REQUEST FOR INFORMATION (RFI)
30 June 2017
W912PQ-17-B-0001
Repair Storm Drainage and Base Pavements and Repair Water Distribution System
Q1 - For bidding purposes, what is the thickness of the existing pavement to be demoed and removed?
A Q1: Subsurface investigations over the past several years have indicated varying pavement depths consisting of 4-8 inches of asphalt and 6-8 inches of aggregate base. These are only representative samples of the areas where they were taken and any extrapolation over the entirety of the Base shall be at the Contractor's risk.