RFI_14-18.pdf

PDF 45 KB Posted

Attached to
Repair Storm Drainage and Base Pavements and Repair Water Distribution System
Solicitation number
W912PQ-17-B-0001
Issued by

About this file

RFI 14-18

View the file

Other files

File Type Posted
Attendance_Sheet.pdf PDF
OF_1419A_PAGE_3.pdf PDF
OF_1419A_PAGE_4.pdf PDF
OF_1419_Page_1.pdf PDF
OF_1419_Page_2.pdf PDF
W912PQ-17-B-0001_0003.pdf PDF
Attachment_2_Wage_Determination_07-14-2017.pdf PDF
RFI_019-020.pdf PDF
RFI_14-18.pdf PDF
RFI_13.pdf PDF
RFI_2-12.pdf PDF
W912PQ-17-B-0001-0002.pdf PDF
RFI_001.pdf PDF
PREBID_Slides_-_Water_Dist_Rev.pdf PDF
Attendance_Sheet.pdf PDF
Conform_W912PQ-17-B-0001-0001.pdf PDF
W912PQ-17-B-0001-0001.pdf PDF
W912PQ-17-B-0001.pdf PDF
022017_DWG_Binder_2017-03-31.pdf PDF
Attachment_2_Wage_Determination.pdf PDF
182092_Specifications.pdf PDF
182092_DWG_Binder_2017-03-31.pdf PDF
182092_-_Addendum_of_Section_01_11_00.pdf PDF
022017-_Addendum_of_Section_01_11_00.pdf PDF
022017_Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

6 July 2017

W912PQ-17-B-0001

Repair Storm Drainage and Base Pavements and Repair Water Distribution System

Q14- For water line 2F plan sheet CU106 calls out a 2” water line and the profile on plan sheet CU211 for water line 2F calls out 3” water. Please clarify which is the correct pipe size for water line 2F?

A14- Water line 2F shall be 3” as shown in the profile on sheet CU211.

Q15- For water line 5A plan sheet CU109 calls out a length of 58.86’ (0+58.86) and the profile on plan sheet CU216 for water line 5A calls out 28.31’ (0+28.31). Please clarify which is the correct run length for water line 5A?

A15 – The length of water line 5A shall be 58.86’ as shown on sheet CU109.

Q16- For water line 5B plan sheet CU109 calls out a 2” water line servicing Bldg 3105 and the profile on plan sheet CU216 for water line 5B calls out 6” water. Please clarify which is the correct pipe size for water line 5B?

A16 – Water line 5B shall be 2” as shown on sheet CU109.

Q17- For water line 5B plan sheet CU109 calls out a length of 92.14’ (0+92.14) and the profile on plan sheet CU216 for water line 5B calls out 20.20’ (0+20.20). Please clarify which is the correct run length for water line 5B?

A17 – Water line 5B shall be 92.14’ as shown on sheet CU109.

Q18- Can your engineer QA/QC the plans for any additional discrepancies?

A18 – QA/QC was performed prior to Issue for Bid; therefore, no additional reviews will be conducted during the bid period.

6 July 2017