Q&A_V.pdf
PDF 20 KB Posted
- Attached to
- Industrial Wastewater Filtration System
- Solicitation number
- W912PQ-17-T-0033
About this file
Q&A V
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A_IV.pdf | ||
| Q&A_III.pdf | ||
| Q&A_II.pdf | ||
| Aerial_View.jpg | JPG image | |
| Q&A.pdf | ||
| SF_1449_Solicitation_W912PQ-17-T-0033.pdf | ||
| Statement_of_Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q. If we provide a system with remote telemetry and controls can it be run longer than an 8 hour day?
A. The system can run 24/7 as long as someone does not have to be on site to monitor. Yes remote monitoring is possible but not through existing on base infrastructure.
Q. Does the system need to be manned at all times during operation?
A. The system can run 24/7 as long as someone does not have to be on site to monitor.
Q. What is the maximum daily discharge limit for the sewer system?
A. The sanitary main line is 8 inch for the entire base and has accepted up to 200 gpm in the past from lagoon discharge.
Q. I understand that the contractor is only responsible for two samples if the system provides non-detect results. The first is to demonstrate system compliance. When is the second test required?
A Prior to draining the second lagoon. Each logon (2) is to be treated independently and have been isolated as such.