REQUEST FOR INFORMATION (RFI)
6 July 2017
W912PQ-17-B-0001
Repair Storm Drainage and Base Pavements and Repair Water Distribution System
Q14- For water line 2F plan sheet CU106 calls out a 2” water line and the profile on plan sheet CU211 for water line 2F calls out 3” water. Please clarify which is the correct pipe size for water line 2F?
A14- Water line 2F shall be 3” as shown in the profile on sheet CU211.
Q15- For water line 5A plan sheet CU109 calls out a length of 58.86’ (0+58.86) and the profile on plan sheet CU216 for water line 5A calls out 28.31’ (0+28.31). Please clarify which is the correct run length for water line 5A?
A15 – The length of water line 5A shall be 58.86’ as shown on sheet CU109.
Q16- For water line 5B plan sheet CU109 calls out a 2” water line servicing Bldg 3105 and the profile on plan sheet CU216 for water line 5B calls out 6” water. Please clarify which is the correct pipe size for water line 5B?
A16 – Water line 5B shall be 2” as shown on sheet CU109.
Q17- For water line 5B plan sheet CU109 calls out a length of 92.14’ (0+92.14) and the profile on plan sheet CU216 for water line 5B calls out 20.20’ (0+20.20). Please clarify which is the correct run length for water line 5B?
A17 – Water line 5B shall be 92.14’ as shown on sheet CU109.
Q18- Can your engineer QA/QC the plans for any additional discrepancies?
A18 – QA/QC was performed prior to Issue for Bid; therefore, no additional reviews will be conducted during the bid period.