AMEND_2.pdf
PDF 283 KB Posted
- Attached to
- IDIQ MATOC CONTRACT FOR 109TH AIRLIFT WING
- Solicitation number
- W912PQ15R0006
About this file
See info on amendment the amendment must be acknowledged as part of the RFP package- responses to questions begin on pages 12 - 18.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_B.docx | DOCX document | |
| 2015_05_20_-_Bldg_1_-_Addendum_2_final.pdf | ||
| Addendum_2_MATOC_Site_Visit_Attendance_List.pdf | ||
| ADDENDUM_1_-_MATOC.docx | DOCX document | |
| Addendum_1_Attachement_Pre-Renovation_Hazardous_Materials_Survey_Report 1 .pdf | ||
| 2nd_site_visit.docx | DOCX document | |
| Pre-prosoal_confence_and_site_visit_attendance.pdf | ||
| MATOC_PRE-PROPOSAL_MTG.pptx | PPTX presentation | |
| Pre-Performance_Conference_ _Site_Visit_Minutes.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA6323 - 109 MSG/MSC STRATTON ANGB
1 AIR NATIONAL GUARD ROAD
SCOTIA NY 12302-9752
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. An extension has been issued all proposals are due on June 4 by 1 PM (1300).
B. All additional questions must be e-mailed on or before May 26, 2015 no later than 1500 (3 PM); pending the complexity of the question, w e w ill do our best to post all responses by May 29, 2015 (to the FBO).
C. Questions received to date are posted to this amendment.
D. Nothing follow s.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 70
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-May-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PQ-15-R-0006
X 9B. DATED (SEE ITEM 11)
23-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-May-2015
CODE
W912PQ - 109 MSG/MSC
1 AIR NATIONAL GUARD ROAD
SCOTIA NY 12302-9752
W912PQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912PQ
FACILITY CODECODE
EMAIL:TEL:
W912PQ-15-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The standard size code $33,500,000 has been added.
The Issued By organization has changed from
W912PQ - USP&FO-NY
ATTN: MNPF-PC
330 OLD NISKAYUNA ROAD
LATHAM NY 12110-3514
to
W912PQ - 109 MSG/MSC
1 AIR NATIONAL GUARD ROAD
SCOTIA NY 12302-9752
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0001 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
2 yrs. ADC 100 N/A
FOB: Destination
The following Delivery Schedule for CLIN 0002 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
2 yrs. ADC 50 N/A
The following Delivery Schedule for CLIN 0003 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
2 yrs. ADC 50 N/A
The following have been modified:
SECTION 10
TABLE OF CONTENTS/NOTES
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 - PRICING SCHEDULE, NOTES, AREAS OF CONSIDERATION,
SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATION
SECTION 00700 - CONTRACT CLAUSES
SECTION 00800 - SPECIAL MATOC CONTRACT REQUIREMENTS
SECTION 01001 - 01700 – DIVISION 1 - TECHNICAL SPECIFICATIONS
ATTACHMENT 1 – MASTER SPECIFICATIONS “TO BE PROVIDED AT TIME OF AWARD”
ATTACHMENT 2- QUESTIONS AND ANSWERS DOCUMENT DATED “TO BE INSERTED AT
TIME OF AWARD.”
EXHIBIT A- Performance Relevancy Questionnaire EXHIBIT B- Subcontract Information and Consent Form EXHIBIT C- Package Information & Forms; Cover Letter; Respondent Identification & Ratings EXHIBIT D- Technical Proposal Format and Questions EXHIBIT E- VBDZ132003 Renovate O & T Building 1 Project Offering Form
SECTION 00010 NOTES
The following apply to this contract:
Task Orders in the following location(s) are applicable to this contract: (to be completed by the contracting officer at time of award).
In addition to Task Orders issued on a small business set-aside basis contractor is eligible to complete for Task Orders set-aside for: (to be completed by the contracting officer at time of award).
Applicable Maximum order dollar values (to be completed by the contracting officer at time of award).
A Task Order in the amount of $200 will be issued upon award of this contract. Contractors may invoice for the initial Task Order following acceptance by the Contracting Officer of the Master Safety and Quality Control Plans. These plans shall be submitted not later than 30 days from the award of a MATOC contract and receipt of the initial Task Order. Plans submitted with the proposal in response to the solicitation are not acceptable. In the event the Contractor awarded a MATOC does not submit the required plans within 60 days of award the Contracting Officer may unilaterally cancel the MATOC contract at no cost to the Government.
IAW FAR 52.228-1 Bid Bonds are required for Bldg. 1 Repair O&T - information is found in Exhibit E offering letter.
Areas in Table of Contents shown in gray which include Sections, 00100, 00110, 00120, and 00600 will be physically removed and not placed in contract award, however shall remain in the Table of Contents and deemed to be incorporated by reference in that award.
Contractor’s attention is invited to Section 00800, Special Contract Requirements. Important information on the Task Order process is contained therein. Offerors are encouraged to read this section in its entirety to reach a better understanding of the MATOC Task Order Process. The minimum guaranteed Task Order amount for the entire contract period, to include any exercised option periods, is $200 per IDIQ contract awarded. (See note above).
The term “Contracting Officer” is applicable to this Solicitation and resulting contract(s). The terms “Contracting Officer” and “Ordering Officer” may be used interchangeably when referring to individual Task Orders.
Reference Contract Clause 252.236-7008, CONTRACT PRICES – BIDDING SCHEDULES. The term Bidding Schedule shall also be construed to mean Offer Schedule or Schedule. The terms “bid” and “offer” shall be construed as having the same meaning in this solicitation and resulting contract(s) and any future Task Orders.
Reference Contract Clause 52.215-5, FACSIMILE PROPOSALS. This clause will not apply to individual Task Order Request for Proposals to be issued under the basic contract. It does not apply to this (Basic Contract) solicitation. Individual MATOC Task Order Requests for Proposals will indicate the applicability of this clause.
Reference Contract Clause 52.228-15, PERFORMANCE AND PAYMENT BONDS. Applicability will be defined in individual MATOC orders.
The Government intends to award Multiple Contracts pursuant to this solicitation. Federally warranted Contracting Officers at the Stratton ANGB, 109th AW, Scotia, NY may place Task Orders against resulting contracts.
DO NOT insert prices in the Basic and Option Years CLINs provided immediately after the SF 1442.
Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
1.. DOLLAR VALUE OF PROJECTS
The contractor must identify the dollar range of projects they are interested in receiving consideration for under the MATOC contract. Each offeror must check ONLY one of the ranges listed below. (This limitation may be due to business size or company bonding limitations). Note: Task Order offerings in excess of $5M will be offered only to contractors awarded at the $5M level or through options have reached the $5M level. Such contractors may be required to provide additional capability information to include bonding capability and financial capability depending on the dollar amount of the proposed Task Order.
Table B allows an offeror to start at a smaller dollar range and grow with the program based on successful performance and capabilities. Select from A OR B but not both.
A- DOLLAR VALUE
( ) $200 - $250,000
( ) $200 - $500,000
( ) $200 - $1 Million
( ) $200 - $3 Million
( ) $200 - $5 Million
$2 Million - $5 Million
B- Optional Escalating Scale The amount on this chart allow for increases in limits in option years. Check only one range.
( ) Basic $200 - $250,000 Option One $200- $500,000 Option Two $200,00- $1M Option Three 200-$2M
( ) Basic $200 - $500,000 Option One $200- $1M Option Two $200- $2M Option Three 200-$3M
( ) Basic $200 - $1M Option One $200- $2M Option Two $200- $3M Option Three $200-$5M
( ) Basic $200 - $2M Option One $200- $5M
Increases in option years will be granted based on Satisfactory performance at sole discretion of the Contracting Officer.
End of Section 00010
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
SECTION 100
Section 00100
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. INTRODUCTION
1.1. SCOPE: You are invited to submit a proposal in response to our Request for Proposal (RFP) entitled, “109th AW MATOC Solicitation” for construction and design-build services for all facilities located at the Stratton ANGB (including CounterDrug and CST). As a result of this solicitation, the Government intends that a minimum of nine (9) indefinite-delivery, indefinite-quantity, (IDIQ) Task Order Contracts will be awarded, providing sufficient qualified contractors present offers. All awards will be made to small business pursuant to a 100% small business set-aside. The contracting officer may set-aside Task Orders for SBA Certified 8(a) participants;
Certified HUBZone Small Business Concerns, Small Business Service Disabled Veteran Owned Business and Women Owned Small Businesses Concerns providing 2 or more qualified contractors in each category present conforming offers and are awarded a MATOC. The Government also reserves the right to set-aside Task Orders for other authorized socio-economic programs approved for use during the existence of this MATOC and implemented by the FAR or
DFARS.
1.1.1. Awards will be made to offerors whose proposals, responsive and conforming to the RFP, are determined to be most advantageous to the Government in terms of Technical, Price and other factors considered. Socioeconomic status of the offeror will also be considered.
1.2. Work to be performed under the MATOC contracts will include, but is not limited to, construction, demolition/remediation services, environmental, and limited design services for projects designated for real property facilities normally at the Stratton Air National Guard Base, Scotia, NY. Projects will principally be bid build type from already completed designs, and/or projects specified by a Statement of Work using the Master Specification. However, offerings (to include the initial Project) may include some design/build options/projects; which may be non-complex or complex performance based offerings. Complex design-build projects will normally be solicited using a two phase approach as described in Section 00800.
1.2.1. The Government reserves the right to issue additional solicitations and award additional contracts within the activities covered by this contract. In this event, new MATOC contractors, in accordance with the terms of their contracts, may compete for Task Orders with the Contractors selected under this solicitation. This is not a solicitation for a Requirements Contract.
1.3. PROJECT CATEGORIES: Work performed under these Multi-Discipline Contracts will generally be of, but are not limited to, the following general project categories:
1.3.1. Construction, repair and alteration of various facilities.
1.3.2. Construction, repairs and alteration of Electrical Systems (ES)
1.3.3. Construction, repair and alteration of Mechanical Systems (e.g. HVAC systems, and controls.)
1.3.4. Concrete and/or Asphalt Paving.
1.3.5. Demolition of facilities when required. Note: Demolition projects that are stand-alone, not part of a rebuild, fall under the Service Contract Act, and the Davis Bacon Act is not applicable, nor is bonding. FAR 52.222-41, Services Contract Act of 1965, and FAR 52.246-13, Inspection—Dismantling, Demolition, or Removal of Improvements clauses and requirements apply. Note that the applicable clauses for Prompt Payment, Value Engineering, and Termination are likewise different from such clauses applicable to all other requirements under this contract.
1.4. CONTRACT DURATION, LIMITS, AND AMOUNTS: Each of the resulting contracts will include a two-year base period (2 years) and three one-year option periods. The maximum value of each contract will not exceed $10 Million over the life of the contract. The Minimum and Maximum values for a single Task Order are $200 and $5 Million, respectively.
The minimum guaranteed order for each contract is one (1) Task Order valued at $200 with a guaranteed fee of $200 for the life of the contract. At time of award of the basic contract, a Task Order for $200 will be issued and will be paid only if the awarded contractor submits acceptable Master Quality Control and Safety Plans to the Contracting Officer. Plans are due 30 days after issuance of the Task Order. Failure to submit the required plans within 60 days of issuance of the Task Order may result in the Government unilaterally cancelling the Task Order and basic award. See Section 00800 for details.
1.5. TASK ORDERS
1.5.1. As requirements develop, Task Orders will be competed among the MATOC awardees, or negotiated on a sole source basis as described in Section 00800. Section 00800 describes the Task Order process in detail. Offerors are highly encouraged to read Section 00800 before submitting a proposal.
1.5.2. The basic contract will be administered, (e.g. issuing modifications, exercising options), by the Contracting Office, Stratton ANGB, 1 Air National Guard Rd, Scotia, NY 12302.
1.5.3. Individual Task Orders and modifications will be negotiated, awarded and administered by federally appointed contracting officers located at the Stratton ANGB, Scotia, NY. The Task Order and Modifications coordinated by 109th Contracting Officer may be signed by any United States Property and Fiscal Office for New York (USP&FO-NY) Contracting Officer. Organizations other than the 109th will not be allowed to utilize these awards.
1.5.4. Construction performance requirements will be specified for each project in the Task Order Request for Proposal. MATOC Awardees will compete for Task Orders among themselves. The majority of all Task Orders shall be awarded based on competitive proposals received in response to the agency request for quotation.
1.6. NOTICE OF PRE-PROPOSAL CONFERENCE:
1.6.1. A pre-proposal conference will be conducted on 8 May 2015 at 1000 hours for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at Stratton ANGB, 1 Air National Guard Road, Scotia, NY. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
1.6.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to MSgt Wanda Yarbor at the following addresses: 109aw.msgmsc@ang.af.mil or wanda.yarbor@ang.af.mil.
Firm Name and Telephone Number Visitor’s Name and Social Security No.
Drivers License Citizenship
1.6.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary;
however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
1.6.4. Visitors must pick up their passes at the Installation’s Main Entry Gate at arrival.
You will be required to present the following information upon arrival: (1) Vehicle Registration,
(2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
1.6.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
1.6.6. A record of the conference shall be made and furnished to all prospective offerors via posting to our web site at https://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
1.7. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
1.7.1. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, for proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
1.7.2. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed responsive and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED TO
SUBMIT QUESTIONS EARLY IN THIS PROCESS.
1.7.3. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to https://www.fbo.gov.
1.7.3.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals.
Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
1.7.4. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information:
1.7.4.1. Effective May 29, 2012 Government systems such as CCR and ORCA (on-line representations and certifications) are migrating to in System for Award Management (SAM). Interested offerors must be registered in SAM. To register go to:
https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register.
Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities
(FedBizOpps) website on-line at https://www.fbo.gov/. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies.
Interested bidders/offerors must register with FedBizOpps before accessing the system.
FedBizOpps registration requires the following information: 1) Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4) Email address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY) Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. Contractors who do not already have a MPIN are advised that the normal processing is 7 to 15 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. See video in vendor guide at 3.3 on advanced functions for other information. . Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/Offerors cannot log into the FedBizOpps home page and search for data.
1.7.5. Submit request for information, by email to the contracting office at the address show below. REQUEST FOR INFORMATION- INQUIRY FORMAT
Subject Line: Reference No. W912PQ-15-R-0006 Email: 109aw.msgmsc@ang.af.mil or wanda.yarbor@ang.af.mil.
Date of Inquiry: _______________ From: Company Name: __________________________________ Address: __________________ Phone Number: _________ Email address:___________________
Question: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document).
1.8. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS: The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted on the following website: https://www.fbo.gov.
1.8.1. Though every effort will be made to provide email notification when a change is posted such notification is NOT guaranteed and should not be expected. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the latest information.
1.9. HAND CARRIED PROPOSALS/INVITATIONS:
1.9.1. A bid repository is provided for hand carried proposals and is located at the Contracting Office, Building 25, Stratton ANGB, 1 Air National Guard Road, Scotia, NY. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
1.9.2. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined in the instructions in the paragraph above titled, “Notice of Pre Proposal Conference for entry. Delays are probable at the entry point and should be accommodated for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
1.10. WAGE DETERMINATION:
1.10.1. Davis Bacon Wage Rates are applicable to the prototypical project. Prevailing wage determination information, current at time of issuance of solicitation, is found in the offering form, Exhibit E. In the event the current prevailing Wage Determination is changed by the Department of Labor prior to closing date of this solicitation it is the offeror’s responsibility to ensure the most recent determination is used in preparing the proposal. An Amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Applicable wage rates can be found at: http://www.wdol.gov/wdol/scafiles/davisbacon/NY.html.
1.11. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS: This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
1.12. REMOVAL OF SECTIONS AT TIME OF AWARD. Sections 00100, 00110, 00120, 00600 and 00010 Areas of Consideration will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
1.13. DISPOSITION OF UNSUCCESSFUL PROPOSALS AND EXTRA SUCCESSFUL
PROPOSALS: In compliance with FAR Subpart 4.8, the Government will retain one copy of all proposals. The Government will destroy extra copies of proposals. No destruction certificate will be provided.
1.14. PROPOSAL ACCEPTABILITY: Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award. The offeror is hereby advised that its proposal is presumed to represent its best and final offer in response to this solicitation.
1.15. CLARIFICATIONS: Offeror may, at the discretion of the Government, be asked to provide information for clarification purposes regarding their proposals. Requests for such clarification information do not constitute discussions.
1.16. EXCEPTIONS: If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00120) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation.
(The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
1.17. CLAUSES
1.17.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
1.17.2. Clauses and provisions in this document may not appear in consecutive order.
SECTION 00700 - CONTRACT CLAUSES
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 % (percent) of the bid price or $3 Million, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
AMEND 2 RESPONSES TO QUESTIONS
ADDENDUM #3
MATOC – W912PQ-15-R-0006
QUESTIONS AND ANSWERS
*** NOTE – THERE WAS A MAIL CONVERSION AT THE 109TH – THE NEW 109TH
BOX ADDRESS IS: usaf.ny.109-aw.mbx.msg-msc@mail.mil
Q.1. Seed Project Bldg. 1 – Specification section 012900, 1.1.D indicates the use of “CAPI” for invoicing. Please advise as to what CAPI is.
A.1: A CAPI is a form we use for Construction Payments and it would be used only when a task order is awarded and after performing services on a Task Order
– it has absolutely bearing on the MATOC award.
Q.2: Seed Project Bldg. 1 - Specification section 013300, 1.3.A.1/2 and 1.3.E.7.A indicate the use of an internet based web site submittal software program such as Newforma of Submittal Exchange. Please confirm that this type of system is required and will be utilized by the Gov’t, A&E, and Contractor.
A.2: The use of a software system for submittals has absolutely bearing on the MATOC award. Systems for submittal exchanges may be used after a task order is awarded. All submittals can be filed through e-mail with the AF Form 3000 (after a task order is awarded).
Q.3. Seed Project Bldg 1 – Numerous specification sections indicate the requirement for LEED compliant products, however, a specification for LEED/Sustainable Design is absent from Division 01 of the specifications. Please confirm whether or not the Seed Project is LEED compliant, and if so, please provide a Div 01 specification accordingly.
A.3: Building 1 will not be LEED certified; however we are encouraging the firm selected for this project, to obtain as many points as possible.
Q.4: Drawing C-200 directs you to "SEE ARCHITECTURAL PLANS FOR WALL AND STAIR DESIGN". The architectural drawings do not contain this information. Structural drawings indicate stairs are to be precast, but no other information is provided. Please provide.
A.4. Drawing C-600 , Detail 7 shows details for the stairs with rebar placement.
Q.5. Is there a detailed description of each scope of work including each CLIN and what is to be included in each task order item number on the MATOC Proposal Form included in the Notice of Proposed Task Order Proposal?
A.5. There are two sets of CLINS – the first set of CLINS found on the MATOC.
CLINS listed on pages 3 – 8 (0001 – 3003 of the RFP) – DO NOT ENTER PRICES IN THESE CLINS – they are for the Contracting Office’s use ONLY and will be used to award task orders subsequent to the Contract awards being made.
Exhibit E is the ONLY place you will enter pricing for the MATOC.
Exhibit E contains the 5 Line Items applicable to Bldg. 1, that ALL interested firms MUST price.
(NOTE: If you are interested in performing this work; in addition to pricing all five line items – YOU MUST SUBMIT A
BID BOND).
Q.6. Is there available contractor lay down area for job trailers, equipment and materials?
A.6. Yes
Q.7. Will there be an extension due to the second offered site visit on May 20th?
A.7. An extension has been issued; all questions must be e-mailed on or before May 26, 2015 no later than 1500 (3 PM); pending the complexity of the question, we will do our best to post all responses by May 29, 2015 and proposals are now due on June 4.
Q.8. Confirm that if a contractor would like to apply for the MATOC contract they are required to provide competitive pricing on the first task order, however if they are not interested or cannot complete the project they should not submit a bid bond with the task order.
A.8. All firms MUST provide pricing for the five Line Items via Exhibit E. A BOND IS ONLY REQUIRED IF you wish to compete for the Bldg. 1 Task Order. (Also See A.5).
Q.9. Confirm the building will be vacant during construction.
A.9.: Yes Bldg. 1 will be vacant during construction.
Q.10. Confirm all furniture, equipment, personnel items will be removed by others and not by the awarded contractor.
A.10. Yes all items will be removed from Bldg. 1 by others prior to the start of construction.
Q.11. Who is the current base fire alarm service contractor?
A.11. Kevin Birdsall is our in-house fire-alarm specialist, but larger jobs have been awarded to Alarm and Fire Suppression
Q.12. Who owns the existing pad mounted transformer to be relocated?
A.12. The base owns the transformer.
Q.13. Who owns the existing pad mounted switch?
A.13. The base owns the switch.
Q.14. Are there any restrictions or requirements when disconnecting power to the building?
A.14. Contact the Base electricians, who will coordinate disconnecting power.
Q.15 Is there availability to provide temporary power from another source while the transformer is disconnected?
A.15. There is a transfer switch that the Contractor could hook a generator to.
Q.16. Please clarify whether new framed/gyp soffits are to be installed at the second floor wing command / wing commander & vice commander rooms (perimeters). The "Gypsum Board" notation per the legend is not indicated at the perimeter of these rooms. The notation of varying ceiling heights in corridors and perimeter of rooms occurs throughout the project.
A.16. Yes, the command suite will have gypsum board installed.
Q.17. Reference is made to the "Installation of Sprinkler" work package on by coded note #1 on sheet E-202. Please clarify where this bid package is to be carried on the proposal form.
A17. The sprinkler system work is classified as new construction for the addition and repair work for the existing facility. The costs need to be broken out against Line Items 0001 and 0002.
Q.18. Is there an electronic version (form) of Exhibit B (see attached file)? If so, may I be provided with an electronic copy (file that allows information to be entered directly on the form)?
A.18. Unfortunately no.
SECTION 01001-01700
DIVISION1 SECTION 01000
GENERAL REQUIREMENTS
WHERE THE FOLLOWING REQUIREMENTS DIFFER FROM REQUIREMENTS
ESTABLISHED BY A SPECIFIC TASK ORDER, THE TASK ORDER
REQUIREMENTS SHALL GOVERN.
1.01 SCOPE)
a. The Contractor will be held responsible for all requirements described in the contract documents and Task Order documents and all work including that of his Sub-contractor, if any, shall be done in accordance with the contract documents and/or Task Order documents. Failure to familiarize himself with their requirements will not relieve the Contractor of his responsibility to comply.
b. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among Sub-contractors or in establishing the extent of the work to be performed by any trade.
1.02 WORK SCHEDULING:
a. Normal base work hours for the Contractor will be between the hours of 7:00 AM through 4:30 PM; excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, he must notify the Contracting Officer three (3) working days in advance of his intention to work during other periods to allow assignment of additional inspection forces and for notification of fire, security and safety. When the Contracting Officer determines that they are reasonably available, he may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the Contract amount. (Note: If applicable, at time of award this paragraph will be modified to the negotiated schedule for this project).
b. The following Federal legal Holidays are observed by are:
New Year's Day 1 Jan Martin Luther King B'day 3rd Mon in Jan President's Day 3rd Mon in Feb Memorial Day Last Mon in May Independence Day 4 July Labor Day 1st Mon in Sep Columbus Day 2nd Mon in Oct Veteran's Day 11 Nov Thanksgiving Day 4th Thurs in Nov Christmas Day 25 Dec
c. NOTE: Any of the above holidays falling on a Saturday will be observed the preceding
Thursday, holidays falling on a Sunday will be observed on the following Monday.
d. Prior to commencing work on the job initially, resumption of work after prolonged interruption (7 calendar days or more), commencement of any warranty work, and upon completion of warranty work, the Contractor must notify the Contracting Officer (or the Contracting Officer’s Representative). When relocating to new sites, returning to sites for follow-up work on a phased work plan, notification to the Contracting Officer’s Representative is sufficient. Notification should be by personal contact; however, advance notification may be by telephone, or in writing, and should be accomplished sufficiently in advance to allow scheduling of inspection forces. The purpose of the above precautions is to ensure construction inspection and recording of work proceedings.
e. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among Sub-contractors or in establishing the extent of the work to be performed by any trade.
1.03 ENTRY TO BASE/ACCESS TO SITE:
a. Locations to be serviced by the resulting contracts include posts and bases that are “closed” to the public, pursuant to Sec 21, Internal Security Act of 1950, 50 U.S.C. 797 and, as such, only those persons granted permission may enter. It is, therefore, required that control be exercised over Contractor personnel while working on the Base. To maintain this control, a listing of all Contractor personnel who will be working under the contract, must be submitted to the Contracting Officer prior to the start of work under the contract. The preferred method of providing this list is via email, to the contract administrator, unless notified otherwise. The listing shall include, but not limited to: contract number, project number, employee name, and the estimated starting and ending date of each employee. Subsequent listings of all additions or deletions will be submitted as employees are hired or released.
b. During construction, the Contractor shall permit base personnel access to the facilities within the work area. The Contractor shall provide protection to persons and property throughout the progress of the work.
c. In the event of a declared National Emergency the Contracting Officer may be required to stop work on this contract for security reasons. Contractor shall ensure the Contracting Officer has a current “Off Duty” contact name and telephone number at all times to facilitate notification.
d. The Contractor shall be responsible for compliance with all regulations and orders of the Commanding Officer of the Military Installation, respecting identification of employees, movements on installation, parking, truck entry, and all other military regulations, which may affect the work. Special requirements will be identified in the statement of work for an individual Task Order.
e. The work under this Contract may be performed at an operating Military Installation with consequent restrictions on entry and movement of nonmilitary personnel and equipment.
f. The Military Installation may have specific requirements, which will be identified by the Individual Task Orders.
g. The contractor shall inform all personnel working under its jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area, excluding direct haul and access routes, contracting and COR and point of supply and storage is prohibited. Circulation of said personnel will be limited to official business only.
Persons in violation of the above may be apprehended and turned over to the appropriate authorities.
1.04 UNAUTHORIZED PERSONNEL: The Contractor shall inform all personnel working under his jurisdiction (including sub-contractor and visiting supplier personnel) that access to areas outside of the immediate work area excluding, direct haul and access routes, contracting and Civil Engineering offices and point of supply and storage is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
1.05 INSPECTION OF SITE
a. The Contractor shall be responsible for the complete coordination and proper relation of the work of all trades. Reference Contract Clauses FAR 52.236-3, “Site Investigation and Conditions Affecting the Work” and FAR 52.236-8, “Other Contracts”.
b. No allowances or extra construction on behalf of any Contractor will be permitted subsequently by reason of error or oversight on the part of the sub-contractor, or on account of interferences by the activities of the owner or others. Reference Contract Clause FAR 52.236-3, “Site Investigation and Conditions Affecting the Work”.
c. All dimensions shown on the drawings are based on “as-built” record drawings and, to the extent possible, accurately represent existing conditions; however, there may be some variance between existing conditions and contract drawings. The Contractor is responsible for verifying all dimensions and for reporting to the Contracting Officer any discrepancies that may affect performance of the work represented by contract drawings and specifications. Reference Contract Clause DFARS 252.236-7001 “Contract Drawings, Maps, and Specifications”.
1.06 CORRELATION OF DRAWINGS, SPECIFICATIONS AND CONTRACTS: The specifications, Contract and the accompanying Drawings are intended to describe and provide for a complete, new and usable facility. They are intended to be cooperative and what is called for by one shall be as binding as if called for by all. The Contractor will understand that the work herein described shall be complete in every detail, not withstanding every item necessarily involved is not particularly mentioned, and the Contractor shall be held to provide all labor and material for the entire completion of the work intended to be described and shall not avail himself of any manifestly unintentional error or omission, should any exist. Should any error or inconsistency appear in the Drawings or Specifications, the Contractor, before proceeding with the work, shall make mention of same to the Contracting Officer for proper adjustment, and in no case shall he proceed with the work in uncertainty. Reference Contract Clause DFARS 252.236- 7001, “Contract Drawings, Maps and Specifications”.
1.07 REPORT OF ERROR AND DISCREPANCIES
a. The Contractor shall be responsible for any and all discrepancies in work due to failure to obtain dimensions and investigate conditions at the building before fabrication and installation.
b. The Contractor shall bear all costs in replacing all materials and labor due to not observing the above paragraph and such replaced materials shall meet the approval of the Contracting Officer.
c. The Contractor shall promptly notify the Contracting Officer in writing of any discrepancies.
d. Reference Contract Clauses FAR 52.236-21, “Specifications and Drawings for Construction”. FAR 52.246-12 “Inspection of Construction”, and DFARS 252.236-7001, “Contract Drawings, Maps and Specifications”.
e. Any proposed changes to the specifications by the Contractor must be submitted in writing to the Contracting Officer for approval prior to implementation.
1.08 DIVISION OF WORK
a. The various divisions of the Specifications shall not be considered as negotiations of the material and labor involved. The arrangement and order of these divisions have been made for convenience only, and it is not the intent, nor shall it be so construed, a particular trade or sub-contractor must perform that work included in any one division.
b. Any item mentioned under any division heading must be supplied even though it is not specified under the heading for the respective work, but is shown on the Drawings. No claims for extras arising out of real or alleged error in such arrangement or order of the various divisions will be given consideration
c. The organization of the specifications into divisions, sections, and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among Sub-contractors or in establishing the extent of the work to be performed by any trade.
d. Reference Contract Clause FAR 52.236-21, “Specifications and Drawings for Construction”.
1.09 METHOD OF CARRYING ON THE WORK
a. All work under the Contract shall be arranged and carried on in such a manner as to complete work in the least possible time. The Contractor shall consult with the Contracting Officer as to methods or sequence of carrying on the work. A definite program of work shall be arranged before starting. Reference Contract Clause FAR 52.236-15, “Schedules for Construction Contracts”.
b. Activities in the vicinity of this project may be kept in full or partial operation during construction. The Contractor shall coordinate with the Contracting Officer and schedule construction activities. Reference Contract Clause FAR 52.236-8, “Other Contracts”.
1.10 STANDARDS OF MANUFACTURE
a. All recognized regulatory/code standards shall be the latest published edition prior to the date of release for bid/proposal of the contract documents.
b. For purpose of establishing the standard of construction and the requirements to be met in the work of all divisions, the drawings and these specifications are based on the use of products hereinafter specified, adapted to the installation as required to meet the condition.
c. Where brand names are shown, these names are intended to describe a quality of product, and in no way are intended to limit products of equal quality. Therefore, products of other manufacturers may be employed for this work provided they are equivalent materials and construction and equally adaptable to the conditions as approved by the Contracting Officer.
Reference Contract Clause FAR 52.236-5, “Materials and Workmanship”.
1.11 MEANING OF APPROVED, DIRECTED, ETC.: “Approved”, “Directed”, “Required”, “Applicable”, or words of like or similar effect, when used in the specifications shall be interpreted to mean “Approved By”, “Directed By”, etc., the Contracting Officer unless otherwise specifically stipulated.
1.12 MISPLACED MATERIALS: Any material that is deposited elsewhere than areas designated as approved by the Contracting Officer shall be re-handled and deposited where directed. No payment will be made for re-handling such material. The Contracting Officer will notify Contractor of any noncompliance with the foregoing provisions.
1.13 COMPLIANCE WITH CODES AND REGULATIONS
a. All work shall be done in accordance with the applicable codes and/or ordinances in force at the time of construction. It is the Contractor’s responsibility to insure that where EPA, DEQ or other such regulations control the removal, handling, installation or disposal of materials, they shall be strictly adhered to whether or not specifically referenced in the construction documents.
b. Contractor shall have data sheets available at the site on any materials used to comply with Massachusetts OSHA and EPA. Reference Contract Clause FAR 52.223-3, “Hazardous Material Identification and Material Safety Data”.
1.14 MATERIAL TESTING BY NATIONAL LABORATORIES
a. Electrical materials and equipment shall be new and bear the UL label or be listed in UL Electrical Construction Materials Directory or Electrical Appliance and Utilization Equipment Directory, wherever standards have been established by the agency.
b. The Contractor shall submit proof that the material or equipment, which he proposes to furnish under this specification, conforms to the standards of Underwriters’ Laboratories. The label of Underwriters Laboratories (UL) shall be accepted as conforming to this requirement.
c. In lieu of the label, the Contractor may submit a written certification from any recognized testing agency, adequately equipped and competent to perform such services, that the material or equipment has been tested and conforms to the standards, including the methods of testing used.
1.15 KEYS: The Contractor shall be responsible for any Government-owned keys that have been issued to him for access to facilities or areas pertinent to this contract.