W912QR20R0011-0002.pdf
PDF 15 MB Posted
- Solicitation number
- W912QR20R0011
About this file
This solicitation seeks proposals for the construction of a General Purpose Maintenance Facility at Fort Campbell, Kentucky. The project includes vehicle maintenance facilities, open storage areas, organizational vehicle parking, and supporting facilities such as utilities and site development. Construction value is estimated between $25-100 million.
The solicitation will be a firm-fixed-price contract awarded using a best value tradeoff source selection method. Proposals will be evaluated on past performance, technical, small business participation, and price factors. Discussions are not planned but may be held at the government's discretion. The NAICS code is 236220 and offerors must have an active SAM registration. The point of contact is listed.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0011 for the Construction of a General Purpose Maintenance Shop at Fort Campbell, Fort Campbell, Tennessee is hereby modified as follow s:
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0011
X 9B. DATED (SEE ITEM 11)
06-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Feb-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0011-0002
W912QR20R0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
General Purpose Maintenances Shop (GPMS) Ft. Campbell, TN P2 470068
AMENDMENT 0002
SUMMARY OF CHANGES
1. The Proposal due date has been revised to March 24, 2020 at 1p.m. Eastern
2. The following Specification Sections have been revised and replaced entirely:
00 10 00 PRICE BREAKOUT SCHEDULE
3. These sections are new to the Solicitation:
none
4. The following drawings have been revised and replaced entirely:
G-002A DRAWING INDEX (VOLUME 1 OF 5 - SITE)
G-002B DRAWING INDEX (VOLUME 2 OF 5 - ASB)
G-002C DRAWING INDEX (VOLUME 3 OF 5 - EA)
G-002D DRAWING INDEX (VOLUME 4 OF 5 - PB)
G-002E DRAWING INDEX (VOLUME 5 OF 5 - PC)
CD101 OVERALL DEMOLITION PLAN
CD102 DEMOLITION PLAN 1 OF 9
CD103 DEMOLITION PLAN 2 OF 9
CD104 DEMOLITION PLAN 3 OF 9
CD105 DEMOLITION PLAN 4 OF 9
CD106 DEMOLITION PLAN 5 OF 9
CD107 DEMOLITION PLAN 6 OF 9
CD108 DEMOLITION PLAN 7 OF 9
CD109 DEMOLITION PLAN 8 OF 9
CD110 DEMOLITION PLAN 9 OF 9
CS501 SITE DETAILS SHEET 1 OF 5
CS502 SITE DETAILS SHEET 2 OF 5
CG102 GRADING PLAN 1 OF 9
CG103 GRADING PLAN 2 OF 9
CG104 GRADING PLAN 3 OF 9
CG105 GRADING PLAN 4 OF 9
CG106 GRADING PLAN 5 OF 9
CG107 GRADING PLAN 6 OF 9
CG108 GRADING PLAN 7 OF 9
CG109 GRADING PLAN 8 OF 9
CG110 GRADING PLAN 9 OF 9
CG502 DRAINAGE DETAILS SHEET 2 OF 2
CP101 PAVEMENT PLAN
CP402 JOINT PLAN 1 OF 6
CP403 JOINT PLAN 2 OF 6
CP404 JOINT PLAN 3 OF 6
CP405 JOINT PLAN 4 OF 6
CP406 JOINT PLAN 5 OF 6
CP407 JOINT PLAN 6 OF 6
CP408 OPTION JOINT PLAN 1 OF 6
CP409 OPTION JOINT PLAN 2 OF 6
CP410 OPTION JOINT PLAN 3 OF 6
CP411 OPTION JOINT PLAN 4 OF 6
CP412 OPTION JOINT PLAN 5 OF 6
CP413 OPTION JOINT PLAN 6 OF 6
ASB - A621 WINDOW AND LOUVER TYPES AND DETAILS
ASB - M101B ENLARGED HVAC DUCTWORK PLAN AREA “B”
ASB - M601 HVAC SCHEDULES
ASB - M705A DEDICATED OUTDOOR AIR UNIT CONTROL SCHEMATIC &
SEQUENCE OF OPERATIONS
ASB - E121 MECHANICAL POWER PLAN - MACHINE / WELDING SHOP
ASB - E122 MECHANICAL POWER PLAN - CORRIDOR / TEST LANE
ASB - E123 MECHANICAL POWER PLAN - COMPONENT SHOP AREA
EA - A621 WINDOW AND LOUVER TYPES AND DETAILS
EA - E603 PANEL SCHEDULES
EA - E604 PANEL SCHEDULES
EA - E605 PANEL SCHEDULES
EA - E606 PANEL SCHEDULES
EA - E607 PANEL SCHEDULES
EA – E608 PANEL SCHEDULES
EA – E609 PANEL SCHEDULES
PB - I601 INTERIOR ROOM FINISH SCHEDULE
PB - I602 INTERIOR COLOR SCHEDULE
PC - I111 ENLARGED FINISH PLAN AND SPECIAL ITEMS LOCATION PLAN -
OFFICES AREA
PC - M103 ENLARGED HVAC DUCTWORK PLAN - AREA B
PC - M401 ENLARGED HVAC PLAN - MECHANICAL ROOM
PC - M402 MECHANICAL ROOM SECTIONS
PC - M504 GEOTHERMAL FLOW SCHEMATIC
PC - M600 MECHANICAL EQUIPMENT SCHEDULES
PC - M601 MECHANICAL EQUIPMENT SCHEDULES
PC - M705A DEDICATED OUTDOOR AIR UNIT CONTROL SCHEMATIC &
SEQUENCE OF OPERATIONS
PC - P001 PLUMBING NOTES & LEGEND
PC - P105 ENLARGED PLUMBING PLAN - DOMESTIC COLD WATER, HOT
WATER & HOT WATER RECIRCULATION PIPING - AREA A
PC - P106 ENLARGED PLUMBING PLAN - DOMESTIC COLD WATER, HOT
WATER & HOT WATER RECIRCULATION PIPING - AREA B
PC - P402 ENLARGED PLUMBING PLAN - DOMESTIC COLD WATER, HOT
WATER & HOT WATER RECIRCULATION PIPING - RESTROOMS
PC - P403 ENLARGED PLUMBING PLAN - DOMESTIC COLD WATER, HOT
WATER & HOT WATER RECIRCULATION PIPING - MECHANICAL
ROOM
PC - P600 PLUMBING SCHEDULES
The following have been deleted:
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 12-Mar-2020 01:00 PM to 24-Mar-2020 01:00 PM.
The following have been modified:
PRICE BREAKOUT SCHEDULE
00 10 00 PRICE BREAKOUT SCHEDULE
PROJECT: General Purpose Maintenance Shop LOCATION: Fort Campbell, TN
PROPOSER’S NAME: _____________________________________________________
ITEM NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT
BASE PROPOSAL
0001 Primary Facilities – ASB Building 1 Job $__________
0002 Primary Facilities – EA Building 1 Job $__________
0003 Primary Facilities – PB Building 1 Job $__________
0004 Primary Facilities – PC Building 1 Job $__________
0005 Site Work 1 Job $__________
0006 Electrical Utilities 1 Job $ 477,775.00
0007 Gas Utilities 1 Job $ 41,637.00
TOTAL BASE PROPOSAL
OPTIONS
(Bid Option A)
Construct Concrete Org Parking 1 Job $__________
(Bid Option B)
Construct Asphalt POV Parking 1 Job $__________
(Bid Option C)
Construct a Covered Storage Area 1 Job $__________
(Bid Option D)
Provide Epoxy Coating for Flooring 1 Job $__________
TOTAL ALL OPTIONS
TOTAL BASE PROPOSAL AND ALL OPTIONS
NOTES:
1. Failure of the offeror to propose prices for all items in the Proposal Schedule may be cause for rejection of the proposal as unacceptable.
2. Any reference to “bid”, bidder, or “bidding schedule” shall be construed to mean “offeror” and “proposal”
Amendment 0001
3. The estimated utility fees to be proposed for bidding purposes are shown in the schedule, and were provided by the utility owners. If the actual fees vary from these amounts after award, the Contract will be adjusted accordingly.
Amendment 0001
Description of Base Proposal Items
ITEM
NO. SUPPLIES/SERVICES
0001 Primary Facility – Primary Facilities – ASB Building Includes all Base Proposal construction work to construct the Allied Shops Building (ASB) to a line five feet outside the building.
0002 Primary Facility – Primary Facilities –EA Building Includes all Base Proposal construction work to construct the Engineering Automotive Building (EA) to a line five feet outside the building.
0003 Primary Facility – Primary Facilities –PB Building Includes all Base Proposal construction work to construct the Body Shop Building (PB) to a line five feet outside the building.
0004 Primary Facility – Primary Facilities –PC Building Includes all Base Proposal construction work to construct the Production Control Building (PC) to a line five feet outside the building.
0005 Site Work Includes all Base Proposal demolition, utilities, gravel and grading, fencing, landscaping and other construction work required beyond a line five feet outside of the Allied Shops Building (ASB), Engineering Automotive Building (EA), Paint and Body Shop Building (PB), and the Production Control Building (PC), including gravel organizational vehicle parking and privately owned vehicle lots, concrete sidewalks and concrete hardstand portions immediately adjacent to the buildings, site lighting, and bioretention. This line item also includes all permits, site clearing, grading and drainage construction work required within the construction limits for the Base Proposal and all Options.
0006 Electrical Utilities Contractor shall coordinate work performed by the private utility provider City Light and Power, to include but not limited to the following: Construction and demolition of electrical utility infrastructure for the “General Purpose Maintenance Shop” project at Fort Campbell Army Installation, TN. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading, and pavement repair to the final point of connection at the main panelboard in each building from the medium voltage overhead transmission lines running along Tennessee Avenue. Work also includes demolition of existing overhead sight lighting and power infrastructure as shown on drawings which are currently owned by the utility.
0007 Gas Utilities Contractor shall coordinate work performed by the private utility provider Clarksville Gas, to include but not limited to the following: Construction and demolition of natural gas infrastructure for the “General Purpose Maintenance Shop” project at Fort Campbell Army Installation, TN. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading, and pavement repair.
Description of Option Items
0008 Bid Option A – Construct Concrete Org Parking Includes all construction work required to construct a concrete organizational vehicle parking lot.
***This Option may be exercised within 180 calendar days of Notice-to-Proceed (NTP).
0009 Bid Option B – Construct Asphalt POV Parking Includes all construction work required to construct an asphalt privately owned vehicle parking lot.
***This Option may be exercised within 180 calendar days of Notice-to-Proceed (NTP).
0010 Bid Option C – Construct a Covered Storage Area Includes all construction work required to provide a standalone covered storage area next to the Allied Services Building.
***This Option may be exercised within 180 calendar days of Notice-to-Proceed (NTP).
Amendment 0002 0011 Bid Option D – Provide Epoxy Coating for Flooring Includes all construction work required to provide epoxy coating finish on concrete flooring instead of sealed concrete finish in all buildings as denoted on drawings.
***This Option may be exercised within 180 calendar days of Notice-to-Proceed (NTP).
Amendment 0002
(End of Summary of Changes)
DRAWING INDEX (VOLUME 1 OF 5 - SITE)
BLDG ID
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 1 OF 5 - SITE)
BLDG ID
SHEET
NUMBER SHEET TITLE
BASE SUMMARY OF WORK
CONSTRUCT FOUR ONE STORY BUILDINGS MAKING UP THE FT. CAMPBELL
GENERAL PURPOSE MAINTENANCE SHOP. WORK INCLUDES CONCRETE SLABS
ON GRADE, METAL STUD WALLS INFILLED WITH SPRAY FOAM INSULATION AND
VENEERS MADE UP OF INSULATED METAL PANEL AND STANDARD BRICK OVER
RIGID INSULATION AND GLASSMAT SHEATHING, AND ROOFS CONSISTING OF
STANDING SEAM METAL ROOFING OVER GLASSMAT COVERBOARD, BOARD
INSULATION, AND GLASSMAT UNDERLAYMENT OVER METAL DECK. BUILDINGS
SHALL BE EQUIPPED WITH FULL HVAC , PLUMBING, ELECTRICAL, AUTOMATIC
FIRE SUPPRESSION, FIRE ALARM, AND TELECOMMUNICATION SYSTEMS.
BUILDINGS SHALL ALSO INCLUDE AN OVERHEAD CRANE, VEHICLE AND OTHER
EXHAUST SYSTEMS, DUST COLLECTION SYSTEMS, AND PREFABRICATED PAINT
BOOTHS WITH ASSOCIATED COMPONENTS.
SITE WORK INCLUDES GRAVEL ORGANIZATIONAL VEHICLE PARKING AND
PRIVATELY OWNED VEHICLE LOTS, CONCRETE SIDEWALKS AND CONCRETE
HARDSTAND PORTIONS IMMEDIATELY ADJACENT TO THE BUILDINGS, SITE
LIGHTING, AND BIORETENTION.
OPTIONS SUMMARY OF WORK
OPTION A: CONSTRUCT A CONCRETE ORGANIZATIONAL VEHICLE PARKING LOT.
OPTION B: CONSTRUCT AN ASPHALT PRIVATELY OWNED VEHICLE PARKING
LOT.
OPTION C: CONSTRUCT A COVERED STORAGE AREA NEXT TO THE ALLIED
SHOPS BUILDING.
OPTION D: PROVIDE EPOXY COATING CONCRETE FINISH INSTEAD OF SEALED
CONCRETE FINISH FLOORING IN ALL BUILDINGS AS DENOTED IN DRAWINGS.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
JA
N U
AR
Y
C -2
-8
5-
W
2Q R
R
T.
C
H
AN
D
LE
R
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
G
EN
ER
AL
P U
R
PO
SE
M
AI
N
TE
N
AN
C
E
SH
O P
(G
PM
S)
FO
R
T C
AM
PB
EL
L, T N
PN
, F Y2
0, P
READY TO ADVERTISEC:\Users\H2EDDJTC\Documents\470068_v2018_SITE_H2EDDJTC.rvt
2/27/2020 12:43:47 PM
G-002A
GEN
D R
AW
IN
G
IN
D
EX
(V O
LU
M
E
O F
-S
IT
E)
T.
C
H
AN
D
LE
R
T.
C
H
AN
D
LE
R
D .B
AN
JA
N O
VI
C
SITE CP410 OPTION JOINT PLAN 3 OF 6
SITE CP411 OPTION JOINT PLAN 4 OF 6
SITE CP412 OPTION JOINT PLAN 5 OF 6
SITE CP413 OPTION JOINT PLAN 6 OF 6
SITE CP501 PAVEMENT DETAILS
SITE CP502 PAVEMENT DETAILS
SITE CU101 OVERALL UTILITY PLAN
SITE CU102 UTILITY PLAN (1 OF 9)
SITE CU103 UTILITY PLAN (2 OF 9)
SITE CU104 UTILITY PLAN (3 OF 9)
SITE CU105 UTILITY PLAN (4 OF 9)
SITE CU106 UTILITY PLAN (5 OF 9)
SITE CU107 UTILITY PLAN (6 OF 9)
SITE CU108 UTILITY PLAN (7 OF 9)
SITE CU109 UTILITY PLAN (8 OF 9)
SITE CU110 UTILITY PLAN (9 OF 9)
SITE CU111 GEOTHERMAL WELL FIELD
SITE CU112 GEOTHERMAL WELL FIELD
SITE CU201 SANITARY PROFILES (1 OF 3)
SITE CU202 SANITARY PROFILES (2 OF 3)
SITE CU203 SANITARY PROFILES (3 OF 3)
SITE CU501 UTILITY DETAILS
SITE CU502 UTILITY DETAILS
SITE CU503 UTILITY DETAILS
SITE CU504 UTILITY DETAILS
SITE CU505 UTILITY DETAILS
SITE CU506 UTILITY DETAILS
SITE CU507 UTILITY DETAILS
SITE CU508 UTILITY DETAILS
CIVIL: 89
SITE ELECTRICAL
SITE ES101 OVERALL ELECTRICAL SITE PLAN
SITE ES102 ELECTRICAL SITE PLAN (1 OF 11)
SITE ES103 ELECTRICAL SITE PLAN (2 OF 11)
SITE ES104 ELECTRICAL SITE PLAN (3 OF 11)
SITE ES105 ELECTRICAL SITE PLAN (4 OF 11)
SITE ES106 ELECTRICAL SITE PLAN (5 OF 11)
SITE ES107 ELECTRICAL SITE PLAN (6 OF 11)
SITE ES108 ELECTRICAL SITE PLAN (7 OF 11)
SITE ES109 ELECTRICAL SITE PLAN (8 OF 11)
SITE ES110 ELECTRICAL SITE PLAN (9 OF 11)
SITE ES111 ELECTRICAL SITE PLAN (10 OF 11)
SITE ES112 ELECTRICAL SITE PLAN (11 OF 11)
SITE ES501 ELECTRICAL SITE DETAILS
SITE ES502 ELECTRICAL SITE DETAILS
SITE ES601 SITE LIGHTING SCHEDULE
SITE ELECTRICAL: 15
SITE LIFE SAFETY
SITE X-130 FIRE PROTECTION CODE COMPLIANCE SITE PLAN
SITE LIFE SAFETY: 1
Grand total: 133
GENERAL
GEN G-001 COVER SHEET
GEN G-002A DRAWING INDEX
GEN G-002B DRAWING INDEX
GEN G-002C DRAWING INDEX
GEN G-002D DRAWING INDEX
GEN G-002E DRAWING INDEX
GEN G-003 SITE LOCATION AND VICINITY MAPS
GEN G-004 BORROW DISPOSAL AREA PLAN
GEN RF101 REFERENCE DRAWING--AT/FP SETBACKS
GEN RF102 REFERENCE DRAWING--SITE PARKING PLAN
GENERAL: 10
SURVEY/MAPPING
SITE VA101 AERIAL PHOTOGRAPH
SITE VF101 CONTRACTOR WORK LIMITS AND CONTROL POINT
LOCATIONS
SITE VF401 CONTROL POINT DESCRIPTIONS
SURVEY/MAPPING: 3
GEOTECHNICAL
SITE B-101 BORING LOCATION PLAN
SITE B-102 SOIL AND ROCK CLASSIFICATION
SITE B-103 BORING LOGS (SHEET 1 OF 7)
SITE B-104 BORING LOGS (SHEET 2 OF 7)
SITE B-105 BORING LOGS (SHEET 3 OF 7)
SITE B-106 BORING LOGS (SHEET 4 OF 7)
SITE B-107 BORING LOGS (SHEET 5 OF 7)
SITE B-108 BORING LOGS (SHEET 6 OF 7)
SITE B-109 BORING LOGS (SHEET 7 OF 7)
GEOTECHNICAL: 9
EROSION CONTROL
SITE GC101 OVERALL EROSION CONTROL PLAN
SITE GC102 INITIAL EROSION CONTROL PLAN
SITE GC202 INTERMEDIATE EROSION CONTROL PLAN
SITE GC302 FINAL EROSION CONTROL PLAN
SITE GC501 EROSION CONTROL DETAILS (1 OF 2)
SITE GC502 EROSION CONTROL DETAILS (2 OF 2)
EROSION CONTROL: 6
CIVIL
SITE CD101 OVERALL DEMOLITION PLAN
SITE CD102 SITE DEMOLITION PLAN (1 OF 9)
SITE CD103 SITE DEMOLITION PLAN (2 OF 9)
SITE CD104 SITE DEMOLITION PLAN (3 OF 9)
SITE CD105 SITE DEMOLITION PLAN (4 OF 9)
SITE CD106 SITE DEMOLITION PLAN (5 OF 9)
SITE CD107 SITE DEMOLITION PLAN (6 OF 9)
SITE CD108 SITE DEMOLITION PLAN (7 OF 9)
SITE CD109 SITE DEMOLITION PLAN (8 OF 9)
SITE CD110 SITE DEMOLITION PLAN (9 OF 9)
SITE CS101 OVERALL SITE PLAN
SITE CS102 SITE PLAN (1 OF 9)
SITE CS103 SITE PLAN (2 OF 9)
SITE CS104 SITE PLAN (3 OF 9)
SITE CS105 SITE PLAN (4 OF 9)
SITE CS106 SITE PLAN (5 OF 9)
SITE CS107 SITE PLAN (6 OF 9)
SITE CS108 SITE PLAN (7 OF 9)
SITE CS109 SITE PLAN (8 OF 9)
SITE CS110 SITE PLAN (9 OF 9)
SITE CS501 SITE DETAILS SHEET 1 OF 5
SITE CS502 SITE DETAILS SHEET 2 OF 5
SITE CS503 SITE DETAILS SHEET 3 OF 5
SITE CS504 SITE DETAILS SHEET 4 OF 5
SITE CS505 SITE DETAILS SHEET 5 OF 5
SITE CS601 SITE AND ALIGNMENT COORDINATES
SITE CG101 OVERALL GRADING PLAN
SITE CG102 GRADING PLAN (1 OF 9)
SITE CG103 GRADING PLAN (2 OF 9)
SITE CG104 GRADING PLAN (3 OF 9)
SITE CG105 GRADING PLAN (4 OF 9)
SITE CG106 GRADING PLAN (5 OF 9)
SITE CG107 GRADING PLAN (6 OF 9)
SITE CG108 GRADING PLAN (7 OF 9)
SITE CG109 GRADING PLAN (8 OF 9)
SITE CG110 GRADING PLAN (9 OF 9)
SITE CG201 PROFILES
SITE CG202 PROFILES
SITE CG301 STORMLINE PROFILES (SHEET 1 OF 5)
SITE CG302 STORMLINE PROFILES (SHEET 2 OF 5)
SITE CG303 STORMLINE PROFILES (SHEET 3 OF 5)
SITE CG304 STORMLINE PROFILES (SHEET 4 OF 5)
SITE CG305 STORMLINE PROFILES (SHEET 5 OF 5)
SITE CG401 TYPICAL SECTIONS
SITE CG402 SITE SECTION (1 OF 2)
SITE CG403 SITE SECTION (2 OF 2)
SITE CG501 DRAINAGE DETAILS (SHEET 1 OF 2)
SITE CG502 DRAINAGE DETAILS (SHEET 2 OF 2)
SITE CG601 GRADING AND DRAINAGE COORDINATES
SITE CP101 PAVEMENT PLAN
SITE CP102 PAVEMENT PLAN OPTION
SITE CP401 OVERALL JOINT PLAN
SITE CP402 JOINT PLAN 1 OF 6
SITE CP403 JOINT PLAN 2 OF 6
SITE CP404 JOINT PLAN 3 OF 6
SITE CP405 JOINT PLAN 4 OF 6
SITE CP406 JOINT PLAN 5 OF 6
SITE CP407 JOINT PLAN 6 OF 6
SITE CP408 OPTION JOINT PLAN 1 OF 6
SITE CP409 OPTION JOINT PLAN 2 OF 6
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
E N D
M
EN
T
F E
B
2 0
AM
E N
D M
EN
T
F E B
2 0
W
2Q R
R
-0
DRAWING INDEX (VOLUME 2 OF 5 - ASB)
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 2 OF 5 - ASB)
BLDG ID
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 2 OF 5 - ASB)
BLDG ID
SHEET
NUMBER SHEET TITLE
BASE SUMMARY OF WORK
CONSTRUCT FOUR ONE STORY BUILDINGS MAKING UP THE FT. CAMPBELL
GENERAL PURPOSE MAINTENANCE SHOP. WORK INCLUDES CONCRETE SLABS
ON GRADE, METAL STUD WALLS INFILLED WITH SPRAY FOAM INSULATION AND
VENEERS MADE UP OF INSULATED METAL PANEL AND STANDARD BRICK OVER
RIGID INSULATION AND GLASSMAT SHEATHING, AND ROOFS CONSISTING OF
STANDING SEAM METAL ROOFING OVER GLASSMAT COVERBOARD, BOARD
INSULATION, AND GLASSMAT UNDERLAYMENT OVER METAL DECK. BUILDINGS
SHALL BE EQUIPPED WITH FULL HVAC , PLUMBING, ELECTRICAL, AUTOMATIC
FIRE SUPPRESSION, FIRE ALARM, AND TELECOMMUNICATION SYSTEMS.
BUILDINGS SHALL ALSO INCLUDE AN OVERHEAD CRANE, VEHICLE AND OTHER
EXHAUST SYSTEMS, DUST COLLECTION SYSTEMS, AND PREFABRICATED PAINT
BOOTHS WITH ASSOCIATED COMPONENTS.
SITE WORK INCLUDES GRAVEL ORGANIZATIONAL VEHICLE PARKING AND
PRIVATELY OWNED VEHICLE LOTS, CONCRETE SIDEWALKS AND CONCRETE
HARDSTAND PORTIONS IMMEDIATELY ADJACENT TO THE BUILDINGS, SITE
LIGHTING, AND BIORETENTION.
OPTIONS SUMMARY OF WORK
OPTION A: CONSTRUCT A CONCRETE ORGANIZATIONAL VEHICLE PARKING LOT.
OPTION B: CONSTRUCT AN ASPHALT PRIVATELY OWNED VEHICLE PARKING
LOT.
OPTION C: CONSTRUCT A COVERED STORAGE AREA NEXT TO THE ALLIED
SHOPS BUILDING.
OPTION D: PROVIDE EPOXY COATING CONCRETE FINISH INSTEAD OF SEALED
CONCRETE FINISH FLOORING IN ALL BUILDINGS AS DENOTED IN DRAWINGS.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
JA
N U
AR
Y
C -2
-8
5-
W
2Q R
R
T.
C
H
AN
D
LE
R
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
G
EN
ER
AL
P U
R
PO
SE
M
AI
N
TE
N
AN
C
E
SH
O P
(G
T C
AM
PB
EL
L, T N
PN
, F Y2
0, P
READY TO ADVERTISEC:\Users\H2EDDJTC\Documents\470068_v2018_SITE_H2EDDJTC.rvt
2/27/2020 12:43:47 PM
G-002B
GEN
D R
AW
IN
G
IN
D
EX
(V O
LU
M
E
O F
-A
SB
T.
C
H
AN
D
LE
R
T.
C
H
AN
D
LE
R
D .B
AN
JA
N O
VI
C
ASB E-122 MECHANICAL POWER PLAN - CORRIDOR / TEST LANE
AREA
ASB E-123 MECHANICAL POWER PLAN - COMPONENT SHOP AREA
ASB E-140 LIGHTNING PROTECTION PLAN - COMPREHENSIVE
ASB E-401 ENLARGED PLANS
ASB E-501 ELECTRICAL DETAILS
ASB E-502 GROUNDING DETAILS
ASB E-503 GROUNDING DETAILS
ASB E-504 LIGHTNING PROTECTION DETAILS
ASB E-505 LIGHTNING PROTECTION DETAILS
ASB E-506 LIGHTNING PROTECTION DETAILS
ASB E-601 LIGHTING SCHEDULE
ASB E-602 LIGHTING SCHEDULE
ASB E-603 PANEL SCHEDULES
ASB E-604 PANEL SCHEDULES
ASB E-605 PANEL SCHEDULES
ASB E-606 PANEL SCHEDULES
ASB E-607 PANEL SCHEDULES
ASB E-608 PANEL SCHEDULES
ASB E-609 MECHANICAL EQUIPMENT SCHEDULE
ASB E-701 ONE-LINE DIAGRAM AND FEEDER SCHEDULE
ELECTRICAL: 31
TELECOMMUNICATIONS
ASB T-001 TELECOMMUNICATIONS AND LOW VOLTAGE SYSTEMS
LEGEND
ASB T-101 TELECOMMUNICATIONS PLAN - COMPREHENSIVE
ASB T-102 TELECOMMUNICATIONS PLAN - MACHINE / WELDING
SHOP AREA
ASB T-103 TELECOMMUNICATIONS PLAN - CORRIDOR / TEST LANE
AREA
ASB T-104 TELECOMMUNICATIONS PLAN - COMPONENT SHOP AREA
ASB T-401 ENLARGED PLANS
ASB T-501 TELECOMMUNICATIONS DETAILS
ASB T-502 TELECOMMUNICATIONS DETAILS
ASB T-503 TELECOMMUNICATIONS DETAILS
ASB T-504 TELECOMMUNICATIONS DETAILS
ASB T-505 TELECOMMUNICATIONS DETAILS
ASB T-506 TELECOMMUNICATIONS DETAILS
ASB T-507 TELECOMMUNICATIONS DETAILS
ASB T-701 TELECOMMUNICATIONS ONE-LINE
ASB T-702 TELECOMMUNICATIONS ONE-LINES
TELECOMMUNICATIONS: 15
LIFE SAFETY
ASB X-100 LIFE SAFETY CODE REVIEW (FOR REFERENCE ONLY)
ASB X-110 LIFE SAFETY PLAN (FOR REFERENCE ONLY)
LIFE SAFETY: 2
Grand total: 188
ASB IG113 ENLARGED SIGNAGE PLAN - COMPONENT SHOP AREAS
ASB IG501 SIGNAGE DETAILS
ASB IG502 SIGNAGE DETAILS
ASB IG601 SIGNAGE SCHEDULE
INTERIOR: 20
FIRE PROTECTION
ASB FX-101 FIRE PROTECTION PLAN
ASB FX-401 ENLARGED FIRE PROTECTION PLAN AND RISER
DIAGRAM
FIRE PROTECTION: 2
FIRE ALARM
ASB FA001 FIRE ALARM AND MASS NOTIFICATION LEGEND
ASB FA101 FIRE ALARM AND MASS NOTIFICATION PLAN -
COMPREHENSIVE
ASB FA102 FIRE ALARM AND MASS NOTIFICATION PLAN - MACHINE /
WELDING SHOP AREA
ASB FA103 FIRE ALARM AND MASS NOTIFICATION PLAN - CORRIDOR
/ TEST LANE AREA
ASB FA104 FIRE ALARM AND MASS NOTIFICATION PLAN -
COMPONENT SHOP AREA
ASB FA701 FIRE ALARM AND MASS NOTIFICATION RISER DIAGRAM
ASB FA801 FIRE ALARM SYSTEM MATRIX
FIRE ALARM: 7
PLUMBING
ASB P-001 PLUMBING NOTES & LEGEND
ASB P-101 PLUMBING PLAN - WASTE & VENT PIPING
ASB P-102 PLUMBING PLAN - DOMESTIC COLD, HOT WATER & HOT
WATER RECIRCULATION PIPING
ASB P-103 PLUMBING PLAN - COMPRESSED AIR, NITROGEN &
NATURAL GAS PIPING
ASB P-104 PLUMBING PLAN - RADON PIPING, SECTION & DETAILS
ASB P-401 ENLARGED SANITARY PLAN & RISER - WASTE & VENT
PIPING
ASB P-402 ENLARGED PLUMBING PLAN - HOT, COLD & HOT WATER
RECIRCULATION PIPING
ASB P-501 PLUMBING DETAILS
ASB P-502 PLUMBING DETAILS
ASB P-601 PLUMBING SCHEDULES
PLUMBING: 10
MECHANICAL
ASB M-001 MECHANICAL GENERAL NOTES, LEGEND &
ABBREVIATIONS
ASB M-101 COMPOSITE HVAC DUCTWORK PLAN
ASB M-101A ENLARGED HVAC DUCTWORK PLAN AREA "A"
ASB M-101B ENLARGED HVAC DUCTWORK PLAN AREA "B"
ASB M-101C ENLARGED HVAC DUCTWORK PLAN AREA "C"
ASB M-102 HYDRONIC PIPING PLAN
ASB M-401 ENLARGED MECHANICAL ROOM
ASB M-402 ENLARGED MECHANICAL ROOM SECTIONS
ASB M-501 MECHANICAL DETAILS
ASB M-502 MECHANICAL DETAILS
ASB M-503 MECHANICAL DETAILS
ASB M-504 MECHANICAL DETAILS
ASB M-601 HVAC SCHEDULES
ASB M-602 HVAC SCHEDULES
ASB M-700 MECHANICAL CONTROLS - LEGENDS & SYMBOLS
ASB M-701 HVAC CONTROL POINT SCHEDULE INSTRUCTION
ASB M-702 HVAC CONTROL SCHEDULING AND ALARM SQUENCES
ASB M-703 HVAC CONTROL SYSTEM NETWORK
ASB M-704A GEOTHERMAL GROUND LOOP CONTROL SCHEMATIC &
SEQUENCE OF OPERATION
ASB M-704B GEOTHERMAL GROUND LOOP AND BUILDING LOOP
POINTS SCHEDULE
ASB M-705A DEDICATED OUTDOOR AIR UNIT CONTROL SCHEMATIC &
SEQUENCE OF OPERATIONS
ASB M-705B DOAS CONTROL POINTS SCHEDULE
ASB M-706A WATER TO AIR GROUND SOURCE HEAT PUMP CONTROL
SCHEMATIC & SEQUENCE OF OPERATION
ASB M-706B WATER TO AIR GROUND SOURCE HEAT PUMP CONTROL
POINTS SCHEDULE
ASB M-707A MAU-1, EF-1, & 2 CONTROL SCHEMATIC AND SEQUENCE
OF OPERATION
ASB M-707B MAU-1, EF-1, & 2 CONTROL POINTS SCHEDULE & LADDER
DIAGRAMS
ASB M-708A MAU-2, EF-3 & EF-4 CONTROL SCHEMATIC & SEQUENCE
OF OPERATIONS
ASB M-708B MAU-2, EF-3 & EF-4 CONTROL POINTS SCHEDULE
ASB M-709A EXHAUST FAN CONTROL SCHEMATIC, SEQUENCE OF
OPERATION & POINTS SCHEDULE
ASB M-710 GAS FIRED OVERHEAD RADIANT CONTROL SCHEMATIC &
SEQUENCE OF OPERATION
ASB M-711 ELECTRIC & NATURAL GAS UNIT HEATER CONTROL
SCHEMATIC, SEQUENCE OF OPERATION & POINTS
SCHEDULE
ASB M-712 ENERGY AND WATER MONITORING SCHEMATICS &
POINTS SCHEDULE
MECHANICAL: 32
ELECTRICAL
ASB E-001 LEGEND AND ABBREVIATIONS
ASB E-101 LIGHTING PLAN - COMPREHENSIVE
ASB E-102 LIGHTING PLAN - MACHINE / WELDING SHOP AREA
ASB E-103 LIGHTING PLAN - CORRIDOR / TEST LANE AREA
ASB E-104 LIGHTING PLAN - COMPONENT SHOP AREA
ASB E-110 POWER PLAN - COMPREHENSIVE
ASB E-111 POWER PLAN - MACHINE / WELDING SHOP AREA
ASB E-112 POWER PLAN - CORRIDOR / TEST LANE AREA
ASB E-113 POWER PLAN - COMPONENT SHOP AREA
ASB E-120 MECHANICAL POWER PLAN - COMPREHENSIVE
ASB E-121 MECHANICAL POWER PLAN - MACHINE / WELDING SHOP
AREA
GENERAL
GEN G-001 COVER SHEET
GEN G-002A DRAWING INDEX
GEN G-002B DRAWING INDEX
GEN G-002C DRAWING INDEX
GEN G-002D DRAWING INDEX
GEN G-002E DRAWING INDEX
GEN G-003 SITE LOCATION AND VICINITY MAPS
GEN G-004 BORROW DISPOSAL AREA PLAN
GEN RF101 REFERENCE DRAWING--AT/FP SETBACKS
GEN RF102 REFERENCE DRAWING--SITE PARKING PLAN
GENERAL: 10
STRUCTURAL
ASB S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS &
ABBREVIATIONS
ASB S-002 GENERAL STRUCTURAL NOTES
ASB S-003 WIND LOAD DIAGRAMS
ASB S-100 FOUNDATION PLAN - COMPREHENSIVE
ASB S-101 FOUNDATION PLAN - AREA A
ASB S-102 FOUNDATION PLAN - AREA B
ASB S-103 FOUNDATION PLAN - AREA C
ASB S-110 ROOF FRAMING PLAN - COMPREHENSIVE
ASB S-111 ROOF FRAMING PLAN - AREA A
ASB S-112 ROOF FRAMING PLAN - AREA B
ASB S-113 ROOF FRAMING PLAN - AREA C
ASB S-121 ARMS VAULT PLAN AND SECTIONS
ASB S-301 OVERALL BUILDING SECTIONS
ASB S-302 OVERALL BUILDING SECTIONS
ASB S-310 BRACED FRAME ELEVATIONS
ASB S-311 COVERED STORAGE
ASB S-313 JIB CRANE PLAN
ASB S-501 TYPICAL FOUNDATION DETAILS
ASB S-502 TYPICAL FOUNDATION DETAILS
ASB S-503 TYPICAL FOUNDATION DETAILS
ASB S-504 TYPICAL FOUNDATION DETAILS
ASB S-520 TYPICAL FRAMING DETAILS
ASB S-521 TYPICAL FRAMING DETAILS
ASB S-522 TYPICAL FRAMING DETAILS
ASB S-523 TYPICAL FRAMING DETAILS
ASB S-611 COLUMN SCHEDULES
ASB S-901 3D REPRESENTATIONS
STRUCTURAL: 27
ARCHITECTURE
ASB A-001 GENERAL NOTES AND ABBREVIATIONS
ASB A-002 ABA ACCESSIBILITY GUIDELINES
ASB A-003 SEALANT, MASONRY JOINTS & MISC. STANDARD DETAILS
ASB A-101 COMPOSITE FLOOR PLAN
ASB A-102 ENLARGED PLAN - AREA A
ASB A-103 ENLARGED PLAN - AREA B
ASB A-104 ENLARGED PLAN - AREA C
ASB A-111 COMPOSITE REFLECTED CEILING PLAN
ASB A-112 ENLARGED REFLECTED CEILING PLAN - AREA A
ASB A-113 ENLARGED REFLECTED CEILING PLAN - AREA B
ASB A-114 ENLARGED REFLECTED CEILING PLAN - AREA C
ASB A-121 ROOF PLAN
ASB A-201 ELEVATIONS
ASB A-202 ELEVATIONS
ASB A-203 ELEVATIONS
ASB A-301 BUILDING SECTIONS
ASB A-302 BUILDING SECTIONS
ASB A-311 WALL SECTIONS
ASB A-401 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS
ASB A-411 ENLARGED DETAILS AND CASEWORK SECTIONS
ASB A-421 ENLARGED CANOPY FLOOR PLANS AND ROOF DETAILS
ASB A-422 CANOPY COLUMN DETAILS AND COVERED STORAGE
(OPTION C) DETAILS
ASB A-431 ELECTRICAL STORAGE CAGE DETAILS
ASB A-501 WALL AND ROOF DETAILS
ASB A-511 MISCALLANEOUS DETAILS
ASB A-601 PARTITION TYPES
ASB A-611 DOOR/ FRAME SCHEDULE, TYPES, AND DETAILS
ASB A-612 DOOR DETAILS
ASB A-613 DOOR DETAILS
ASB A-621 WINDOW AND LOUVER TYPES AND DETAILS
ASB A-622 WINDOW AND LOUVER DETAILS
ASB A-801 AIR BARRIER PLAN, SECTIONS, AND COMPONENTS
ARCHITECTURE: 32
INTERIOR
ASB I-110 FIRST FLOOR FINISH PLAN COMPREHENSIVE
ASB I-111 ENLARGED FINISH AND SPECIAL ITEMS LOCATION PLAN -
MACHINE / WELDING AREAS
ASB I-112 ENLARGED FINISH AND SPECIAL ITEMS LOCATION PLAN -
CORRIDOR / TEST LANE AREAS
ASB I-113 ENLARGED FINISH AND SPECIAL ITEMS LOCATION PLAN -
COMPONENT SHOP AREAS
ASB I-401 ENLARGED BATHROOM PLAN
ASB I-501 INTERIOR FINISH DETAILS
ASB I-601 INTERIOR ROOM FINISH SCHEDULE
ASB I-602 INTERIOR COLOR AND MATERIAL SCHEDULE
ASB IF110 FIRST FLOOR FURNITURE PLAN - COMPREHENSIVE
ASB IF111 ENLARGED FURNITURE PLAN - MACHINE / WELDING
AREAS
ASB IF112 ENLARGED FURNITURE PLAN - CORRIDOR / TEST LANE
AREAS
ASB IF113 ENLARGED FURNITURE PLAN - COMPONENT SHOP
AREAS
ASB IF401 PANEL PLANS
ASB IG110 FIRST FLOOR SIGNAGE PLAN - COMPREHENSIVE
ASB IG111 ENLARGED SIGNAGE PLAN - MACHINE / WELDING AREAS
ASB IG112 ENLARGED SIGNAGE PLAN - CORRIDOR / TEST LANE
AREAS
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
E N D
M
EN
T
F E
B
2 0
AM
E N
D M
EN
T
F E B
2 0
W
2Q R
R
-0
DRAWING INDEX (VOLUME 3 OF 5 - EA)
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 3 OF 5 - EA)
BLDG ID
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 3 OF 5 - EA)
BLDG ID
SHEET
NUMBER SHEET TITLE
BASE SUMMARY OF WORK
CONSTRUCT FOUR ONE STORY BUILDINGS MAKING UP THE FT. CAMPBELL
GENERAL PURPOSE MAINTENANCE SHOP. WORK INCLUDES CONCRETE SLABS
ON GRADE, METAL STUD WALLS INFILLED WITH SPRAY FOAM INSULATION AND
VENEERS MADE UP OF INSULATED METAL PANEL AND STANDARD BRICK OVER
RIGID INSULATION AND GLASSMAT SHEATHING, AND ROOFS CONSISTING OF
STANDING SEAM METAL ROOFING OVER GLASSMAT COVERBOARD, BOARD
INSULATION, AND GLASSMAT UNDERLAYMENT OVER METAL DECK. BUILDINGS
SHALL BE EQUIPPED WITH FULL HVAC , PLUMBING, ELECTRICAL, AUTOMATIC
FIRE SUPPRESSION, FIRE ALARM, AND TELECOMMUNICATION SYSTEMS.
BUILDINGS SHALL ALSO INCLUDE AN OVERHEAD CRANE, VEHICLE AND OTHER
EXHAUST SYSTEMS, DUST COLLECTION SYSTEMS, AND PREFABRICATED PAINT
BOOTHS WITH ASSOCIATED COMPONENTS.
SITE WORK INCLUDES GRAVEL ORGANIZATIONAL VEHICLE PARKING AND
PRIVATELY OWNED VEHICLE LOTS, CONCRETE SIDEWALKS AND CONCRETE
HARDSTAND PORTIONS IMMEDIATELY ADJACENT TO THE BUILDINGS, SITE
LIGHTING, AND BIORETENTION.
OPTIONS SUMMARY OF WORK
OPTION A: CONSTRUCT A CONCRETE ORGANIZATIONAL VEHICLE PARKING LOT.
OPTION B: CONSTRUCT AN ASPHALT PRIVATELY OWNED VEHICLE PARKING
LOT.
OPTION C: CONSTRUCT A COVERED STORAGE AREA NEXT TO THE ALLIED
SHOPS BUILDING.
OPTION D: PROVIDE EPOXY COATING CONCRETE FINISH INSTEAD OF SEALED
CONCRETE FINISH FLOORING IN ALL BUILDINGS AS DENOTED IN DRAWINGS.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
JA
N U
AR
Y
C -2
-8
5-
W
2Q R
R
T.
C
H
AN
D
LE
R
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
G
EN
ER
AL
P U
R
PO
SE
M
AI
N
TE
N
AN
C
E
SH
O P
(G
T C
AM
PB
EL
L, T N
PN
, F Y2
0, P
READY TO ADVERTISEC:\Users\H2EDDJTC\Documents\470068_v2018_SITE_H2EDDJTC.rvt
2/27/2020 12:43:52 PM
G-002C
GEN
D R
AW
IN
G
IN
D
EX
(V O
LU
M
E
O F
-E
A)
T.
C
H
AN
D
LE
R
T.
C
H
AN
D
LE
R
D .B
AN
JA
N O
VI
C
EA M-712 GAS FIRED OVERHEAD RADIANT CONTROL SCHEMATIC &
SEQUENCE OF OPERATION
EA M-713 ELECTRIC & NATURAL GAS UNIT HEATER CONTROL
SCHEMATIC, SEQUENCE OF OPERATION & POINTS
SCHEDULE
EA M-714 ENERGY AND WATER MONITORING CONTROL
SCHEMATIC AND POINTS SCHEDULE
MECHANICAL: 44
ELECTRICAL
EA E-001 LEGEND AND ABBREVIATIONS
EA E-101 LIGHTING PLAN - COMPREHENSIVE
EA E-102 LIGHTING PLAN - ENLARGED OFFICE AREAS
EA E-103 LIGHTING PLAN - ENLARGED LOW TO HIGH ROOF BAY
AREA
EA E-104 LIGHTING PLAN - ENLARGED HIGH ROOF BAY AREA
EA E-110 POWER PLAN - COMPREHENSIVE
EA E-111 POWER PLAN - ENLARGED OFFICE AREAS
EA E-112 POWER PLAN - ENLARGED ENLARGED LOW TO HIGH
ROOF BAY AREA
EA E-113 POWER PLAN - ENLARGED HIGH ROOF BAY AREA
EA E-121 MECHANICAL POWER PLAN - COMPREHENSIVE
EA E-122 MECHANICAL POWER PLAN - ENLARGED OFFICE AREAS
EA E-123 MECHANICAL POWER PLAN - ENLARGED LOW TO HIGH
ROOF BAY AREA
EA E-124 MECHANICAL POWER PLAN - ENLARGED HIGH ROOF BAY
AREA
EA E-130 GROUNDING PLAN - COMPREHENSIVE
EA E-140 LIGHTNING PROTECTION PLAN - COMPREHENSIVE
EA E-150 HAZARDOUS CLASSIFICATION PLAN - COMPREHENSIVE
EA E-401 ENLARGED PLANS
EA E-501 ELECTRICAL DETAILS
EA E-502 GROUNDING DETAILS
EA E-503 GROUNDING DETAILS
EA E-504 LIGHTNING PROTECTION DETAILS
EA E-505 LIGHTNING PROTECTION DETAILS
EA E-506 LIGHTNING PROTECTION DETAILS
EA E-601 LIGHTING SCHEDULE
EA E-602 PANEL SCHEDULES
EA E-603 PANEL SCHEDULES
EA E-604 PANEL SCHEDULES
EA E-605 PANEL SCHEDULES
EA E-606 PANEL SCHEDULES
EA E-607 PANEL SCHEDULES
EA E-608 MECHANICAL EQUIPMENT SCHEDULE
EA E-609 LIGHTING CONTROL SCHEDULE
EA E-701 ONE-LINE DIAGRAM AND FEEDER SCHEDULE
ELECTRICAL: 33
TELECOMMUNICATIONS
EA T-001 TELECOMMUNICATIONS AND LOW VOLTAGE SYSTEMS
LEGEND
EA T-101 TELECOMMUNICATIONS PLAN - COMPREHENSIVE
EA T-102 TELECOMMUNICATIONS PLAN - ENLARGED OFFICE
AREAS
EA T-103 TELECOMMUNICATIONS PLAN - ENLARGED LOW TO HIGH
ROOF BAY AREA
EA T-104 TELECOMMUNICATIONS PLAN - ENLARGED HIGH ROOF
BAY AREA
EA T-401 ENLARGED PLANS
EA T-501 TELECOMMUNICATIONS DETAILS
EA T-502 TELECOMMUNICATIONS DETAILS
EA T-503 TELECOMMUNICATIONS DETAILS
EA T-504 TELECOMMUNICATIONS DETAILS
EA T-505 TELECOMMUNICATIONS DETAILS
EA T-506 TELECOMMUNICATIONS DETAILS
EA T-507 TELECOMMUNICATIONS DETAILS
EA T-701 TELECOMMUNICATIONS ONE-LINES
EA T-702 TELECOMMUNICATIONS ONE-LINES
TELECOMMUNICATIONS: 15
LIFE SAFETY
EA X-100 LIFE SAFETY CODE REVIEW (FOR REFERENCE ONLY)
EA X-110 LIFE SAFETY PLAN (FOR REFERENCE ONLY)
LIFE SAFETY: 2
Grand total: 208
FIRE PROTECTION: 2
FIRE ALARM
EA FA001 FIRE ALARM & MASS NOTIFICATION LEGEND
EA FA101 FIRE ALARM AND MASS NOTIFICATION PLAN -
COMPREHENSIVE
EA FA102 FIRE ALARM AND MASS NOTIFICATION - ENLARGED
OFFICE AREAS
EA FA103 FIRE ALARM AND MASS NOTIFICATION - ENLARGED HIGH
ROOF BAY AREA
EA FA104 FIRE ALARM AND MASS NOTIFICATION - ENLARGED HIGH
ROOF BAY AREA
EA FA701 FIRE ALARM AND MASS NOTIFICATION RISER DIAGRAM
EA FA801 FIRE ALARM SYSTEM MATRIX
FIRE ALARM: 7
PLUMBING
EA P-001 PLUMBING NOTES & LEGEND
EA P-101 PLUMBING PLAN - WASTE & VENT PIPING
EA P-102 ENLARGED PLUMBING PLAN - SANITARY - AREA A
EA P-103 ENLARGED PLUMBING PLAN - SANITARY - AREA B
EA P-104 ENLARGED PLUMBING PLAN - SANITARY - AREA C
EA P-105 PLUMBING PLAN - DOMESTIC COLD & HOT WATER PIPING
EA P-106 ENLARGED PLUMBING PLAN - DOMESTIC HOT & COLD
WATER - AREA A
EA P-107 ENLARGED PLUMBING PLAN - DOMESTIC HOT & COLD
WATER - AREA B
EA P-108 ENLARGED PLUMBING PLAN - DOMESTIC HOT & COLD
WATER - AREA C
EA P-109 PLUMBING PLAN - COMPRESSED AIR & GAS PIPING
EA P-110 ENLARGED PLUMBING PLAN - COMPRESSED AIR & GAS -
AREA A
EA P-111 ENLARGED PLUMBING PLAN - COMPRESSED AIR & GAS -
AREA B
EA P-112 ENLARGED PLUMBING PLAN - COMPRESSED AIR & GAS -
AREA C
EA P-113 PLUMBING PLAN - RADON PIPING
EA P-401 ENLARGED RESTROOM PLUMBING PLAN & RISER -
WASTE & VENT PIPING
EA P-402 ENLARGED MAINT. BAY RISER - WASTE AND VENT
EA P-403 ENLARGED RESTROOM PLUMBING & RISER - DOMESTIC
COLD & HOT WATER PIPING
EA P-404 MAINTENANCE BAY PLUMBING PLAN-DOMESTIC HOT &
COLD WATER
EA P-501 PLUMBING DETAILS
EA P-502 PLUMBING DETAILS
EA P-600 PLUMBING SCHEDULES
PLUMBING: 21
MECHANICAL
EA M-001 HVAC & HYDRONIC NOTES & LEGENDS
EA M-101 COMPOSITE HVAC DUCTWORK PLAN
EA M-102 ENLARGED HVAC PLAN - AREA A
EA M-103 ENLARGED HVAC PLAN - AREA B
EA M-104 ENLARGED HVAC PLAN - AREA C
EA M-105 COMPOSITE HYDRONIC PIPING PLAN
EA M-106 ENLARGED HYDRONIC PLANS
EA M-301 HVAC SECTIONS
EA M-302 HVAC SECTIONS
EA M-401 ENLARGED MECHANICAL ROOM PLAN & SECTIONS
EA M-402 ENLARGED MECHANICAL ROOM SECTIONS
EA M-405 DUCT RISER DIAGRAM
EA M-406 HYDRONIC RISER DIAGRAMS
EA M-407 CARPENTRY MACHINERY LAYOUT
EA M-501 MECHANICAL DETAILS
EA M-502 MECHANICAL DETAILS
EA M-503 MECHANICAL DETAILS
EA M-504 GEOTHERMAL FLOW SCHEMATIC
EA M-600 MECHANICAL EQUIPMENT SCHEDULES
EA M-601 MECHANICAL EQUIPMENT SCHEDULES
EA M-602 MECHANICAL EQUIPMENT SCHEDULES
EA M-700 CONTROL LEGENDS AND SYMBOLS
EA M-701 HVAC CONTROL POINT SCHEDULE INSTRUCTION
EA M-702 HVAC CONTROL SCHEDULING AND ALARM SQUENCES
EA M-703 HVAC CONTROL SYSTEM NETWORK
EA M-704A GEOTHERMAL GROUND LOOP CONTROL SCHEMATIC &
SEQUENCE OF OPERATION
EA M-704B GEOTHERMAL GROUND LOOP CONTROL POINTS AND
DAMPER SCHEDULES
EA M-705A WATER TO AIR GROUND SOURCE HEAT PUMP CONTROL
SCHEMATIC & SEQUENCE OF OPERATION
EA M-705B WATER TO AIR GROUND SOURCE HEAT PUMP CONTROL
POINTS , VALVE & DAMPER SCHEDULES
EA M-706A DEDICATED OUTDOOR AIR UNIT (DOAS-1) CONTROL
SCHEMATIC & SEQUENCE OF OPERATION
EA M-706B DEDICATED OUTDOOR AIR UNIT (DOAS-1) CONTROL
POINTS, VALVE & DAMPER SCHEDULES
EA M-707A MAU-1 & EF-1, 2, 3, & 4 CONTROL SCHEMATIC AND
SEQUENCE OF OPERATION
EA M-707B MAU-1 & EF-1, 2, 3, & 4 CONTROL LADDER DIAGRAMS
EA M-707C MAU-1 & EF-1, 2, 3, & 4 CONTROL POINTS & DAMPERS
SCHEDULES
EA M-708A MAU-2, TPEF-1, 2, 3, 4 & 5 CONTROL SCHEMATIC &
SEQUENCE OF OPERATION
EA M-708B MAU-2, TPEF-1, 2, 3, 4 & 5 CONTROL POINTS SCHEDULE
EA M-709A MAU-3, TPEF- 6, 7, 8, 9, 10 & 11 CONTROL SCHEMATIC &
SEQUENC OF OPERATION
EA M-709B MAU-3, TPEF- 6, 7, 8, 9, 10 & 11 CONTROL POINTS
SCHEDULE & LADDER DIAGRAMS
EA M-710A EXHAUST FAN CONTROL SCHEMATIC, SEQUENCE OF
OPERATION & POINTS SCHEDULE
EA M-711A MAU-4, EF-8, DCU-1 & DCU-2 CONTROL SCHEMATIC AND
SEQUENCE OF OPERATION
EA M-711B MAU-4, EF-8, DCU-1 & DCU-2 CONTROL POINTS
SCHEDULE & LADDER DIAGRAMS
GENERAL
GEN G-001 COVER SHEET
GEN G-002A DRAWING INDEX
GEN G-002B DRAWING INDEX
GEN G-002C DRAWING INDEX
GEN G-002D DRAWING INDEX
GEN G-002E DRAWING INDEX
GEN G-003 SITE LOCATION AND VICINITY MAPS
GEN G-004 BORROW DISPOSAL AREA PLAN
GEN RF101 REFERENCE DRAWING--AT/FP SETBACKS
GEN RF102 REFERENCE DRAWING--SITE PARKING PLAN
GENERAL: 10
STRUCTURAL
EA S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS &
ABBREVIATIONS
EA S-002 GENERAL STRUCTURAL NOTES
EA S-003 WIND LOAD DIAGRAMS
EA S-100 FOUNDATION PLAN - COMPREHENSIVE
EA S-101 FOUNDATION PLAN - AREA A
EA S-103 FOUNDATION PLAN - AREA B
EA S-104 FOUNDATION PLAN - AREA C
EA S-110 ROOF FRAMING PLAN - COMPREHENSIVE
EA S-111 ROOF FRAMING PLAN - AREA A
EA S-112 ROOF FRAMING PLAN - AREA B
EA S-113 ROOF FRAMING PLAN - AREA C
EA S-114 CRANE FRAMING PLAN
EA S-301 OVERALL BUILDING SECTIONS
EA S-302 OVERALL BUILDING SECTIONS
EA S-303 OVERALL BUILDING SECTIONS
EA S-304 MECHANICAL EQUIPMENT RACK DETAILS
EA S-310 BRACED FRAME ELEVATIONS
EA S-311 BRACED FRAME ELEVATIONS
EA S-501 TYPICAL FOUNDATION DETAILS
EA S-502 TYPICAL FOUNDATION DETAILS
EA S-503 TYPICAL FOUNDATION DETAILS
EA S-504 TYPICAL FOUNDATION DETAILS
EA S-510 TYPICAL FRAMING DETAILS
EA S-511 TYPICAL FRAMING DETAILS
EA S-512 TYPICAL FRAMING DETAILS
EA S-513 TYPICAL FRAMING DETAILS
EA S-514 TYPICAL FRAMING DETAILS
EA S-515 TYPICAL FRAMING DETAILS
EA S-516 TYPICAL FRAMING DETAILS
EA S-520 CRANE FRAMING DETAILS
EA S-611 COLUMN SCHEDULES
EA S-901 3D REPRESENTATIONS
STRUCTURAL: 32
ARCHITECTURE
EA A-001 GENERAL NOTES AND ABBREVIATIONS
EA A-002 ABA ACCESSIBILITY GUIDELINES
EA A-003 SEALANT, MASONRY JOINTS & MISC. STANDARD DETAILS
EA A-101 COMPOSITE FLOOR PLAN
EA A-102 ENLARGED PLAN - AREA A
EA A-103 ENLARGED PLAN - AREA B
EA A-104 ENLARGED PLAN - AREA C
EA A-111 COMPOSITE REFLECTED CEILING PLAN
EA A-112 ENLARGED REFLECTED CEILING PLAN - AREA A
EA A-113 ENLARGED REFLECTED CEILING PLAN - AREA B
EA A-114 ENLARGED REFLECTED CEILING PLAN - AREA C
EA A-121 ROOF PLAN
EA A-201 ELEVATIONS
EA A-202 ELEVATIONS
EA A-203 ELEVATIONS
EA A-301 BUILDING SECTION
EA A-302 BUILDING SECTION
EA A-311 WALL SECTIONS
EA A-401 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS
EA A-411 ENLARGED DETAILS AND CASEWORK SECTIONS
EA A-501 WALL AND ROOF DETAILS
EA A-505 FLOOR PLAN DETAILS
EA A-511 MISCALLANEOUS DETAILS
EA A-601 PARTITION TYPES
EA A-611 DOOR/ FRAME SCHEDULE, TYPES, AND DETAILS
EA A-612 DOOR DETAILS
EA A-621 WINDOW TYPES AND WINDOW DETAILS
EA A-622 WINDOW AND LOUVER DETAILS
EA A-801 AIR BARRIER PLAN, SECTIONS, AND COMPONENTS
ARCHITECTURE: 29
INTERIOR
EA I-110 FIRST FLOOR FINISH PLAN - COMPREHENSIVE
EA I-111 ENLARGED FINSH PLAN AND SPECIAL ITEMS LOCATION
PLAN- OFFICE AREAS
EA I-401 ENLARGED PLANS - BATHROOMS
EA I-501 INTERIOR FINISH DETAILS
EA I-601 INTERIOR ROOM FINISH SCHEDULE
EA I-602 INTERIOR COLOR AND MATERIAL SCHEDULE
EA IF110 FIRST FLOOR FURNITURE PLAN - COMPREHENSIVE
EA IF111 ENLARGED FURNITURE PLAN - OFFICE AREAS
EA IG110 FIRST FLOOR SIGNAGE PLAN - COMPREHENSIVE
EA IG111 ENLARGED SIGNAGE PLAN - OFFICE AREAS
EA IG501 SIGNAGE DETAILS
EA IG502 SIGNAGE DETAILS
EA IG601 SIGNAGE SCHEDULE
INTERIOR: 13
FIRE PROTECTION
EA FX101 FIRE PROTECTION PLAN
EA FX401 ENLARGED FIRE PROTECTION PLAN AND RISER
DIAGRAM
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
E N D
M
EN
T
F E
B
2 0
AM
E N
D M
EN
T
F E B
2 0
W
2Q R
R
-0
DRAWING INDEX (VOLUME 4 OF 5 - PB)
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 4 OF 5 - PB)
BLDG ID
SHEET
NUMBER SHEET TITLE
BASE SUMMARY OF WORK
CONSTRUCT FOUR ONE STORY BUILDINGS MAKING UP THE FT. CAMPBELL
GENERAL PURPOSE MAINTENANCE SHOP. WORK INCLUDES CONCRETE SLABS
ON GRADE, METAL STUD WALLS INFILLED WITH SPRAY FOAM INSULATION AND
VENEERS MADE UP OF INSULATED METAL PANEL AND STANDARD BRICK OVER
RIGID INSULATION AND GLASSMAT SHEATHING, AND ROOFS CONSISTING OF
STANDING SEAM METAL ROOFING OVER GLASSMAT COVERBOARD, BOARD
INSULATION, AND GLASSMAT UNDERLAYMENT OVER METAL DECK. BUILDINGS
SHALL BE EQUIPPED WITH FULL HVAC , PLUMBING, ELECTRICAL, AUTOMATIC
FIRE SUPPRESSION, FIRE ALARM, AND TELECOMMUNICATION SYSTEMS.
BUILDINGS SHALL ALSO INCLUDE AN OVERHEAD CRANE, VEHICLE AND OTHER
EXHAUST SYSTEMS, DUST COLLECTION SYSTEMS, AND PREFABRICATED PAINT
BOOTHS WITH ASSOCIATED COMPONENTS.
SITE WORK INCLUDES GRAVEL ORGANIZATIONAL VEHICLE PARKING AND
PRIVATELY OWNED VEHICLE LOTS, CONCRETE SIDEWALKS AND CONCRETE
HARDSTAND PORTIONS IMMEDIATELY ADJACENT TO THE BUILDINGS, SITE
LIGHTING, AND BIORETENTION.
OPTIONS SUMMARY OF WORK
OPTION A: CONSTRUCT A CONCRETE ORGANIZATIONAL VEHICLE PARKING LOT.
OPTION B: CONSTRUCT AN ASPHALT PRIVATELY OWNED VEHICLE PARKING
LOT.
OPTION C: CONSTRUCT A COVERED STORAGE AREA NEXT TO THE ALLIED
SHOPS BUILDING.
OPTION D: PROVIDE EPOXY COATING CONCRETE FINISH INSTEAD OF SEALED
CONCRETE FINISH FLOORING IN ALL BUILDINGS AS DENOTED IN DRAWINGS.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
JA
N U
AR
Y
C -2
-8
5-
W
2Q R
R
T.
C
H
AN
D
LE
R
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
G
EN
ER
AL
P U
R
PO
SE
M
AI
N
TE
N
AN
C
E
SH
O P
(G
T C
AM
PB
EL
L, T N
PN
, F Y2
0, P
READY TO ADVERTISEC:\Users\H2EDDJTC\Documents\470068_v2018_SITE_H2EDDJTC.rvt
2/27/2020 12:43:55 PM
G-002D
GEN
D R
AW
IN
G
IN
D
EX
(V O
LU
M
E
O F
-P
B)
T.
C
H
AN
D
LE
R
T.
C
H
AN
D
LE
R
D .B
AN
JA
N O
VI
C
PLUMBING: 12
MECHANICAL
PB M-001 HVAC & HYDRONIC NOTES & LEGENDS
PB M-101 HVAC DUCTWORK PLAN
PB M-102 HYDRONIC PIPING PLAN
PB M-301 ENLARGED MECHANICAL ROOM SECTIONS
PB M-401 ENLARGED MECHANICAL ROOM PLAN
PB M-402 ENLARGED ISOMETRIC PAINTBOOTHS
PB M-501 MECHANICAL DETAILS
PB M-502 MECHANICAL DETAILS
PB M-601 MECHANICAL EQUIPMENT SCHEDULES
PB M-602 MECHANICAL EQUIPMENT SCHEDULES
PB M-603 MECHANICAL EQUIPMENT SCHEDULES
PB M-700 CONTROL LEGENDS AND SYMNBOLS
PB M-701 HVAC CONTROL POINT SCHEDULE INSTRUCTION
PB M-702 HVAC CONTROL SCHEDULING AND ALARM SQUENCES
PB M-703 HVAC CONTROL SYSTEM NETWORK
PB M-704A AHU-1 & CU-1 CONTROL SCHEMATIC
PB M-704B AHU-1 POINT SCHEDULE, SEQUENCE OF OPERATION &
LADDER DIAGRAM
PB M-705A ERU-1 CONTROL SCHEMATIC, SEQUENCE OF
OPERATION, AND LADDER DIAGRAM
PB M-705B ERU-1 POINT SCHEDULE
PB M-706A MAU-1 & EF-3 SEQUENCE OF OPERATION AND
SEQUENCE OF OPERATION
PB M-706B MAU-1 & EF-3 LADDER DIAGRAMS & POINT SCHEDULE
PB M-707A MAU-2, EF-1 & EF-2 CONTROL SCHEMATIC & SEQUENCE
OF OPERATION
PB M-707B MAU-2, EF-1 &EF-2 LADDER DIAGRAMS, POINT SCHEDULE
PB M-708A HOT WATER SYSTEM CONTROL SCHEMATIC
PB M-708B HOT WATER SYSTEM SEQUENCE OF OPERATION AND
POINT SCHEDULE
PB M-709 UNIT HEATER CONTROL SCHEMATIC, SEQUENCE OF
OPERATION, LADDER DIAGRAM AND POINT SCHEDULE
PB M-710 EXHAUST FAN CONTROL SCHEMATICS, LADDER
DIAGRAMS AND POINTS SCHEDULE
PB M-711 ENERGY AND WATER MONITORING CONTROL
SCHEMATIC AND POINTS SCHEDULE
MECHANICAL: 28
ELECTRICAL
PB E-001 LEGEND AND ABBREVIATIONS
PB E-101 LIGHTING PLAN - COMPREHENSIVE
PB E-110 POWER PLAN - COMPREHENSIVE
PB E-120 MECHANICAL POWER PLAN - COMPREHENSIVE
PB E-121 ROOF MECHANICAL POWER PLAN - COMPREHENSIVE
PB E-140 LIGHTNING PROTECTION PLAN - COMPREHENSIVE
PB E-150 HAZARDOUS CLASSIFICATION PLAN - COMPREHENSIVE
PB E-401 ENLARGED PLANS
PB E-501 ELECTRICAL DETAILS
PB E-502 GROUNDING DETAILS
PB E-503 GROUNDING DETAILS
PB E-504 LIGHTNING PROTECTION DETAILS
PB E-505 LIGHTNING PROTECTION DETAILS
PB E-506 LIGHTNING PROTECTION DETAILS
PB E-601 LIGHTING SCHEDULE
PB E-602 LIGHTING SCHEDULE
PB E-603 PANEL SCHEDULES
PB E-604 PANEL SCHEDULES
PB E-605 PANEL SCHEDULES
PB E-606 LIGHTING CONTROL SCHEDULE
PB E-701 ONE-LINE DIAGRAM AND FEEDER SCHEDULE
ELECTRICAL: 21
TELECOMMUNICATIONS
PB T-001 TELECOMMUNICATIONS AND LOW VOLTAGE SYSTEMS
LEGEND
PB T-101 TELECOMMUNICATIONS PLAN - COMPREHENSIVE
PB T-501 TELECOMMUNICATIONS DETAILS
PB T-502 TELECOMMUNICATIONS DETAILS
PB T-503 TELECOMMUNICATIONS DETAILS
PB T-701 TELECOMMUNICATIONS ONE-LINES
TELECOMMUNICATIONS: 6
LIFE SAFETY
PB X-100 LIFE SAFETY CODE REVIEW (FOR REFERENCE ONLY)
PB X-110 LIFE SAFETY PLAN (FOR REFERENCE ONLY)
LIFE SAFETY: 2
Grand total: 137
GENERAL
GEN G-001 COVER SHEET
GEN G-002A DRAWING INDEX
GEN G-002B DRAWING INDEX
GEN G-002C DRAWING INDEX
GEN G-002D DRAWING INDEX
GEN G-002E DRAWING INDEX
GEN G-003 SITE LOCATION AND VICINITY MAPS
GEN G-004 BORROW DISPOSAL AREA PLAN
GEN RF101 REFERENCE DRAWING--AT/FP SETBACKS
GEN RF102 REFERENCE DRAWING--SITE PARKING PLAN
GENERAL: 10
STRUCTURAL
PB S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS &
ABBREVIATIONS
PB S-002 GENERAL STRUCTURAL NOTES
PB S-003 WIND LOAD DIAGRAMS
PB S-100 FOUNDATION PLAN
PB S-110 ROOF FRAMING PLAN
PB S-301 OVERALL BUILDING SECTIONS
PB S-302 OVERALL BUILDING SECTIONS
PB S-310 BRACED FRAME ELEVATIONS
PB S-311 MASONRY WALL ELEVATIONS
PB S-501 TYPICAL FOUNDATION DETAILS
PB S-502 TYPICAL FOUNDATION DETAILS
PB S-503 TYPICAL FOUNDATION DETAILS
PB S-504 TYPICAL FOUNDATION DETAILS
PB S-520 TYPICAL FRAMING DETAILS
PB S-521 TYPICAL FRAMING DETAILS
PB S-522 TYPICAL FRAMING DETAILS
PB S-523 TYPICAL FRAMING DETAILS
PB S-524 TYPICAL FRAMING DETAILS
PB S-525 TYPICAL FRAMING DETAILS
PB S-526 TYPICAL FRAMING DETAILS
PB S-611 COLUMN SCHEDULES
PB S-901 3D REPRESENTATIONS
STRUCTURAL: 22
ARCHITECTURE
PB A-001 GENERAL NOTES AND ABBREVIATIONS
PB A-002 ABA ACCESSIBILITY GUIDELINES
PB A-003 SEALANT, MASONRY JOINTS & MISC. STANDARD DETAILS
PB A-101 FLOOR PLAN
PB A-111 FIRST FLOOR REFLECTED CEILING PLAN
PB A-121 ROOF PLAN
PB A-201 ELEVATIONS
PB A-202 ELEVATIONS
PB A-301 BUILDING SECTIONS
PB A-302 BUILDING SECTIONS
PB A-311 WALL SECTIONS
PB A-401 ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS
PB A-501 WALL AND ROOF DETAILS
PB A-502 WALL AND ROOF DETAILS
PB A-505 PLAN DETAILS
PB A-511 MISCELLANEOUS DETAILS
PB A-601 PARTITION TYPES
PB A-611 DOOR/ FRAME SCHEDULE, TYPES, AND DETAILS
PB A-612 DOOR DETAILS
PB A-621 WINDOW TYPES AND WINDOW DETAILS
PB A-622 WINDOW AND LOUVER DETAILS
ARCHITECTURE: 21
INTERIOR
PB I-110 FIRST FLOOR FINISH AND SPECIAL ITEMS LOCATION
PLAN
PB I-401 ENLARGED PLAN BATHROOMS
PB I-501 INTERIOR DETAILS
PB I-601 INTERIOR ROOM FINISH SCHEDULE
PB I-602 INTERIOR COLOR SCHEDULE
PB IF110 FIRST FLOOR FURNITURE PLAN
PB IG110 FIRST FLOOR SIGNAGE PLAN
PB IG501 SIGNAGE DETAILS
PB IG601 SIGNAGE SCHEDULE
INTERIOR: 9
FIRE PROTECTION
PB FX-101 FIRE PROTECTION PLAN
PB FX-401 ENLARGE FIRE PROTECTION PLAN & RISER
FIRE PROTECTION: 2
FIRE ALARM
PB FA001 FIRE ALARM LEGEND
PB FA101 FIRE ALARM PLAN - COMPREHENSIVE
PB FA701 FIRE ALARM RISER DIAGRAM
PB FA801 FIRE ALARM SYSTEM MATRIX
FIRE ALARM: 4
PLUMBING
PB P-001 PLUMBING NOTES & LEGEND
PB P-101 PLUMBING PLAN - WASTE & VENT PIPING
PB P-102 PLUMBING PLAN - DOMESTIC COLD, HOT WATER & HOT
WATER RECIRCULATION PIPING
PB P-103 PLUMBING PLAN - COMPRESSED AIR PIPING
PB P-104 PLUMBING PLAN - RADON PIPING
PB P-105 PLUMBING PLAN - NATURAL GAS PIPING
PB P-401 ENLARGED PLUMBING PLAN AND RISER
PB P-402 ENLARGED PLUMBING PLAN & RISER
PB P-403 PLUMBING RISER - TOOL & BREATHING COMPRESSED
AIR PIPING RISER
PB P-501 PLUMBING DETAILS
PB P-502 PLUMBING DETAILS
PB P-601 PLUMBING SCHEDULES
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
E N D
M
EN
T
F E
B
2 0
AM
E N
D M
EN
T
F E B
2 0
W
2Q R
R
-0
DRAWING INDEX (VOLUME 5 OF 5 - PC)
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 5 OF 5 - PC)
BLDG ID
SHEET
NUMBER SHEET TITLE
DRAWING INDEX (VOLUME 5 OF 5 - PC)
BLDG ID
SHEET
NUMBER SHEET TITLE
BASE SUMMARY OF WORK
CONSTRUCT FOUR ONE STORY BUILDINGS MAKING UP THE FT. CAMPBELL
GENERAL PURPOSE MAINTENANCE SHOP. WORK INCLUDES CONCRETE SLABS
ON GRADE, METAL STUD WALLS INFILLED WITH SPRAY FOAM INSULATION AND
VENEERS MADE UP OF INSULATED METAL PANEL AND STANDARD BRICK OVER
RIGID INSULATION AND GLASSMAT SHEATHING, AND ROOFS CONSISTING OF
STANDING SEAM METAL ROOFING OVER GLASSMAT COVERBOARD, BOARD
INSULATION, AND GLASSMAT UNDERLAYMENT OVER METAL DECK. BUILDINGS
SHALL BE EQUIPPED WITH FULL HVAC , PLUMBING, ELECTRICAL, AUTOMATIC
FIRE SUPPRESSION, FIRE ALARM, AND TELECOMMUNICATION SYSTEMS.
BUILDINGS SHALL ALSO INCLUDE AN OVERHEAD CRANE, VEHICLE AND OTHER
EXHAUST SYSTEMS, DUST COLLECTION SYSTEMS, AND PREFABRICATED PAINT
BOOTHS WITH ASSOCIATED COMPONENTS.
SITE WORK INCLUDES GRAVEL ORGANIZATIONAL VEHICLE PARKING AND
PRIVATELY OWNED VEHICLE LOTS, CONCRETE SIDEWALKS AND CONCRETE
HARDSTAND PORTIONS IMMEDIATELY ADJACENT TO THE BUILDINGS, SITE
LIGHTING, AND BIORETENTION.
OPTIONS SUMMARY OF WORK
OPTION A: CONSTRUCT A CONCRETE ORGANIZATIONAL VEHICLE PARKING LOT.
OPTION B: CONSTRUCT AN ASPHALT PRIVATELY OWNED VEHICLE PARKING
LOT.
OPTION C: CONSTRUCT A COVERED STORAGE AREA NEXT TO THE ALLIED
SHOPS BUILDING.
OPTION D: PROVIDE EPOXY COATING CONCRETE FINISH INSTEAD OF SEALED
CONCRETE FINISH FLOORING IN ALL BUILDINGS AS DENOTED IN DRAWINGS.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .