SECTOR 2

IF-127 SECOND FLOOR FF&E PLAN - SECTOR 3

I-201 ENLARGED PLANS AND ELEVATIONS

I-501 FINISH DETAILS

I-503 FURNITURE DETAILS

I-504 MILLWORK DETAILS

I-505 SIGNAGE DETAILS

I-602 SCHEDULES

I-603 SCHEDULES

I-604 SCHEDULES

FIRE PROTECTION

FA001 FIRE ALARM / MNS LEGEND AND NOTES 1 12/04/2024

FA002 FIRE ALARM DEMOLITION PLAN - FIRST FLOOR

FA003 FIRE ALARM DEMOLITION PLAN - SECOND FLOOR

FA111 FIRE ALARM FIRST FLOOR PLAN - STANDS 6 & 7 1 12/04/2024

FA112 FIRE ALARM FIRST FLOOR PLAN - STANDS 3, 4, & 5 1 12/04/2024

FA113 FIRE ALARM FIRST FLOOR PLAN - STANDS 1 & 2

FA121 FIRE ALARM SECOND FLOOR PLAN - STANDS 6 & 7

FA122 FIRE ALARM SECOND FLOOR PLAN - STANDS 3, 4, & 5 1 12/04/2024

FA123 FIRE ALARM SECOND FLOOR PLAN - STANDS 1 & 2 1 12/04/2024

FA600 RISER DIAGRAM & MOUNTING DETAIL 1 12/04/2024

FA601 TYPICAL FIRE ALARM AND MNS INPUT/OUTPUT MATRIX 1 12/04/2024

FA602 FIRE ALARM AND MNS AUDIBLE AND VISUAL MESSAGES

FX001 FIRE SUPPRESSION NOTES

FX110 FIRE SUPPRESSION FIRST FLOOR PLAN 1 12/04/2024

FX120 FIRE SUPPRESSION SECOND FLOOR PLAN 1 12/04/2024

FX600 FIRE SUPPRESSION DETAILS

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

ARCHITECTURAL

A-002 GENERAL PROJECT NOTES

A-003 LEGENDS

A-004 LEGENDS

A-005 LEGENDS

A-012 ACCESSIBILITY

A-013 ACCESSIBILITY

A-021 AIR BARRIER - FIRST FLOOR PLAN

A-022 AIR BARRIER - SECOND FLOOR PLAN

A-023 AIR BARRIER - BUILDING SECTIONS

A-024 AIR BARRIER - BUILDING SECTIONS

A-031 IC TECH SPEC FOR ICD/ICS 705 - FIRST FLOOR

A-032 IC TECH SPEC FOR ICD/ICS 705 - SECOND FLOOR

A-041 UL ASSEMBLIES - FIRST FLOOR

A-042 UL ASSEMBLIES - SECOND FLOOR

A-051 STC ASSEMBLIES - FIRST FLOOR

A-052 STC ASSEMBLIES - SECOND FLOOR

A-091 AREA CALCULATIONS - FIRST FLOOR PLAN

A-092 AREA CALCULATIONS - SECOND FLOOR PLAN

AD110 FIRST FLOOR DEMOLITION PLAN - COMPOSITE

AD111 FIRST FLOOR DEMOLITION PLAN - SECTOR 1

AD112 FIRST FLOOR DEMOLITION PLAN - SECTOR 2

AD113 FIRST FLOOR DEMOLITION PLAN - SECTOR 3

AD120 SECOND FLOOR DEMOLITION PLAN - COMPOSITE

AD121 SECOND FLOOR DEMOLITION PLAN - SECTOR 1

AD122 SECOND FLOOR DEMOLITION PLAN - SECTOR 2

AD123 SECOND FLOOR DEMOLITION PLAN - SECTOR 3

A-110 FIRST FLOOR PLAN - COMPOSITE

A-111 FIRST FLOOR PLAN - SECTOR 1

A-112 FIRST FLOOR PLAN - SECTOR 2

A-113 FIRST FLOOR PLAN - SECTOR 3

A-120 SECOND FLOOR PLAN - COMPOSITE

A-121 SECOND FLOOR PLAN - SECTOR 1

A-122 SECOND FLOOR PLAN - SECTOR 2

A-123 SECOND FLOOR PLAN - SECTOR 3

A-130 ROOF PLAN - COMPOSITE

A-131 ROOF PLAN - SECTOR 1

A-132 ROOF PLAN - SECTOR 2

A-133 ROOF PLAN - SECTOR 3

A-201 EXTERIOR ELEVATIONS

A-211 ENLARGED EXTERIOR ELEVATIONS

A-212 ENLARGED EXTERIOR ELEVATIONS

A-301 BUILDING SECTIONS

A-302 BUILDING SECTIONS

A-311 WALL SECTIONS

A-312 WALL SECTIONS

A-313 WALL SECTIONS

A-314 WALL SECTIONS

A-315 WALL SECTIONS

A-401 ENLARGED PLANS AND ELEVATIONS

A-407 ENLARGED PLANS AND ELEVATIONS

A-405 ENLARGED PLANS AND ELEVATIONS

A-406 ENLARGED PLANS AND ELEVATIONS

A-402 ENLARGED PLANS AND ELEVATIONS

A-403 ENLARGED PLANS AND ELEVATIONS

A-404 ENLARGED PLANS AND ELEVATIONS

A-501 DETAILS

A-502 DETAILS

A-503 DETAILS

A-504 DETAILS

A-508 DETAILS

A-506 DETAILS

A-601 PARTITION SCHEDULE

A-602 PARTITION SCHEDULE

A-611 DOOR SCHEDULE 1 12/04/24

A-710 FIRST FLOOR REFLECTED CEILING PLAN - COMPOSITE

A-720 SECOND FLOOR REFLECTED CEILING PLAN - COMPOSITE

A-711 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 1

A-712 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 2

A-713 FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 3

A-721 SECOND FLOOR REFLECTED CEILING PLAN - SECTOR 1

A-722 SECOND FLOOR REFLECTED CEILING PLAN - SECTOR 2

A-723 SECOND FLOOR REFLECTED CEILING PLAN - SECTOR 3

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

GENERAL

G-001 COVER SHEET

G-002 SHEET INDEX 1 12/04/24

G-003 SHEET INDEX 1 12/04/24

GI001 CODE ANALYSIS

GI002 CODE ANALYSIS CONTINUED

GI003 FPLS FORM

GI004 FPLS FORM CONT.

GI010 CODE COMPLIANCE SITE PLAN

GI110 LIFE SAFETY PLAN - FIRST FLOOR 1 12/04/2024

GI120 LIFE SAFETY PLAN - SECOND FLOOR 1 12/04/2024

HAZMAT

HA101 FIRST FLOOR PLAN - COMPOSITE

HA102 SECOND FLOOR PLAN SECTOR - SECTOR 1

CIVIL

GI001 PROJECT LOCATION MAPS

GC101 PROPOSED HAUL ROUTE AND LAYDOWN AREA PLAN

GR101 SITE PHOTO LOCATIONS

GR102 SITE PHOTOS

VF101 EXISTING CONDITIONS PLAN

VF102 SURVEY CONTROL PLAN

CD101 SITE DEMOLITION PLAN

CS101 AERIAL SITE PLAN

CG101 SITE GRADING PLAN

CG102 SITE GRADING PLAN AND PROFILES

CG111 EROSION CONTROL PLAN

CG301 CROSS SECTIONS

CG501 EROSION CONTROL DETAILS

CP101 SITE PLAN

CP401 ENLARGED SITE PLAN

CP501 SITE DETAILS

CU101 SITE UTILITY PLAN

CU501 SITE UTILITY DETAILS

CU502 SITE UTILITY DETAILS

LS101 LANDSCAPE PLAN

STRUCTURAL

S-001 GENERAL NOTES

S-002 GENERAL NOTES

S-101 FOUNDATION PLAN - SECTOR 1 1 12/04/24

S-102 FOUNDATION PLAN - SECTOR 2 1 12/04/24

S-103 FOUNDATION PLAN - SECTOR 3 1 12/04/24

S-111 FIRST FLOOR FLATWORK PLAN - SECTOR 1 1 12/04/24

S-112 FIRST FLOOR FLATWORK PLAN - SECTOR 2 1 12/04/24

S-113 FIRST FLOOR FLATWORK PLAN - SECTOR 3 1 12/04/24

S-121 STRUCTURAL FLOOR PLAN - SECTOR 1 1 12/04/24

S-123 STRUCTURAL FLOOR PLAN - SECTOR 3 1 12/04/24

S-141 SECOND FLOOR FRAMING PLAN - SECTOR 1 1 12/04/24

S-142 SECOND FLOOR FRAMING PLAN - SECTOR 2 1 12/04/24

S-143 SECOND FLOOR FRAMING PLAN - SECTOR 3 1 12/04/24

S-151 MAIN ROOF FRAMING PLAN - SECTOR 1 1 12/04/24

S-152 MAIN ROOF FRAMING PLAN - SECTOR 2 1 12/04/24

S-153 MAIN ROOF FRAMING PLAN - SECTOR 3 1 12/04/24

S-161 HIGH ROOF FRAMING PLAN - SECTOR 1 1 12/04/24

S-221 MASONRY WALL ELEVATIONS AND DETAILS

S-241 ROOF TOP PLATFORM FRAMING PLAN, ELEVATIONS AND DETAILS 1 12/04/24

S-301 STRUCTURAL SECTIONS

S-501 FOUNDATION DETAILS

S-511 FLATWORK DETAILS

S-541 FRAMING DETAILS 1 12/04/24

S-542 FRAMING DETAILS

S-601 SCHEDULES

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

W

2Q R

R

_P la ns -0

GENERAL NOTES

1. THESE DRAWINGS ARE NOT TO BE SCALED. REFER TO DIMENSIONS

INDICATED ON DIMENSION PLANS, SHOP DRAWINGS, OR ESTABLISHED

FIELD DIMENSIONS. WHERE NO DIMENSIONS OR METHOD OF

DETERMINING A LOCATION IS GIVEN, VERIFY WITH ARCHITECT PRIOR TO

PROCEEDING.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

C

R e v it L o c a l\ A

R C

H B

C

F je ff re y .h u b e rt

.r v t

/3 /2

:5

:4

A

M

G-003

M N

O B

E R

T

M N

O B

E R

T

G P

A R

K E

R

M B

U T

L E

R

S H

E E

T I N

D E

X

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

O C

T O

B E

R

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

ELECTRICAL

E-001 ELECTRICAL LEGEND AND ABBREVIATIONS 1 12/04/24

ED100 FIRST FLOOR ELECTRICAL DEMOLITION PLAN - COMPOSITE 1 12/04/24

ED200 SECOND FLOOR ELECTRICAL DEMOLITION PLAN - COMPOSITE

EG500 GROUNDING DETAILS

EP111 FIRST FLOOR POWER PLAN - SECTOR 1 1 12/04/24

EP112 FIRST FLOOR POWER PLAN - SECTOR 2 1 12/04/24

EP113 FIRST FLOOR POWER PLAN - SECTOR 3 1 12/04/24

EP211 SECOND FLOOR POWER PLAN - SECTOR 1 1 12/04/24

EP212 SECOND FLOOR POWER PLAN - SECTOR 2

EP213 SECOND FLOOR POWER PLAN - SECTOR 3 1 12/04/24

EQ121 FIRST FLOOR EQUIPMENT POWER PLAN - SECTOR 1

EQ122 FIRST FLOOR EQUIPMENT POWER PLAN - SECTOR 2

EQ123 FIRST FLOOR EQUIPMENT POWER PLAN - SECTOR 3

EQ221 SECOND FLOOR EQUIPMENT POWER PLAN - SECTOR 1

EQ222 SECOND FLOOR EQUIPMENT POWER PLAN - SECTOR 2

EQ223 SECOND FLOOR EQUIPMENT POWER PLAN - SECTOR 3

EQ321 ROOF EQUIPMENT POWER PLAN - SECTOR 1

EQ322 ROOF EQUIPMENT POWER PLAN - SECTOR 2

EQ323 ROOF EQUIPMENT POWER PLAN - SECTOR 3

EQ600 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

EL001 LIGHTING LEGEND AND SCHEDULES 1 12/04/24

EL121 FIRST FLOOR LIGHTING PLAN - SECTOR 1 1 12/04/24

EL122 FIRST FLOOR LIGHTING PLAN - SECTOR 2

EL123 FIRST FLOOR LIGHTING PLAN - SECTOR 3 1 12/04/24

EL211 SECOND FLOOR LIGHTING PLAN - SECTOR 1 1 12/04/24

EL212 SECOND FLOOR LIGHTING PLAN - SECTOR 2

EL213 SECOND FLOOR LIGHTING PLAN - SECTOR 3 1 12/04/24

EL501 LIGHTING DETAILS

E-600 FEEDER SCHEDULE

E-601A ELECTRICAL ONE-LINE--EXISTING

E-601B ELECTRICAL ONE-LINE DIAGRAM-REMODEL 1 12/04/24

E-601C ELECTRICAL ONE-LINE DIAGRAM - NEW SERVICE 1 12/04/24

E-611 ELECTRICAL SCHEDULES 1 12/04/24

E-612 ELECTRICAL SCHEDULES 1 12/04/24

E-613 ELECTRICAL SCHEDULES 1 12/04/24

E-614 ELECTRICAL SCHEDULES 1 12/04/24

TELECOMMUNICATIONS

T-000 TELECOM GENERAL NOTES, SYMBOLS & ABBREVIATIONS 1 12/04/24

T-010 TELECOMMUNICATIONS SITE PLAN

T-110 FIRST FLOOR TELECOMMUNICATIONS PLAN - COMPOSITE

T-111 FIRST FLOOR TELECOMMUNICATION PLAN - SECTOR 1 1 12/04/24

T-112 FIRST FLOOR TELECOMMUNICATION PLAN - SECTOR 2

T-113 FIRST FLOOR TELECOMMUNICATION PLAN - SECTOR 3 1 12/04/24

T-120 SECOND FLOOR TELECOMMUNICATION PLAN - COMPOSITE

T-121 SECOND FLOOR TELECOMMUNICATION PLAN - SECTOR 1 1 12/04/24

T-122 SECOND FLOOR TELECOMMUNICATION PLAN - SECTOR 2

T-123 SECOND FLOOR TELECOMMUNICATION PLAN - SECTOR 3

T-210 FIRST FLOOR TELECOMMUNICATIONS RCP – COMPOSITE

T-401 TELECOMMUNICATIONS ENLARGED PLANS - A6-103

T-402 TELECOMMUNICATIONS ENLARGED PLANS - A2-105

T-501 TELECOMMUNICATIONS DETAILS

T-502 TELECOMMUNICATIONS DETAILS 1 12/04/24

T-503 TELECOMMUNICATIONS DETAILS 1 12/04/24

T-601 TELECOMMUNICATIONS RISERS

T-701 TELECOMMUNICATIONS BACKBONE DIAGRAM

T-801 TELECOMMUNICATIONS SCHEDULES 1 12/04/24

AUDIO VISUAL

TA000 AUDIO VISUAL SYMBOLS & ABBREVIATIONS

TA120 SECOND FLOOR AUDIO VISUAL PLAN - COMPOSITE

TA121 SECOND FLOOR AUDIO VISUAL PLAN - SECTOR 1

TA123 SECOND FLOOR AUDIO VISUAL PLAN - SECTOR 3

TA401 AUDIO VISUAL ENLARGED PLANS - CONF S2-202

TA402 AUDIO VISUAL ENLARGED PLANS - CONF A6-202

TA501 AUDIO VISUAL DETAILS

SECURITY

TY000 SECURITY SYMBOLS & ABBREVIATIONS

TY110 FIRST FLOOR SECURITY PLAN - COMPOSITE

TY111 FIRST FLOOR SECURITY PLAN - SECTOR 1 1 12/04/24

TY112 FIRST FLOOR SECURITY PLAN - SECTOR 2 1 12/04/24

TY113 FIRST FLOOR SECURITY PLAN - SECTOR 3 1 12/04/24

TY120 SECOND FLOOR SECURITY PLAN - COMPOSITE

TY121 SECOND FLOOR SECURITY PLAN - SECTOR 1 1 12/04/24

TY122 SECOND FLOOR SECURITY PLAN - SECTOR 2

TY123 SECOND FLOOR SECURITY PLAN - SECTOR 3 1 12/04/24

TY401 SECURITY ENLARGED PLAN - A6-103 1 12/04/24

TY402 SECURITY ENLARGED PLAN - A2-105 1 12/04/24

TY500 ACCESS CONTROL DOOR DETAILS

TY501 ACCESS CONTROL DOOR DETAILS 1 12/04/24

TY502 SECURITY DETAILS

SHEET INDEX

SHEET

NUMBER SHEET NAME REVISION

REVISION

DATE

PLUMBING

P-001 LEGEND AND ABBREVATIONS

PD110 FIRST FLOOR PLUMBING DEMOLITION PLAN - COMPOSITE

PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTOR 1

PD113 FIRST FLOOR PLUMBING DEMOLITION PLAN - SECTOR 3

PD120 SECOND FLOOR PLUMBING DEMOLITION PLAN - COMPOSITE

PD121 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTOR 1

PD123 SECOND FLOOR PLUMBING DEMOLITION PLAN - SECTOR 3

PP100 UNDERGROUND SANITARY AND VENT - COMPOSITE

PP101 UNDERGROUND SANITARY AND VENT - SECTOR 1 1 12/04/24

PP103 UNDERGROUND SANITARY AND VENT - SECTOR 3

PP110 FIRST FLOOR SANITARY AND VENT - COMPOSITE

PP111 FIRST FLOOR SANITARY AND VENT - SECTOR 1 1 12/04/24

PP113 FIRST FLOOR SANITARY AND VENT - SECTOR 3

PP120 SECOND FLOOR SANITARY AND VENT - COMPOSITE

PP121 SECOND FLOOR SANITARY AND VENT - SECTOR 1 1 12/04/24

PP123 SECOND FLOOR SANITARY AND VENT - SECTOR 3 1 12/04/24

PP210 FIRST FLOOR SUPPLY - COMPOSITE

PP211 FIRST FLOOR SUPPLY - SECTOR 1 1 12/04/24

PP213 FIRST FLOOR SUPPLY - SECTOR 3

PP220 SECOND FLOOR SUPPLY - COMPOSITE

PP221 SECOND FLOOR SUPPLY - SECTOR 1 1 12/04/24

PP223 SECOND FLOOR SUPPLY - SECTOR 3 1 12/04/24

P-501 SCHEDULES 1 12/04/24

P-601 DETAILS

P-701 PLUMBING RISERS - SECTOR 1 1 12/04/24

P-702 PLUMBING RISERS - SECTOR 3 1 12/04/24

MECHANICAL

M-001 LEGEND AND ABBREVIATIONS

MD110 FIRST FLOOR HVAC DEMOLITION PLAN - COMPOSITE

MD113 FIRST FLOOR HVAC DEMOLITION PLAN - SECTOR 3

MD120 SECOND FLOOR HVAC DEMOLITION PLAN - COMPOSITE

MD121 SECOND FLOOR HVAC DEMOLITION PLAN - SECTOR 1

MD123 SECOND FLOOR HVAC DEMOLITION PLAN - SECTOR 3

MD130 ROOF MECHANICAL DEMOLITION PLAN - COMPOSITE

MD131 ROOF MECHANICAL DEMOLITION PLAN - SECTOR 1

MD133 ROOF MECHANICAL DEMOLITION PLAN - SECTOR 3

MD210 FIRST FLOOR PIPING DEMOLITION PLAN - COMPOSITE

MD211 FIRST FLOOR PIPING DEMOLITION PLAN - SECTOR 1

MD213 FIRST FLOOR PIPING DEMOLITION PLAN - SECTOR 3

MD220 SECOND FLOOR PIPING DEMOLITION PLAN - COMPOSITE

MD221 SECOND FLOOR PIPING DEMOLITION PLAN - SECTOR 1

MD223 SECOND FLOOR PIPING DEMOLITION PLAN - SECTOR 3

MH110 FIRST FLOOR HVAC PLAN - COMPOSITE

MH111 FIRST FLOOR HVAC PLAN - SECTOR 1

MH113 FIRST FLOOR HVAC PLAN - SECTOR 3

MH120 SECOND FLOOR HVAC PLAN - COMPOSITE

MH121 SECOND FLOOR HVAC PLAN - SECTOR 1 1 12/04/24

MH123 SECOND FLOOR HVAC PLAN - SECTOR 3 1 12/04/24

M-130 ROOF MECHANICAL PLAN - COMPOSITE

M-131 ROOF MECHANICAL PLAN - SECTOR 1

M-133 ROOF MECHANICAL PLAN - SECTOR 3

MP210 FIRST FLOOR PIPING PLAN - COMPOSITE

MP211 FIRST FLOOR PIPING PLAN - SECTOR 1

MP213 FIRST FLOOR PIPING PLAN - SECTOR 3

MP220 SECOND FLOOR PIPING PLAN - COMPOSITE

MP221 SECOND FLOOR PIPING PLAN - SECTOR 1

MP223 SECOND FLOOR PIPING PLAN - SECTOR 3

M-401 LARGE SCALE UTILITY A3-103 MECHANICAL PLAN

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-604 MECHANICAL SCHEDULES

M-701 MECHANICAL SCHEMATICS 1 12/04/24

M-702 MECHANICAL SCHEMATICS

M-801 CONTROL SCHEMATICS 1 12/04/24

M-802 CONTROL SCHEDULES

M-803 RTU/DOAS CONTROL SEQUENCES AND SCHEMATICS

M-804 ROOFTOP UNIT POINTS SCHEDULE

M-805 DOAS POINTS SCHEDULE

M-806 DUCTLESS SPLIT AIR CONDITIONER

SEQUENCE/SCHEMATIC/POINTS SCHEDULE

M-807 CHILLER CONTROL SEQUENCE AND SCHEMATICS 1 12/04/24

M-808 CHILLER POINTS SCHEDULE 1 12/04/24

M-809 ELECTRIC UNIT HEATER CONTROL

SEQUENCE/SCHEMATIC/POINTS SCHEDULE

M-810 SHUTDOWN SWITCH CONTROL SEQUENCE/SCHEMATIC/POINTS

SCHEDULE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

M

B

W

2Q R

R

_P la ns -0

S S

S

S

S S

S S

S S

S

S

S S

S

S

S SS

S S

S S

S S

S

MAINTENANCE SHOP

S7-101

LABORATORY

S2-101

LABORATORY

S1-101

UTILITY

A6-103

LABORATORY

S4-101

LABORATORY

S3-102

UTILITY

A3-104

ADMINISTRATIVE

VESTIBULE

A3-101

LABORATORY

S6-101

UTILITY

A3-105

ADMINISTRATIVE

VESTIBULE

A2-101

UTILITY

A2-105 TD: 46 FT

TD: 48 FT TD: 37 FT

2S-101A

6S-101C

6S-101A

6A-101A

0.2

33"

0.2

67"

0.2

67" 0.2

67"

0.2

33"

0.2

33"

0.2

33"

0.2

33"

0.2

33"

0.2

67"

0.2

67"

OPEN OFFICE

A1-102

0.2

67"

1 1

FEB

FEB

FEB

FEB

FEB

TD: 58 FT

WORKROOM

A4-102

TEST CHAMBER

S5-102

CONTINUED

FROM GI120

FMCUTSP

TSP

TSP

CP: 81 FT

CP: 62 FT CP: 83 FT

CONTINUED

FROM GI120CONTINUED

FROM GI120

7S-101A

6A-103A 2A-105A

1S-101B

1A-102A

1A-101A

STANDS 6 & 7 STAND 5 STANDS 3 & 4 STANDS 1 & 2

OPEN

(NO ROOF)

0.2

67"

0.2

67"

0.2

33"

0.2

33"

0.2

67"

0.2

67"

0.2

33"

OPEN

(NO ROOF)

LOCLOC

LOC

LO

C

ELECTRICAL

E1-101

FEB

FEB

FEB

FEB

FEB

FEB

TD: 99 FT

TD: 43 FT

TD: 38 FT

BUILDING B71A

2S-101B

TD: 48 FT

2A-108A

CP: 73 FT

CONTINUED

FROM GI120CONTINUED

FROM GI120

TD: 107 FT

TRAVEL DISTANCE, TD

COMMON PATH, CP

DEAD END DISTANCE, DE

ACCESSIBLE ENTRANCE/EXIT

EXIT LIGHT CEILING MOUNT

EXIT LIGHT WALL MOUNT

MULTIPURPOSE DRY CHEMICAL FIRE

EXTINGUISHER IN CABINET (FEC)

MULTIPURPOSE DRY CHEMICAL FIRE

EXTINGUISHER ON BRACKET (FEB)

1-HOUR FIRE BARRIER

SMOKE PARTITION

2-HOUR FIRE BARRIER

FIRE RATED DOOR (X=DOOR RATING IN HRS)

DOOR NUMBER

LIFE SAFETY LEGEND

OCCUPANCY CLASSIFICATION

S S

X

NFPA 101: ORDINARY HAZARD STORAGE

IBC: MODERATE-HAZARD STORAGE, GROUP S-1

NFPA 101: NEW BUSINESS

IBC: BUSINESS, GROUP B

FEC

FEB

XXXX

.X

XXX

XX

XX" CLEAR WIDTH

EXIT CAPACITY FACTOR

CALCULATED EXIT CAPACITY

ASSIGNED EXIT CAPACITY

SECURE AREA BOUNDARY

WHERE INCIDENTAL TO ANOTHER OCCUPANCY, AREAS USED FOR STORAGE

SHALL BE PERMITTED TO BE CONSIDERED PART OF THE PREDOMINANT

OCCUPANCY AND SHALL BE SUBJECT TO THE PROVISIONS OF THE CODE THAT

APPLY TO THE PREDOMINANT OCCUPANCY (IBC §311.1.1, NFPA 101 §6.1.14.1.3).

KEY PLAN

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B

U

IL

D

IN

G

P

2# : 5

C

R e v it L o c a l\ F

IR

E

-C F d a n ie l.

n in o X

S T

T F

.r v t

/2 /2

:1

:0

P

M

GI110

C

E N

N

IS

F S

E G

O V

IA

N

S A

N M

A N

N

M B

U T

L E

R

LI

F

E S

A F

E T

Y P

LA

N

F

IR

S

T F

L O

O R

A M

E N

D M

E N

T

O C

T O

B E

R

1/16" = 1'-0"

LIFE SAFETY PLAN - FIRST FLOOR

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

FIRST FLOOR OCCUPANT LOAD CALCULATIONS - STANDS 1 & 2

ROOM / AREA ROOM NUMBER SQ. FT.

OCCUPANCY

CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

VESTIBULE & OFFICE A1-102 511.91 BUSINESS 150 GROSS 4

VESTIBULES, OFFICE, AND TOILETS A2-101-103 1,395.30 BUSINESS 150 GROSS 10

UTILITY A2-105 502.07 BUILDING EQUIPMENT 500 GROSS 2

LABORATORY S1-101 1,887.59 INDUSTRIAL USE 100 GROSS 19

LABORATORY S2-101 1,756.64 INDUSTRIAL USE 100 GROSS 18

6,053.51 53

KEY NOTES :

1. THE ASSIGNED EXIT CAPACITY INCLUDES THE OCCUPANT LOAD

FROM THE SECOND FLOOR. REFER TO SHEET GI120 FOR

ASSOCIATED AREA AND OCCUPANT LOAD CALCULATIONS.

2. LESS THAN 3 FT BETWEEN BUILDINGS B71 AND B71A. EACH

EXTERIOR WALL SHALL BE 2 HOUR FIRE RATED.

3. STEAM TUNNEL SEPARATION FROM BUILDING IS 3 HOURS.

4. VERTICAL ROLLING DOOR ASSEMBLY PERMITTED AS THE

OCCUPANT LOAD DOES NOT EXCEED 10 AND THE ROOM CONTAINS

ORDINARY HAZARD CONTENTS PER NFPA 101 §7.2.1.4.1(5). A

READILY VISIBLE SIGN ADJACENT TO THE DOOR OPENING SHALL BE

PROVIDED IN LETTERS AT LEAST 1 INCH HIGH ON A CONTRASTING

BACKGROUND THAT READS AS FOLLOWS: "THIS DOOR TO REMAIN

OPEN WHEN THE SPACE IS OCCUPIED."

THIS DRAWING IS FOR REFERENCE ONLY. IT IS NOT PART OF THE

CONSTRUCTION CONTRACT AND ALL INFORMATION CONTAINED HERE IS

LOCATED ON CONSTRUCTION DOCUMENTS.

STANDS 6 & 7, STAND 5, STANDS 3 & 4, AND STANDS 1 & 2 HAVE ARE INDEPENDENT IN TERMS OF MEANS OF EGRESS. OCCUPANTS FROM ONE STAND OR GROUP OF STANDS CANNOT EGRESS THROUGH ANOTHER STAND. THUS, OCCUPANT LOAD CALCULATIONS ARE PROVIDED BY STAND OR GROUP OF STANDS. THE OCCUPANT LOAD FACTORS ARE FROM UFC 3-600-01 TABLE 10-1 AND NFPA 101 TABLE 7.3.1.2.

GENERAL NOTES:

1. PANELS FOR FIRE ALARM SHOWN. REFER TO FA SERIES

DRAWINGS FOR INITIATING AND NOTIFICATION DEVICE LOCATION.

DEVICES OMITTED TO ENSURE LIFE SAFETY ITEMS ARE LEGIBLE.

2. THE EXIT SIGNS SHOWN IN STANDS 3 & 4 ARE EXISTING FROM AS-

BUILT DRAWINGS DATED FEBRUARY 1, 2017.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

FIRST FLOOR OCCUPANT LOAD CALCULATIONS - STANDS 3 & 4

ROOM / AREA ROOM NUMBER SQ. FT.

OCCUPANCY

CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

ADMIN VESTIBULE & TOILETS A3-101-103 & S3-101 645.46 BUSINESS 150 GROSS 5

UTILITY A3-104 & 105 1,165.73 BUILDING EQUIPMENT 500 GROSS 3

LABORATORY S3-102 1,121.55 INDUSTRIAL USE 100 GROSS 12

LABORATORY S4-101 1,695.79 INDUSTRIAL USE 100 GROSS 17

4,628.53 37

FIRST FLOOR OCCUPANT LOAD CALCULATIONS - STAND 5

ROOM / AREA ROOM NUMBER SQ. FT.

OCCUPANCY

CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

WORKROOM A4-102 978.27 INDUSTRIAL USE 100 GROSS 10

TEST CHAMBER S5-102 881.94 INDUSTRIAL USE 100 GROSS 9

1,860.22 19

FIRST FLOOR OCCUPANT LOAD CALCULATIONS - STANDS 6 & 7

ROOM / AREA ROOM NUMBER SQ. FT.

OCCUPANCY

CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

ADMIN VEST & TOILET A6-101 & 102 435.70 BUSINESS 150 GROSS 3

UTILITY A6-103 617.21 BUILDING EQUIPMENT 500 GROSS 2

ELECTRICAL E1-101 357.16 BUILDING EQUIPMENT 500 GROSS 1

LABORATORY S6-101 1,977.47 INDUSTRIAL USE 100 GROSS 20

MAINTENANCE SHOP S7-101 1,595.63 INDUSTRIAL USE 100 GROSS 16

4,983.17 42

0 8' 16' 32'

OCCUPANT LOAD CALCULATIONS

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L W

2Q

R

R

_P la ns

-0

LO

CLO

C

LO

C

LO

C

LO

C

LO

CLO

C

LO

C

OPEN OFFICE

A6-201

OPEN OFFICE

A2-201OPEN OFFICE

A3-201

OFFICE

A3-202

OFFICE

A3-203

CONFERENCE

A3-204 CORRIDOR

A3-205

LABORATORY

PLATFORM

S3-201

CP: 81 FT

CP: 62 FT

TD: 33 FT

TD: 51 FT

TD: 65 FT

0.2

33"

0.2

33"

0.2

33"

FEB

FEB

FEB

OPEN TO

BELOW

OPEN TO

BELOW

OPEN TO

BELOW

TD: 95 FT

CONT. ON

SHEET

GI110

CONT. ON

SHEET

GI110

CONT. ON

SHEET

GI110

CP: 83 FT

FEB

FEB

6A-201A 2A-201A 1A-201A

STANDS 6 & 7 STAND 5 STANDS 3 & 4 STANDS 1 & 2

OPEN

(NO ROOF)

OPEN

(NO ROOF) NO SECOND

FLOOR

OPEN TO

BELOW

OPEN TO

BELOW

OPEN

TO

BELOW

OPEN

TO

BELOW

STAND-4

S4-201

OFFICE

A4-201 STORAGE

S1-201

OPEN OFFICE

A1-201

OPEN OFFICE

S2-201

CONFERENCE ROOM

S2-202

LABORATORY

PLATFORM

S6-201

MEETING ROOM

A6-202

0.2

33"

0.2

33"

STORAGE

S7-201

FEB FEB

FEB

FEB

FEB

TD: 41 FT

TD: 81 FT

TD: 107 FT

BUILDING B71ALO

C

CP: 73 FT

CONT. ON

SHEET

GI110

CONT. ON

SHEET

GI110

KEY PLAN

TRAVEL DISTANCE, TD

COMMON PATH, CP

DEAD END DISTANCE, DE

ACCESSIBLE ENTRANCE/EXIT

EXIT LIGHT CEILING MOUNT

EXIT LIGHT WALL MOUNT

MULTIPURPOSE DRY CHEMICAL FIRE

EXTINGUISHER IN CABINET (FEC)

MULTIPURPOSE DRY CHEMICAL FIRE

EXTINGUISHER ON BRACKET (FEB)

1-HOUR FIRE BARRIER

SMOKE PARTITION

2-HOUR FIRE BARRIER

FIRE RATED DOOR (X=DOOR RATING IN HRS)

DOOR NUMBER

LIFE SAFETY LEGEND

OCCUPANCY CLASSIFICATION

S S

X

NFPA 101: ORDINARY HAZARD STORAGE

IBC: MODERATE-HAZARD STORAGE, GROUP S-1

NFPA 101: NEW BUSINESS

IBC: BUSINESS, GROUP B

FEC

FEB

XXXX

.X

XXX

XX

XX" CLEAR WIDTH

EXIT CAPACITY FACTOR

CALCULATED EXIT CAPACITY

ASSIGNED EXIT CAPACITY

SECURE AREA BOUNDARY

WHERE INCIDENTAL TO ANOTHER OCCUPANCY, AREAS USED FOR STORAGE

SHALL BE PERMITTED TO BE CONSIDERED PART OF THE PREDOMINANT

OCCUPANCY AND SHALL BE SUBJECT TO THE PROVISIONS OF THE CODE THAT

APPLY TO THE PREDOMINANT OCCUPANCY (IBC §311.1.1, NFPA 101 §6.1.14.1.3).

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

. P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

Z H

T V

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E , O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

LS

A

N A

LY

S

IS

L

A B

F /2

B

U

IL

D

IN

G

P

2# : 5

C

R e v it L o c a l\ F

IR

E

-C F d a n ie l.

n in o X

S T

T F

.r v t

/2 /2

:1

:0

P

M

GI120

C

E N

N

IS

F S

E G

O V

IA

N

S A

N M

A N

N

M B

U T

L E

R

LI

F

E S

A F

E T

Y P

LA

N

S

E C

O N

D F

L O

O R

A M

E N

D M

E N

T

O C

T O

B E

R

1/16" = 1'-0"

LIFE SAFETY PLAN - SECOND FLOOR

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

SECOND FLOOR OCCUPANT LOAD CALCULATIONS - STANDS 1 & 2

ROOM / AREA ROOM NUMBER SQ. FT. OCCUPANCY CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

OFFICE A1-201 482.80 BUSINESS 150 GROSS 4

OPEN OFFICES A2-201 & S2-201 2,196.01 CONCENTRATED BUSINESS 50 GROSS 44

STORAGE S1-201 1,587.99 STORAGE 500 GROSS 4

CONFERENCE ROOM S2-202 287.50 ASSEMBLY, LESS CONCENTRATED 15 NET 20

4,554.30 72

THIS DRAWING IS FOR REFERENCE ONLY. IT IS NOT PART OF THE

CONSTRUCTION CONTRACT AND ALL INFORMATION CONTAINED HERE IS

LOCATED ON CONSTRUCTION DOCUMENTS.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

GENERAL NOTES:

1. PANELS FOR FIRE ALARM SHOWN. REFER TO FA SERIES

DRAWINGS FOR INITIATING AND NOTIFICATION DEVICE LOCATION.

DEVICES OMITTED TO ENSURE LIFE SAFETY ITEMS ARE LEGIBLE.

2. THE EXIT SIGNS SHOWN IN STANDS 3 & 4 ARE EXISTING FROM AS-

BUILT DRAWINGS DATED FEBRUARY 1, 2017.

SECOND FLOOR OCCUPANT LOAD CALCULATIONS - STANDS 3 & 4

ROOM / AREA ROOM NUMBER SQ. FT. OCCUPANCY CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

OFFICES A3-201-203 & 205 1,230.72 BUSINESS 150 GROSS 9

CONFERENCE A3-204 299.10 ASSEMBLY, LESS CONCENTRATED 15 NET 20

LABORATORY PLATFORM S3-201 1,141.93 INDUSTRIAL USE 100 GROSS 12

STAND-4 S4-201 1,152.24 INDUSTRIAL USE 100 GROSS 12

3,823.97 53

SECOND FLOOR OCCUPANT LOAD CALCULATIONS - STAND 5

ROOM / AREA ROOM NUMBER SQ. FT. OCCUPANCY CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

OFFICE A4-201 800.13 BUSINESS 150 GROSS 6

800.13 6

SECOND FLOOR OCCUPANT LOAD CALCULATIONS - STANDS 6 & 7

ROOM / AREA ROOM NUMBER SQ. FT. OCCUPANCY CLASSIFICATION

OCCUPANT LOAD FACTOR

(SQ.FT / PERSON)

GROSS OR

NET

OCCUPANT

LOAD

OPEN OFFICE A6-201 803.15 CONCENTRATED BUSINESS 50 GROSS 17

MEETING ROOM A6-202 215.01 ASSEMBLY, LESS CONCENTRATED 15 NET 15

LABORATORY PLATFORM S6-201 1,069.72 STORAGE 500 GROSS 3

STORAGE S7-201 1,425.40 STORAGE 500 GROSS 3

3,513.28 38

0 8' 16' 32'

STANDS 6 & 7, STAND 5, STANDS 3 & 4, AND STANDS 1 & 2 HAVE ARE INDEPENDENT IN TERMS OF MEANS OF EGRESS. OCCUPANTS FROM ONE STAND OR GROUP OF STANDS CANNOT EGRESS THROUGH ANOTHER STAND. THUS, OCCUPANT LOAD CALCULATIONS ARE PROVIDED BY STAND OR GROUP OF STANDS. THE OCCUPANT LOAD FACTORS ARE FROM UFC 3-600-01 TABLE 10-1 AND NFPA 101 TABLE 7.3.1.2.

OCCUPANT LOAD CALCULATIONS

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L W

2Q

R

R

_P la ns

-0

FACE TO FACE OF CONCRETE

20'-0" (FIELD VERIFY)

FACE TO FACE OF CONCRETE

23'-0" (FIELD VERIFY)

FACE TOFACE OF CONCRETE

23'-0" (FIELD VERIFY)

5'-4" +/- 17'-8" +/-

/2

/2

8" TYP 8" TYP

F2 F2

3.104

3.104

3.104

3.104

TOF

98'-0"

(TYP. OF 3)

TOF

98'-0"

(TYP. OF 3)

6.5 6.2

6.A

6.B

6.C

6.D

7.C

7.D

7.E

7.F

7.5 7.1

8" 12'-8" 6'-0" 8"

7 STAND 6 STAND

8" 20'-0" 2'-4"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

(F

IE

L D

V E

R

IF

Y

TOF

99'-0"

TOF

99'-0"

EX. TOF

95'-0"

EX. TOF

95'-0"

(TYP. OF 4)

5" 6'-10" +/- 8'-6" 6'-10"

5"

F2.5

F2.5A

F2.5A

F2.5 F2.5

F2.5A

F2.5A

F2.5

TOF

99'-0"

(TYP. OF 8)

C

S

-1

C

S

-1

3.102

7.B

7.A

7.2

L17 S-501

TYP

L17 S-501

TYP

H17 S-501

H17 S-501

TYP

13'-3" 2'-0"

3.111

3.111

3.111

3.111

TOF

98'-0"

3.104 3.104

FOUNDATION

PLAN GENERAL NOTES:

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,

AND SYMBOLOGY.

4. TOP OF FOOTING ELEVATION = 99'-0" UNLESS NOTED OTHERWISE.

5. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

6. REFER TO SHEET S-501 FOR TYPICAL FOUNDATION DETAILS.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:4

P

M

S-101

F O

U N

D A

T

IO

N P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

1/8" = 1'-0"S-101

FOUNDATION PLAN - SECTOR 1C5

GRAPHIC SCALE 1/8" = 1'-0"

KEYED NOTES

3.102 CONCRETE FOOTING: 9'-0" WIDE X 24" THICK X FULL WIDTH OF BAY

WITH #6 BARS AT 8" OC. EACH WAY, TOP AND BOTTOM. PROVIDE

STANDARD HOOK AT ENDS OF TOP BARS.

3.104 CONCRETE FOOTING: 24" THICK WITH #6 BARS AT 8" OC. EACH WAY,

TOP AND BOTTOM. SEE PLAN FOR EXTENTS OF FOOTING. PROVIDE

STANDARD HOOK AT ENDS OF TOP BARS.

3.111 PROVIDE 1" VIBRATION ISOLATION JOINT BETWEEN EDGES OF

CONCRETE FOOTINGS AND SURROUNDING STRUCTURE.

CONCRETE SPREAD FOOTING SCHEDULE

MARK

SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT

REMARKSWIDTH LENGTH THICKNESS LONG. TRANS. LONG. TRANS.

F2 2'-0" 2'-0" 1'-0" (3) #5 BARS (3) #5 BARS

F2.5 2'-6" 2'-6" 1'-0" (3) #5 BARS (3) #5 BARS

F2.5A 2'-6" 4'-9" 1'-0" (3) #5 BARS (5) #5 BARS

CONCRETE SPREAD FOOTING SCHEDULE GENERAL NOTES

1. SEE NOTE SHEET S-001 FOR BEARING SOILS PREPARATION REQUIREMENTS.

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

NO WORK IN SECTOR 2

C

S

-1

C

S

-1

C

S

-1

C

S

-1

FOUNDATION

PLAN GENERAL NOTES:

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,

AND SYMBOLOGY.

4. TOP OF FOOTING ELEVATION = 99'-0" UNLESS NOTED OTHERWISE.

5. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

6. REFER TO SHEET S-501 FOR TYPICAL FOUNDATION DETAILS.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:4

P

M

S-102

F O

U N

D A

T

IO

N P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

1/8" = 1'-0"S-102

FOUNDATION PLAN - SECTOR 2C5

GRAPHIC SCALE 1/8" = 1'-0"

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

1.A

1.5 1.1

1.B

1.C

1.E

1.F

2.5 2.1

2.A

2.G

2.B

2.C

2.E

2.F

1.4

FACE TO FACE OF CONCRETE

20'-0" (FIELD VERIFY)

1'-2"

FACE TO FACE OF CONCRETE

22'-0" (FIELD VERIFY)

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

8" 18'-8" 8"

1'-2" 8"

1'-0" 19'-8" 8"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

2 STAND 1 STAND

3.101

3.101

3.101

3.101

3.101

3.101

3.103

3.102

3.101

TOF

98'-0"

(TYP. OF 6)

5'-4" 16'-10" (FIELD VERIFY)

/2

/2

F2 F2

TOF

99'-0"

TOF

99'-0"

EX. TOF

95'-0"

(TYP. OF 4)

C

S

-1

C

S

-1

1.D

3.101

3.101

H17 S-501

TYP

L17 S-501

TYP

L17 S-501

TYP

TOF

98'-0"

(TYP. OF 5)

FOUNDATION

PLAN GENERAL NOTES:

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,

AND SYMBOLOGY.

4. TOP OF FOOTING ELEVATION = 99'-0" UNLESS NOTED OTHERWISE.

5. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

6. REFER TO SHEET S-501 FOR TYPICAL FOUNDATION DETAILS.

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:5

P

M

S-103

F O

U N

D A

T

IO

N P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

1/8" = 1'-0"S-103

FOUNDATION PLAN - SECTOR 3C5

GRAPHIC SCALE 1/8" = 1'-0"

KEYED NOTES

3.101 CONCRETE FOOTING: 8'-0" WIDE X 24" THICK X FULL WIDTH OF BAY

WITH #6 BARS AT 8" OC. EACH WAY, TOP AND BOTTOM. PROVIDE

STANDARD HOOK AT ENDS OF TOP BARS.

3.102 CONCRETE FOOTING: 9'-0" WIDE X 24" THICK X FULL WIDTH OF BAY

WITH #6 BARS AT 8" OC. EACH WAY, TOP AND BOTTOM. PROVIDE

STANDARD HOOK AT ENDS OF TOP BARS.

3.103 CONCRETE FOOTING: 20-3" (FIELD VERIFY) WIDE X 24" THICK X FULL

WIDTH OF BAY WITH #6 BARS AT 8" OC. EACH WAY, TOP AND

BOTTOM. PROVIDE STANDARD HOOK AT ENDS OF TOP BARS.

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

3.202

6.5 6.2

6.A

6.B

6.C

6.D

7.C

7.D

7.E

7.F

7.5 7.1

8" 12'-8" 6'-0" 8"

FACE TO FACE OF CONCRETE

20'-0" (FIELD VERIFY)

FACE TO FACE OF CONCRETE

23'-0" (FIELD VERIFY)

7 STAND 6 STAND

8" 20'-0" 2'-4"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

SLB06

SLB06

TSL = 100'-0"

SLB08

SLB08

SLB06

TSL = 100'-0"

3.210 3.210

C J

CJCJ

CJCJ

C J

CJCJ

C J

C J

CJCJ

C J

C J

C J

CJCJ

C J

CJCJ

CJCJ

3.203

3.205

3.205

C

S

-1

C

S

-1

NO WORK IN

5 STAND

CJCJ

CJCJ

C J

C J

FD

FD

3.210

C J

C J

CJ CJ

CJ CJ

CJ CJ

CJ

7.B

7.A

7.2

3.206

3.206

TYP

3.403

3.206

C J

FCO

FCO

FD

S L B

T S

L

D O

W N

D O

W N

D O

W N

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,

AND SYMBOLOGY.

4. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

5. REFER TO SHEET S-511 FOR TYPICAL DETAILS NOT REFERENCED ON

THIS SHEET.

6. REFER TO DETAIL K17/S-511 FOR STRUCTURAL SLAB TYPES.

7. FLOAT AND TROWEL FLOOR SLABS PER REQUIREMENTS OF ARCH.

FLOOR FINISH SYSTEM.

8. (2) DASHED LINES INDICATE (2) ADDITIONAL #4 BARS

(4'-0" LONG) DIAGONAL 2" FROM CORNER IN SLAB, 2" CLEAR FROM

TOP OF SLAB. REFER TO DETAIL H9/S-511 FOR ADDITIONAL SLAB

REINFORCEMENT AT DOOR OPENINGS.

8. SEE ARCHITECTURAL DRAWINGS FOR EXTENT OF EXISTING SLAB

DEMOLITION REQUIRED.

FLATWORK

PLAN GENERAL NOTES:

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:5

P

M

S-111

F

IR

S T

F L

O O

R F

L A

T W

O R

K P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

1/8" = 1'-0"S-111

FIRST FLOOR FLATWORK PLAN - SECTOR 1C5

GRAPHIC SCALE 1/8" = 1'-0"

KEYED NOTES

3.202 1" VIBRATION ISOLATION JOINT AROUND PERIMETER OF SLAB IN

STAND 7 ONLY. SEE SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

3.203 1" VIBRATION ISOLATION JOINT AT COLUMN CLOSURE POUR,

TYPICAL.

3.205 1" VIBRATION ISOLATION JOINT BETWEEN NEW SLAB ON GRADE AND

EXISTING STEAM TUNNEL LID.

3.206 THICKENED SLAB AT STAIR STRINGER BASE. (REFER TO DETAIL

A9/S-511)

3.210 EXISTING STEAM TUNNEL LID TO REMAIN. PATCH AND REPAIR

SPALLS/CRACKS AS REQUIRED.

3.403 HSS COLUMN CENTERED ON CONCRETE WALL BELOW. ANCHORED

WITH (4) 5/8" DIAMETER F1554-36 THREADED RODS EPOXIED 3 1/4"

INTO EXISTING CONCRETE. SEE DETAIL E1/S-601 FOR BASE PLATE.

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

C

S

-1

C

S

-1

C

S

-1

C

S

-1

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,

AND SYMBOLOGY.

4. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

5. REFER TO SHEET S-511 FOR TYPICAL DETAILS NOT REFERENCED ON

THIS SHEET.

6. REFER TO DETAIL K17/S-511 FOR STRUCTURAL SLAB TYPES.

7. FLOAT AND TROWEL FLOOR SLABS PER REQUIREMENTS OF ARCH.

FLOOR FINISH SYSTEM.

8. (2) DASHED LINES INDICATE (2) ADDITIONAL #4 BARS

(4'-0" LONG) DIAGONAL 2" FROM CORNER IN SLAB, 2" CLEAR FROM

TOP OF SLAB. REFER TO DETAIL H9/S-511 FOR ADDITIONAL SLAB

REINFORCEMENT AT DOOR OPENINGS.

8. SEE ARCHITECTURAL DRAWINGS FOR EXTENT OF EXISTING SLAB

DEMOLITION REQUIRED.

FLATWORK

PLAN GENERAL NOTES:

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:5

P

M

S-112

F

IR

S T

F L

O O

R F

L A

T W

O R

K P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

GRAPHIC SCALE 1/8" = 1'-0"

1/8" = 1'-0"S-112

FIRST FLOOR FLATWORK PLAN - SECTOR 2C5

NO WORK IN SECTOR 2

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

1.A

1.5 1.1

1.B

1.C

1.E

1.F

2.5 2.1

2.A

2.G

2.B

2.C

2.E

2.F

1.4

FACE TO FACE OF CONCRETE

20'-0" (FIELD VERIFY)

1'-2"

FACE TO FACE OF CONCRETE

22'-0" (FIELD VERIFY)

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

8" 18'-8" 8"

1'-2" 8"

1'-0" 19'-8" 8"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

2 STAND 1 STAND

SLB06

SLB06

SLB06

SLB06

3.210 3.210

CJCJ

C J

CJCJ

CJCJ

C J

C J

C J

C J

C J

C J

C J

CJCJ CJCJ

CJCJ

CJCJ

CJCJ

A13 S-511

TYP

C

S

-1

C

S

-1

1.D

FD

FD

3.206

3.206

CJCJ

FD

3.211

3.211

CJ

TYP

FCO

FCO

3.207

U P

DN DN

D O

W N

D O

W N

D O

W N

D O

W N

D O

W N

D O

W N

SLB06

SLB06

CON

JNT

CJ

CJ

CJ

C O

N J

N T

CJ

CJ

C J

3.211

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,

AND SYMBOLOGY.

4. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

5. REFER TO SHEET S-511 FOR TYPICAL DETAILS NOT REFERENCED ON

THIS SHEET.

6. REFER TO DETAIL K17/S-511 FOR STRUCTURAL SLAB TYPES.

7. FLOAT AND TROWEL FLOOR SLABS PER REQUIREMENTS OF ARCH.

FLOOR FINISH SYSTEM.

8. (2) DASHED LINES INDICATE (2) ADDITIONAL #4 BARS

(4'-0" LONG) DIAGONAL 2" FROM CORNER IN SLAB, 2" CLEAR FROM

TOP OF SLAB. REFER TO DETAIL H9/S-511 FOR ADDITIONAL SLAB

REINFORCEMENT AT DOOR OPENINGS.

8. SEE ARCHITECTURAL DRAWINGS FOR EXTENT OF EXISTING SLAB

DEMOLITION REQUIRED.

FLATWORK

PLAN GENERAL NOTES:

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:5

P

M

S-113

F

IR

S T

F L

O O

R F

L A

T W

O R

K P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

GRAPHIC SCALE 1/8" = 1'-0"

1/8" = 1'-0"S-113

FIRST FLOOR FLATWORK PLAN - SECTOR 3C5

KEYED NOTES

3.206 THICKENED SLAB AT STAIR STRINGER BASE. (REFER TO DETAIL

A9/S-511)

3.207 REMOVE UPPER 1/2" OF EXISTING SLAB ON GRADE. PREPARE

REMAINING CONCRETE SURFACE FOR NEW 2-1/2" THICK BONDED

CONCRETE OVERLAY (5,000 PSI MINIMUM).

3.210 EXISTING STEAM TUNNEL LID TO REMAIN. PATCH AND REPAIR

SPALLS/CRACKS AS REQUIRED.

3.211 REMOVE AND REPLACE PORTION OF EXISTING 6" SLAB AS

REQUIRED FOR INSTALLATION OF NEW PLUMBING. DOWEL NEW

SLAB TO EXISTING PER DETAIL A13/S-511.

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS

AND SYMBOLOGY.

4. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

5. REFER TO SHEET S-221 FOR MASONRY SIZE AND REINFORCEMENT,

AND TYPICAL DETAILS NOT REFERENCED ON THIS SHEET.

6. REFER TO SHEET S-601 FOR STRUCTURAL SCHEDULES.

7. GROUT ALL MASONRY SOLID BELOW ELEVATION 100'-0".

8. ALL MASONRY WALL REINFORCEMENT SHALL BE FULL HEIGHT

UNLESS NOTED OR DETAILED OTHERWISE.

9. STRUCTURAL WALL TYPES SHALL REMAIN CONTINUOUS ACROSS

LINTELS AND MASONRY CONTROL JOINTS (MCJ), UNLESS NOTED OR

DETAILED OTHERWISE.

10. PROVIDE L19 LINTEL AT ALL MASONRY OPENINGS (NOT INDICATED

EXCEEDING 1'-0" (4'-0" MAX) IN WIDTH. COORDINATE WITH ALL OTHER

DISCIPLINES FOR LOCATION AND SIZE OF SUCH PENETRATIONS.

11. COORDINATE REQUIRED WALL PENETRATIONS WITH ALL OTHER

DISCIPLINES TO AVOID PENETRATION OF STRUCTURAL MEMBERS AT

LINTELS, TOP OF WALL, AND ANY OTHER STRUCTURAL ELEMENTS IN

THE FIELD OF THE MASONRY OR CONCRETE WALL. NOTIFY

CONTRACTING OFFICER PRIOR TO PENETRATION OF ANY

STRUCTURAL MEMBERS INCLUDING, BUT NOT LIMITED TO, BOND

BEAMS AND PORTIONS OF FULLY GROUTED MASONRY WALLS.

12. ALL NEW SAWCUT OPENINGS IN EXISTING CONCRETE WALLS SHALL

NOT OCCUR WITHIN 2'-0" OF ADJACENT WALL OPENINGS OR OTHER

PENETRATIONS. PROVIDE A MINIMUM OF (3 X DIAMETER) CENTER TO

CENTER SPACING OF CORES AT CORE DRILLED PENETRATIONS FOR

PIPE AND CONDUIT.

13. CONTROL JOINTS IN MASONRY SHALL NOT BE LOCATED CLOSER

THAN 2'-0" TO THE EDGE OF MASONRY OPENINGS, UNLESS NOTED

OTHERWISE.

STRUCTURAL

FLOOR PLAN GENERAL NOTES:

6.5 6.2

6.A

6.B

6.C

6.D

7.C

7.D

7.E

7.F

7.5 7.1

S-221

H16

2'-6"

EXISTING CMU OPENING

18'-0" +/- 2'-6"

23'-0" FIELD VERIFY

8" 18'-8" 8"

/2

8" 20'-0" 2'-4"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

S-221

H11

S-221 H6

7.B

7.A

7.2

12'-8" 6'-0"

3.403

3.310

3.302

3.303

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:5

P

M

S-121

S T

R U

C T

U R

A L

F L

O O

R P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

KEYED NOTES

3.302 NEW OPENING CUT IN EXISTING CONCRETE WALL FOR NEW

OVERHEAD DOOR. NO HEADER REQUIRED.

3.303 ENLARGE EXISTING WALL OPENING AS REQUIRED FOR NEW

DOUBLE DOOR OPENING. NO HEADER REQUIRED.

3.310 PATCH AND REPAIR 7-FOOT LONG SPALL/CRACK IN EXISTING

CONCRETE WALL AT INTERIOR FACE AS REQUIRED. CLEAN,

PREPARE, WIDEN, AND FINISH SPALL/CRACK IN ACCORDANCE WITH

REPAIR PRODUCT MANUFACTURER'S WRITTEN INSTRUCTIONS.

SUBMIT PRODUCT DATA AND METHOD OF REPAIR TO THE

CONTRACTING OFFICER FOR APPROVAL.

3.403 HSS COLUMN CENTERED ON CONCRETE WALL BELOW. ANCHORED

WITH (4) 5/8" DIAMETER F1554-36 THREADED RODS EPOXIED 3 1/4"

INTO EXISTING CONCRETE. SEE DETAIL E1/S-601 FOR BASE PLATE.

1/8" = 1'-0"S-121

FIRST FLOOR STRUCTURAL WALL PLAN - SECTOR 1C5

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

GRAPHIC SCALE 1/8" = 1'-0"

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS

AND SYMBOLOGY.

4. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

5. REFER TO SHEET S-221 FOR MASONRY SIZE AND REINFORCEMENT,

AND TYPICAL DETAILS NOT REFERENCED ON THIS SHEET.

6. REFER TO SHEET S-601 FOR STRUCTURAL SCHEDULES.

7. GROUT ALL MASONRY SOLID BELOW ELEVATION 100'-0".

8. ALL MASONRY WALL REINFORCEMENT SHALL BE FULL HEIGHT

UNLESS NOTED OR DETAILED OTHERWISE.

9. STRUCTURAL WALL TYPES SHALL REMAIN CONTINUOUS ACROSS

LINTELS AND MASONRY CONTROL JOINTS (MCJ), UNLESS NOTED OR

DETAILED OTHERWISE.

10. PROVIDE L19 LINTEL AT ALL MASONRY OPENINGS (NOT INDICATED

EXCEEDING 1'-0" (4'-0" MAX) IN WIDTH. COORDINATE WITH ALL OTHER

DISCIPLINES FOR LOCATION AND SIZE OF SUCH PENETRATIONS.

11. COORDINATE REQUIRED WALL PENETRATIONS WITH ALL OTHER

DISCIPLINES TO AVOID PENETRATION OF STRUCTURAL MEMBERS AT

LINTELS, TOP OF WALL, AND ANY OTHER STRUCTURAL ELEMENTS IN

THE FIELD OF THE MASONRY OR CONCRETE WALL. NOTIFY

CONTRACTING OFFICER PRIOR TO PENETRATION OF ANY

STRUCTURAL MEMBERS INCLUDING, BUT NOT LIMITED TO, BOND

BEAMS AND PORTIONS OF FULLY GROUTED MASONRY WALLS.

12. ALL NEW SAWCUT OPENINGS IN EXISTING CONCRETE WALLS SHALL

NOT OCCUR WITHIN 2'-0" OF ADJACENT WALL OPENINGS OR OTHER

PENETRATIONS. PROVIDE A MINIMUM OF (3 X DIAMETER) CENTER TO

CENTER SPACING OF CORES AT CORE DRILLED PENETRATIONS FOR

PIPE AND CONDUIT.

13. CONTROL JOINTS IN MASONRY SHALL NOT BE LOCATED CLOSER

THAN 2'-0" TO THE EDGE OF MASONRY OPENINGS, UNLESS NOTED

OTHERWISE.

STRUCTURAL

FLOOR PLAN GENERAL NOTES:

1.A

1.5 1.1

1.B

1.C

1.E

1.F

2.5 2.1

2.A

2.G

2.B

2.C

2.E

2.F

1.4

FACE TO FACE OF CONCRETE

20'-0" (FIELD VERIFY)

1'-2"

FACE TO FACE OF CONCRETE

22'-0" (FIELD VERIFY)

8" 18'-8" 8"

1'-2" 8"

1'-0" 19'-8" 8"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

2 STAND 1 STAND

S-221

H1

1.D

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

3.301

SHEET ID

D E

S

IG

N B

Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

F ile

P a th

P lo t D a te

US Army Corps of Engineers ®

IS

S

U E

D A

T E

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

S

IZ

E

A N

S I D

P R

O J E

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L L O

U

IS

V

IL

L E

K

E N

T U

C K

Y

W R

IG

H

T -P

A T

T E

R S

O N

A

IR

F O

R C

E B

A S

E O

H

IO

R E

N O

V A

T E

M A

T E

R

IA

L S

A N

A L

Y S

IS

L

A B

F /2

B U

IL

D

IN

G

P

Z H

T V

-2

.0

M H

P R

O J E

C T

N O

C

R e v it L o c a l\ S

T R

C -C

F m a rk

.e lli s m e a d h u n t.

c o m

.r v t

/2 /2

:4

:0

P

M

S-123

S T

R U

C T

U R

A L

F L

O O

R P

L A

N

S E

C T

O R

C E

R T

IF

IE

D F

IN

A

L S

U B

M

IT

T A

L

M E

L L

IS

D

M A

T T

H E

W S

J

F E

N S

K E

M B

U T

L E

R

O C

T O

B E

R

KEYED NOTES

3.301 NEW DOOR OPENING CUT IN EXISTING CONCRETE WALL. NO

HEADER REQUIRED.

GRAPHIC SCALE 1/8" = 1'-0"

1/8" = 1'-0"S-123

FIRST FLOOR STRUCTURAL WALL PLAN - SECTOR 3C5

PLAN NORTH

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

S

T A

N D

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

A

D M

IN

E

L E

C

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

R

E V

IS

E

D I N

A C

C O

R D

A N

C E

W

IT

H A

M E

N D

M E

N T

/0 /2

W

2Q R

R

_P la ns -0

8" 18'-8" 8"

14'-0" 6'-0"

W12X30

W12X30

W12X30

W12X30

W X

W X

W X

W X

W X

W X

W12X19

W12X30

W X

W X

W X

W X

W X

W X

W12X30

W12X19

W12X30

W12X30

W X

9W12X19

W12X19

W12X19

FACE TO FACE OF CONCRETE

20'-0" (FIELD VERIFY)

(2

S

P A

T

(2

S

P A

T

(3

S

P A

C E

S A

T

FACE TO FACE OF CONCRETE

23'-0" (FIELD VERIFY)

(3

S P

A C

E S

A T

7 STAND 6 STAND

HSS8X8X1/2

7 STAND

TYPICAL OF (11)

HSS8X8X1/2

6 STAND

TYPICAL OF (8)

W X

(1

/2

W10X15 (107'-3 1/2")

P ip e S

T D

Pipe3STD

O P

E N

ALL TOP OF STEEL

ELEVATIONS FOR 6 STAND

= 110'-7 1/2" (UNO).

ALL TOP OF STEEL

ELEVATIONS FOR

7 STAND = 111'-7 1/2"

(UNO).

3.501

3.501

3.501

3.504

6.5 6.2

6.A

6.B

6.C

6.D

7.C

7.D

7.E

7.F

7.5 7.1

8" 20'-0" 2'-4"

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

(F

IE

L D

V E

R

IF

Y

S

T A

N D

F A

C E

T O

F A

C E

O F

C O

N C

R E

T E

W12X30

W12X19

[10]

W12X19

[10]

[6]

W12X19

[10]

[6]

[8] [7]

[4

[4

[1

[1

H9 S-541

SIM

E X

W

X

(1

E X

W

X

(1

W8X10

(108'-5 1/2")

W8X10

(108'-5 1/2")

Pipe3STD

(TYP. OF 8)

W X

(1

'-5

/2

W X

(1

'-5

/2

W X

(1

'-5

/2

W X

(1

'-5

/2

H17 S-541

TYP AT MOMENT

CONNECTION

C

S

-1

C

S

-1

3.5113.511

3.511

3.511

3.511

6"

" 26"6"

7 3/4"

6" 6"

/4

6" 6"

/4

"5" 5"

26"

7.B

7.A

7.2

12'-8" 6'-0"

W X

(1

'-7

/2

W X

(1

'-7

/2

W12X19

(109'-7 1/2")

W12X30

(109'-7 1/2")

W12X30

(109'-7 1/2")

W12X19

(109'-7 1/2")

W12X19

(109'-7 1/2")

W X

(1

'-7

/2

W X

(1

'-7

/2

W12X19

(109'-7 1/2")

W12X19

W

X

(1

'-7

/2

W12X19

(109'-7 1/2")

W12X19

(109'-7 1/2")

W12X19

(109'-7 1/2")

(3

S

P A

T

(4

S

P A

C E

S A

T

HSS4X4X5/16

W14X30 (109'-7 1/2")

W

X

(1

'-7

/2

W

X

(1

'-7

/2

W12X26

W12X19 (109'-7 1/2")

E13 S-542

E13 S-542

(109'-7 1/2")

.5

A13 S-542

L9 S-542

L1 S-542

E13 S-542

A3 S-542

E13 S-542

E13 S-542

E13 S-542

H9 S-542

A3 S-542

E13 S-542

3.511

W12X30

W12X30

3.505

3.403

W12X19

[10]

W12X19

[10]

W12X19

[10]

W12X19

[10] .4

.4

1'-3"

A3 S-542

A3 S-542

S-541

H5

HSS10X8X1/2

A13 S-542

OPP

HAND

1. SEE ARCHITECTURAL DRAWINGS FOR SITE DATUM OF FINISHED

FLOOR. ELEVATION 100'-0" ON STRUCTURAL DRAWINGS = TOP OF

EXISTING STEAM TUNNEL LID IN EACH STAND OR ADMIN SPACE.

2. FIELD VERIFY ALL DIMENSIONS, BRING ANY DISCREPANCIES TO THE

ATTENTION OF THE COR FOR FINAL DECISION.

3. REFER TO SHEET S-001 FOR STRUCTURAL LEGENDS, ABBREVIATIONS,

AND SYMBOLOGY.

4. REFER TO SHEET S-101 FOR FOUNDATION SCHEDULES.

REFER TO SHEET S-601 FOR ALL OTHER SCHEDULES.

5. REFER TO SHEETS S-541 AND S-542 FOR TYPICAL DETAILS NOT

REFERENCED ON THIS SHEET.

6. CHILLER SUPPORT BEAM SPACING BASED ON PRELIMINARY UNIT

CUTSHEET. FIELD VERIFY FINAL LOCATION OF NEW CHILLER.

CONTRACTING OFFICER TO BE NOTIFIED REGARDING ANY

ADJUSTMENTS TO SUPPORT BEAM FRAMING.

7. CHILLER BASIS OF DESIGN OPERATING WEIGHT APPROXIMATELY 6300

LBS AND GEOMETRY 134.25" LONG X 88.375" WIDE X 84.8125" HIGH.

8. ALL EXTERIOR MEMBERS SHALL BE HOT DIP GALVANIZED. SEE NOTE

S-13 ON SHEET S-002 FOR ADDITIONAL INFORMATION.

9. FIELD VERIFY ALL EDGE OF DECK DIMENSIONS THAT OCCUR

ADJACENT TO EXISTING WALLS. INCORPORATE ANY ADJUSTMENTS AS

NEEDED PRIOR TO ISSUANCE OF STEEL SHOP DRAWINGS AND STEEL

FABRICATI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .