Repair Buildings 27 - Renovation_Specs 03-03-12.pdf
PDF 1 MB Posted
- Attached to
- Renovation Building 27 Stratton ANGB
- Solicitation number
- W912PQ12R0024
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS FROM BUILDING 27 RENOVATION SITE VISIT.docx | DOCX document | |
| Bldg 27 site visit.pdf | ||
| 2012-03-03 - 22982 - Structural_SIGNED.PDF | ||
| W912PQ12R0024.doc | DOC document | |
| Repair Buildings 27 - Renovation_Final Submission Drawings 03-03-12.pdf | ||
| W912PQ12R0025.doc | DOC document | |
| Repair Buildings 27 - Renovation_Cost Estimate 03-03-12.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
109TH AIRLIFT WING
STRATTON AIR NATIONAL GUARD BASE
Building 27 – Renovation Scotia, New York
PROJECT MANUAL
109TH AIRLIFT WING
Building 27 – Renovation
January, 2012
CHA PROJECT #: 22982
Prepared for:
Prepared by:
CHA
III Winners Circle
Albany, New York 12205
(518) 453-4500
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01100 Summary 01250 Contract Modification Procedures 01290 Payment Procedures 01310 Project Management and Coordination 01320 Construction Progress Documentation 01330 Submittal Procedures 01400 Quality Requirements 01420 References 01600 Product Requirements 01731 Cutting and Patching 01732 Selective Demolition 01770 Closeout Procedures
DIVISION 04 – MASONRY
04200 Unit Masonry
DIVISION 05 – METALS
05500 Metal Fabrications
DIVISION 06 – WOOD AND PLASTICS
06402 Interior Architectural Woodwork
DIVISION 07 – THERMAL AND MOISTURE
PROTECTION
07155 Preparation For Roof Penetrations 07210 Building Insulation 07841 Through-Penetration Firestop Systems 07015 Modifications to Existing Warrantied Roof
System
DIVISION 08 – DOORS AND WINDOWS
08800 Glazing 08110 Steel Doors And Frames 08211 Flush Wood Doors 08311 Access Doors And Frames 08331 Overhead Coiling Doors 08580 Sliding Service Windows 08710 Door Hardware
DIVISION 09 – FINISHES
09912 Interior Painting 09111 Non-Load-Bearing Steel Framing 09250 Gypsum Board 09310 Ceramic Tile 09511 Acoustical Panel Ceilings 09651 Resilient Floor Tile 09653 Resilient Wall Base & Accessories 09680 Carpet 09720 Wall Coverings
DIVISION 10 – SPECIALTIES
10270 Access Flooring
DIVISION 11 – EQUIPMENT
11132 Projection Screens
DIVISION 15 – MECHANICAL
15004 Coordination with Other Trades 15030 Electrical Requirements for Mechanical Equipment 15050 Basic Mechanical Materials and Methods 15100 Valves and Appurtenances 15135 Meters and Gages 15140 Hangers, Supports, and Anchors 15250 Mechanical and Plumbing Insulation 15366 Clean-Agent Extinguishing Systems 15420 Drainage and Vent Systems 15510 Hydronic Piping 15515 Hydronic Specialties 15530 Refrigerant Piping 15738 Ductless Split-System Air-Conditioners 15782 Rooftop Heating and Cooling Units 15790 Air Coils 15855 Diffusers, Registers, and Grills 15891 Metal Ducts 15910 Duct Accessories 15933 Air Terminals 15975 Control Systems Equipment 15985 Sequence of Operation 15990 Testing, Adjusting, and Balancing
DIVISION 16 – ELECTRICAL
16010 Basic Electrical Requirements 16110 Raceways 16120 Building Wire and Cable 16130 Outlet Boxes 16132 Pull and Junction Boxes 16140 Wiring Devices 16190 Hangers and Supports 16195 Electrical Identification 16440 Safety Switches 16450 Grounding 16470 Panelboards and Circuit Breakers 16475 Fuses 16501 Lamps and Ballasts 16510 Interior Lighting Fixtures 16915 Lighting Control Equipment
SUMMARY PAGE 1 OF 3
CHA PROJECT NO. 22982
L:\WP\22982\01100 Summary.DOC SECTION 01100
SECTION 01100 - SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: Project consists of repair, reconfiguration, and renovation of the interior spaces in the NCC and the mailroom in Building 27.
1. Project Location: Building 27, Stratton Air National Guard Base, Scotia, NY 12302
2. Owner: New York Air National Guard
B. Engineer Identification: The Contract Documents, dated May 2011, were prepared for Project by CHA Consulting, Inc. located at III Winners Circle, PO Box 5269, Albany, NY 12205.
C. In general, the work of this contract includes, but is not limited to:
1. Upgrade of the HVAC systems, to include relocation of the boiler controls, installation of DDC controls, cleaning, reconfiguring, and reinstallation of the VAV and duct systems, and minor reconfiguration of the plumbing systems.
2. Upgrade of the existing back up generator to one that is properly sized and replacement of the interior lighting in renovated areas.
3. Reconfiguration of the interior spaces to provide for additional work stations within the facility..
1.3 CONTRACT
A. Project will be constructed under a general construction contract. Furnish and install the work as a lump sum price with all work completed and closeout as specified.
1.4 WORK BY OTHERS
A. Coordinated work with National Guard operations schedule.
1.5 DRAWINGS PRINTS AND SPECIFICATIONS
A. Specifications: Refer to specifications.
B. Drawings shall be as listed on Contract Title Sheet; record drawings are for information only.
PART 2 - PRODUCTS
2.1 MATERIAL/EQUIPMENT
A. Unless otherwise noted the contractor shall furnish all material and equipment.
SUMMARY PAGE 2 OF 3
L:\WP\22982\01100 Summary.DOC SECTION 01100
B. Drawings shall be as listed on Contract Title Sheet; record drawings are for information only.
PART 3 - EXECUTION
3.1 GENERAL
A. The Contractor shall visit the site prior to submitting his bid to become familiar with the site conditions and scope of work that may affect cost, progress or performance of his work to complete the project.
1. Dimensions shall be field verified by Contractor with all discrepancies reported to the
Engineer.
2. Contractor shall field verify all existing conditions prior to beginning work.
B. Incorrectly fabricated, damaged, or otherwise misfitting or nonconforming materials or conditions shall be reported to ANG prior to remedial or corrective action. Any such action shall require prior approval from ANG.
C. Contractor shall provide dust protection and keep work areas clean and free from construction debris at all times. Properly dispose of all construction debris. Contractor shall furnish dumpsters for material disposal; use of ANG dumpsters is prohibited.
D. Contractor shall provide and maintain temporary weather protection as required. Protect existing equipment in the work area; allow access to all equipment for ANG operations personnel.
E. ANG will relocate all materials, furniture and equipment for Contractor access to the work areas.
Coordinate all work activities with ANG prior to start of work in each area.
F. Parking and staging of materials shall be restricted to areas identified by the Contracting Officer.
Staging and laydown areas will be identified by the Contracting Officer during the pre-construction meeting.
3.2 SAFETY & SECURITY
A. Contractor shall comply with ANG safety requirements as a condition of permitted entry by all personnel. ANG safety instructions will be presented at the pre-construction meeting.
B. Contractor personnel shall maintain visible identification while on the project site.
C. Contractor shall maintain fire watch during all welding activities; Contractor shall provide all fire extinguishers. Contractor shall obtain permit from ANG prior to all welding and cutting operations.
D. Contractor shall be responsible for construction safety and for compliance with all regulations.
3.3 INSTALLATION
A. Materials and equipment shall be installed in accordance with manufacturer’s instructions and recommendations.
B. Locations of underground utilities are taken from record drawings provided by ANG and are only approximate. Contractor shall use care in excavating between the buildings.
SUMMARY PAGE 3 OF 3
L:\WP\22982\01100 Summary.DOC SECTION 01100
C. Where piping system removals are made, terminate with valve and cap; where piping is removed without reconnection, remove branch piping back to main and terminate with valve and cap within five feet of main.
D. Prior to backfilling underground insulated piping, Contractor shall test carrier and casing pipe for leaks. Upon completing backfill, carrier and casing pipe shall be retested for leaks. Leaks shall be repaired prior to final acceptance.
END OF SECTION
CONTRACT MODIFICATION PROCEDURES PAGE 1 OF 3
CHA PROJECT NO.22982
L:\WP\22982\01250 Contract Modification Procedures.DOC SECTION 01250
SECTION 01250 - CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements for handling and processing Contract modifications.
1.3 MINOR CHANGES IN THE WORK
A. Supplemental instructions authorizing minor changes in the Work, not involving an adjustment to the Contract Price or Contract Time, will be issued by the Contracting Officer’s Representative in writing. If the Contractor is not in agreement that no change in Contract Price or Contract Time is warranted, submit a claim in accordance with the requirements of this section for Contractor Initiated Change Order proposal requests within 30 days of receipt of the Contracting Officer’s written supplemental instructions.
1.4 PROPOSAL REQUESTS
A. Owner-Initiated Proposal Requests: Contracting Officer’s Representative will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
1. Proposal Requests issued by the Contracting Officer’s Representative are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change.
2. Unless otherwise indicated in the proposal request, within 20 days after receipt of proposal request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
c. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
B. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the Contract, Contractor may propose changes by submitting a request for a change to the Contracting Officer’s Representative.
CONTRACT MODIFICATION PROCEDURES PAGE 2 OF 3
L:\WP\22982\01250 Contract Modification Procedures.DOC SECTION 01250
1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
4. Include an updated Contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
5. Comply with requirements in Division 1 Section "Product Requirements" if the proposed change requires substitution of one product or system for product or system specified.
C. Proposal Request Form: For Change Order proposals, use CSI Change Order Request (proposal format). A sample copy is included at end of this Section.
1.5 ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts, base each Change Order proposal on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed.
3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit-cost allowances.
4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the Purchase Order amount or Contractor's handling, labor, installation, overhead, and profit. Submit claims within 30 days of receipt of the Change Order or Construction Change Directive authorizing work to proceed. Owner will reject claims submitted later than 30 days after such authorization.
1. Do not include Contractor’s or subcontractor’s indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents.
2. No change to Contractor’s indirect expense is permitted for selection of higher- or lower-priced materials or systems of the same scope and nature as originally indicated.
CONTRACT MODIFICATION PROCEDURES PAGE 3 OF 3
L:\WP\22982\01250 Contract Modification Procedures.DOC SECTION 01250
1.6 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Proposal Request, Contracting Officer’s Representative will issue a Change Order for signatures of Owner and Contractor on form included at end of Part 3.
1.7 WORK CHANGE DIRECTIVE
A. Work Change Directive: Contracting Officer’s Representative may issue a Work Change Directive on form included at end of Part 3. Work Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
1. Work Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.
B. Documentation: Maintain detailed records on a time and material basis of work required by the Work Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
© Copyright 1994, Construction Specifications Institute, Page 1 of 1 July 1994 601 Madison Street, Alexandria, VA 22314-1791 CSI Form 13.6A
CHANGE ORDER
REQUEST (PROPOSAL)
Project: Change Order Request Number:
From (Contractor):
To: Date:
A/E Project Number:
Re: Contract For:
This change Order Request (C.O.R.) contains an itemized quotation for changes in the Contract Sum or Contract Time in response to proposed modifications to the Contract Documents based on Proposal Request No.________.
Description of Proposed Change:
Attached supporting information from: Subconractor Supplier
Reason For Change:
Does Proposed Change involve a change in Contract Sum? No Yes [Increase] [Decrease] $
Does Proposed Change involve a change in Contract Time? No Yes [Increase] [Decrease] days
Attached pages:
Proposal Worksheet Summary:
Proposal Worksheet Detail(s):
Signed by:
Copies: Owner Consultants File
WORK CHANGE DIRECTIVE
No. __________________
DATE OF ISSUANCE _________________ EFFECTIVE DATE ___________________
OWNER
CONTRACTOR
Contract:
Project:
OWNER's Contract No. ___________________ ENGINEER's Project No. _________________
You are directed to proceed promptly with the following change(s):
Description:
Purpose of Work Change Directive:
Attachments: (List documents supporting change)
If OWNER or CONTRACTOR believe that the above change has affected Contract Price any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents.
Method of determining change in Contract Price:
Unit Prices
Lump Sum
Cost of the Work______________________
Estimated increase (decrease) in Contract Price:
If the change involves an increase, the estimated amount is not to be exceeded without further authorization.
Estimated increase (decrease) in Contract Times:
Substantial Completion: ______ days;
Ready for final payment: ______ days.
RECOMMENDED:
ENGINEER
By: ___________________________________
AUTHORIZED:
OWNER
By: ___________________________________
EJCDC No. 1910-8-F (1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute.
WORK CHANGE DIRECTIVE
INSTRUCTIONS
A. GENERAL INFORMATION
This document was developed for use in situations involving changes in the Work which, if not processed expeditiously, might delay the Project. These changes are often initiated in the field and may affect the Contract Price or the Contract Times. This is not a Change Order, but only a directive to proceed with Work that may be included in a subsequent Change Order.
For supplemental instructions and minor changes not involving a change in the Contract Price or the Contract Times a Field Order should be used.
B. COMPLETING THE WORK CHANGE DIRECTIVE FORM
Engineer initiates the form, including a description of the items involved and attachments.
Based on conversations between Engineer and Contractor, Engineer completes the following:
METHOD OF DETERMINING CHANGE, IF ANY, IN CONTRACT PRICE: Mark the method to be used in determining the final cost of Work involved and the estimated net effect on the Contract Price. If the change involves an increase in the Contract Price and the estimated amount is approached before the additional or changed Work is completed, another Work Change Directive must be issued to change the estimated price or Contractor may stop the changed Work when the estimated time is reached. If the Work Change Directive is not likely to change the Contract Price, the space for estimated increase (decrease) should be marked "Not Applicable".
Once Engineer has completed and signed the form, all copies should be sent to Owner for authorization because Engineer alone does not have authority to authorize changes in Price or Times. Once authorized by Owner, a copy should be sent by Engineer to Contractor. Price and Times may only be changed by Change Order signed by Owner and Contractor with Engineer's recommendation.
Paragraph 10.03.A.2 of the General Conditions requires that a Change Order be initiated and processed to cover any undisputed sum or amount of time for Work actually performed pursuant to this Work Change Directive.
Once the Work covered by this directive is completed or final cost and times are determined, Contractor should submit documentation for inclusion in a Change Order.
THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT
PRICE OR CONTRACT TIMES. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED
PROMPTLY.
PAYMENT PROCEDURES PAGE 1 OF 5
L:\WP\22982\01290 Payment Procedures 012900.DOC SECTION 01290
SECTION 01290 - PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.
1.3 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.
1.4 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule.
1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following:
a. Contractor’s progress schedule.
b. Application for Payment form.
c. List of subcontractors.
d. Schedule of allowances.
e. Schedule of alternates.
f. List of products.
g. List of principal suppliers and fabricators.
h. Schedule of submittals.
2. Submit the Schedule of Values to Engineer at earliest possible date but no later than 21 days before the date scheduled for submittal of initial Applications for Payment.
3. Subschedules: Where the Work is separated into phases requiring separately phased payments, provide subschedules showing values correlated with each phase of payment.
B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the Schedule of Values:
a. Project name and location.
b. Name of Engineer.
c. Project number.
d. Contractor's name and address.
PAYMENT PROCEDURES PAGE 2 OF 5
L:\WP\22982\01290 Payment Procedures 012900.DOC SECTION 01290
e. Date of submittal.
2. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed:
a. Generic Name
b. Related Specification Section or Division.
c. Description of the Work.
d. Name of subcontractor.
e. Name of manufacturer or fabricator.
f. Name of supplier.
g. Change Orders (numbers) that affect value.
h. Dollar value.
1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.
3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate.
4. Round amounts to nearest whole dollar; total shall equal the Contract Sum.
5. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.
a. Differentiate between items stored on-site and items stored off-site. Include evidence of insurance or bonded warehousing if required.
6. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.
7. Allowances: Provide a separate line item in the Schedule of Values for each allowance.
Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured quantity. Use information indicated in the Contract Documents to determine quantities.
8. Each item in the Schedule of Values and Applications for Payment shall be complete.
Include total cost and proportionate share of general overhead and profit for each item.
a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.
9. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.
1.5 APPLICATIONS FOR PAYMENT
A. Each Application for Payment shall be consistent with previous applications and payments as certified by Engineer and paid for by Owner.
PAYMENT PROCEDURES PAGE 3 OF 5
L:\WP\22982\01290 Payment Procedures 012900.DOC SECTION 01290
1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements.
B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement.
C. Payment Application Times: The date for each progress payment is 15th day of each month. The period covered by each Application for Payment starts on the day following the end of the preceding period and ends 15 days before the date for each progress payment.
D. Payment Application Forms: Use AIA Document G702 and AIA Document G703 Continuation Sheets or EJCDC D rm for Applications for Payment.
E. Payment Application Forms: Use forms provided by Owner for Applications for Payment.
F. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Engineer will return incomplete applications without action.
1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made.
2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.
G. Transmittal: Submit 3 signed and notarized original copies of each Application for Payment to Engineer by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required.
1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.
H. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from every entity who is lawfully entitled to file a mechanic's lien arising out of the Contract and related to the Work covered by the payment.
I. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's liens from subcontractors, sub-subcontractors, and suppliers for construction period covered by the previous application.
1. Submit partial waivers on each item for amount requested, before deduction for retainage, on each item.
2. When an application shows completion of an item, submit final or full waivers.
3. Owner reserves the right to designate which entities involved in the Work must submit waivers.
4. Waiver Delays: Submit each Application for Payment with Contractor's waiver of mechanic's lien for construction period covered by the application.
PAYMENT PROCEDURES PAGE 4 OF 5
L:\WP\22982\01290 Payment Procedures 012900.DOC SECTION 01290
a. Submit final Application for Payment with or preceded by final waivers from every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.
5. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to Owner.
J. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:
1. List of subcontractors.
2. Schedule of Values.
3. Contractor's Construction Schedule (preliminary if not final).
4. Products list.
5. Schedule of unit prices.
6. Submittals Schedule (preliminary if not final).
7. List of Contractor's staff assignments.
8. List of Contractor's principal consultants.
9. Copies of building permits.
10. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.
11. Initial progress report.
12. Report of preconstruction conference.
13. Certificates of insurance and insurance policies.
14. Performance and payment bonds.
15. Data needed to acquire Owner's insurance.
16. Initial settlement survey and damage report if required.
K. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.
2. This application shall reflect Certificates of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work.
L. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:
1. Evidence of completion of Project closeout requirements.
2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid.
3. Updated final statement, accounting for final changes to the Contract Sum.
4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims."
5. AIA Document G706A, "Contractor's Affidavit of Release of Liens."
6. AIA Document G707, "Consent of Surety to Final Payment."
PAYMENT PROCEDURES PAGE 5 OF 5
L:\WP\22982\01290 Payment Procedures 012900.DOC SECTION 01290
7. Evidence that claims have been settled.
8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work.
9. Final, liquidated damages settlement statement.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01290
PROJECT MANAGEMENT AND COORDINATION PAGE 1 OF 7
L:\WP\22982\01310 Project Management and Coordination.DOC SECTION 01310
SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Coordination.
2. Submittals.
3. Administrative and supervisory personnel.
4. Project meetings.
5. General installation provisions.
6. Cleaning and protection.
B. Where applicable, each prime Contractor shall participate in these coordination requirements, even though certain areas of responsibility are assigned to a specific prime Contractor.
1.3 COORDINATION
A. Coordination: Coordinate construction activities included under various Sections of these Specifications to assure efficient and orderly installation of each part of the Work. Coordinate construction operations included under different Sections of these Specifications that are dependent upon each other for proper installation, connection, and operation.
B. Coordination: Each prime contractor shall cooperate with Owner’s, coordinate construction activities to assure efficient and orderly installation of each part of the Work.
1. Where installation of one part of the Work is dependent on installation of other components, either before or after its own installation, cooperate with scheduled construction activities in the sequence required to obtain the best results.
2. Where availability of space is limited, coordinate installation of different components to assure maximum accessibility for required maintenance, service and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Coordinate construction activities with public and private utilities.
a. Notify “Dig Safely New York (DIGFSAFE)” a minimum of 48 hours prior to excavation or blasting.
b. Notify the Owner and Engineer of any utility locations encountered which conflict with the work. Coordinate with the Owner and Utility Company in the protection, removal, relocation or replacement of conflicting utility locations.
C. Where necessary, prepare memoranda for distribution to each party involved outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.
PROJECT MANAGEMENT AND COORDINATION PAGE 2 OF 7
L:\WP\22982\01310 Project Management and Coordination.DOC SECTION 01310
1. Prepare similar memoranda for the Owner and separate Contractors where coordination of their Work is required.
D. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Pre-installation conferences.
7. Project closeout activities.
E. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.
1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. Refer to other Sections for disposition of salvaged materials that are designated as Owner’s property.
1.4 SUBMITTALS
A. Coordination Drawings: Prepare and submit coordination Drawings where close and careful coordination is required for installation of products and materials fabricated off-site by separate entities, and where limited space availability necessitates maximum utilization of space for efficient installation of different components.
1. Show the interrelationship of components shown on separate Shop Drawings.
2. Indicate required installation sequences.
3. Comply with requirements contained in Section “Submittals Procedures.”
4. Refer to Division-15 Section “Basic Mechanical Requirements,” “Coordinated Shop Drawings,” and Division-16 Section “Basic Electrical Requirements” for specific coordination Drawing requirements for mechanical and electrical installations.
B. Staff Names: Within 15 days of starting construction operations, submit a list of principal staff assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project.
1. Post copies of list in Project meeting room, in temporary field office, and by each temporary telephone.
1.5 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
PROJECT MANAGEMENT AND COORDINATION PAGE 3 OF 7
L:\WP\22982\01310 Project Management and Coordination.DOC SECTION 01310
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Engineer of scheduled meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Engineer, within 3 days of the meeting.
B. Preconstruction Conference: Schedule a preconstruction conference and organizational meeting at the Project site or other convenient site prior to commencement of construction activities.
Conduct the meeting to review responsibilities and personnel assignments.
1. Attendees: Authorized representatives of Owner, the Engineer, Engineer and their consultants; the Contractor and its superintendent; major subcontractors; manufacturers;
suppliers and other concerned parties shall each be represented at the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing.
d. Designation of responsible personnel.
e. Procedures for processing field decisions and Change Orders.
f. Procedures for processing Applications for Payment.
g. Distribution of the Contract Documents.
h. Submittal procedures.
i. Preparation of Record Documents.
j. Use of the premises.
k. Responsibility for temporary facilities and controls.
l. Parking availability.
m. Office, work, and storage areas.
n. Equipment deliveries and priorities.
o. Safety procedures.
p. First aid.
q. Security.
r. Progress cleaning.
s. Working hours.
t. Housekeeping.
u. Subcontractors.
v. Preliminary Schedule of Shop Drawings and Samples.
w. Minority Business Enterprise Goals.
x. Co-ordination with other contractors.
y. Insurance in Force.
z. Contractor's Schedule of Values.
C. Pre-installation Conferences: Conduct a pre-installation conference at Project site before each construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and
PROJECT MANAGEMENT AND COORDINATION PAGE 4 OF 7
L:\WP\22982\01310 Project Management and Coordination.DOC SECTION 01310 installations that have preceded or will follow, shall attend the meeting. Advise the Engineer of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration at each pre-installation conference, including requirements for the following:
a. Contract Documents.
b. Options.
c. Related Change Orders.
d. Purchases.
e. Deliveries.
f. Shop Drawings, Product Data and quality control Samples.
g. Review of mockups.
h. Possible conflicts.
i. Compatibility problems.
j. Time schedules.
k. Weather limitations.
l. Manufacturer's written recommendations.
m. Warranty requirements.
n. Compatibility of materials.
o. Acceptability of substrates.
p. Temporary facilities and controls.
q. Space and access limitations.
r. Governing regulations.
s. Testing and inspecting requirements.
t. Required performance results.
u. Protection of construction and personnel.
v. Safety.
w. Recording requirements.
3. Record significant discussions and agreements and disagreements of each conference, along with the approved progress schedule. Distribute the record of the meeting to everyone concerned, promptly, including the Owner and Engineer.
4. Do not proceed with installation if the conference cannot be successfully concluded.
Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.
D. Progress Meetings: Conduct progress meetings at the Project Site at regularly scheduled intervals. Coordinate dates of meetings with preparation of payment requests.
1. Attendees: In addition to representatives of the Owner and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to the current status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting.
Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from
PROJECT MANAGEMENT AND COORDINATION PAGE 5 OF 7
L:\WP\22982\01310 Project Management and Coordination.DOC SECTION 01310 parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.
b. Review present and future needs of each entity present, including the following:
1) Interface requirements.
2) Time.
3) Sequence of operations.
4) Status of submittals.
5) Deliveries.
6) Off-site fabrication.
7) Access.
8) Site utilization.
9) Temporary facilities and controls.
10) Work hours.
11) Hazards and risks.
12) Progress cleaning.
13) Quality and work standards.
14) Change Orders.
15) Documentation of information for payment requests.
3. Reporting: No later than 3 days after each progress meeting date, distribute copies of minutes of the meeting to each party present and to parties who should have been present.
Include a brief summary, in narrative form, of progress since the previous meeting and report.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized.
Issue the revised schedule concurrently with the report of each meeting.
E. Coordination Meetings: Conduct Project coordination meetings at regularly scheduled intervals.
Project coordination meetings are in addition to specific meetings held for other purposes, such as progress meetings and pre-installation conferences.
1. Attendees: In addition to representatives of the Owner and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work
2. Agenda: Review and correct or approve minutes of the previous coordination meeting.
Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
a. Combined Contractor's Construction Schedule: Review progress since the last coordination meeting. Determine whether each contract is on time, ahead of schedule, or behind schedule, in relation to Combined Contractor's Construction Schedule. Determine how construction behind schedule will be expedited;
secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.
b. Schedule Updating: Revise Combined Contractor's Construction Schedule after each coordination meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with report of each meeting.
PROJECT MANAGEMENT AND COORDINATION PAGE 6 OF 7
L:\WP\22982\01310 Project Management and Coordination.DOC SECTION 01310
c. Review present and future needs of each contractor present, including the following:
1) Interface requirements.
2) Time.
3) Sequence of operations.
4) Status of submittals.
5) Deliveries.
6) Off-site fabrication.
7) Access.
8) Site utilization.
9) Temporary facilities and controls.
10) Work hours.
11) Hazards and risks.
12) Progress cleaning.
13) Quality and work standards.
14) Change Orders.
3. Reporting: Record meeting results and distribute copies to everyone in attendance and to others affected by decisions or actions resulting from each meeting.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 GENERAL INSTALLATION PROVISIONS
A. Inspection of Conditions: Require the Installer of each major component to inspect both the substrate and conditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.
B. Manufacturer’s Instructions: Comply with manufacturer’s installation instructions and recommendations, to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in Contract Documents.
C. Inspect materials or equipment immediately upon delivery and again prior to installation. Reject damaged and defective items.
D. Provide attachment and connection devices and methods necessary for securing Work. Secure Work true to line and level. Allow for expansion and building movement.
E. Visual Effects: Provide uniform joint widths in exposed Work. Arrange joints in exposed Work to obtain the best visual effect. Refer questionable choices to the Engineer for final decision.
F. Recheck measurements and dimensions, before starting each installation.
G. Install each component during weather conditions and Project status that will ensure the best possible results. Isolate each part of the completed construction from incompatible material as necessary to prevent deterioration.
H. Coordinate temporary enclosures with required inspections and tests, to minimize the necessity of uncovering completed construction for that purpose.
PROJECT MANAGEMENT AND COORDINATION PAGE 7 OF 7
L:\WP\22982\01310 Project Management and Coordination.DOC SECTION 01310
I. Mounting Heights: Where mounting heights are not indicated, install individual components at standard mounting heights recognized within the industry for the particular application indicated.
Refer questionable mounting height decisions to the Engineer for final decision.
3.2 CLEANING AND PROTECTION
A. During handling and installation, clean and protect construction in progress and adjoining materials in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
B. Clean and maintain completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
C. Limiting Exposures: Supervise construction activities to ensure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. Where applicable, such exposures include, but are not limited to, the following:
1. Excessive static or dynamic loading.
2. Excessive internal or external pressures.
3. Excessively high or low temperatures.
4. Thermal shock.
5. Excessively high or low humidity.
6. Air contamination or pollution.
7. Water or ice.
8. Solvents.
9. Chemicals.
10. Light.
11. Radiation.
12. Puncture.
13. Abrasion.
14. Heavy traffic.
15. Soiling, staining and corrosion.
16. Bacteria.
17. Rodent and insect infestation.
18. Combustion.
19. Electrical current.
20. High speed operation,
21. Improper lubrication,
22. Unusual wear or other misuse.
23. Contact between incompatible materials.
24. Destructive testing.
25. Misalignment.
26. Excessive weathering.
27. Unprotected storage.
28. Improper shipping or handling.
29. Theft.
30. Vandalism.
CONSTRUCTION PROGRESS DOCUMENTATION PAGE 1 OF 4
L:\WP\22982\01320 Construction Progress Documentation.DOC SECTION 01320
SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:
1. Contractor's Construction Schedule.
2. Submittals Schedule.
1.3 SUBMITTALS
A. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.
B. Submittals Schedule: Submit 3 copies of schedule. Arrange the following information in a tabular format:
1. Scheduled date for first submittal.
2. Specification Section number and title.
3. Submittal category (action or informational).
4. Name of subcontractor.
5. Description of the Work covered.
6. Scheduled date for Engineer's final release or approval.
C. Contractor's Construction Schedule: Submit 2 printed copies of initial schedule, one a reproducible print and one a blue- or black-line print, large enough to show entire schedule for entire construction period.
D. Construction Photographs: Submit 2 prints of each photographic view within 7 days of taking photographs
1. Format: 8-by-10-inch (203-by-254-mm) smooth-surface matte prints on single-weight commercial-grade stock, enclosed back to back in clear plastic sleeves that are punched for standard 3-ring binder.
2. Identification: On back of each print, provide an applied label or rubber-stamped impression with the following information:
a. Name of Project.
b. Name and address of photographer.
c. Name of Engineer.
d. Name of Contractor.
e. Date photograph was taken.
CONSTRUCTION PROGRESS DOCUMENTATION PAGE 2 OF 4
L:\WP\22982\01320 Construction Progress Documentation.DOC SECTION 01320
f. Description of vantage point, indicating location, direction (by compass point), and elevation or story of construction.
3. Negatives: Submit a complete set of photographic negatives in protective envelopes as a Project Record Document. Identify date photographs were taken.
1.4 COORDINATION
A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.
B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.
1. Secure time commitments for performing critical elements of the Work from parties involved.
2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.
C. Auxiliary Services: Cooperate with photographer and provide auxiliary services requested, including access to Project site and use of temporary facilities including temporary lighting.
PART 2 - PRODUCTS
2.1 SUBMITTALS SCHEDULE
A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates.
1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule.
2. Initial Submittal: Include submittals required during the first 60 days of construction.
List those required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.
a. At Contractor's option, show submittals on the…