Section 00010 - Solicitation Contract Form

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lump Sum

Repair ECM Shop - Phase II

FFP

VBDZ122003(A) REPAIR ECM SHOP - Phase II, Bldg 9.

The Contractor shall provide all material, labor, equipment, and supervision required to renovate the ECM building on Stratton Air National Guard Base. All materials and construction methods will adhere to the specifications and drawings as advertised with this solicitation package. The Contractor will coordinate with 109th CE with the location of the utilities and will submit a Digsafe permit prior to any excavation. The Contractor will coordinate bi-weekly meetings with the 109th AW to discuss project status and completion milestones. The Contractor will sign an AF Form 1354 at the end of the project in order to capitalize the project on the Real Property records.

MAGNITUDE OF PROJECT: In accordance with FAR 36.204 (e) this project i sestimated to be between $500,000 and $1,000,000.

PERIOD OF PERFORMANCE: The period of performance on this project is 120 calendar days after the agreed upon date of the signed Notice to Proceed.

FEDERAL WAGE RATES: See attached General Decision for applicable worker classifications for this project.

PAYMENT & PERFORMANCE BONDS: In accordance with the Miller Act, construction contract awards exceeding $150,000 require Performance bonds (standard form 25) and Payment bonds (standard form 25-a) for 100 percent of the contract price. Bonds are due within 14 calendar days, or at the time of the pre-construction meeting.

FOB: Destination

NSN: Z2EB-00-000-0000

PURCHASE REQUEST NUMBER: F9S3S42065A002

SIGNAL CODE: A

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
120 dys. ADC
1
F9S3S4 - 109 CES RPM-SRM

1 AIR NATIONAL GUARD ROAD

SCOTIA NY 12302-9752

518-344-2349

FOB: Destination F9S3S4

Section 00700 - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
JAN 2012
52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
APR 1984
52.203-7
Anti-Kickback Procedures
OCT 2010
52.204-7
Central Contractor Registration
FEB 2012
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.211-13
Time Extensions
SEP 2000
52.211-18
Variation in Estimated Quantity
APR 1984
52.222-3
Convict Labor
JUN 2003
52.222-6
Davis Bacon Act
JUL 2005
52.222-7
Withholding of Funds
FEB 1988
52.222-8
Payrolls and Basic Records
JUN 2010
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
JUL 2005
52.222-12
Contract Termination-Debarment
FEB 1988
52.222-13
Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
FEB 1988
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-35
Equal Opportunity for Veterans
SEP 2010
52.222-50
Combating Trafficking in Persons
FEB 2009
52.228-5
Insurance - Work On A Government Installation
JAN 1997
52.229-3
Federal, State And Local Taxes
APR 2003
52.232-5
Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-25
Prompt Payment
OCT 2008
52.232-33
Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1
Disputes
JUL 2002
52.233-3
Protest After Award
AUG 1996
52.236-2
Differing Site Conditions
APR 1984
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10
Operations and Storage Areas
APR 1984
52.236-11
Use and Possession Prior to Completion
APR 1984
52.236-12
Cleaning Up
APR 1984
52.236-15
Schedules for Construction Contracts
APR 1984
52.236-17
Layout of Work
APR 1984
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-23
Responsibility of the Architect-Engineer Contractor
APR 1984
52.236-24
Work Oversight in Architect-Engineer Contracts
APR 1984
52.236-26
Preconstruction Conference
FEB 1995
52.242-13
Bankruptcy
JUL 1995
52.242-14
Suspension of Work
APR 1984
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.243-1
Changes--Fixed Price
AUG 1987
52.246-12
Inspection of Construction
AUG 1996
52.247-34
F.O.B. Destination
NOV 1991
52.249-1
Termination For Convenience Of The Government (Fixed Price) (Short Form)
APR 1984
52.249-2
Termination For Convenience Of The Government (Fixed-Price)
MAY 2004
52.249-10
Default (Fixed-Price Construction)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
MAR 2008
252.236-7000
Modification Proposals-Price Breakdown
DEC 1991
252.236-7001
Contract Drawings, and Specifications
AUG 2000
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
MAR 1998

CLAUSES INCORPORATED BY FULL TEXT

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)

(a) Definition.

"Small business concern," as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.

(b) Applicability. This clause applies only to--

(1) Contracts that have been totally set aside or reserved for small business concerns; and

(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) General. (1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.

(2) Any award resulting from this solicitation will be made to a small business concern.

(d) Agreement. A small business concern submitting an offer in its own name shall furnish, in performing the contract, only end items manufactured or produced by small business concerns in the United States or its outlying areas. If this procurement is processed under simplified acquisition procedures and the total amount of this contract does not exceed $25,000, a small business concern may furnish the product of any domestic firm. This paragraph does not apply to construction or service contracts.

(End of clause)

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least FIFTEEN (15) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

THURSDAY, APRIL 19TH AT 10:00 AM.

(c) Participants will meet at--

BLDG 25, CIVIL ENGINEERING. ALL PERSONNEL INTERESTED IN ATTENDING THIS SITE VISIT MUST SUBMIT A COPY OF THEIR DRIVER’S LICENSE NO LATER THAN 24 HOURS PRIOR TO THE SCHEDULED SITE VISIT. SUBMIT THROUGH OFFICE EMAIL AT 109AW.MSC@ANG.AF.MIL OR FAX AT 518-344-2687. IT IS YOUR RESPONSIBILITY TO VERIFY YOUR LICENSE HAS BEEN RECEIVED BY THIS OFFICE BY CALLING 518-344-2487.

(End of provision)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

WWW.FARSITE.HILL.AF.MIL

(End of clause)

Section 00800 - Special Contract Requirements

DAVIS BACON WAGE RATES

General Decision Number: NY120002 04/06/2012 NY2

Superseded General Decision Number: NY20100002

State: New York

Construction Types: Building, Heavy and Highway

Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie and Washington

Counties in New York.

BUILDING CONSTRUCTION PROJECTS (For all counties except

COLUMBIA, FULTON & GREENE) (does not include single family homes and apartments up to a including 4 stories), HEAVY AND

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 01/06/2012

1 01/27/2012

2 02/10/2012

3 03/09/2012

4 04/06/2012

ASBE0040-002 05/01/2009

Rates Fringes

Asbestos/Insulator Worker

SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems.....................$ 27.14 16.88

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting;

stripping; removal;

scrapping; vacuuming;

bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems..........$ 17.37 9.95

* BOIL0197-002 01/01/2012

Rates Fringes

BOILERMAKER......................$ 30.00 23.76

BRNY0002-019 06/01/2011

Rates Fringes

BRICKLAYER

BRICKLAYERS, STONE MASONS,

CEMENT MASONS, PLASTERERS,

POINTERS, CAULKERS &

CLEANERS....................$ 26.91 15.78

HEAVY & HIGHWAY

CONSTRUCTION

CEMENT MASONS..............$ 27.87 15.04

MARBLE, TILE & TERRAZZO

FINISHERS...................$ 22.59 13.53

MARBLE, TILE & TERRAZZO

WORKERS.....................$ 28.53 16.03

CARP0279-006 07/01/2011

Rates Fringes

Carpenters:

HEAVY AND HIGHWAY

CONSTRUCTION (COLUMBIA AND

GREENE COUNTIES)

Carpenters, Millwrights, Pile Drivers...............$ 27.77 23.50

CARP0290-003 07/01/2011

Rates Fringes

Carpenters:

SARATOGA COUNTY

HEAVY & HIGHWAY

CONSTRUCTION:...............$ 28.00 15.60

WASHINGTON COUNTY

HEAVY & HIGHWAY

CONSTRUCTION:...............$ 27.55 15.55

PAID HOLIDAYS: Labor Day, provided the employee has been on the payroll the calender week or any of the holiday week preceding the holiday and works the day after the holiday.

CARP0290-006 07/01/2011

ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND

SCHOHARIE COUNTIES

Rates Fringes

Carpenters:

BUILDING CONSTRUCTION

Carpenters & Soft Floor

Layers.....................$ 27.35 17.05

Piledriver.................$ 27.35 17.05

HEAVY & HIGHWAY

CONSTRUCTION

Carpenters.................$ 27.79 17.55

CARP0290-008 07/01/2009

Rates Fringes

Carpenters:

CARPENTERS..................$ 26.39 14.95

DIVER TENDERS...............$ 25.49 14.95

DIVERS (Dry Day)............$ 25.49 14.95

DIVERS......................$ 60.00 14.95

PILEDRIVERS.................$ 24.49 14.95

ELEC0236-001 06/01/2011

ALBANY; COLUMBIA; FULTON; GREENE (that portion North of a line following the south limits of the city of Catskill);

MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE;

WASHINGTON

Rates Fringes

ELECTRICIAN......................$ 32.50 3%+18.07

ELEC0363-004 04/01/2011

GREENE COUNTY (Portion of)

Rates Fringes

ELECTRICIAN......................$ 37.00 23.12

ELEC1249-003 05/02/2011

Rates Fringes

LINE CONSTRUCTION: Lineman

(LIGHTING AND TRAFFIC SIGNAL

Including any and all Fiber

Optic Cable necessary for

Traffic Signal Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 25.21 7.5%+25.5

Groundman Truck Driver

(tractor trailer unit)......$ 35.72 7.5%+25.5

Groundman Truck Driver......$ 33.62 7.5%+25.5

Lineman & Technician........$ 42.02 7.5%+25.5

Mechanic....................$ 33.62 7.5%+25.5

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-004 01/01/2011

Rates Fringes

Line Construction:

Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities (where no other trades are or have been involved):

Flagman....................$ 24.79 15.00+6.5%+a

Groundman digging machine operator...................$ 37.19 15.00+6.5%+a

Groundman truck driver

(tractor trailer unit).....$ 35.12 15.00+6.5%+a

Groundman Truck driver.....$ 33.06 15.00+6.5%+a

Lineman and Technician.....$ 41.32 15.00+6.5%+a

Mechanic...................$ 33.06 15.00+6.5%+a

Overhead transmission line work (where other trades are or have been involved):

Flagman....................$ 26.29 15.00+6.5%+a

Groundman digging machine operator...................$ 39.44 15.00+6.5%+a

Groundman truck driver

(tractor trailer unit).....$ 37.25 15.00+6.5%+a

Groundman truck driver.....$ 35.06 15.00+6.5%+a

Lineman and Technician.....$ 43.82 15.00+6.5%+a

Mechanic...................$ 35.06 15.00+6.5%+a

Substation:

Cable Splicer..............$ 45.45 15.00+6.5%+a

Flagman....................$ 24.79 15.00+6.5%+a

Ground man truck driver....$ 33.06 15.00+6.5%+a

Groundman digging machine operator...................$ 37.19 15.00+6.5%+a

Groundman truck driver

(tractor trailer unit).....$ 35.12 15.00+6.5%+a

Lineman & Technician.......$ 41.32 15.00+6.5%+a

Mechanic...................$ 33.06 15.00+6.5%+a

Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation

Cable Splicer..............$ 46.87 15.00+6.5%+a

Flagman....................$ 25.57 15.00+6.5%+a

Groundman Digging Machine

Operator...................$ 38.35 15.00+6.5%+a

Groundman Truck Driver

(tractor-trailer unit).....$ 36.22 15.00+6.5%+a

Groundman Truck Driver.....$ 34.09 15.00+6.5%+a

Lineman & Technician.......$ 42.61 15.00+6.5%+a

Mechanic...................$ 34.09 15.00+6.5%+a

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer/Central

Office Person..............$ 23.07 3.05+3%

Cable splicer..............$ 27.44 4.43 + 3%

Groundman..................$ 13.81 4.43 + 3%

Installer Repairman-

Teledata

Lineman/Tecnician-

Equipment Operator.........$ 26.05 4.43 + 3%

TREE TRIMMER................$ 21.64 7.36+3%

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

Day, Good Friday, Independence Day, Labor Day, Thanksgiving

Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New

York State, provided the employee works two days before or two days after the holiday.

b. New Years Day, Washington's Birthday, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving Day and Christmas

Day.

ELEC1249-007 05/03/2011

LINE CONSTRUCTION (LINEMAN) LIGHTING AND TRAFFIC SIGNAL

INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD

WEATHER INFORMATION SYSTEMS

COLUMBIA COUNTY

Rates Fringes

LINE CONSTRUCTION: Lineman

Flagman.....................$ 25.21 7.5%+25.5

Groundman Digging Machine

Operator....................$ 37.82 7.5%+25.5

Groundman Truck Driver

(Tractor-trailer unit)......$ 35.72 7.5%+25.5

Groundman Truck Driver......$ 33.62 7.5%+25.5

Lineman and Technician......$ 42.02 7.5%+25.5

Mechanic....................$ 33.62 7.5%+25.5

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good

Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the

President of the United States and Election Day for the

Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEV0035-001 01/01/2012

ALBANY; COLUMBIA (Towns of Claverack, Hillsdale, Ghent, Stockport, Austerlitz, Canaan, New Lebanon, Chatham, Kinderhook, Styvesant and Greenport); FULTON; GREENE (Towns of

Durham, Greenville, New Baltimore, Coxcsackie and Athens);

MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND

WASHINGTON COUNTIES

Rates Fringes

Elevator Constructor.............$ 40.09 23.535+a+b

FOOTNOTES:

a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving

Day, and the day after Thanksgiving Day, Christmas Day.

b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ELEV0138-004 01/01/2012

COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE,

GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY

(THE TOWNS OF HUNTER AND CATSKILL)

Rates Fringes

ELEVATOR MECHANIC................$ 50.11 23.535+a+b

FOOTNOTES:

a. 8 PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving

Day, the Friday after Thanksgiving Day and Christmas Day.

b. Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0106-001 07/01/2011

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 33.79 21.85+a

GROUP 2.....................$ 33.36 21.85+a

GROUP 3.....................$ 32.45 21.85+a

GROUP 4.....................$ 29.88 21.85+a

GROUP 5.....................$ 34.97 21.85+a

GROUP 6.....................$ 33.79 21.85+a

GROUP 7.....................$ 33.79 21.85+a

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Boom Truck (over 5 tons), Crane, Cherry Picker (over

5 ton capacity), Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane

GROUP 2: Automated Concrete Spreader (CMI), Automatic Fine

Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Belt Placer (CMI type), Black Top Plant (Automated), Boom

Truck (5 tons and under), Cableway, Caisson Auger, Central

Mix Concrete Plant (Automated), Concrete Pump (8" or over), Dredge, Dual Drum Paver, Excavator (All Purpose-Hydraulicly

Operated) (Gradall or similar), Fork Lift (Factory Rated 15

ft. and over), Front End Loader (4 c.y. and over), Head

Tower (Sauerman or equal), Hoist (2 or 3 Drum), Holland

Loader, Mine Hoist, Mucking Machine or Mole, Pavement

Breaker (SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P), Quad 9, Quarry Master (or equivalent), Scraper, Shovel, Side Boom, Slip Form Paver, Tractor Drawn Belt-Type Truck Crane, Truck or Trailer

Mounted Log Chipper (Self-Feeder), Tug Operator (Except

Manned Rented Equipment), Tunnel Shovel

GROUP 3: Asphalt Paver, Backhoe (Tractor Mounted, Rubber

Tired), Bituminous Spreader and Mixer, Blacktop Plant

(Non-Automated), Blast or Rotary Drill (Truck or Tractor

Mounted), Boring Machine, Cage-Hoist, Central Mix Plant

(Non-Automated) and All Concrete Batching Plants, Cherry

Picker (5 Tons Capacity and Under), Compressors (4 or less)

Exceeding 2000 C.F.M. Combined Capacity, Concrete Paver

(over 16S), Concrete Pump (Under 8"), Crusher, Diesel Power

Unit, Drill Rigs (Tractor Mounted), Front End Loader (under

4 c.y.), Hi-Pressure - Boiler (15 lbs. and over), Hoist

(One Drum), Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive, Maintenance

Engineer/Greaseman/ Welder, Mixer (For Stabilized Base

Self-Propelled), Monorail Machine, Plant Engineer, Profiler

(105 H.P. and under), Pug Mill, Pump Crete, Ready Mix

Concrete Plant, Refrigeration Equipment (For Soil

Stabilization), Road Widener, Roller (All Above Subgrade), Sea Mule, Self-contained Ride-on-Rock Drill, excluding

Air-Track Type Drill, Skidder, Tractor with Dozer and/or pusher, Trencher, Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 4: A-Frame Winch Hoist on Truck, Ballast Regulator

(Ride- On), Compressors (4 not to exceed 2000 C.F.M.

Combined Capacity, or 3 or less with more than 1200 C.F.M.

but not to exceed 2000 C.F.M.), Directional Drill Machine

Locator Dust Collectors, Generators, Pumps, Welding

Machines, Light Plants (4 of Any Type Of Combination), Concrete Pavement Spreaders and Finishers, Conveyor, Drill

Core, Drill Well, Electric Pump Used In Conjunction with

Well Point System, Farm Tractor with Accessories, Fine

Grade Machine, Fork Lift (under 15 ft.), Grout Pump, Gunite

Machine, Hammers (Hydraulic-Self-Propelled), Hydra- Spiker

(Ride-On), Hydro-Blaster Water, Post Hole Digger and Post

Driver, Power Sweeper, Roller (Grade and Fill), Scarifier

(Ride-On Spansaw (Ride-On), Skid Steer loader (Bobcat or similar), Submersible Electric Pump (When Used In Lieu Of

Well Point System), Tamper (Ride-On), Tie Extractor

(Ride-On), Tie Handler, Tie Inserter (Ride-On), Tie Spacer

(Ride-On), Tire Repair, Track Liner, Tractor With Towed

Accessories, Vibrator Compactor, Vibro Tamp, Well Point, Aggregate Plant, Boiler (Used In Conjunction With

Production), Cement and Bin Operator, Compressors (3 or less not to Exceed 1200 C.F.M. Combined Capacity), Dust

Collectors, Generators, Pumps, Welding Machines, Light

Plants (3 or less of Any Type or Combination), Concrete or

Mixer (16S and under), Concrete Saw (Self-Propelled), Fireman, Form Tamper, Hydraulic Pump (Jacking System), Light Plants, Mulching Machine, Oiler, Parapet-Concrete or

Pavement Grinder, Power Broom (Towed), Power Heaterman, Revinius Widener, Shell Winder, Steam cleaner, Tractor

GROUP 5: Master Mechanic

GROUP 6: Crane Premium with Boom Length and Jib 150 Ft.- 199

Ft.

GROUP 7: Crane Premium with Boom Length and Jib 200 Ft. and over

Tower Crane Premium .50

Hazmat Work Premium 2.50

Hydrographic .50

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day, Lincoln's

Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day and Veteran's Day

ENGI0106-002 07/01/2011

BUILDING

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 33.85 21.60+a

GROUP 2.....................$ 33.41 21.60+a

GROUP 3.....................$ 32.50 21.60+a

GROUP 4.....................$ 29.93 21.60+a

GROUP 5

1..........................$ 34.35 21.60+a

2..........................$ 34.85 21.60+a

GROUP 6.....................$ 34.35 21.60+a

GROUP 7.....................$ 34.50 21.60+a

GROUP 8.....................$ 35.00 21.60+a

Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.

FOOTNOTE:

a. Paid Holidays: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (BUILDING)

GROUP 1: Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)

GROUP 2: Shovel, All backhoe (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under)

GROUP 3: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hoisting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model

CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller

GROUP 4: Fork lift, high lift, lull, oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack

(belcrete system), seeding, and mulching machines, pumps

GROUP 5: Crane Premiums:

1 over 150'

2 over 200'

GROUP 6: Tower Crane

GROUP 7: Master mechanic (other than nuclear work)

GROUP 8: Master mechanic on nuclear work

IRON0012-011 05/01/2011

ALBANY; COLUMBIA; FULTON (Albin, Bleecker, Broad, Johnstown, Mayfield, Northampton and Perth); GREENE, MONTGOMERY

(Amsterdam, Charleston, Florida, Glen, Mohawk and Root);

RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; and WASHINGTON

COUNTIES:

Rates Fringes

Ironworkers:

Sheeter, Bucker-up..........$ 25.78 17.96

Sheeter.....................$ 27.90 19.24

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone

Derrickmen..................$ 27.65 19.24

IRON0440-007 05/01/2011

FULTON (Twps. of Caroga, Ephratah, Oppenheim, Stratford);

MONTGOMERY (Twps of Canajoharie, Minden, Palatine, St.

Johnsville):

Rates Fringes

Ironworkers:

Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone

Derrickman..................$ 23.63 22.01

LABO0017-001 06/01/2010

COLUMBIA COUNTY (Twps of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

Rates Fringes

Laborers:

COLUMBIA COUNTY (Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont, and the City of Hudson)

(Asbestos, lead, toxic and hazardous waste abatement and any other environmental related work) HEAVY & HIGHWAY

GROUP 1:...................$ 32.75 17.95+a

GROUP 2:...................$ 36.65 17.95+a

GREENE COUNTY (Township of

Catskill) HEAVY & HIGHWAY:

GROUP 1:...................$ 28.40 17.95+a

GROUP 2:...................$ 32.75 17.95+a

GROUP 3:...................$ 36.65 17.95+a

GROUP 4:...................$ 39.15 17.95+a

TUNNEL, SHAFT & CAISSON

WORK

GROUP 1....................$ 39.15 17.95+a

For HEAVY & HIGHWAY CLASSIFICATIONS in COLUMBIA COUNTY

(Townships of Greenport, Claverack, Clermont, Germantown, Livingston, Hillsdale, Taghkanic, Gallatin, Copake, Ancram, Philmont and the City of Hudson)

HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective equipment and clothing are not required

GROUP 2: Asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required

For HEAVY & HIGHWAY CLASSIFICATIONS in GREENE COUNTY

(Township of Catskill)

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas

Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons.

GROUP 1: Flagperson, gateperson

GROUP 2: General laborers, chuck tender, handling and distributing drinking water, distributing all tools and supplies of laborers, nipper, powder carrier, magazine tender, warehouse laborers, concrete man, vibrator man, mason tender, mortar man, spraying, brushing and covering of concrete for curing and preservative purposes, traffic striper, scaffold builder, concrete curb and sidewalk form setter; permanent traffic striping and reflective devices, placing and maintenance of all flares, cones, lights, signs, barricades, traffic patterns, and all temporary reflective type materials for traffic control, custodial work, traffic directors, temporary heat or light tenders, tool room, dewatering pump men, pitman, dumpmen, snow removal and firewatch, asphalt man, joint setter, signal person, pipelayer, pipe lining and relining, wellpoints, conduit and duct layer, wire puller, rip rap and dry stone layer, steel rod carrier, core drill, rock splitter, Hilti gun air or electric, jackhammer, bush hammer, pavement breaker, chipping hammer, wagon drill, air track, jib rig, joy drill, gunite and sand blasting, coal passer and other machine operators, power tool operator, sprayer and nozzle man on mulching and seeding machine, all guard rail and fence, all seeding and sod laying, all landscape work, grade checker, all bridge work, walk behind self-propelled power saw, grinder, groover or similar type machine, walk behind tamper and roller of all types, salvage, stripping, wrecking and dismantling laborer (including barman, cutting torch and burner man), sheeting and shoring coming under laborers jurisdiction, bit grinder, operator of form pin puller and drivers, sandblasting, joint and jet sealer, filling and wiring baskets for gabion walls, permanent sign man, median barrier, sta-wall or similar type product, chain saw operator, railroad track laborer, waterproofer, pre-stressed and pre-cast concrete brick, block and stone pavers, power tools used to perform work usually done by laborers, power buggy and pumpcrete operator, fireproof, plaster and caustic pump, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous materials abatement when protective clothing and equipment is not required, power brush cutter, retention liners, artificial turf, retaining walls, walk behind surface planer, welding related to laborers work, remote controlled equipment normally operated by laborers, all technician work including but not limited to stitching, seaming, heat welding, fireproof sprayer, mortar mixer, concrete finisher, form setter for concrete curbs and flatwork.

Gunite nozzle man, stone cutters, granite stone layer, manhole, catch basin or inlet installing, laser men.

Ground man on milling machine

GROUP 3 Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman

GROUP 4: Asbestos, toxic, lead or hazardous material abatement foreman

For TUNNEL, SHAFT & CAISSON WORK CLASSIFICATIONS

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, President's Day, Memorial

Day, Independence Day, Labor Day, Election Day, Veterans

Day, Thanksgiving Day, Christmas Day

GROUP 1: Laborer, Pit and Dumpman, Chuck Tender, Brakeman and

Powderman;

Miner and all machine men, Safety Miner, all shaft work, caisson work, drilling, blow pipe, all air tools, tugger, scaling, nipper gunniting from pot to nozzle, bit grinder, signal man (top and bottom), shield driven tunnel, mixed face and soft ground liner plate tunnel in free air

LABO0035-001 06/01/2010

FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD);

MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND

ST. JOHNSVILLE)

Rates Fringes

Laborers Building Construction

Asbestos Removal............$ 21.50 13.44

Blasters, Form Setters, MotorBuggy Operator (Rider

Type)......................$ 20.50 13.44

Hazardous Waste Removal

Hazardous waste removal includes wetting, stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems.........$ 21.50 13.44

HEAVY & HIGHWAY:

GROUP 1:...................$ 24.30 16.54

GROUP 2:...................$ 24.50 16.54

GROUP 3:...................$ 24.70 16.54

GROUP 4:...................$ 24.90 16.54

Laborers....................$ 20.00 13.44

Pipelayers, Motor Mixers, Motor Buggy Operator

(Walk Behind) Power Lift

(Walk Behind)...............$ 20.15 13.44

Wagon Drill Operator........$ 20.40 13.44

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day and Christmas Day.

GROUP 1: Common Laborers, Flagman, Outboard and Hand boats

GROUP 2: Bull Float, Chain Saw, Concrete aggregate bin, Concrete Bootman, Gin Buggy, Hand or Machine Vibrator, Jackhammer, Mason Tender, Mortar Mixer, Pavement Breaker, Handlers of all steel mesh, Small generators for laborer's tools, Installation of bridge drainage, Pipelayers, Vibrator type rollers, Tamper, Drill doctor, Tail or Screw

Operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding and sand blasting), Laborers on chain link fence erection, Rock splitter and power unit, Pusher type concrete saw and all other gas, electric, oil, and air tool operators, Wrecking laborers

GROUP 3: All rock or drilling machine operators (except quarry master and similar type), Acetylene torch operators, and Asphalt paver, Powderman

GROUP 4: Blasterers, Form setters, Stone or Granite Curb setters

LABO0157-001 07/01/2009

FULTON (Twps. of Bleeker, Mayfield, Northhampton, Johnstown, Broadalbin and Perth); MONTGOMERY (Twps. of Mohawk, Glen, Charleston, Amsterdam, and Florida); SARATOGA (Twps. of Day, Hadley, Edinburg, Corinth, Moreau, South Glens Falls, Providence, Greenfield, Wilton, Northcumberland, Galway, Milton, Saratoga Springs, Charlton, Ballston, Malta and Clifton

Park); SCHENECTADY and SCHOHARIE COUNTIES.

Rates Fringes

LABORER

BUILDING:

GROUP 1....................$ 22.88 13.65

GROUP 2....................$ 24.23 13.65

HEAVY & HIGHWAY:

GROUP 1:...................$ 24.34 14.40+a

GROUP 2:...................$ 24.54 14.40+a

GROUP 3:...................$ 24.74 14.40+a

GROUP 4:...................$ 24.94 14.40+a

GROUP 5:...................$ 26.34 14.40+a

LABORER CLASSIFICATIONS

Group 1: Common Laborers

Group 2: Asbestos and Toxic Materials

Commercial projects valued at $800,000 or less and/or industrial projects valued at $100,000 or less, excluding demolition work (the complete razing of structures) 75% of the basic wage scale with full benefits will apply

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day

LABORER CLASSIFICATIONS

GROUP 1: Common laborers, flagman, outboard & hand boats

GROUP 2: Bull float, chain saw, concrete aggregate bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tamper, drill doctor, tail or screw operator on asphalt paver, water pump operator (1 1/2") and single diaphragm), nozzle (asphalt, gunnite, seeding, and sand blasting), laborers on chain fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, and air tool operators, wrecking laborers

GROUP 3: All rock drilling machine operators (except quarry master and similar type), acetylene torch operator, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb setters

GROUP 5: Hazardous waste removal

LABO0190-001 01/01/2012

ALBANY; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY

(Townships of Stillwater, Halfmoon, Saratoga)

Rates Fringes

Laborers:

BUILDING:

GROUP 1....................$ 22.86 16.67

GROUP 2....................$ 24.21 16.67

LABORERS CLASSIFICATIONS

GROUP 1: Common Laborers

GROUP 2: Hazardous waste removal Commercial projects valued at $800,000 or less and/or industrial projects valued at

$100,000 or less excluding demolition work, (complete razing of structures) will receive 75% of basic wage scale with full fringes will apply

LABO0190-002 07/01/2011

ALBANY; RENSSELAER; COLUMBIA (Twps. of Stuyvesant, Stockport, Kinderhook, New Lebanon, Cannan, Ghent, Chatham, Austerlitz).

GREENE (except Catskill Township). WASHINGTON COUNTY. SARATAGO

COUNTY (Townships of Stillwater, Halfmoon Saratoga)

Rates Fringes

Laborers:

HEAVY & HIGHWAY:

GROUP 1:...................$ 25.39 16.95

GROUP 2:...................$ 25.39 16.95

GROUP 3:...................$ 25.59 16.95

GROUP 4:...................$ 25.79 16.95

GROUP 5:...................$ 25.99 16.95

FOOTNOTE:

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

LABORERS CLASSIFICATIONS

GROUP 1: Common laborers, flagmen, outboard and hand boats

GROUP 2: Bull float, chain saw, concrete aggregated bin, concrete bootman, gin buggy, hand or machine vibrator, jackhammer, mason tender, mortar mixer, pavement breaker, handlers of all steel mesh, small generators for laborers' tools, installation of bridge drainage, pipelayers, vibrator type rollers, tampers, drill doctor, Tail or screw operator on asphalt paver, Water pump operator (1 1/2" and single diaphragm), Nozzle (asphalt, gunnite, seeding, and sand blasting) Laborers on chain link fence erection, rock splitter and power unit, pusher type concrete saw and all other gas, electric, oil, air tool operators, and wrecking laborers

GROUP 3: All rock air drilling machine operators (except quarry master and similar type), acetylene torch operators, and asphalt paver, powderman

GROUP 4: Blasterers, form setters, stone or granite curb setters

GROUP 5: Hazardous waste removal

LABO1000-005 05/01/2009

COLUMBIA (Twps. of Greenport, Claverack, Hillsdale, Livingston, Germantown, Taghkanic, Copake, Clermont, Gallatin, Ancram):

Rates Fringes

Laborers:

HEAVY & HIGHWAY

GROUP 1....................$ 24.20 18.75+a

GROUP 2....................$ 27.96 18.75+a

GROUP 3....................$ 28.96 18.75+a

LABORERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Flagperson; Placing and maintenance of all flares, cones, lights, signs, barricades; traffic control custodial work; traffic directors; temporary heat or light tenders;

tool rooms

GROUP 2: General Laborers, Dumpman, Pitman, Concrete man;

Signal man; Pipelayers; Rip rap; Dry stone layer; Jack hammer; Powderman; Highscalers power buggy operator; Steel rod carrier; Vibratory operator; other machine operator;

wrecking; Vibrator operator-compactor; Gunite and sandblasting; Water pump 2" or under; Nipper; Chucker;

Asphalt Workers

GROUP 3: Asphalt raker; Asphalt Screedman; Drillers (all);

Laser Beam Operator; Form Setter/Aligners; Blasters

FOOTNOTE:

a. PAID HOLIDAYS: New Years Day, Presidents Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, November Election Day, Thanksgiving Day, and

Christmas Day

PAIN0009-005 05/01/2011

Rates Fringes

Painters:

Lead Abatement Workers, Structural Steel

Zone 1.....................$ 27.39 8.53

Zone 2.....................$ 26.04 9.88

Painters, Drywall

Finishers, Spray

Zone 1.....................$ 26.39 8.53

Zone 2.....................$ 26.39 8.53

Zone #1 Entire counties of ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

ZONE #2 All of WASHINGTON County

PAIN0009-013 07/01/2011

Rates Fringes

GLAZIER..........................$ 23.60 15.54

PAIN0155-002 05/01/2010

COLUMBIA AND GREENE COUNTIES

Rates Fringes

Painters:

Drywall Finisher............$ 27.39 16.31

Lead Abatement Work.........$ 27.39 16.31

Painter/Paperhanger.........$ 27.39 16.31

Spray Rate..................$ 28.39 16.31

PAIN0806-002 10/01/2010

ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER,

SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON

Rates Fringes

Painters:

Structural Steel and Bridge.$ 46.25 31.03

PLUM0007-001 05/01/2011

ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER;

SCHENECTADY; SARATOGA (Towns of Charlton, Clifton Park, Galway, Halfmoon, Milton, Stillwater and Waterford)

Rates Fringes

PLUMBER/PIPEFITTER...............$ 33.46 20.95

PLUM0112-019 05/01/2011

Townships of Canajoharie and Minden

Rates Fringes

Plumber and Steamfitter

Northern Zone...............$ 29.90 19.49

PLUM0773-002 05/01/2011

SARATOGA (Remainder of County); WASHINGTON COUNTY:

Rates Fringes

PLUMBER/PIPEFITTER...............$ 30.25 20.53

ROOF0203-003 06/01/2010

SCHOHARIE COUNTY:

Rates Fringes

ROOFER...........................$ 21.20 10.34

ROOF0241-001 06/01/2010

Rates Fringes

ROOFER...........................$ 25.65 10.97

SFNY0669-001 04/01/2011

Rates Fringes

SPRINKLER FITTER.................$ 30.15 18.90

SHEE0083-001 06/01/2011

Rates Fringes

Sheet metal worker...............$ 29.78 20.21+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day. If any of these holidays fall on a Saturday or Sunday, either the preceding Friday or following Monday will be observed as the holiday.

TEAM0294-002 05/01/2006

BUILDING CONSTRUCTION

Rates Fringes

Truck drivers:

GROUP 1.....................$ 22.27 9.84+a

GROUP 2.....................$ 22.57 9.84+a

FOOTNOTES:

a. One week vacation after 1 year; 2 weeks vacation after 5 years.

TRUCK DRIVERS BUILDING CLASSIFICATIONS

GROUP 1: Straight, winch, transit mix on job site, road oilers, dump, panel, pick-up, water and fuel trucks on site

(including nozzle)

GROUP 2: Euclid or similar equipment, lowboy or lowboy trailers

TEAM0294-003 07/01/2011

Rates Fringes

Truck drivers:

HEAVY & HIGHWAY

GROUP 1....................$ 26.67 15.65+a

GROUP 2....................$ 26.72 15.65+a

GROUP 3....................$ 26.77 15.65+a

GROUP 4....................$ 26.92 15.65+a

GROUP 5....................$ 27.07 15.65+a

TRUCK DRIVERS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Pick-ups, panel trucks, flatboy material trucks

(straight jobs), single axle dump trucks, dumpsters, receivers, greasers, truck tireman

GROUP 2: Tandems, batch trucks, mechanics

GROUP 3: Semi-trailers, low-boy trucks, asphalt distributor trucks, agitator, mixer trucks and dumpcrete type vehicles, truck mechanic, fuel truck

GROUP 4: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded, straddle (ross) carrier, self-contained concrete unit

GROUP 5: Off-highway tandem back dump, twin engine equipment and double hitched equipment where not self-loaded

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the day before and the day after the holiday.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be

July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION